This document provides details for a federal solicitation to repair various lift stations. The solicitation number is FA252122B0004 and is being issued by the Department of the Air Force Space Command to provide labor, equipment, and materials to repair lift stations on Cape Canaveral Space Force Station according to the drawings and specifications in Attachment 1. The work includes all temporary power and bypass necessary to ensure continuous operation of sanitary sewer systems. Responses are due as indicated in the official bid opening referenced in the document.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERMIT(S)/ENVIRONMENTAL ACTIONS
REQUIRED PRIOR TO CONSTRUCTION
ERP/STORMWATER
ERP/WETLANDS/DREDGE & FILL
FDEP/DRINKING WATER
FDEP/DOM. WASTE WATER ARCHEO./HISTORICAL
SURVEY/WILDLIFE
OTHER
NONE
FDEP/IND. WASTE WATER
IRP
FDEP/FUEL TANK
NOI/SWPPP
ASBESTOS
NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS MATERIAL NOT
IDENTIFIED ON THESE DRAWINGS IS REQUIRED TO BE DISTURBED IN
ORDER TO PERFORM THE CONTRACT WORK, LEAVE MATERIAL
UNDISTURBED AND IMMEDIATELY INFORM THE CONTRACTING OFFICER.
HEAVY METALS
YES NO
LEAD
OTHER
NOT
VERIFIED
HAZARDOUS MATERIALS
SCALE:
LOCATION MAP
NONE
TRUE
NORTH
N
S
K
I
D
S
T
R
I
P
A
T
L
A
N
T
C
O
E
A
N
B
A
N
A
N
A
R
V
E
R
INDUSTRIAL
AREA
DBEH 20-1563
REPAIR LIFT STATIONS VARIOUS
CAPE CANAVERAL SPACE FORCE STATION
CAPE CANAVERAL, FLORIDA
PIER RD.
LS 55853
P
H
I L
L
I P
R
K
W
A
Y
C-105:
AREA 59
BASE OPERATIONS:
COMMUNICATIONS:
PROJECT MANAGER:
CHIEF, ENGINEERING FLIGHT:
USER:
SAFETY:
SECURITY FORCES:
ATO:
OTHER:
ENVIRONMENTAL:
FIRE:
A
P
P
R
O
V
E
D
C-103:
POSEIDON
LS 90404
LS 90405
C-104:
GREENHOUSE
LS 88928
C-101:
BLG & CHT DEMO
C-102:
BLG & CHT SITE
LS 79139
LS 79140
A
B
2 3
C
D
1 2 3
4 5 6
B
U I L
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
F
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C O
N T
R A
F
A F
T R
A C
E S
T E
C H
N I C
A L
R
A N
G E
C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d e s b r i t o
H
A
C J O
D H
A N
J K
O C
I
J
L O
N G
S H
O R
E
X X
X X
D B
R E
P A
F
T
S
T A
T I O
N
V
A R
I O
U S
C C
S F
S
F
L
N E
L S
O N
E N
G I N
E E
R I N
G
G-001
C O
V E
R
S
H E
E T
LS 55900
LS 88944
DEMO:
NEW:
DEMO:
NEW:
DRAWING INDEX
SHEET
NUMBER
SHEET TITLE REV
CIVIL
G-001 COVER SHEET
G-002 GENERAL NOTES AND LEGEND
C-001 CIVIL GENERAL NOTES
C-101 TRIDENT LS BLG 79140 & CHT 79139 - DEMOLITION PLAN
C-102 TRIDENT LS BLG 79140 AND CHT 79139 - SITE PLAN
C-103 POSEIDON LS BLG 90404 AND CHT 90405 - DEMOLITION AND SITE PLAN
C-104
C-105
GREENHOUSE LS 88928 - DEMOLITION & LS 88944 - SITE PLAN
AREA 59 LS 55853 - DEMOLITION AND SITE PLAN
C-501 CIVIL DETAILS 1
C-502 CIVIL DETAILS 2
C-503 CIVIL DETAILS 3
E-001 ELECTRICAL GENERAL NOTES
E-501 ELECTRICAL DETAILS 1
E-502 ELECTRICAL DETAILS 2
E-601 LIFT STATION WIRING DIAGRAM 1
E-602 LIFT STATION WIRING DIAGRAM 2
E-603 LIFT STATION WIRING DIAGRAM 3
E-604 LIFT STATION WIRING DIAGRAM 4
E-605 AC POWER DISTRIBUTION
E-606 DC POWER DISTRIBUTION
E-607 SCADAPACK WIRING DIAGRAM
E-608 PRESSURE SENSOR WIRING DIAGRAM
E-609 LIFT STATION CONTROL SCHEDULES & MATERIALS LIST
ELECTRICAL
GENERAL NOTES:
1. TO THE GREATEST EXTENT POSSIBLE, DEMOLITION WORK MUST OCCUR AFTER THE NEW SEWER LIFT
STATION SYSTEM IS PLACED INTO OPERATION TO MINIMIZE THE FREQUENCY AND DURATION OF SEWER
OUTAGES.
2. NEW ELECTRICAL SUPPLY AND CONTROL PANEL MUST BE INSTALLED AND VERIFIED OPERATIONAL
PRIOR TO ANY DEMOLITION TO MINIMIZE POWER OUTAGE DURING TRANSFER.
3. COORDINATE ALL UTILITY OUTAGES THROUGH THE CONTRACTING OFFICER. SUBMIT A PLAN AND BE
RESPONSIBLE FOR TEMPORARY PUMP STATION SEWAGE BYPASS AT EACH LIFT STATION TO SUPPORT
THE UTILITY TIE-IN CONNECTIONS AND TRANSFER SERVICE TO THE NEW LIFT STATION. ALL UTILITY
OUTAGE REQUESTS MUST INCLUDE ALTERNATIVE MEANS AND METHODS FOR COLLECTION AND
TRANSMISSION OF WASTE WATER.
4. REQUEST UTILITY LOCATES AND OBTAIN A CCSFS DIG PERMIT SF FORM 103 PRIOR TO CONSTRUCTION.
5. UNDERGROUND UTILITY LINES SHOWN WERE NOT LOCATED BY FIELD SURVEY, BUT ARE PROVIDED BY
GOV'T FOR INFORMATIONAL PURPOSES ONLY.
6. TEST EXISTING CONCRETE FOR ASBESTOS PER SPECIFICATION PRIOR TO IMPACTING CONCRETE FOR
ENVIRONMENTAL AND PERSONAL PROTECTION, TRANSPORTATION AND DISPOSAL OF STRUCTURES
SHOWN TO BE REMOVED OR DEMOLISHED.
7. COORDINATE WITH 45 CEIE PRIOR TO CONSTRUCTION ACTIVITIES FOR AN ENVIRONMENTAL SURVEY.
8. A REQUEST FOR FDEP WASTE WATER COLLECTION TRANSMISSION SYSTEM PERMIT CLEARANCE MUST
BE APPROVED PRIOR TO PLACING NEW LIFT STATIONS 55900, AND 88944 INTO OPERATION.
9. DURING DEMOLITION OF THE EXISTING LIFT STATIONS, THE EXISTING PUMPS, CONTROL PANEL, AND
ELECTRICAL EQUIPMENT AND ACCESSORIES THAT ARE TO BE REMOVED ARE THE PROPERTY OF THE
UNITED STATES GOVERNMENT. EXISTING EQUIPMENT WITH REMAINING USEFUL LIFE MAY BE KEPT FOR
SPARE PARTS. CONTACT THE CONTRACTING OFFICER PRIOR TO DISPOSAL. SUFFICIENTLY CLEAN AND
DISINFECT EQUIPMENT, IDENTIFIED TO BE SALVAGED, PRIOR TO TURNOVER TO THE CONTRACTING
OFFICER'S REPRESENTATIVE. DISPOSE AND/OR RECYCLE ALL OTHER EQUIPMENT NOT IDENTIFIED FOR
SALVAGE.
10. GREENHOUSE LS 88928 WILL BE REPLACED BY NEW FACILITY NUMBER LS 88944 AND AREA 59 LS 55853
WILL BE REPLACED BY NEW FACILITY NUMBER LS 55900.
11. ALL UNSURFACED AREAS DISTURBED BY GRADING, TRENCH OR EXCAVATION OPERATION MUST
RECEIVE THREE (3) INCHES OF TOP SOIL AND BE SODDED TO MATCH SURROUNDING AREA.
12. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING
UTILITIES AS SHOWN ON THESE PLANS ARE BASED ON RECORDS PROVIDED BY CCSFS. THE
INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL
THE APPROPRIATE UTILITIES COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST
EXACT FIELD LOCATION OF UTILITIES. THE CONTRACTOR IS RESPONSIBLE TO RELOCATE ALL EXISTING
UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.
ABBREVIATIONS:
LEGEND: BOLD NOTES NEW ITEMS
EXISTING ABANDON WATER
EXISTING FIRE WATER
EXISTING POTABLE WATER
EXISTING UG ELECTRIC
EXISTING AERIAL ELECTRIC
EXISTING COMMUNICATION
EXISTING SANITARY SEWER
EXISTING NATURAL GAS
EXISTING STORM DRAIN
PROPOSED SANITARY SEWER FORCE MAIN
E
E-OH
C
SS
NG
SD
FM
W
FW
AB/W EXISTING VALVE
EXISTING BACKFLOW PREVENTION
EXISTING FIRE HYDRANT
EXISTING COMMUNICATI0NS MANHOLE
EXISTING ELECTRIC MANHOLE
EXISTING SANITARY SEWER MANHOLE
EXISTING SANITARY SEWER CLEANOUT
EXISTING LIGHT POLE
EXISTING WET WELL VENT
EXISTING HOSE BIBB
EXISTING CONCRETE BOLLARD
EXISTING METAL BOLLARD
EXISTING LIFT STATION CONTROL PANEL
EXISTING CORROSION PROTECTION
NEW METAL BOLLARD
NEW CONCRETE ANCHORED METAL
BOLLARD
C
E
PROPOSED SILT FENCE
PROPOSED WATER W
EXISTING SANITARY SEWER FORCE MAIN FM
AIP AIP
SS
SM
S
PROPOSED SANITARY SEWER
V
EXISTING EFFLUENT
SF
EFF
EXISTING ABANDONED IN PLACE
A
B
2 3
C
D
1 2 3
4 5 6
I
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C O
N T
R A
F
A F
T R
A C
E S
T E
C H
N I C
A L
R
A N
C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d i t
A
C J O
D H
A N
J K
O C
I
J
L O
N G
S H
O R
E
X X
X X
D B
R E
P A
F
T
S
T A
T I O
N
V
A R
I O
U S
C C
S F
S
F
L
N E
L S
O N
E N
G I N
E E
R I N
G
G-002
G E
N E
R A
L
N
O T
G
E N
D
EXISTING BILGE
EXISTING COLECTION, HOLDING AND
TRANSFER
BLG
CHT
E-1
DETAIL BUBBLE
DETAIL REFERENCE NUMBER
SECTION DETAIL BUBBLE
DETAIL SHEET REFERENCE NUMBER
DETAIL PLAN REFERENCE NUMBER
DETAIL REFERENCE LETTER
DRAWING WHERE DETAIL IS SHOWN/REFERENCED
ASBESTOS CEMENT
AMERICAN CONCRETE INSTITUTE
AMERICAN SOCIETY FOR TESTING AND MATERIALS
APPROXIMATE
ARCHEOLOGICAL
AMERICAN WIRE GAUGE
AMERICAN WATER WORKS ASSOCIATION
BILGE
CAPE CANAVERAL SPACE FORCE STATION
COLLECTION, HOLDING AND TRANSFER
CAST IN PLACE
CLEAN OUT
COMMUNICATION
CONCRETE REINFORCEMENT STEEL INSTITUTE
COMPLEX
DUCTILE IRON
DOMESTIC
EDGE OF PAVEMENT
ENVIRONMENTAL RESOURCE PERMIT
ELECTRIC SERVICE PANEL
ELECTRIC TRANSFORMER
FUSION BONDED EPOXY
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
FLANGED END
FLANGED
FORCE MAIN
FIBERGLASS REINFORCEMENT POLYESTER
HOSE BIB
HIGH DENSITY POLYETHYLENE
HANGAR
HYDRANT STATION
INTEGRATE TRANSFER LAUNCH
LINEAR FEET
LIFT STATION
INDUSTRIAL
MAXIMUM
MINIMUM
MECHANICAL JOINT
MANHOLE
MISCELLANEOUS MANHOLE
METAL
NATIONAL ELECTRICAL CODE
NUMBER
NOTICE OF INTENT
NATIONAL FIRE PROTECTION ASSOCIATION
ON CENTER
ON CENTER EACH WAY
OPERATIONS
POLYVINYL CHLORIDE
REINFORCED CONCRETE PIPE
GALVANIZED RIGID STEEL CONDUIT
REMOTE TERMINAL UNIT
SCHEDULE
SPACE FORCE
SANITARY SEWER
SANITARY MANHOLE
SOUTHWEST
STORMWATER POLLUTION PREVENTION PLAN
SQUARE
SANITARY SEWER PIPE
TYPICAL
VALVE PIT
UNDERGROUND
WITH
WET WELL
WELDED WIRE FABRIC
AC
ACI
ASTM
APPROX.
ARCHEO.
AWG
AWWA
BLG
CCSFS
CHT
CIP
CO
COMM
CRSI
CX
DI
DOM.
EOP
ERP
ESP
ET
FBE
FDEP
FE
FL
FM
FRP
HB
HDPE
HGR
HS
ITL
LF
LS
IND.
MAX.
MIN.
MJ
MH
MMH
MTL.
NEC
NO.
NOI
NFPA
O.C.
O.C. E.W.
OPS
PVC
RCP
RSC
RTU
SCH
SF
SS
SSMH
SW
SWPPP
SQ.
SSx
TYP.
VP
UG
W/
WW
W.W.F.
LEGEND:
CP
SF SF SF SF SF SF SF SF SF SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
BLG
CHT
BL
G
BLG
BL
G
BLG
BLG
BLG
BLG
CHT
CHT CHT CHT CHT CHT
CHT
CHT
A
B
2 3
C
D
1 2 3
4 5 6
AS
B
U
IL
T D
AT
E:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
R
EV
IE
W
ED
B
Y:
D
AT
E:
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N C
O N
TR
AC
T N
O
FA
-1
8- F-
TR
AC
ES
TE
C H
N
IC
AL
R
AN
G
E
AR
C H
IT
EC
T
EN
G
IN
EE
R
IN
G
SE
R
VI
C
ES
D
EL
IV
ER
Y N
O
Ne ls on En gi ne er in gCo rh od es b rit
AA
1/
/2
C .J
O D
H
AN
J.
KO
C I
J.
L
O N
G
SH
O R
E
-1
XX
XX
D
BE
H
0-
R
EP
AI
R
L
IF
T
ST
AT
IO
N V
AR
IO
U S
C C
SF
S, F L
N
EL
SO
N
EN
G
IN
EE
R
IN
G
1. PROVIDE, INSTALL AND MAINTAIN 170 LF OF SILT FENCE (APPROX.
LOCATION); REMOVE UPON COMPLETION. SEE SHEET C-503 FOR TYP.
SILT FENCE DETAIL.
2. DEMOLISH EXISTING CONCRETE SLAB BETWEEN WET WELL AND VALVE
PIT IN ITS ENTIRETY. EXISTING CONCRETE VALVE PIT AND WET WELL ARE
EXISTING TO REMAIN.
3. EXISTING SANITARY FORCE MAIN AND FE TO REMAIN. PROVIDE
TEMPORARY MEANS TO PREVENT DIRT AND DEBRIS FROM ENTERING
EXISTING SYSTEM.
4. CUT AND REMOVE ALL FORCE MAIN PIPES AND FITTINGS FROM INSIDE
VALVE PIT ABOVE EXISTING REMAINING FE AND FORCE MAIN.
5. SALVAGE EXISTING CONCRETE VALVE PIT METAL LIDS AND REMOVE
CONCRETE BOX TOP RIM SECTION.
6. REMOVE EXISTING TWO (2) INCH DRAIN LINE CONNECTING WET WELL
AND VALVE PIT.
7. REMOVE EXISTING SIX (6) INCH FORCE MAINS LOCATED BETWEEN WET
WELL AND VALVE PIT. GROUT SEAL EXISTING HOLES REMAINING IN WET
WELL AND VALVE PIT AFTER REMOVAL OF PIPING.
8. SAW CUT AND REMOVE APPROX. 70 SF OF EXISTING PAVEMENT IN ITS
ENTIRETY.
9. VERTICAL FM PIPE AND FE IN WET WELL TO REMAIN.
10. REMOVE 90 DEGREE BEND AND HORIZONTAL FM PIPE INSIDE OF WET
WELL. DO NOT TO DAMAGE WET WELL LINER.
11. PUMP GUIDES TO REMAIN. PERFORM CORROSION CONTROL AND
GREASE.
DEMOLITION FLAG NOTES:
TRIDENT LS - BLG 79140 AND CHT 79139 - DEMOLITION PLAN
1" = 5'SCALE:
N
5' 10'0
GRAPHICS SCALE: 1" - 5'
EXISTING COMM MH
EXISTING FIRE HYDRANT
HS-11-04
EXISTING LIGHT
POLE (TYP.)
EXISTING EOP
EXISTING EOP
10" PVC
4" PVC
6" PVC
12" PVC
6" PVC
2" PVC 6" PVC
EXISTING VENT
6" PVC 6" DI
6" DI
EXISTING SS CO
EXISTING
SS MH
2" PVC
6" PVC
EXISTING VENT
6" PVC 6" DI
6" DI
C-101
TR
ID
EN
T
LS
B
LG
C
H T
- D
EM
O
LI
TI
O N
P
LA
N
CHT LS 79139 - 90° BEND DEMO FACING SW
N
BLG LS 79140 - 90° BEND DEMO FACING WN
BLG & CHT SLAB DEMOLITION FACING NE
N
TYP. VALVE PIT PIPE DEMO FACING W
N
TYP. VALVE PIT LID/RIM DEMO FACING EN
METAL LID
CONCRETE
RIM
SCALE: N.T.S.
SCALE: N.T.S.
SCALE: N.T.S.
SCALE: N.T.S.
SCALE: N.T.S.
LG
B
LG
B
LG
C
H
T
C
H
T
C
H
T
C
H
T
C
H
T
C
H
T
CHT
F M
F M
F M
F M
F M
F
M
F
M
F
M
F
M
F
M
F
M
B L G
B L G
CHT CHT
EFF
F
M
F
M
E
F
F
F M
F
M
CP
SF SF SF SF SF SF SF SF SF SF SF
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
SFSFSFSFSFSFSFSFSFSFSFSF
B
LG
B
LG
B
LG
C
H
T
C
H
T
C
H
T
C
H
T
C
H
T
C
H
T
CHT
F M
F M
F M
F M
F M
F
M
F
M
F
M
F
M
F
M
F
M
B L G
B L G
CHT CHT
CP
SF SF SF SF SF SF SF SF SF SF SF
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
S F
SFSFSFSFSFSFSFSFSFSFSFSF
..\..\..\Photos\3. Demo Photos\C-101\IMG_7868.JPG
POSEIDON LS - BLG 90404 & CHT 90405 - DEMOLITION PLAN
1" = 5'SCALE:
N
DEMOLITION FLAG NOTES:
1. PROVIDE, INSTALL AND MAINTAIN 220 LF OF SILT FENCE
(APPROX. LOCATION); REMOVE UPON COMPLETION. SEE
TYPICAL SILT FENCE DETAIL SHEET C-503.
2. DEMOLISH EXISTING CONCRETE SLAB BETWEEN WET WELL
AND VALVE PIT IN ITS ENTIRETY. EXISTING CONCRETE VALVE
PIT AND WET WELL ARE EXISTING TO REMAIN.
3. EXISTING SANITARY FORCE MAIN AND FE TO REMAIN.
PROVIDE TEMPORARY MEANS TO PREVENT DIRT AND DEBRIS
FROM ENTERING EXISTING SYSTEM.
4. CUT AND REMOVE ALL FORCE MAIN PIPES AND FITTINGS
FROM INSIDE VALVE PIT ABOVE EXISTING REMAINING FE AND
FORCE MAIN.
5. SALVAGE EXISTING CONCRETE VALVE PIT METAL LIDS AND
REMOVE CONCRETE BOX TOP RIM SECTION.
6. REMOVE EXISTING TWO (2) INCH DRAIN LINE CONNECTING
WET WELL AND VALVE PIT.
7. REMOVE EXISTING SIX (6) INCH FORCE MAINS LOCATED
BETWEEN WET WELL AND VALVE PIT.
8. VERTICAL FM PIPE AND FE IN WET WELL TO REMAIN.
9. REMOVE 90 DEGREE BEND AND HORIZONTAL FM PIPE INSIDE
WET WELL. DO NOT TO DAMAGE WET WELL LINER.
10. PUMP GUIDES TO REMAIN. PERFORM CORROSION CONTROL
AND GREASE.
CONSTRUCTION FLAG NOTES:
11. DURING NEW DISCHARGE PIPE TIE-IN CONSTRUCTION, PHASE
DISCHARGE PIPING TO MAINTAIN SERVICE OF ONE PUMP. AN
ALTERNATIVE BYPASS PLAN MAY BE CONSIDERED IN
ACCORDANCE WITH SHEET G-002, GENERAL NOTE 3.
12. EXISTING MOTOR CONTROL PANEL, JUNCTION BOX, DISCONNECT,
RTU, AND ANTENNA TO REMAIN.
13. EXISTING SIX (6) INCH FORCE MAIN TIE IN LOCATION.
14. CORE DRILL CONCRETE SLAB DIRECTLY ABOVE EXISTING WET
WELL DISCHARGE PIPES AND EXTEND EXISTING VERTICAL PIPE
LOCATED IN WET WELL, THROUGH SLAB, TO A MIN. OF 36 INCHES
ABOVE GRADE. CONNECT TO NEW 90 DEGREE FL BEND IN NEW
ASSEMBLY. VERTICAL SIX (6) INCH DI (MJxFE), AND ABOVE GRADE
VALVE ASSEMBLY AS SHOWN IN DETAIL ON SHEET.
15. CORE DRILL EXISTING CONCRETE VALVE PIT AND WET WELL.
CONSTRUCT SIX (6) INCH PVC DRAIN LINE CONNECTION, LINK-SEAL
STRUCTURE OPENINGS AND REPAIR LINER AROUND PIPE INSIDE
WET WELL.
16. ABOVE GROUND SIX (6) INCH FL PLUG VALVE WITH TWO (2) 45
DEGREE FL BENDS TO 90 DEGREE FL BEND DOWNWARD. SIX (6)
INCH FL DI THROUGH NEW CONCRETE TOP SLAB, SEAL OPENING
WITH LINK-SEAL OR APPROVED EQUIVALENT.
17. CONSTRUCT APPROX. 10 LF OF SIX (6) INCH FL DI FORCE MAIN
WITHIN EXISTING CONCRETE VAULT AND CONNECT TO EXISTING
SIX (6) INCH DI FORCE MAIN.
18. INSTALL REINFORCED PRECAST CONCRETE VAULT TOP SLAB WITH
SQUARE MANHOLE FRAME AND DUAL SOLID HATCHED LIDS WITH
LIFTING HANDLES. PROVIDE #5 VERTICAL SMOOTH DOWELS SET IN
EPOXY AT 24 INCH O.C. TO CONNECT THE NEW TOP SLAB TO
VERTICAL WALLS OF EXISTING VALVE PIT, GROUT SEAL JOINT WITH
NON-SHRINK CEMENTITIOUS GROUT INTERIOR AND EXTERIOR.
PRECAST CONCRETE LID TO BE CONTRACTOR DELEGATED DESIGN
WITH SHOP DRAWING SUBMITTALS IN ACCORDANCE WITH
SPECIFICATION 03 41 16. SEE DETAIL THIS SHEET.
19. GROUT AND SEAL ALL PENETRATIONS AFTER REMOVAL OF
EXISTING FORCE MAIN PIPING AND ANY VISIBLE CRACKS ON THE
INTERIOR OF EXISTING CONCRETE VALVE PIT. APPLY THREE
COATS CONSEAL (CS-55) AND SHERWIN WILLIAMS DTM ACRYLIC OR
APPROVED EQUIVALENT FOR WATERPROOF SEAL TO ALL SEALED
PENETRATIONS.
20. INSTALL TWO (2) INCH SCH 80 PVC WASH WATER SERVICE WITH
TWO (2) INCH X ONE (1) INCH REDUCER, A ONE (1) INCH BACK FLOW
PREVENTER, HOSE BIBB CONNECTION IN CONCRETE STAND AND
VALVE BOX WITH ONE (1) INCH GATE VALVE FOR LOCAL
DISCONNECT AT LIFT STATION. PROVIDE WET TAP TO EXISTING
AC/DI/PVC WATER LINE. WATER LINE LOCATED APPROXIMATELY 30
FEET WEST OF LIFT STATIONS. SEE SHEET C-502 FOR POTABLE
WATER BACKFLOW ASSEMBLY DETAIL.
21. CONSTRUCT NEW SLAB FOR PIPE SUPPORT SPANNING BETWEEN
LIFT STATION WET WELL AND VALVE PIT. SEE THIS SHEET FOR TYP.
CIP SLAB DETAIL.
22. PROVIDE TWO PIPE BOLLARDS AT EITHER SIDE. SEE SHEET C-503
FOR TYP. BOLLARD DETAIL.
23. GROUT AND SEAL HOLES REMAINING PENETRATIONS AFTER
REMOVAL OF EXISTING FORCE MAIN PIPING IN WET WELL. WHERE
APPLICABLE REPAIR LINER IN ACCORDANCE WITH
MANUFACTURERS RECOMMENDATIONS. IF MANUFACTURER'S
RECOMMENDED REPAIR IS UNFEASIBLE SEAL WITH THREE COATS
OF CONSEAL (CS-55) AND SHERWIN WILLIAMS DTM ACRYLIC OR
APPROVED EQUIVALENT FOR WATER PROOFING.
5' 10'0
GRAPHICS SCALE: 1" - 5'
EXISTING EOP
4" PVC
4" PVC
EXISTING CO
3" PVC
10" PVC
10" PVC
LIFT STATION
CONTROL PANEL
LIFT STATION
CONTROL PANEL
CORROSION
PROTECTION
WW VENT (TYP.)
EXISTING EOP
4" PVC
4" PVC
SS CO
3" PVC
10" PVC
10" PVC
LIFT STATION
CONTROL PANEL
LIFT STATION
CONTROL PANEL
CATHODIC
PROTECTION
WET WELL VENT (TYP.)
POSEIDON LS - BLG 90404 & CHT 90405 - SITE PLAN
1" = 5'SCALE:
N
A
B
2 3
C
D
1 2 3
4 5 6
I
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C O
N T
R A
F
A F
T R
A C
E S
T E
C H
N I C
A L
R
A N
C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d i t
A
C J O
D H
A N
J K
O C
I
J
L O
N G
S H
O R
E
X X
X X
D B
R E
P A
F
T
S
T A
T I O
N
V
A R
I O
U S
C C
S F
S
F
L
N E
L S
O N
E N
G I N
E E
R I N
G
C-103
P O
S E
I D
A
D
E M
O L I T
I O
N
A
T
E
P
L A
N
LIFT STATION 90404 & 81726 - DISCHARGE RE-PIPING ASSEMBLY DETAIL
FLANGED CHECK VALVE
(LEVER & WEIGHT)
SEAT END OF PLUG VALVE
PLUG VALVE (FLANGED)
FLANGED SPOOL PIECE OR
FLANGED FILLER AS NEEDED.
6" PVC DRAIN LINE BELOW
12" LONG (MIN)
FLANGE SPOOL PIECE
FL PLUG VALVE W/2-INCH OPERATOR
NUT AND GEAR ACTUATOR
SEAT END OF PLUG VALVE
(2) 45° FL BENDS
AIR RELEASE VALVE
TEE (FLANGED) TYP.
SEAT END ON CHECK VALVE SIDE
PLUG VALVE (FLANGED)
REDUCER (FLANGED) IF REQUIRED
BLIND FLANGE w/NIPPLE (S.S.)
PUMPOUT MALE 3" CAMLOCK (PO)
w/CAP (ALUM.)
90° FL BEND DOWN
90° FL BEND
(INSIDE VAULT)
B
NOTE: PIPING SECTIONS AND
DETAILS NOT TO SCALE. SHOWN
FOR GENERAL LAYOUT
PURPOSES. CONTRACTOR TO
FABRICATE ASSEMBLY.
FLANGED CHECK VALVE
(LEVER & WEIGHT)
SEAT END OF PLUG VALVE
PLUG VALVE (FLANGED)
FLANGED SPOOL PIECE OR
FLANGED FILLER AS NEEDED.
12" LONG (MIN)
FLANGE SPOOL PIECE
LS 90405 - DISCHARGE RE-PIPING ASSEMBLY DETAIL
6" PVC DRAIN LINE BELOW
SEAT END ON CHECK VALVE SIDE
PLUG VALVE (FLANGED)
REDUCER (FLANGED) IF REQUIRED
BLIND FLANGE w/NIPPLE (S.S.)
PUMPOUT MALE 3" CAMLOCK (PO)
w/CAP (ALUM.)
AIR RELEASE VALVE
FL PLUG VALVE W/2-INCH OPERATOR
NUT AND GEAR ACTUATOR
SEAT END OF PLUG VALVE
90° FL BEND DOWN
90° FL BEND
(INSIDE VAULT)
(2) 45° FL BENDS
NOTE: PIPING SECTIONS AND
DETAILS NOT TO SCALE. SHOWN
FOR GENERAL LAYOUT
PURPOSES. CONTRACTOR TO
FABRICATE ASSEMBLY.
LIFT STATION DISCHARGE RE-PIPING SECTION "B"
TOP SLAB
FINISHED GRADE
* EXISTING
CONCRETE
VAULT
* CONTRACTOR MUST FILL ANY CRACKS INSIDE
EXISTING CONCRETE VAULT WITH NON-SHRINK
GROUT THEN APPLY THREE COATS CONSEAL
(CS-55), SHERWIN WILLIAMS DTM ACRYLIC, OR
APPROVED EQUAL FOR WATERPROOF SEAL.
REPAIR SPECIALTY LINER TO RESEAL
AROUND 6" PVC DRAIN LINE PER LINER
MANUFACTURER'S RECOMMENDATIONS
THIN-SET MORTAR, SLOPE TO DRAIN
LINK-SEAL (OR APPROVED
EQUAL) ALL OPENINGS (TYP.)
6" PVC
DRAIN LINE
FL ADAPTER CONNECT TO
EXISTING 6" FM
EXISTING 6"
EFFLUENT FM PIPE
(2) CONCRETE
PIPE SUPPORTS
EXTERIOR JOINT
TAPE (TYP.)
PIPE STAND (TYP.)
#5 DRILLED
EPOXY
ANCHORED
DOWELS @ 24"
O.C.
6" DUCTILE
IRON PIPE
1" CHAMFER
EDGES (TYP.)
DUAL ACCESS HATCH
DOORS (H-20 LOAD RATING)
SHOWN OPEN, DRILL (2), 2"
Ø HOLES EACH DOOR
90° FL BEND
AIR RELEASE VALVE W/ 1-1/2" SCH 80
PVC DRAIN PIPE TO WET WELL
1-1/2" SCH 80 PVC DRAIN
PIPE ATTACH TO PIPE W/
CONDUIT HANGERS
PIPE STAND (TYP.)
ISOLATION
JOINT
(2) FL TEE (NOT SHOWN)
SEAT END ON CHECK VALVE SIDE
12" FL SPOOL
INSTALL 2" WELDED STAINLESS STEEL
NIPPLE OR 2" DOUBLE STRAP SADDLE
W/ 2" 316 S.S. BALL VALVE & 2" S.S. PLUG
FL CHECK VALVE
(LEVER & WEIGHT)
36" MAX.
12" ±
12"
5"
8"
MIN. 36"
6' ± EXISTING VAULT
EXISTING COVER
90° FL BEND
36" MAX.
(2) 45° FL BENDS TO
90° FL BEND
NOTE: PIPING SECTIONS AND
DETAILS NOT TO SCALE. SHOWN
FOR GENERAL LAYOUT
PURPOSES. CONTRACTOR TO
FABRICATE ASSEMBLY.
TYP. VALVE PIT LID/RIM DEMO FACING E
METAL LID
CONCRETE
TOP RIM
TYP. VALVE PIT DEMO FACING E
N
TYP. 90° BEND DEMO FACING E
N
N
B
SCALE: N.T.S.
SCALE: N.T.S.
SCALE: N.T.S.
SCALE: N.T.S.
SCALE: N.T.S.
SCALE: N.T.S.
5" 3"
1" CHAMFER EDGES (TYP.)
6x6-W 2.9x2.9 W.W.F.
4000 PSI CONCRETE
TYP. CIP CONCRETE PAD DETAIL
SCALE: N.T.S.
EXISTING WET WELL
EXISTING WET WELL
NOTE: NOT APPLICABLE TO PRECAST
VALVE PIT SLABS.
M
F
M
F
M
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S F
S F
S F
F
M
F
M
F
M
F
M
F
M
F
M
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S F
S F
S F
..\..\..\Photos\3. Demo Photos\C-109\IMG_6171.png
LS 88928 GREENHOUSE - DEMOLITION PLAN
1" = 5'SCALE:
N
1. PROVIDE, INSTALL AND MAINTAIN 130 FEET OF SILT FENCE (APPROX. LOCATION);
REMOVE UPON COMPLETION. SEE TYP. SILT FENCE DETAIL ON SHEET C-503.
2. ONCE NEW LIFT STATION IS OPERATIONAL, DEMOLISH EXISTING WET WELL AND
CONCRETE VALVE PIT IN THEIR ENTIRETY, REMOVE AND DISPOSE OF DEBRIS FROM
LS 88928.
3. DEMOLISH EXISTING SEPTIC TANKS IN THEIR ENTIRETY.
4. DEMOLISH EXISTING CONCRETE SLABS IN THEIR ENTIRETY.
5. CUT AND REMOVE PORTION OF SEWER FORCE MAIN PIPE.
6. CUT AND REMOVE PORTION OF SANITARY SEWER PIPE.
7. PORTION OF EXISTING SANITARY SEWER AND FORCE MAIN TO REMAIN.
8. DEMOLISH LIFT STATION CONTROL PANEL INCLUDING EQUIPMENT, ENCLOSURES,
FRAME, END DEVICES, CONTROL CONDUIT AND WIRING. DEMOLISH ELECTRICAL
DISCONNECT SWITCH. ELECTRICAL CONDUCTORS AND CONDUIT TO REMAIN FOR
REUSE.
DEMOLITION FLAG NOTES:
9. PROVIDE DUPLEX LIFT STATION, SIX (6) FOOT INNER DIA. WET WELL, TWO (2)
IN-SERVICE NON-CLOG EXPLOSION PROOF SUBMERSIBLE PUMPS, PERIMETER
CONCRETE PAD TOP ELEV. 7.50', FORCE MAIN PIPING AND ABOVE GROUND VALVES.
SEE SHEET C-501.
10. CONSTRUCT APPROX. 30 LF - EIGHT (8) INCH C900 DR18 GRAVITY SEWER FROM
EXISTING EIGHT (8) INCH SANITARY SEWER TIE IN POINT TO NEW WET WELL. MIN.
SLOPE 0.4%.
11. CONSTRUCT APPROX. 25 LF - SIX (6) INCH C900 DR18 GRAVITY SEWER FROM
EXISTING SIX (6) INCH SANITARY SEWER TIE IN POINT TO NEW WET WELL. MIN. SLOPE
0.4%
12. CONSTRUCT APPROX. 25 LF - THREE (3) INCH DISCHARGE FORCE MAIN TO CONNECT
FROM EXISTING THREE (3) INCH FORCE MAIN TO NEW LS 88944. PROVIDE MIN. 30
INCH COVER.
13. CONSTRUCT RESTRAINED ONE (1), SIX (6) INCH 45 DEGREE MJ FITTINGS.
14. CONSTRUCT RESTRAINED ONE (1), EIGHT (8) INCH 45 DEGREE MJ FITTINGS.
15. ABOVE GRADE THREE (3) INCH FL PLUG VALVE TO AIR RELEASE VALVE WITH TWO (2),
THREE (3) INCH 45 DEGREE BENDS TO TRANSITION BELOW GRADE.
16. INSTALL NEW LIFT STATION CONTROL PEDESTAL. EXTEND CONDUCTORS AND
CONDUITS AS REQUIRED TO SUPPLY NEW DISCONNECT SWITCH ON PEDESTAL FROM
EXISTING ELECTRICAL CIRCUIT. REFER TO ELECTRICAL SHEETS FOR LIFT STATION
CONTROLS PEDESTAL DESIGN, SPECIFICATIONS AND DETAILS.
17. PROVIDE TWO (2) INCH SCH 80 PVC WASH WATER SERVICE, WITH TWO (2) INCH X ONE
(1) INCH REDUCER, A ONE (1) INCH BACK FLOW PREVENTER HOSE BIBB CONNECTION
IN CONCRETE STAND AND VALVE BOX WITH ONE (1) INCH GATE VALVE FOR LOCAL
DISCONNECT AT LIFT STATION. CONNECT FROM EXISTING WATER LINE DIRECTLY
ADJACENT TO THE PROPOSED LOCATION. SEE SHEET C-502 FOR POTABLE WATER
BACKFLOW ASSEMBLY DETAIL.
18. PROVIDE TWO (2) INCH WATER SERVICE SADDLE TAP WITH TWO (2) INCH GATE
VALVE.
19. PROVIDE MINIMUM UTILITY SEPARATION AT SANITARY SEWER AND WATER
CROSSING. SEE SHEET C-502 FOR UTILITY SEPARATION DETAIL.
20. INSTALL SANITARY CLEAN OUT. CLEANOUT DIAMETER SIZE TO MATCH SEWER
LATERAL SIZE. SEE SHEET C-503 FOR CLEANOUT DETAIL.
CONSTRUCTION FLAG NOTES:
5' 10'0
GRAPHICS SCALE: 1" - 5'
8" PVC
LS 88944 GREENHOUSE - SITE PLAN
1" = 5'SCALE:
N
6" PVC
8" PVC
4" PVC
EDGE OF SIDEWALK
EXISTING EOP
EXISTING LIFT STATION
CONTROL PANEL
EXISTING ABANDONED SEPTIC
TANK AND PIPING
NEW LIFT STATION NO. 88944 WET WELL
LOCATION ELEVATION
TOP OF STATION 7.50'
HIGH WATER ALARM 2.50'
LAG PUMP ON 1.50'
LEAD PUMP ON 0.50'
PUMPS OFF
(-) 0.50'
SUMP INVERT
(-) 2.50'
NEW LIFT STATION NO. 88944 GREENHOUSE
HYDROMATIC S3NX, 300 GPM @ 31' TDH
6.9 INCH DIA. IMPELLER
1750 RPM, 200V/3PH/60HZ - 5 HP
PUMP SELECTION:
PRIMARY SYSTEM OPERATING CONDITION*
DESIGN CONDITIONS:
A
B
2 3
C
D
1 2 3
4 5 6
I
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C O
N T
R A
F
A F
T R
A C
E S
T E
C H
N I C
A L
R
A N
C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d i t
A
C J O
D H
A N
J K
O C
I
J
L O
N G
S H
O R
E
X X
X X
D B
R E
P A
F
T
S
T A
T I O
N
V
A R
I O
U S
C C
S F
S
F
L
N E
L S
O N
E N
G I N
E E
R I N
G
C-104
G R
E E
N H
O U
E M
O L
I T
I O
I T
E
P
L A
N
..\..\..\Photos\3. Demo Photos\C-109\IMG_6172.JPG
EXISTING STATION TOTAL DEMO FACING NE
N
SCALE: N.T.S.
EXISTING SEPTIC TANK DEMO FACING S
N
SCALE: N.T.S.
EXISTING SEPTIC TANK DEMO FACING S
N
SCALE: N.T.S.
EXISTING ABANDONED SEPTIC
TANK AND PIPING
EXISTING LS 88928
EXISTING VALVE PIT
*CALCULATED SYSTEM TOTAL DYNAMIC HEAD, CONTRACTOR
MUST PERFORM A FIELD PUMP TEST TO VERIFY TDH AND
COORDINATE WITH BASE OPERATIONS SUPPORT
CONTRACTOR PRIOR TO ORDERING PUMPS.
FIELD VERIFY ELEVATION, LOCATION, TYPE, SIZE AND
AMOUNT OF UNDERGROUND PIPE PRIOR TO ORDERING OR
CONSTRUCTING WET WELL.
EXISTING UNDERGROUND UTILITY INFORMATION PER CCSFS
PROVIDED GIS MAP. FIELD VERIFY EXISTING UNDERGROUND
UTILITIES BEFORE PERFORMING ANY EXCAVATION OR
DEMOLITION.
AVOID THE USE OF DISSIMILAR METAL CONTACT. IF THE USE
IS UNAVOIDABLE, VENDOR MUST PROVIDE AN INSULATING
BARRIER TO PREVENT GALVANIC CORROSION.
PROVIDE SOD RESTORATION FOR ALL DISTURBED AREAS, IN
ACCORDANCE WITH SPECIFICATION.
PROVIDE CLEAN FILL AROUND LIFT STATION TO BRING AREA
UP TO GRADE, SLOPE MAX 1:4 DOWN TO MATCH EXISTING
GRADE.
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F M
F M
F M
CP
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
SF
SF
SF
SF
SF
SF
SF
SF
S F
S F
S F
S F
S F
S F
S F
S F
S F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
F
M
F
M
F
M
F
M
F M
F M
F
M
F M
F
M
F
M
F
M
F
M
F
M
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
SF
SF
SF
SF
SF
SF
SF
SF
S F
S F
S F
S F
S F
S F
S F
S F
S F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
AREA 59 LS 55900 - SITE PLAN
1" = 5'SCALE:
N
AREA 59 LS 55853 - DEMOLITION PLAN
1" = 5'SCALE:
N
5' 10'0
GRAPHICS SCALE: 1" - 5'
4" PVC
4" PVC
4" PVC
3" PVC
CORROSION
PROTECTION
EXISTING LIFT STATION
CONTROL PANEL
EXISTING HOSE BIBB
3/4" VALVE STATION
EXISTING EOP
*CALCULATED SYSTEM TOTAL DYNAMIC HEAD, PERFORM A
FIELD PUMP TEST TO VERIFY TDH AND COORDINATE WITH
BASE OPERATIONS SUPPORT CONTRACTOR PRIOR TO
ORDERING PUMPS.
FIELD VERIFY ELEVATION, LOCATION, TYPE, SIZE AND
AMOUNT OF UNDERGROUND PIPE PRIOR TO ORDERING OR
CONSTRUCTING WET WELL.
EXISTING UNDERGROUND UTILITY INFORMATION PER CCSFS
PROVIDED GIS MAP. FIELD VERIFY EXISTING UNDERGROUND
UTILITIES BEFORE PERFORMING ANY EXCAVATION OR
DEMOLITION.
AVOID THE USE OF DISSIMILAR METAL CONTACT. IF THE USE
IS UNAVOIDABLE, VENDOR SHALL PROVIDE AN INSULATING
BARRIER TO PREVENT GALVANIC CORROSION.
PROVIDE SOD RESTORATION FOR ALL DISTURBED AREAS, IN
ACCORDANCE WITH SPECIFICATION.
PROVIDE CLEAN FILL AROUND LIFT STATION TO BRING AREA
UP TO GRADE, SLOPE MAX 1:4 DOWN TO MATCH EXISTING
GRADE.
NEW LIFT STATION NO. 55900 AREA 59
HYDROMATIC HPGHX, 75 GPM @ 66' TDH
5.75 INCH DIA. IMPELLER
3450 RPM, 200V/3PH/60HZ - 5 HP
PUMP SELECTION:
PRIMARY SYSTEM OPERATING CONDITION*
DESIGN CONDITIONS:
1. PROVIDE, INSTALL AND MAINTAIN APPROX. 245 LF SILT FENCE (APPROX. LOCATION);
REMOVE UPON COMPLETION. SEE SHEET C-503 FOR TYP. SILT FENCE DETAIL.
2. EXISTING SANITARY SEWER FORCE MAIN TO REMAIN.
3. CUT AND REMOVE APPROX. 80 LF OF SANITARY SEWER FORCE MAIN IN FOUR (4)
LOCATIONS. DEMOLITION WILL PROCEED THE INSTALL.
4. DEMOLISH THE EXISTING LIFT STATION CONTROL PANEL WITH ASSOCIATED
EQUIPMENT, ENCLOSURES, FRAME, END DEVICES, CONTROL CONDUIT AND WIRING.
DEMOLISH ELECTRICAL DISCONNECT SWITCH. ELECTRICAL CONDUCTORS AND
CONDUIT TO REMAIN FOR REUSE.
5. DEMOLISH THE EXISTING WET WELL, CONCRETE VALVE PIT AND ASSOCIATED
CATHODIC PROTECTION IN THEIR ENTIRETY.
6. CLOSE EXISTING GATE VALVE, DEMOLISH THE EXISTING HOSE BIBB, BACKFLOW
PREVENTER AND CONCRETE SLAB IN THEIR ENTIRETY. EXISTING GATE VALVE TO
REMAIN.
DEMOLITION FLAG NOTES:
7. INSTALL DUPLEX LIFT STATION, SIX (6) FOOT INNER DIA. WET WELL, TWO (2)
IN-SERVICE NON-CLOG EXPLOSION PROOF SUBMERSIBLE PUMPS, PERIMETER
CONCRETE PAD AND GROUND DISCHARGE ASSEMBLY IN ACCORDANCE TO
RESPECTIVE DETAILS ON SHEET C-501.
8. INSTALL NEW LIFT STATION CONTROL PEDESTAL. EXTEND CONDUCTORS AND
CONDUITS AS REQUIRED TO SUPPLY NEW DISCONNECT SWITCH ON PEDESTAL
FROM EXISTING ELECTRICAL CIRCUIT. REFER TO ELECTRICAL SHEETS FOR LIFT
STATION CONTROLS PEDESTAL DESIGN, SPECIFICATIONS AND DETAILS.
9. INSTALL ABOVE GRADE THREE (3) INCH FL PLUG VALVE TO AIR RELEASE VALVE
WITH TWO (2), THREE (3) INCH 45 DEGREE BENDS TO TRANSITION BELOW GRADE.
REFER TO LIFT STATION DETAIL ON SHEET C-501.
10. INSTALL APPROX. SEVEN (7) LF OF THREE (3) INCH DIA. PIPE TO ONE (1) THREE (3)
INCH DUCTILE IRON TO PVC TRANSISION ADAPTER BELOW GRADE WITH THREE (3)
INCH TO FOUR (4) INCH PVC REDUCER.
11. INSTALL APPROX. 30 LF OF FOUR (4) INCH C900 PVC
12. INSTALL APPROX. 20 LF OF FOUR (4) INCH C900 PVC
13. INSTALL APPROX. 23 LF OF THREE (3) INCH C 900 PVC
14. INSTALL APPROX. 11 LF OF THREE (3) INCH SCH 80 PVC
15. INSTALL APPROX. 17 LF OF FOUR (4) INCH C900 PVC
16. INSTALL APPROX. THREE (3) LF OF FOUR (4) INCH C900 PVC
17. INSTALL ONE (1) INCH BACK FLOW PREVENTER AND HOSE BIBB CONNECTION IN
CONCRETE STAND AT LIFT STATION. SEE SHEET C-502 FOR POTABLE WATER
BACKFLOW ASSEMBLY.
CONSTRUCTION FLAG NOTES:
A
B
2 3
C
D
1 2 3
4 5 6
I
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C O
N T
R A
F
A
F
T R
A C
E S
T E
C H
N I C
A L
R
A N
C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d i t
A
C J O
D H
A N
J K
O C
I
J
L O
N G
S H
O R
E
X X
X X
D B
R E
P A
F
T
S
T A
T I O
N
V
A R
I O
U S
C C
S F
S
F
L
N E
L S
O N
E N
G I N
E E
R I N
G
C-107
A R
D
E M
O L I T
I O
N
A
T
E
P
L A
N
..\..\..\Photos\3. Demo Photos\C-112\IMG_6342.JPG
..\..\..\Photos\3. Demo Photos\C-112\IMG_6338.JPG ..\..\..\Photos\3. Demo Photos\C-112\IMG_6341.JPG
HOSE BIB AND CONTROLS DEMO FACING S
N
SCALE: N.T.S.
EXISTING STATION TOTAL DEMO FACING NE
N
SCALE: N.T.S.
HOSE BIB, BACKFLOW, AND CONCRETE DEMO FACING N
N
SCALE: N.T.S.
EXISTING LS 55853
EXISTING VALVE PIT
4" PVC
4" PVC
3" PVC
NEW LIFT STATION NO. 55900 WET WELL
LOCATION ELEVATION
TOP OF STATION 9.00'
HIGH WATER ALARM 4.00'
LAG PUMP ON 3.00'
LEAD PUMP ON 2.00'
PUMPS OFF 1.00'
SUMP INVERT
(-) 1.00'
4" PVC PIPE
3" PVC
SCALE:
LIFT STATION CONDUIT PENETRATION
N.T.S.
C
C-501
SCALE:
LIFT STATION PAD
N.T.S.
B
C-501
12"
1. ALL EXPOSED FERROUS METAL MUST BE PRIMED WITH TWO COATS OF EXTERIOR ENAMEL PAINT, CCSFS OLIVE GREEN.
2. BASE AND FIRST RISER UNIT OF PRECAST STRUCTURES TO BE CAST MONOLITHIC.
3. VALVES, ELBOWS, AND SPOOL PIECES MUST BE SIZED TO PERMIT EASY REMOVAL OF CHECK VALVE SPINDLES WITH MIN.
CLEARANCES AS SHOWN FOR SIX (6) INCH DIA. PIPE AND SMALLER. CLEARANCES MUST INCREASE AS REQUIRED FOR
LARGER PIPE SIZES.
4. ALL LOCATIONS WHERE PIPES ENTER OR LEAVE THE WET WELL MUST BE MADE WATER-TIGHT WITH WALL SLEEVES AND
LINK-SEAL.
5. NO VALVES OR ELECTRICAL JUNCTION BOXES IN THE WET WELL.
6. AVOID THE USE OF DISSIMILAR METAL CONTACT. WHERE USE IS UNAVOIDABLE, PROVIDE AN INSULATING BARRIER TO
PREVENT GALVANIC CORROSION.
7. WET WELL COVERS MUST BE ALUMINUM WITH 316 STAINLESS STEEL HARDWARE AND LOCK BRACKET. SIZE AS REQUIRED BY
PUMP MANUFACTURER.
8. ALL HARDWARE IN WET WELL AND ABOVEGROUND MUST BE 316 STAINLESS STEEL; ALL NUTS/BOLTS/ WASHERS MUST BE
CONNECTED USING LOCK WASHERS.
9. FLEXIBLE COUPLINGS MUST BE SLEEVE TYPE.
10. INSTALL AN ADJUSTABLE STAINLESS STEEL PIPE STAND UNDER EACH CHECK VALVE AT THE EDGE OF THE WET WELL.
11. SEE ELECTRICAL PLANS FOR CONTROL PANEL CONNECTIONS.
12. PROVIDE AND INSTALL ALL NECESSARY PIPING, VALVES, WET WELL, MANHOLES, ACCESSORIES, AND CONTROLS, FOR A
COMPLETE AND OPERABLE SANITARY SEWAGE LIFT STATION.
13. CONCRETE WET WELL IS PREFERRED. WET WELL MUST HAVE THE ENTIRE INSIDE SURFACE OF WET WELL & TOP SLAB LINED
WITH EPOXYTEX UME COMPOSITE SYSTEM, OR EQUAL APPROVED LINER. LINER INSTALLER MUST BE CERTIFIED BY LINER
MANUFACTURER. SUBMIT CERTIFICATION WITH SHOP DRAWING SUBMITTAL.
14. ALL ABOVE GROUND EXPOSED FORCE MAIN PIPE AND FITTINGS MUST BE PAINTED WITH A SAFETY GREEN LATEX, OR OTHER
COLOR APPROVED BY THE CONTRACTING OFFICER.
15. COORDINATE THE FINAL PUMP SELECTION WITH BASE OPERATIONS SUPPORT CONTRACTOR PRIOR TO ORDERING TO CHECK
FOR COMMON PUMPS STOCKED AND AVAILABILITY OF MATCHING REPLACEMENT PUMPS AND PARTS.
16. SUBMIT A PLAN AND BE RESPONSIBLE FOR TEMPORARY PUMP STATION SEWAGE BYPASS AT EACH LIFT STATION TO
SUPPORT THE UTILITY TIE-IN CONNECTIONS AND TRANSFER SERVICE TO THE NEW LIFT STATION. REQUESTING A UTILITY
OUTAGE WITHOUT ALTERNATIVE MEANS TO PROVIDE SEWAGE COLLECTION IS NOT ACCEPTABLE.
5"
GENERAL NOTES:
GRAVITY SS INFLUENT
LINE, (SHOWN ROTATED
FOR CLARITY)
6" (MIN) CLEARANCE
BETWEEN PUMP BODY AND
HATCH OPENING (AROUND
ALL EDGES OF PUMP)
A
18"
DOUBLE DOOR ALUMINUM CHECKER
PLATE HATCH COVER CAST IN TOP SLAB
LINED PRECAST CONCRETE TOP SLAB
TO BE 4000 PSI CONCRETE WITH HATCH
OPENING CENTERED IN WET WELL
UNLESS OTHERWISE NOTED. CONCRETE
& REINFORCING TO BE CERTIFIED BY A
FLORIDA ENGINEER. DESIGNED FOR H-20
TRAFFIC LOADING.
DROP BOWL
316 S.S. CABLE HOLDER (3/8" ROD HOOKS,
ETC., SEE SPECIFICATIONS) LOCATED ON
OPPOSITE SIDE AS DISCHARGE PIPES.
SUBMERSIBLE SEWAGE PUMPS TO
BE LOCATED ALONG C.L. OF WET
WELL UNLESS OTHERWISE NOTED.
DUAL 2" ORANGE SAFETY GRATES ATTACH ON OPPOSITE
SIDES OF HATCH FRAME UNDER THE COVER, AS
MANUFACTURED BY USF FABRICATION, HALLIDAY, OR
APPROVED EQUAL CONTRACTOR TO ENSURE HATCH
OPENING AND SAFETY GRATE DIMENSIONS WHEN FULLY
OPEN PROVIDE REQUIRED CLEARANCE, INSTALL PER
MANUFACTURER'S RECOMMENDATIONS.
2" CORE DRILL
FOR DRAIN PIPE
12" LONG (MIN)
FLANGE SPOOL PIECE
90° BEND (FLANGED)
FLANGED SPOOL PIECE OR FLANGED
FILLER AS NEEDED, SEE PUMP
SEPARATION NOTES.
PLUG VALVE
(FLANGED)
AIR RELEASE VALVE
DRAIN TO WET WELL
1-1/2" SCH 80 PVC PIPE
TO 45° MJ BEND
PVC AND SCH 80
EFFLUENT PIPE
(BELOW GROUND)
45° (FL BEND DOWN)
TEE (FLANGED) TYP.
SEAT END ON CHECK VALVE SIDE
PLUG VALVE (FLANGED)
REDUCER (FLANGED) IF REQUIRED
BLIND FLANGE W/ NIPPLE (S.S.)
PUMPOUT MALE 3" CAMLOCK
(PO) W/ CAP (ALUM)
PLUG VALVE (FLANGED)
SEAT END OF PLUG VALVE
FLANGED CHECK VALVE
(LEVER & WEIGHT)
OUTER ACCESS
DOOR HINGES
SCALE:
LIFT STATION - PLAN
N.T.S.
HIGH LEVEL ALARM ELEV. "C"
LAG PUMP ON EVEL. "D"
LEAD PUMP ON EVEL. "E"
BOTH PUMPS OFF ELEV. "F"
WET WELL INVERT = ELEV. "G"
TOP OF CASTING = ELEV. "H"
ELEV. "A"ELEV. "A"
FINISHED
GRADE
SCALE:
LIFT STATION WET WELL
N.T.S.
SECTION "A - A"
6" 6"
30°
LIFTING
BAIL
8"
5"
3'
MAX.
6"
30"
PIPE STAND
(TYP.)
M I N
5'
C
O V
E R
6"
FL ECCENTRIC REDUCER (3" X 2" FBE IF
NECESSARY BASED ON PUMP SELECTION)
BASE ELL TO BE FABRICATED BY PUMP MANUFACTURER.
BASE ELBOW TO BE SIZED FOR EFFLUENT PIPE CONNECTION
GROUT FROM BASE PLATE TO A HEIGHT OF 1' ABOVE
BOTTOM ALL AROUND WITH CLASS "C" CONCRETE
SUBMERSIBLE SEWAGE PUMPS, EXPLOSION PROOF
PUMP BASE PLATE
UNDISTURBED SOIL MIN. BEARING
CAPACITY: 2000 LB/SQ FT
12" #57 STONE OR PEA GRAVEL
PRIMARY LEVEL READER BY LEVEL
TRANSMITTAL, AS MANUFACTURED BY
MERCOID MODEL PBLTX-5-50W/ ZENER
BARRIER. INSTALL INSIDE 4" PVC STILLING
WELL
MANUFACTURER APPLIED SPECIALTY
LINER OVER INTERIOR GROUT
316 STAINLESS STEEL
CLAMPING BRACKETS, SPACE
EVERY 4" OR 2 BRACKETS MIN.
SDR35 PVC DROP PIPE SIZES VARY
DROP BOWL OUTLET DO NOT CAP
INFLUENT PIPE SIZE, TYPE, ELEVATION AND
LOCATION VARY BY LIFT STATION. FIELD
VERIFY EXISTING UTILITY CONDITIONS AND
PROVIDE MIN. SLOPE TO CONNECT WITH NEW
WET WELL.
FLOAT SWITCHES, ONE SHOWN FOR CLARITY,
PROVIDE (4), HIGH LEVEL ALARM, LAG PUMP
ON, LEAD PUMP ON AND PUMP OFF
LINER TO BE APPLIED TO
VERTICAL WALLS AND TOP
EXTERIOR JOINT SEALANT
MEMBRANE TAPE (TYP.)
316 S.S. GUIDE RAILS FOR
PUMP REMOVAL STILLING
316 S.S. PIPE CLAMP
316 STAINLESS STEEL LIFTING
CHAINS WITH 3'-0" MIN. EXCESS
CONDUITS TO CONTROL PANEL
(PUMPS/TRANSMITTER/FLOATS) SEE
PUMP STATION ELECTRIC PLANS
1" CHAMFER EDGES (TYP.)
PROTECTIVE LINER TOP SLAB
AND WALL SECTION
EXPANSION JOINT AROUND
PERIMETER
4" POLY-AIR PCF-PLVF VENT W/ ACTIVATED CARBON STACK
FILTER 4" VENT W/ 6" DIA. SLAB OPENING
ACCESS DOOR AND DUAL
2" ORANGE SAFETY
GRATES INSIDE, BOTH
SHOWN OPEN
90° FL BEND
FL CHECK VALVE (LEVER & WEIGHT)
INSTALL 2" WELDED STAINLESS STEEL NIPPLE OR 2" DOUBLE
STRAP SADDLE W/ 2" 316 S.S. BALL VALVE & 2" S.S. PLUG
12" FL SPOOL
SEAT END ON CHECK VALVE SIDE
FL PLUG VALVE W/ 2-INCH OPERATOR NUT AND GEAR ACTUATOR
AIR RELEASE VALVE DRAIN TO WET
WELL 1-1/2" SCH. 80 PVC
45° FL BEND
FL PLUG VALVE W/ BAR OPERATOR
AND GEAR ACTUATOR
PIPE STAND (TYP.)
LINK-SEAL OPENINGS
316 S.S. CABLE HOLDER (3/8" ROD HOOKS,
ETC., 6 HOOKS MIN. OR AS NEEDED)
316 S.S. PIPE BRACE
DUCTILE IRON PIPE
FExMJ DI PIPE
45° MJ BEND
316 S.S.
RESTRAINT
RODS
ENTIRE INSIDE SURFACE OF CONCRETE WET WELL & TOP
SLAB MUST BE LINED WITH APPROVED LINER. LINER
INSTALLER MUST BE CERTIFIED BY LINER MANUFACTURER.
SUBMIT CERTIFICATION WITH SHOP DRAWING SUBMITTAL.
THE EXCAVATED HOLE MUST BE DRY (DE-WATERED) DURING
THE WET WELL INSTALLATION. SEE NOTE 13.
(2) 45° FL BENDS (FBE) BUTTED FACE
TO FACE ADJUST AS NECESSARY FOR
PIPE ALIGNMENT THROUGH TOP SLAB
1" CHAMFER EDGES (TYP.)
6 x 6 - W2.9 x 2.9 W.W.F.
OR FIBERMESH
4000 PSI CONCRETE
CONCRETE W/ LINER
PROVIDE LINK -SEAL
FOR ALL WALL AND
STRUCTURE TOP
PENETRATIONS
A
B
2 3
C
D
1 2 3
4 5 6
I
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C O
N T
R A
F
A F
T R
A C
E S
T E
C H
N I C
A L
R
A N
C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d i t
A
C J O
D H
A N
J K
O C
I
J
L O
N G
S H
O R
E
X X
X X
D B
R E
P A
F
T
S
T A
T I O
N
V
A R
I O
U S
C C
S F
S
F
L
N E
L S
O N
E N
G I N
E E
R I N
G
C-501
C I V
T
A I L
S
LIFT STATION ELEVATIONS
ELEVATION
GREENHOUSE
LS 88944
SET POINT
HEIGHTS
AREA 59
LS 55900
SET POINT
HEIGHTS
"A" 7.50' 9.00'
"B" 3.50' 6.50'
"C" 2.50' 5.00 4.00' 5.00
"D" 1.50' 4.00 3.00' 4.00
"E" 0.50' 3.00 2.00' 3.00
"F"
(-) 0.50'
2.00 1.00' 2.00
"G"
(-) 2.50'
0.00
(-)1.00'
0.00
"H"
(-) 3.50' (-)2.00'
LOWEST CALCULATED INFLUENT PIPE
ELEVATION BASED ON SPACE FORCE
PROVIDED GIS INFO. ELEV. "B"
FULL JOINT CENTERED
JOINT SPACING AT CROSSINGS
3' MINIMUM
ALTERNATE
CROSSINGS (1)HORIZONTAL SEPARATION
VACUUM TYPE
SANITARY SEWER
STORM SEWER,
STORMWATER FORCE MAIN
RECLAIMED WATER (2)
OTHER PIPE
3' MINIMUM
ALTERNATE
6' MINIMUM
ALTERNATE
FULL JOINT CENTERED
GRAVITY OR PRESSURE
SANITARY SEWER,
SANITARY SEWER FORCE MAIN,
RECLAIMED WATER (4)
10 FT. MINIMUMON-SITE SEWAGE TREATMENT AND
DISPOSAL SYSTEM
FULL JOINT CENTERED
SCALE:
UTILITY SEPARATION
10' PREFERRED
6' MINIMUM (3)
WATER MAIN
10' PREFERRED
3' MINIMUM
WATER MAIN
3' MINIMUM
WATER MAIN
WATER MAIN
12" IS THE MINIMUM, EXCEPT FOR
STORM SEWER, THEN 6" IS THE
MINIMUM AND 12" IS PREFERRED
WATER MAIN
12" PREFERRED
6" MINIMUM
12" IS THE MINIMUM, EXCEPT FOR
GRAVITY SEWER, THEN 6" IS THE
MINIMUM AND 12" IS PREFERRED
WATER MAIN
WATER MAIN
WATER MAIN
WATER MAIN
LOCATION OF PUBLIC WATER SYSTEM MAINS IN ACCORDANCE WITH F.A.C. RULE 62-555.314
9.7
7.5
10"
A
B
B
A
A
C
B
B
B
B
C
B
B(22-1/2)
C
B (45°)
A
2.7
1.4
4"
3.8
5.0
9.3
2.6
5.3
1.5
8"6"
6.71.5
0.75
3"
MINIMUM BEARING AREA (SQ FT)
PIPE SIZE
LETTER
THRUST BLOCK NOTES
TEE
CROSS & PLUG
90° ELBOW
TEE & PLUG
BEND
REDUCER
THE FIGURES IN THIS TABLE REPRESENT AREA OF CONCRETE
BLOCKING AGAINST THE VERTICAL TRENCH WALL OF UNDISTURBED
EARTH IN SQUARE FEET AT 2000 P.S.F. SOIL BEARING CAPACITY.
1. WRAP ALL FITTINGS WITH POLYETHYLENE FILM
BEFORE POURING THRUST BLOCK, MAKING CERTAIN
TO KEEP CONCRETE AWAY FROM ALL BOLTS,
GLANDS, AND FLANGES.
2. THRUST BLOCKS TO BE POURED AGAINST
UNDISTURBED EARTH.
3. REQUIRED VOLUMES OF BEARING AREAS TO BE AS
SHOWN IN CHART. ADJUSTMENTS, IF NEEDED, WILL
BE ALLOWED TO CONFORM TO TEST PRESSURE AND
ALLOWABLE SOIL BEARING STRESS AS SHOWN IN
SPECIFICATIONS.
4. BEARING AREA FOR THRUST BLOCK ON HORIZONTAL
BENDS IS BASED ON A TEST PRESSURE OF 200 P.S.I.
AND SOIL BEARING STRESS OF 2,000 P.S.F. THE
DEPTH TO THE THRUST BLOCK BASE TO BE EQUAL TO
OR GREATER THAN TWICE THE HEIGHT. (EXAMPLE: IF
BLOCK IS 2' DEEP, THE BASE IS TO BE NO GREATER
THAN 4' BELOW GRADE.)
5. VERTICAL BEND THRUST BLOCKS TO BE THE SAME AS
HORIZONTAL BENDS.
6. BEARING AREA OF THRUST BLOCK TO BE NOT LESS
THAN ONE SQUARE FOOT.
L
L
L
L
L
L
L
FLOW
BASE PLATE
CONCRETE
ANCHOR BOLT
(4 TYP.)
2" SCH. 40 S.S.
EXTENSION
SUPPORT STUD
PIPE SIZE BASE PLATE SIZE
3" 4"x6"x1.25"
4"-12" 8"x8"x1.25"
A
B
2 3
C
D
1 2 3
4 5 6
I
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C O
N T
R A
F
A F
T R
A C
E S
T E
C H
N I C
A L
R
A N
C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d i t
A
C J O
D H
A N
J K
O C
I
J
L O
N G
S H
O R
E
X X
X X
D B
R E
P A
F
T
S
T A
T I O
N
V
A R
I O
U S
C C
S F
S
F
L
N E
L S
O N
E N
G I N
E E
R I N
G
C-502
C I V
T
A I L
S
SCALE:
REQUIRED LENGTH OF RESTRAINT (FT.) FOR FITTINGS
N.T.S.
NOMINAL PIPE SIZE
90° BEND
FITTING
8"6"
45° BEND
22.5° BEND
10282
45/1034/8
TEE/PLUG
VERTICAL OFFSET
THRUST BLOCK,SF 53
(UPPER/LOWER)
THRUST BLOCK SQ. FT.
WHERE REQUIRED BY
EXISTING PIPE
10"
54/12
4"
22/6
SCALE:
THRUST BLOCKS
N.T.S.
B(22-1/2)
C
B (45°)
A
2.7
1.4
4"
3.8
5.0
9.3
2.6
5.3
1.5
8"6"
6.7
SCALE:
PIPE STAND DETAIL
N.T.S.
NOTE: PIPE SUPPORT AND ANCHORING HARDWARE MATERIAL
MUST BE 316 OR 304 S.S. A NEOPRENE LINER MUST BE USED WHEN
SUPPORTING STEEL OR PVC PIPE.
3"
20/5
1.5
1.5
0.75
3"
BASE PLATE
CONCRETE
ANCHOR BOLT
(4 TYP.)
2" SCH. 40 S.S.
EXTENSION
SUPPORT STUD
PIPE SIZE BASE PLATE SIZE
3" 4"x6"x1.25"
4"-12" 8"x8"x1.25"
SCALE:
AIR RELEASE VALVE DETAIL -
1-1/2" SCH 80 PVC, DRAIN TO WET WELL LENGTH AS REQUIRED
EXISTING 3" FM PIPE, D.I. OR PVC (DR-18)
2" DOUBLE STRAP TAPPING SADDLE, S.S.
SEWER AIR RELEASE VALVE 2" NPT, ARI MODEL
DESCRIPTION
M A T E R I A L S
2" CORPORATION BRASS1
1" SHORT NIPPLE, S.S.
2" X 1" REDUCER, S.S.
2" TEE, S.S.
2" BALL VALVE, S.S.
2" x 4" NIPPLE, S.S.
1" CURB STOP, S.S.
11 REQD.
ITEM QUANT.
D-025 P, CRISPIN USL20 OR APPROVED EQUAL
FULL JOINT CENTERED
JOINT SPACING AT CROSSINGS
3' MINIMUM
ALTERNATE
CROSSINGS (1)HORIZONTAL SEPARATION
VACUUM TYPE
SANITARY SEWER
STORM SEWER,
STORMWATER FORCE MAIN
RECLAIMED WATER (2)
OTHER PIPE
3' MINIMUM
ALTERNATE
6' MINIMUM
ALTERNATE
FULL JOINT CENTERED
GRAVITY OR PRESSURE
SANITARY SEWER,
SANITARY SEWER FORCE MAIN,
RECLAIMED WATER (4)
10 FT. MINIMUMON-SITE SEWAGE TREATMENT AND
DISPOSAL SYSTEM
(1) WATER MAIN SHOULD CROSS ABOVE OTHER PIPE. WHEN WATER MAIN MUST BE BELOW OTHER PIPE, THE MINIMUM SEPARATION IS 12 INCHES.
(2) RECLAIMED WATER REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C.
(3) 3 FT. FOR GRAVITY SANITARY SEWER WHERE THE BOTTOM OF THE WATER MAIN IS LAID AT LEAST 6" ABOVE THE TOP OF THE GRAVITY SANITARY SEWER.
(4) RECLAIMED WATER NOT REGULATED UNDER PART III OF CHAPTER 62-610.
FULL JOINT CENTERED
SCALE:
UTILITY SEPARATION
VALVE
BOX
SCALE:
POTABLE WATER BACKFLOW ASSEMBLY -
MINIMUM BEARING AREA (SQ FT)
PIPE SIZE
LETTER
TEE
CROSS & PLUG
90° ELBOW
TEE & PLUG
BEND
REDUCER
THE FIGURES IN THIS TABLE REPRESENT AREA OF CONCRETE
BLOCKING AGAINST THE VERTICAL TRENCH WALL OF UNDISTURBED
EARTH IN SQUARE FEET AT 2000 P.S.F. SOIL BEARING CAPACITY.
BEND
PLUG
TEE90° ELBOW
10' PREFERRED
6' MINIMUM (3)
WATER MAIN
10' PREFERRED
3' MINIMUM
WATER MAIN
3' MINIMUM
WATER MAIN
WATER MAIN
12" IS THE MINIMUM, EXCEPT FOR
STORM SEWER, THEN 6" IS THE
MINIMUM AND 12" IS PREFERRED
WATER MAIN
12" PREFERRED
6" MINIMUM
12" IS THE MINIMUM, EXCEPT FOR
GRAVITY SEWER, THEN 6" IS THE
MINIMUM AND 12" IS PREFERRED
WATER MAIN
WATER MAIN
WATER MAIN
WATER MAIN
LOCATION OF PUBLIC WATER SYSTEM MAINS IN ACCORDANCE WITH F.A.C. RULE 62-555.314
90° BRASS BEND
(TYP 3 PLCS)
BRASS HOSE BIB, IPT IN 3/4"
GARDEN HOSE THREAD,
WITH VACUUM BREAKER
1" REDUCED PRESSURE BACKFLOW
PREVENTER - ZURN WILKINS MODEL
975XL2 OR APPROVED EQUIVALENT
IPT BRASS UNION
BRASS TEE
WATER PRESSURE SENSOR
W/TRANSMITTER WIRED TO
SCADAPACK IN CONTROL PANEL
1" SCH 80 BRASS PIPE
TRACER WIRE
1" CHAMFER
EDGE (TYP.)
CONNECT TRACER WIRE TO
TRACER ALONG SERVICE
1" IPT BALL VALVE
3' - 0"
0' - 9"
PROVIDE 90° BRASS BEND.
TRANSITION FROM PVC TO
BRASS BEFORE ELB.
ELECTRICAL GENERAL NOTES:
1. DE-ENERGIZE ALL ITEMS TO BE DEMOLISHED OR REMOVED. PERFORM LOCKOUT/TAGOUT IN
ACCORDANCE WITH OSHA 29 CFR 1910.147 AND THE LATEST REVISION OF NFPA 70E.
2. TAKE NECESSARY PRECAUTIONS AND PROVIDE PROTECTION AS REQUIRED TO PRESERVE CONDITION
OF EXISTING UTILITIES, EQUIPMENT, FURNISHINGS, AND SURFACES NOT INDICATED FOR REMOVAL. IT IS
THE CONTRACTOR'S RESPONSIBILITY TO WORK AROUND THE EXISTING CONDITIONS TO ACCOMPLISH
THE WORK.
3. ALL ELECTRICAL CONSTRUCTION/ INSTALLATION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION
OF THE FOLLOWING CODES; UFC TAKES PRIORITY:
UFC 3-501-01 ELECTRICAL ENGINEERING
UCF 3-560-01 OPERATION AND MAINTENANCE: ELECTRICAL SAFETY, WITH CHANGE 1
UFC 3-550-01 EXTERIOR ELECTRICAL POWER DISTRIBUTION, WITH CHANGE 2
NATIONAL ELECTRICAL CODE, NFPA 820
4. LOCATIONS OF ALL ELECTRICAL EQUIPMENT ARE APPROXIMATE AND MAY BE RELOCATED TO AN
APPROVED LOCATION. FIELD VERIFY ALL LOCATIONS AND SPACING. COORDINATE WITH THE PROJECT
ENGINEER PRIOR TO ANY FIELD CHANGES.
5. PROVIDE ALL MATERIAL, LABOR, AND EXPERTISE REQUIRED TO COMPLETE THE WORK AND PROVIDE A
COMPLETE AND FUNCTIONAL ELECTRICAL SYSTEM AS SHOWN IN THE CONTRACT DOCUMENTS.
COORDINATE WORK WITH OTHER CONSTRUCTION TRADES AS NECESSARY.
6. COMPLETE ALL GROUNDING AND BONDING IN ACCORDACNE WITH ARTICLE 250 OF THE NEC. BONDING
JUMPERS SHALL BE USED TO BOND CONDUIT TO ENCLOSURES, BOXES, AND EQUIPMENT WHERE
CONCENTRIC OR ECCENTRIC KNOCKOUTS ARE USED.
7. USE AN APPROPRIATE OXIDE INHIBITOR FOR ALL BONDS BETWEEN DISSIMILAR METALS.
8. ENSURE ALL NEW CONDUIT IS MINIMUM 3/4 INCH RSC. INSTALL CONDUIT SYSTEM WITH APPROPRIATE
SEALS IN HAZARDOUS LOCATIONS IN ACCORDANCE WITH ARTICLE 500 OF THE NEC.
LED LIGHT (G FOR GREEN, R FOR RED)
ALARM HORN
TERMINAL BLOCK/SURGE SUPPRESSOR
COIL
CIRCUIT BREAKER
HOUR METER
HOA SWITCH HAND OFF AUTO
R
A
B
2 3
C
D
1 2 3
4 5 6
I
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C O
N T
R A
F
A
F
T R
A C
E S
T E
C H
N I C
A L
R
A N
C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d i t
A
C J O
D H
A N
J K
O C
I
B K
O L
A K
D B
X X
X X
D B
R E
P A
F
T
S
T A
T I O
N
V
A R
I O
U S
C C
S F
S
F
L
N E
L S
O N
E N
G I N
E E
R I N
G
N:\BIM\Rhodes and Brito\TRACES\DBEH 12-1551, Lift Stations Various, CCAFS\Drawings\DWG\Civil\Reference\space-force-logo.jpg
E-001
E L E
C T
R I C
A L
G
E N
E R
A L
N
O T
E S
LEGEND:
ABBREVIATIONS:
AC ALTERNATING CURRENT
COAX COAXIAL CABLE
COMM COMMUNICATION
DC DIRECT CURRENT
DIA DIAMETER
DR DUPLEX RECEPTACLE
GND GROUND
LED LIGHT EMITTING DIODE
SS SURGE SUPPRESSOR
TB TERMINAL BLOCK
XFMR TRANSFORMER
RTU REMOTE TERMINAL UNIT
RF RADIO FREQUENCY
MCCB MOLDED CASE CIRCUIT BREAKER
MLCB MAIN LINE CIRCUIT BREAKER
CHCB CONDENSATION HEATER
0 0 0 0 0 0.0
LIFT STATION
TYPICAL MOTOR POWER BOX DETAIL
N.T.S.SCALE:
TYPICAL LIFT STATION (PARTIAL PLAN VIEW)
N.T.S.SCALE:
1. MOTOR POWER BOX COVER SHALL FACE AWAY FROM THE PIT.
2. MOTOR POWER BOX ENCLOSURE SHALL BE NEMA 4X STAINLESS STEEL. ENCLOSURE SHALL BE
MINIMUM 36” X 42”. DEPTH SHALL BE DETERMINED BY THE MANUFACTURER.
3. PROVIDE AND INSTALL LAMICOID LABELS FOR EACH COMPONENT, TEXT AS SHOWN IN THE ELEVATION.
PROVIDE LAMICOID LABELS WITH BLACK FACE AND WHITE CORE, TEXT HEIGHT 1/4 INCH.
4. SEE SHEET E-609 FOR LIST OF COMPONENT SHOWN IN THIS ELEVATION
5. INSTALL TRANSFORMER AND CIRCUIT BREAKERS PER LIFT STATION ELECTRICAL RATING SCHEDULE ON
THIS SHEET.
TYPICAL LIFT STATION CONTROLS PEDESTAL
N.T.S.SCALE:
1. PROVIDE 1-1/2" MINI 316 STAINLESS STEEL MOUNTING CHANNEL.
2. PROVIDE NEW HAZARDOUS AREA MOTOR POWER BOX CLASS 1,
DIVISION 1, NEMA 4X, CAST ALUMINUM. SEE WIRING DIAGRAM ON
SHEETS E-601 THROUGH E-604 FOR WIRING DETAILS.
3. PROVIDE 4" X 4" CONCRETE POST.
4. INSTALL NEW MAIN DISCONNECT SWITCH, RATING PER LIFT STATION
ELECTRICAL RATING SCHEDULE ON THIS SHEET IN NEMA 4X STAINLESS
STEEL ENCLOSURE.
5. PROVIDE SEALING FITTINGS IN 2" CONDUITS LEAVING THE MOTOR
POWER BOX TO THE LIFT STATIONS.
6. PROVIDE AND INSTALL NEW TELEMETRY ANTENNA, COORDINATE RF
ANGLE WITH BASE MAINTENANCE CONTRACTOR. SUPPORT ANTENNA
WITH STANDARD 1-1/2" STAINLESS STEEL PIPE 10' ABOVE GRADE. BOLT
TO UNISTRUT AND CONCRETE SLAB. PROVIDE AND INSTALL NEW
REMOTE TERMINAL UNIT (RTU) SCADAPACK, POWER SUPPLY, RADIO
INSIDE CONTROL PANEL. PROGRAMMING OF RTU WILL BE PROVIDED BY
CONTRACTOR IN COORDINATION WITH THE BASE MAINTENANCE
CONTRACTOR. TEST ALL EQUIPMENT FOR PROPER OPERATION.
7. PROVIDE NEMA 4X STAINLESS STEEL CONTROLS ENCLOSURE. ENSURE
ENCLOSURE IS 42" X 36" MINIMUM. DEPTH OF ENCLOSURE IS TO BE
DETERMINED BY THE MANUFACTURER. ENSURE BOTTOM OF
ENCLOSURE IS 48" ABOVE GRADE. PROVIDE ENCLOSURE WITH
CONTINUOUS HINGE COVER, SCREW CLAMP CLOSURE, INTERIOR
HINGED DEADFRONT PANEL, AND BACK PANEL.
8. PROVIDE TEE FITTING FITTING FOR POTABLE WATER PIPE AND STATIC
PRESSURE SENSOR.
9. INSTALL ALARM STROBE.
10. INSTALL ALARM HORN.
11. PROVIDE SUN SHIELD.
12. INSTALL WATER TIGHT GLAND FITTING AT COAXIAL CABLE
PENETRATION OF CONTROL ENCLOSURE.
13. INSTALL TWO CONDUITS FROM THE MOTOR POWER BOX TO THE
CONTROLS ENCLOSURE. INSTALL 120VAC WIRING IN ONE CONDUIT AND
INSTALL 12VDC WIRING IN THE OTHER CONDUIT.
FLAG NOTES:
MOTOR POWER BOX NOTES:
QTY. (3) 2 INCH DIA. ELECTRICAL
HUBS 316 STAINLESS STEEL
PROVIDE 20 FOOT GROUND ROD
3/4 IN DIA. BOND TO ANTENNA,
CONTROL PANEL, AND
DISCONNECT SWITCH WITH #2
BARE COPPER
PROVIDE MOUNTING POST AND
SERVICE DISCONNECT WITH
LIGHTNING ARRESTOR
QTY (3) 2 INCH CONDUITS (316 STAINLESS STEEL) (2)
CONDUIT FOR PUMP POWER CABLES, (1) CONDUIT
FOR FLOATS AND PUMP SENSOR CABLES
THERMAL
OVERLOAD RELAY
PUMP 1
CIRCUIT
BREAKER
CONTACTORS
TRANSFORMER
POWER
DISTRIBUTOR
TO LIFT STATION
TO POWER PANEL
LIFT STATION
CONCRETE PAD
88"
24"
12"
GRADE
11"
A
B
2 3
C
D
1 2 3
4 5 6
I
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C O
N T
R A
F
A
F
T R
A C
E S
T E
C H
N I C
A L
R
A N
C
H I T
E C
T
E
N G
I N
E E
R I N
G
S E
R V
I C
E S
D E
L I V
E R
Y
N
O
N el so nE ng in ee ri ng C o.
r h o d i t
A
C J O
D H
A N
J K
O C
I
B K
O L
A K
D B
X X
X X
D B
R E
P A
F
T
S
T A
T I O
N
V
A R
I O
U S
C C
S F
S
F
L
N E
L S
O N
E N
G I N
E E
R I N
G
N:\BIM\Rhodes and Brito\TRACES\DBEH 12-1551, Lift Stations Various, CCAFS\Drawings\DWG\Civil\Reference\space-force-logo.jpg
E-501
E L E
C T
R I C
A L
D
E T
A I
R
G E
S U
P P
R E
S S
O R
CONTACTORS
THERMAL
OVERLOAD RELAY
PUMP 2
CIRCUIT
BREAKER
TRANSFORMER
CIRCUIT BREAKER
CONTROLS
ENCLOSURE
MOTOR
POWER BOX
DIN RAIL (TYP. 4 PLACES)
WIREWAY (TYP. 3 PLACES)
LIFT STATION ELECTRICAL RATING SCHEDULE
LIFT
STATION
NUMBER
DISCONNECT
SWITCH RATING
# OF
PUMPS
MOTOR
HP
PUMP CIRCUIT
BREAKERS
RATING
TRANSFORMER RATING
(SIZE, PRIMARY TO SECONDARY
VOLTAGE)
TRANSFORMER PRIMARY
CIRCUIT BREAKER RATING
55853 600V/ 3P/ 30A 2 3 HP 20A 3KVA, 208V TO 120V 12A
79140 600V/ 3P/ 60A 2 9.4 HP 30A 3KVA, 480V TO 120V 5A
79139 600V/ 3P/ 60A 2 12 HP 40A 3KVA, 480V TO 120V 5A
88928 600V/ 3P/ 60A 2 5 HP 30A 3KVA, 208V TO 120V 12A
90404 600V/ 3P/ 60A 2 15 HP 40A 3KVA, 480V TO 120V 5A
90405 600V/ 3P/ 60A 2 15 HP 40A 3KVA, 480V TO 120V 5A
NEW HAZARDOUS AREA
MOTOR POWER BOX CLASS 1
MAIN DISCONNECT SWITCH
HOA SWITCH
HANDS OFF AUTO
PUMP SELECT
PUMP 1 DUAL PUMP 2
PUMP 1 PUMP 2
PUMP 1
SEAL FAIL
PUMP 1
OVER-TEMP
PUMP 2
SEAL FAIL
PUMP 2
OVER-TEMP
PUMP 1
RUNNING
PUMP 1
FAIL
PUMP 2
RUNNING
PUMP 1 IN
LOCAL
PUMP 2 IN
LOCAL
HORN SILENCE
ACTIVE SILENCE
HOA SWITCH
HANDS OFF AUTO
PUMP 1
FAIL
HOUR
METERS
HOUR
METERS
WET WELL
LIQUID LEVEL
0 0 0 0 0 0.0 0 0 0 0 0 0.0
120 VAC
CONVENIENCE
OUTLET
1606-XLS
DC 12V / 10A
POWER SUPPLY
L N G
INPUT AC
100 - 240V
DC
on
12 -
15v
1606-XLS180B
Allen Bradley
FLOAT
CYCLIC
CHARGING MODE
CHARGING MODE
TEST
BOAC
ENABLE
DISABLE
POWER LOSS
ALARM MODE
1 11
1 11
1 11
TB1 12 VDC
SIGNALS
TB2 +12 VDC
POWER
DISTRIBUTION
TB3 DC GND
BUS
TB4 120 VAC
POWER
DISTRIBUTION
TB5 120 V
NEUTRAL
BUS
TB6 120 VAC
SIGNALS
RELAY 3 RELAY 4
RELAY 7
RELAY 1
RELAY 2
RELAY 5
RELAY 6
RELAY 8
POWER
SUPPLY
SCADAPACK
RADIO
TRANSCEIVER
M L
C B
12 V
BATTERY
CONDENSATION
HEATER
PRESSURE
SENSOR
DC SURGE
SUPPRESSORS
COAXIAL
ANTENNA
SURGE
PROTECTOR
MAINTENANCE LIGHT
4-20 mA
SURGE
SUPPRESSOR
FOR DC POWER
SUPPLY OUTPUT
RADIOBCRTUCB
12VDCCB
12VDC
SURGE
SUPPRESSOR
120VAC
SURGE
SUPPRESSOR
C H
C B
D R
C B
CONTROLS ENCLOSURE DEAD FRONT
CONTROLS ENCLOSURE BACK PANEL
3" = 1'-0"SCALE:
ENCLOSURE DEADFRONT AND BACK PANEL LAYOUT NOTES:
1. ELECTRICAL CONTROL PANEL SHALL FACE AWAY FROM THE PIT.
2. SEE DRAWINGS E-601 THRU E-604 FOR SCHEMATIC DIAGRAMS OF
CONTROL SYSTEM.
3. ROUTE CABLES INSIDE CONTROLS ENCLOSURE IN WIRE WAYS.
4. PROVIDE AND INSTALL CONTROL COMPONENTS, TERMINAL BOARDS
AND BLOCKS, POWER SUPPLY, WIRE WAYS, AND ALL MOUNTING
HARDWARE.
5. SEE DRAWING E-501 FOR ENCLOSURE TYPE AND DIMENSIONS.
6. PROVIDE AND INSTALL LAMICOID LABELS FOR ALL COMPONENTS AS
SHOWN IN THESE ELVATIONS. MAKE LAMICOID LABLELS WITH BLACK
FACE, WHITE CORE, WITH LETTERING 1/4 INCH IN HEIGHT.
7. SEE SHEET E-609 FOR LIST OF COMPONENTS SHOWN IN THESE
ELEVATIONS.
3" = 1'-0"SCALE:
A
B
2 3
C
D
1 2 3
4 5 6
I
T
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
SHEET
IDENTIFICATION
C
D
A
B
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
C O
N T
R A
F
A
F
T R
A C
E S
T E
C H
N I C
A L
R
A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .