Summary of Architectural Drawings for HVAC Dampers and Louvers Repair Project

This document is a comprehensive set of architectural and mechanical drawings (32 sheets total) for Project 671-22-133, "Repair Heating and AC Dampers," at the Audie L. Murphy Memorial Veterans Hospital in San Antonio, Texas. The project involves repair, replacement, and restoration of HVAC dampers, louvers, actuators, and related control systems throughout the facility's main building, warehouse, tower, canteen, polytrauma building, and IMC (Spinal Cord) sections. The scope includes damper replacement, damper repairs, actuator replacement, electrical power restoration, louver replacement/repairs/cleaning, and control system repairs. New and replacement electric actuators must be manufactured by Belimo, matching existing actuators for replacement work. Manual dampers with spring-loaded notched handle positioners (similar to Rossi Positive Locking Air Flow Regulators) are required unless otherwise specified for Belimo actuator installation.

The drawings include detailed interstitial floor plans, pipe space plans, and damper repair/replacement schedules across multiple floors specifying the location, current condition, required repairs, damper configuration, actuator type, and shutdown time for each unit. Contractor responsibilities encompass securing permits, rigging and material handling, coring work, coordinating with all trades, compliance with building codes (San Antonio, International Building Code, International Fire Code, International Mechanical Code, National Electrical Code, and Texas Accessibility Standards), and ensuring proper installation per manufacturer specifications. Work must be performed cleanly with daily jobsite cleanup, isolation of work areas from occupied spaces, and coordination with facility operations. The contractor is responsible for workers' identification, badging, safety, fire protection, liability insurance, barricading, and all HVAC-related conduit, with new electrical work for wire and conduit excluded unless specifically called out on sheet schedules.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2 3 4 5 6 7 7 91

DepartmentA A of Veterans Affairso o

CO

B 7

O

SOUTH TEXAS VETERANS HEALTH CARE

AUDIE L. MURPHY MEMORIAL VETERANS HOSPITALo

7400 MERTON MINTER BLVD. SAN ANTONIO, TEXASCO

C C

PROJECT: REPAIR HEATING AND AC DAMPERSO

PROJECT NO 671-22-133o co

ISSUED FOR CONSTRUCTIONJ D

GENERAL PROJECT NOTESSHEET INDEX

O o

THE FOLLOWING GENERAL NOTES APPLY TO THE ENTIRE SET OF DRAWINGS :GI0.1 COVER SHEET AND SHEET INDEX FIRST FLOOR INTERSTITIAL PLAN - MAIN BUILDING AM-101.3

GENERAL NOTES AND ABBREVIATIONS FIRST FLOOR INTERSTITIAL PLAN - MAIN BUILDING BMI001 M-101.4

KEYPLAN FIRST FLOOR INTERSTITIAL PLAN - MAIN BUILDING CM-000.0 M-101.5

GROUND FLOOR PIPE SPACE PLAN - IMC (SPINAL CORD)M-000.1 FIRST FLOOR INTERSTITIAL PLAN - CANTEENM-101.6 E GROUND FLOOR PIPE SPACE PLAN - WAREHOUSEM-000.2 SECOND FLOOR INTERSTITIAL PLAN - WAREHOUSEM-102.1 E

GROUND FLOOR PIPE SPACE PLAN - MAIN BUILDING AM-000.3 SECOND FLOOR INTERSTITIAL PLAN - MAIN BUILDING AM-102.2

PROPRIETARY PRODUCTS OR ASSEMBLIES UTILIZED AS "BASIS OF DESIGN":

GROUND FLOOR INTERTITIAL PLAN - MAIN BUILDING AM-001.0 SECOND FLOOR INTERSTITIAL PLAN - MAIN BUILDING BM-102.3

GROUND FLOOR INTERTITIAL PLAN - MAIN BUILDING BM-001.1 SECOND FLOOR INTERSTITIAL PLAN - MAIN BUILDING CM-102.4

GROUND FLOOR INTERTITIAL PLAN - MAIN BUILDING CM-001.2 THIRD FLOOR INTERSTITIAL PLAN - WAREHOUSEM-103.1 o

CLC FIRST FLOOR GROUND PLANM-100.0 THIRD FLOOR INTERSTITIAL PLAN - TOWERM-103.2

FIRST FLOOR - CLC SECOND FLOOR PLAN - WAREHOUSEM-100.1 THIRD FLOOR INTERSTITIAL PLAN - MAIN BUILDING AM-103.3

FIRST FLOOR - CLC SECOND FLOOR PLAN - MAIN BUILDING AM-100.2 FOURTH FLOOR INTERSTITIAL PLAN - TOWERM-104.1

FIRST FLOOR - CLC SECOND FLOOR PLAN - POLYTRAUMAM-100.3 FIFTH FLOOR INTERSTITIAL PLAN - TOWERM-105.1CO

FIRST FLOOR - CLC SECOND FLOOR PLAN - CLCM-100.4 SIXTH FLOOR INTERSTITIAL PLAN - TOWERM-106.1

FIRST FLOOR INTERSTITIAL PLAN - IMC (SPINAL CORD)M-101.1 SEVENTH FLOOR INTERSTITIAL PLAN - TOWERM-107.1F

FIRST FLOOR INTERSTITIAL PLAN - WAREHOUSEM-101.2 ROOF LEVEL PLAN - TOWERM-108

o

Drawing Title Project TitleConcur M & 0 Approved: Service Chief

CONSULTANTS: 100% CD FINALARCHITECT: COVER SHEET AND SHEET INDEX(O

Concur Bio-Med Approved: Service Chief Repair Heating and AC DampersSOM Concur Safety Approved: Service Chief Elk Consortium +4*

WestEast Design Group JV, LLCEDWARD GARCIACO

Approved: Service Chief Approved: Service Chief 200 E. Grayson Street, Suite 207

GI0.1.ASTC.06 ‘hs/owro.--

JVApproved: Service Chief Approved: Chief of Staff

Dwg. 1 of 32Revisions: Date

VA FORM 08-6231, OCT 1978

7 3 4 5 6 7 3 9

ELK WestEast

Department of Veterans Affairs

Office of Facilities

Management

Q) O

O O o o o o o o o o

(1)

O D

San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com Texas Registered Architectural Firm

O O

WHERE THE APPLICABLE REQUIREMENTS OF THE REFERENCED RULES, CODES, REGULATIONS,

ORDINANCES, OR LAWS ARE MORE RESTRICTIVE THAN THAT SET FORTH BY THE SPECIFICATION, THE

CONTRACTOR SHALL COMPLY WITH ALL SUCH MORE RESTRICTIVE REQUIREMENTS. ALTHOUGH

SUCH REQUIREMENTS MAY NOT BE ILLUSTRATED BY THE DRAWINGS AND SPECIFICATIONS.

Building Number

Bldg. 1 Drawing Number

O o o O

THE VA MASTER CONSTRUCTION SPECIFICATIONS MAY SET FORTH MORE DETAILED, MORE SPECIFIC, AND/OR MORE RESTRICTIVE REQUIREMENTS THAN THOSE SET FORTH BY THE APPLICABLE

REGULATORY REQUIREMENTS, WHERE THE SPECIFICATIONS PROVIDE MORE DETAILED, MORE

THE INTERSTITIAL FLOOR PLANS SHOW THE LOCATION OF MANY-BUT NOT ALL - EXPOSED PARTS OF THE WORK. FOR ITEMS NOT LOCATED EXACTLY, APPLY THE RULES INDICATED BY THE ARCHITECT

TO DETERMINE THE EXACT LOCATION OF EACH EXPOSED PART OF THE WORK.

APPLICABLE PORTIONS OF THE CODES, REGULATIONS, AND STANDARDS LISTED IN THE

SPECIFICATIONS ARE INCORPORATED BY REFERENCE INTO THE REQUIREMENTS OF THIS CONTRACT

AND ESTABLISH MINIMUM REQUIREMENTS WITH WHICH THE WORK MUST COMPLY.

THE DIMENSIONS, MOUNTING HEIGHTS, CLEARANCES, AND ACCESS REQUIREMENTS OF SPECIFIED PRODUCTS AND ASSEMBLIES OTHER THAN THE "BASIS OF DESIGN" MAY VARY FROM THAT SHOWN

BY THE DRAWINGS.

THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO THE START OF WORK AND SHALL NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES PRIOR TO

PROCEEDING WITH THE WORK.

O o

O o

REFER TO THE AS-BUILT STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND OTHER

SPECIALTY ENGINEERING DRAWINGS FOR THE DETAILED DESIGN OF THE STRUCTURAL,

MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS, OF WHICH PORTIONS MAY ALSO BE SHOWN ON

THE INTERSTITIAL FLOOR PLANS.

ALL PARTS OF THE WORK - INCLUDING DELEGATED DESIGNS, MATERIALS, METHODS, ASSEMBLIES, ETC - SHALL COMPLY WITH ALL APPLICABLE GOVERNING RULES, CODES, REGULATIONS, ORDINANCES, AND LAWS OF ALL FEDERAL, STATE DISTRICT, TERRITORIAL AND LOCAL GOVERNMENT AUTHORITIES HAVING JURISDICTION OVER THE DESIGN, CONSTRUCTION, AND OCCUPANCY OF THE PROJECT, WHETHER LISTED BY THE CONTRACT DOCUMENTS OR NOT. NO PART OF THE CONTRACT

DOCUMENTS SHALL BE CONSTRUED TO REQUIRE OR PERMIT WORK CONTRARY TO AN APPLICABLE

GOVERNING RULE, CODE, REGULATION, ORDINANCE, OR LAW.

O C

SPECIFIC, AND/OR MORE RESTRICTIVE REQUIREMENTS, THE CONTRACTOR SHALL COMPLY WITH

THOSE REQUIREMENTS.

ON OCCASION, THE DRAWINGS MAY REFER TO A SINGLE PROPRIETARY PRODUCT OR ASSEMBLY

WHILE THE SPECIFICATIONS LIST TWO OR MORE ACCEPTABLE MANUFACTURERS AND/OR PRODUCTS, WHEN THIS OCCURS, THE PRODUCT OR ASSEMBLY ILLUSTRATED BY THE DRAWINGS IS THE "BASIS

OF DESIGN" PRODUCT OR ASSEMBLY.

THE CONTRACTOR MAY UTILIZE ANY OTHER SPECIFIED PRODUCT OR ASSEMBLY IN LIEU OF THE "BASIS OF DESIGN" PRODUCT OR ASSEMBLY. HOWEVER, THE CONTRACTOR IS RESPONSIBLE (AT NO ADDITIONAL EXPENSE TO THE OWNER) FOR ALL COORDINATION AND REVISIONS TO DIMENSIONS AND/OR DETAILS NECESSARY TO ACHIEVE THE SAME FUNCTIONAL AND AESTHETIC DESIGN INTENT

AS ILLUSTRATED BY THE "BASIS OF DESIGN" SHOWN BY THE CONTRACT DOCUMENTS.

IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF ALL

SUBCONTRACTORS, TRADES AND SUPPLIERS WITH REQUIREMENTS OF THE CONTRACT DOCUMENTS

BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT ALL PARTIES ARE AWARE OF ALL

REQUIREMENTS, REGARDLESS OF WHERE THE REQUIREMENTS OCCUR IN THE CONTRACT

DOCUMENTS, WHICH MIGHT AFFECT THE WORK OF THAT PARTY.

IF A CONFLICT EXISTS BETWEEN THE CONTRACT DOCUMENTS AND A REGULATORY REQUIREMENT, THE CONTRACTOR SHALL COMPLY WITH THE ONE ESTABLISHING THE MORE STRINGENT OR

RESTRICTIVE REQUIREMENT:

Project Number

671 -22-133 o o

O C o

II

O C o

II

O C

Q O

O O

O C o

II

Approved: Project Director

PROJECT MANAGER, MARIA HERNANDEZ

(D C o

II

0) O

O D

O o

C s O

C o o

(D C o

II

O C

O o

II

o° - + co

Q o

II

O C

C o O o

Checked

EG

Drawn

HG

o o

II

o C

Vakr 2.

Location Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter Blvd., San Antonio, Texas

Date 1

NOV. 08, 2024

HVAC DAMPERS & LOUVERS

Repair HVAC Dampers & Louvers

2 3 4 5 6 7 7 91

GENERAL MECHANICAL NOTES: ABBREVIATIONS

1. 24.

CONTRACTOR IS TO SECURE & PAY ALL FEES & PERMITS PERTAINING TO CONTRACT.2.

25.

3.

26.

A 4. A 27.

5.

28.

6.

THE SCOPE OF THIS PROJECT INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING:29.

7.

a. DAMPER REPLACEMENT e. ACCESS DOORS

b. DAMPER REPAIRS f. LOUVER REPLACEMENT/REPAIRS/CLEANING 8.

C. ACTUATOR REPLACEMENT g. CONTROLS REPAIRS AS NOTED

d. REPAIR AND RESTORING OF ELECTRICAL POWER AS NOTEDh. TESTING

CONTRACTOR IS RESPONSIBLE FOR ALL RIGGING, HANDLING & PROTECTION OF MATERIALS.9.o

30.

O

10. I O

(OO

31.B 711.

J

12. 32.

c i

33.

CONTRACTOR IS RESPONSIBLE FOR ALL CORING RELATING TO HIS WORK.13.

• MASTER SPREADSHEET: THE CELL IN HIGHLIGHTED IN GREEN AND THE ONLY THE ITEMS IN BOLD ARE INCLUDED IN THE CONTRACT.

VERIFY FINISH WITH ARCHITECT PRIOR TO PURCHASING GRILLES, REGISTERS, DIFFUSERS & OTHER AIR DISTRIBUTION DEVICES.14.

• DRAWING SCHEDULE: THE CELL INCLUDES A BOLD OUTLINE AND ONLY THE ITEMS IN BOLD ARE INCLUDED IN THE CONTRACT.

15.

34.

O

16.

35.(O

O

17.O c c36.

CONTRACTOR IS TO VERIFY THAT ALL EQUIPMENT FITS IN SPACE PROVIDED PRIOR TO ORDERING EQUIPMENT.18.

ALL NEW AND REPLACED ACTUATORS SHALL BE CLEARLY LABELED WITH 1/2" ENGRAVED LETTERING ON 1" PHENOLIC NAME PLATES37.

19.C i

38.

20.

39.21.

OUNCE X

O

40.22.

(O

23.

ZONE41.

J D o o

E E

0) o

CO

E

O o

Project TitleConcur M & 0 Approved: Service Chief

CONSULTANTS: 100% CD FINALARCHITECT:(O

Office ofConcur Bio-Med Approved: Service Chief Repair Heating and AC Dampers Facilities

Concur Safety Approved: Service Chief Elk Consortium + Management4* WestEast Design Group JV, LLC Drawing NumberEDWARD GARCIACO

Approved: Service Chief Approved: Service Chief 71117 200 E. Grayson Street, Suite 207

MI001

Date Checked DrawnJVApproved: Service Chief Approved: Chief of Staff

EG HGNOV. 08,2024 Dwg. 2 of 32Revisions: Date

VA FORM 08-6231, OCT 1978

7 3 4 5 6 7 3 9

ELK WestEast

Department of Veterans Affairs

AS ME

ASPE

ASTM

AV

AVG

AWWA

0)

O

SOME DAMPERS CURRENTLY DO NOT HAVE ACTUATORS INSTALLED. UNLESS NOTED OTHERWISE, THE DAMPERS WILL REMAIN MANUAL AND

ARE USED ONLY FOR BALANCING.

SP

SPEC

SQ.FT.

SUCT

Building Number

Bldg. 1

O O

O O o C> o C> o C>

O Q o O

D dB D

DBT

DC

DDC

DEG

DENS

DIA

DIFF

DN

DP

DPT

Approved: Project Director

PROJECT MANAGER, MARIA HERNANDEZ

N N/A

NC

N.C.

NEBB

N.I.C.

N.O.

N.T.S.

Z

ZN

O□

W w/ w/o W

WC

WG

WB

WBT

WT

V V

VA

VAC

VAR

VAV

VEL

VENT

VERT

VFD

VOL

VP

VTR

PRI

PRESS

PSI

PSIA

PSIG

PT

o O

0) O o O

CONTRACTOR SHALL PROVIDE REQUIRED MOUNTING BRACKETS AND LINKAGES AS REQUIRED WHEN INSTALLING OR REPLACING NEW

ACTUATORS.

E E/A

EA

EAT

EDH

EF

EFF

ENTH.

EOD

EPO

ET

EVP

EWT

EXP

OUTSIDE AIR DAMPER

OUTSIDE DIAMETER

OUTSIDE AIR

OUTSIDE AIR

Project Number

671 -22-133

0) O

ALL WORK IS TO CONFORM TO THE LATEST EDITIONS OF BUILDING-RELATED CODES OF THE CITY OF SAN ANTONIO, INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE CODE, INTERNATIONAL MECHANICAL CODE, INTERNATIONAL PLUMBING CODE, INTERNATIONAL FUEL GAS CODE, INTERNATIONAL ENERGY CONSERVATION CODE, NATIONAL ELECTRICAL CODE, AND TEXAS ACCESSIBILITY STANDARDS.

ALL EQUIPMENT IS TO BE INSTALLED IN STRICT COMPLIANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. CONTRACTOR IS TO PROVIDE

ALL HANGERS & SUPPORTS REQUIRED FOR A COMPLETE INSTALLATION.

WORK IS TO INCLUDE ALL LABOR, MATERIALS, ACCESSORIES, ETC. NECESSARY FOR INSTALLATION OF EACH PIECE OF EQUIPMENT & SYSTEM, TO PROVIDE A COMPLETE & OPERATING HVAC SYSTEM, TO ENSURE THAT SYSTEM MEETS ALL REQUIREMENTS OF ITS LISTING, AND TO ENSURE

THAT ALL MANUFACTURER'S GUARANTEES & WARRANTIES REMAIN IN EFFECT.

KITCHEN HOOD EXHAUST

KILOWATTS

KILOWATT HOUR

WHERE THE TERM "PROVIDE" IS USED, IT MEANS "FURNISH & INSTALL". CONTRACTOR IS TO COORDINATE HIS WORK WITH ALL OTHER TRADES

PRIOR TO FABRICATION, PURCHASE, AND/OR INSTALLATION OF WORK.

WHERE CONDUIT, CABLES, OR PIPING PASS THROUGH FIRE-RATED FLOORS OR WALLS, SLEEVES ARE TO BE COMPLETELY SEALED PER SPECIFICATIONS. WHERE DUCTWORK PASSES THROUGH FIRE-RATED FLOORS OR WALLS, PROVIDE UL-LISTED FIRE DAMPERS. THESE MATERIALS AND DEVICES ARE TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS TO MAINTAIN FIRE RATING OF

PENETRATED WALL OR FLOOR.

CONTRACTOR IS TO COORDINATE ANY EQUIPMENT REQUIRING WIRING WORK WITH ELECTRICAL CONTRACTOR PRIOR TO FABRICATION, PURCHASE, AND/OR INSTALLATION OF ALL WORK.

CONTRACTOR IS RESPONSIBLE FOR WORKERS' IDENTIFICATION & BADGING, SAFETY & FIRE PROTECTION, CONTRACTOR'S LIABILITY INSURANCE, BARRICADES, WARNING SIGNS, TRASH REMOVAL, AND CUTTING & PATCHING.

REFERENCE SPECIFICATION SECTION 01 10 00 FOR GUIDANCE FOR OWNER-CONTRACTED HVAC CONTROL SYSTEM. NOTE THE GENERAL

CONTRACTOR IS RESPONSIBLE FOR ALL HVAC CONDUIT.

DUCT/DAMPER SIZES HAVE BEEN PROVIDED FOR ESTIMATING PURPOSES, CONTRACTOR TO VERIFY DUCT/DAMPER SIZES REQUIRED BEFORE

CONSTRUCTING OR PURCHASING.

THE BASIS FOR THE CONSTRUCTION DOCUMENTS IS THE DAMPER REPORT CREATED BY MUELLER & WILSON AND IS BEING PROVIDED FOR REFERENCE. THE FOLLOWING PROJECT DOES NOT INCLUDE ALL THE ITEMS NOTED FRO REPAIRAND REPLACEMENT. THE PROJECT INCLUDES THE REPLACEMENT OF PNEUMATIC DAMPER OPERATORS WITH BELIMO ACTUATORS AND ONLY ADDRESSES REPAIRS AND REPLACEMENT RELATED TO THE ORIGINAL DESIGN AND DOES NOT ATTEMPT TO UPGRADE THE CONTROL STRATEGY OF ANY SYSTEM.

T

TD

TEMP

TONS

TSTAT

TU

CONTRACTOR IS RESPONSIBLE FOR SAFEKEEPING OF HIS OWN PROPERTY ON JOBSITE. OWNER ASSUMES NO RESPONSIBILITY FOR

PROTECTION OF PROPERTY AGAINST FIRE, THEFT & ENVIRONMENTAL CONDITIONS.

ALL NEW DUCTWORK SHALL BE CONSTRUCTED OF TYPE G90 COATED MILD STEEL MATCHING GAGES OF EXISTING DUCTWORK. JOINT CONSTRUCTION SHALL ALSO MATCH EXISTING DUCTWORK JOINTS. ALL NEW DUCTWORK SHALL BE SEALED MEETING THE SMACNA

REQUIREMENTS FOR 2"WG CLASS A SEAL DUCT CONSTRUCTION.

DUCT SIZES SHALL MATCH EXISTING AND CONTRACTOR SHALL SEAL DUCT AS NOTED ABOVE AND INSULATE TO MATCH EXISTING INSULATION

TYPE AND THICKNESS.

PROVIDE ACCESS DOORS IN DUCTS & INACCESSIBLE FINISHES AT ALL FIRE DAMPERS, COMBINATION FIRE/SMOKE DAMPERS, VALVES, TRAP

PRIMERS & ANY OTHER ITEMS REQUIRING ADJUSTMENT OR PERIODIC MAINTENANCE.

FIELD VERIFY ALL DIMENSIONS & CONDITIONS PRIOR TO PURCHASE OF ANY EQUIPMENT OR OTHER MATERIALS, AND BEFORE PROCEEDING WITH ANY WORK. WHERE DISCREPANCIES OCCUR BETWEEN THESE DOCUMENTS & CURRENT CONDITIONS, REPORT ANY DISCREPANCIES TO

ARCHITECT AND/OR ENGINEER FOR EXPEDITING & RESOLUTION.

CONTRACTOR IS TO SUBMIT DIMENSIONED SHOP DRAWINGS DEPICTING ALL MECHANICAL SLEEVE, PIPE, AND DUCT PENETRATIONS THROUGH

FIRST AND SECOND FLOORS PRIOR TO COMMENCING WORK.

NEW ELECTRICAL WORK (WIRE AND CONDUIT) IS NOT INCLUDED IN THE CONTRACT UNLESS SPECIFICALLY CALLED OUT ON THE SHEET SCHEDULE; HOWEVER, CONNECTING ELECTRICAL POWER AND CONTROLS OF EXISTING ELECTRICAL ACTUATORS OR REPLACED ACTUATORS

TO RESTORE ELECTRICAL POWER IS INCLUDED IN THE CONTRACT.

WHEN “NO” IS INSERTED IN THE SPREADSHEET COLUMN LABELED “REPAIR/REPLACE” IT MEANS EITHER THERE IS NO WORK REQUIRED OR THE WORK IS NOT IN THE SOW. THIS OCCURS MANY TIMES WHEN ELECTRICAL AND CONTROL WORK IS REQUIRED TO COMPLETE THE INSTALLATION.

THE INTENT IS FOR THE WORK TO BE COMPLETED AS PART OF A SEPARATE CONTROLS CONTRACT.

PLEASE NOTE THERE ARE SEVERAL ACTUATORS THAT DO NOT HAVE ELECTRICAL SERVICE. THE ELECTRICAL WORK IS NOT INCLUDED IN THE

SOW FOR THIS SCENARIO.

WHEN THERE ARE MULTIPLE TASKS NOTED IN THE COLUMN LABELED “ADDITIONAL REPAIRS NEEDED” THE WORK IS NOTED ON THE MASTER

SPREAD SHEET AND THE WORK IS NOTED ON THE DRAWING SCHEDULES AS FOLLOWS:

NEW AND REPLACEMENT ELECTRIC ACTUATORS SHALL BE MANUFACTURED BY BELIMO. THE CONTRACTOR FOR THIS PROJECT SHALL MATCH THE EXISTING ACTUATOR FOR REPLACEMENT AND SHALL COORDINATE WITH CONTROLS CONTRACTOR FOR VOLTAGE AND MODEL NUMBER OF NEW ACTUATORS. IF THE CONTROLS CONTRACTOR IS NOT UNDER CONTRACT, COORDINATE ACTUATOR NOMENCLATURE WITH VA ENGINEERING

SERVICES.

THE TERM FROZEN AND SEIZED ARE USED THROUGHOUT THE CONSTRUCTION DOCUMENTS TO DESCRIBE DAMPERS THAT ARE NOT

OPERATIONAL AND CAN NOT BE ADJUSTED DUE TO DAMAGE, RUST, OF MECHANICAL BINDING.

H

HCL

HD

HGT

HP

HPS

HR

HUM

HVU

HWP

HWR

HWS

HZ

M

MAX.

MBH

MCA

MCF

MIN.

MOCP

MPS

MSS

NOT APPLICABLE

NOISE CRITERIA

NORMALLY CLOSED

NAT'L ENVIRONMENTAL BALANCING BUREAU

NOT IN CONTRACT

NORMALLY OPEN

NOT TO SCALE

YARD CLEANOUT

YARD

YEAR

O C

ALL WORK IS TO BE PERFORMED IN A CLEAN & PROFESSIONAL MANNER. CLEAN JOBSITE DAILY AND REMOVE FROM PREMISES ANY DIRT &

DEBRIS CAUSED BY WORK INCLUDED IN THIS CONTRACT.

CONTRACTOR IS TO COORDINATE INSTALLATION OF EQUIPMENT TO MAINTAIN CLEARANCES & ACCESSIBILITY TO ALL EQUIPMENT, AS REQUIRED

BY CODE, MANUFACTURER'S INSTRUCTIONS, AND GENERAL SERVICEABILITY.

CONTRACTOR IS TO PROVIDE ALL NECESSARY TEMPORARY OR PERMANENT CAPS FOR DUCTWORK. DUCTWORK IS NOT TO BE LEFT

OPEN-ENDED.

CARE IS TO BE EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF BUILDING. ISOLATE WORK AREAS BY MEANS OF TEMPORARY PARTITIONS AND/OR TARPS TO KEEP DUST & DIRT WITHIN CONSTRUCTION AREA. WORK AREA TO BE CLEANED AT END OF EACH WORKDAY TO A MANNER ACCEPTABLE TO BUILDING OWNER. CONTRACTOR IS TO USE ROUTES FOR EQUIPMENT, DUCTWORK & PIPING

ACCEPTABLE TO BUILDING OWNER.

PRESSURE CONTROL VALVE

PRESSURE DIFFERENCE

PHASE

PART PER MILLION

GALLONS

GALLONS PER HOUR

GALLONS PER MINUTE

GRAINS

HEATING COIL

HOOD

HEIGHT

HORSEPOWER

HIGH PRESSURE STEAM

HOUR

HUMIDIFIER

HEAT/VENT UNIT

HOT WATER PUMP

HOT WATER RETURN

HOT WATER SUPPLY

HERTZ

HEAT TRANSFER COEFFICIENT

UNDER COUNTER

UNDERGROUND

UNIT HEATER

UNLESS NOTED OTHERWISE

UNIT VENTILATOR

TEMPERATURE DIFFERENCE

TEMPERATURE

TONS OF REFRIGERATION

THERMOSTAT

TERMINAL UNIT

CONTRACTOR IS TO COORDINATE WITH ARCHITECT FINAL LOCATION(S) OF ANY EQUIPMENT, DUCT, PIPE, ETC., OMITTED OR INTERFERED WITH

BY OTHER ITEMS.

USE OF OWNER'S SERVICE ELEVATORS & BUILDING CORRIDORS FOR HANDLING OF EQUIPMENT/MATERIALS IS TO BE AT DIRECTION OF OWNER

AND IS TO BE COORDINATED WITH THEIR OPERATIONS.

SUBMISSION OF PROPOSAL DIRECTLY OR INDIRECTLY IN CONNECTION WITH THIS WORK IMPLIES THAT BIDDER HAS EXAMINED JOBSITE UNDER WHICH THEY WILL BE OBLIGATED TO OPERATE. SHOULD CONTRACTOR BE AWARDED WORK UNDER THIS CONTRACT, NO EXTRA CHARGE WILL

BE ALLOWED FOR FAILURE OF ANY BIDDER TO EXAMINE SITE PRIOR TO BID.

UNLESS OTHERWISE NOTED ON DRAWINGS, UNDERFLOOR CRAWLSPACE AREAS SHALL BE CONSIDERED OUTDOOR AREAS FOR PURPOSES OF

DETERMINING TYPES OF INSULATION AND COVERING TO BE USED.

THE MASTER SPREADSHEET INCLUDED IN SPECIFICATION SECTION 23 05 11A IS THE GOVERNING DOCUMENT FOR THE WORK TO BE DONE. THE SCHEDULE ON EACH SHEET WAS EXTRACTED FROM THE MASTER SPREADSHEET. COPIES OF THE MASTER SPREADSHEET MAY BE REQUESTED

FROM THE VA.

WHEN REPLACEMENT OF DAMPER(S) IS CALLED OUT IN THE SCHEDULE, THE CONTRACTOR SHALL PROVIDE A MANUAL DAMPER WITH A SPRING-LOADED NOTCHED HANDLE POSITIONER SIMILAR TO THE ROSSI POSITIVE LOCKING AIR FLOW REGULATORS UNLESS IT IS SPECIFICALLY STATED TO REPLACE WITH A BELIMO ACTUATOR. REFERENCE THE SPECIFICATION FOR BOTH THE MANUAL OPERATOR AND THE TYPE OF

BELIMO ACTUATOR TO BE PROVIDED.

A

ABV

AC

ACMPR

ACU

ADJ

AFF

AFMS

AHU

AMB

AMP

ANSI

APPROX.

ARI

ASHRAE

ABOVE

ALTERNATING CURRENT / ABOVE CEILING

AIR COMPRESSOR

AIR CONDITIONING UNIT

ADJUSTABLE

ABOVE FINISHED FLOOR

AIR FLOW MEASURING STATION

AIR HANDLING UNIT

AMBIENT

AMPERE

"AMERICAN NATIONAL STANDARDS INSTITUTE"

APPROXIMATE

AMERICAN REFRIGERATION INSTITUTE

"AMERICAN SOCIETY OF HEATING,

REFRIGERATION, and AIR CONDITIONING ENGINEERS"

"AMERICAN SOCIETY OF MECHANICAL ENGINEERS"

"AMERICAN SOCIETY OF PLUMBING ENGINEERS"

"AMERICAN SOCIETY FOR TESTING AND MATERIALS"

AIR VENT- AUTOMATIC VENT (AV) OR MANUAL VENT (MV)

AVERAGE

"AMERICAN WATER WORKS ASSOCIATION"

BOILER

BAROMETRIC

BAROMETRIC PRESSURE

BUILDING AUTOMATION SYSTEM

BELOW FLOOR

BELOW FINISHED CEILING

BRAKE HORSEPOWER

BELOW

BOTTOM OF DUCT

BILL OF MATERIAL

BOTTOM OF PIPE

BRITISH THERMAL UNIT

EXHAUST AIR

EACH

ENTERING AIR TEMPERATURE

ELECTRIC DUCT HEATER

EXHAUST FAN

EFFICIENCY

ENTHALPY

EMERGENCY OVERFLOW DRAIN

EMERGENCY POWER OFF BUTTON

EXPANSION TANK

EVAPORATIVE COOLER

ENTERING WATER TEMPERATURE

EXPANSION

LOUVER DESIGNATION

LEAVING AIR TEMPERATURE

POUNDS

LIQUID

LOW PRESSURE STEAM

LEAVING WATER TEMPERATURE

MAXIMUM

THOUSAND BTU'S

MINIMUM CIRCUIT AMPACITY

THOUSAND CUBIC FEET

MINIMUM or MINUTES

MAXIMUM OVERCURRENT PROTECTION

MEDIUM PRESSURE STEAM

MECHANICAL SUPPORT SYSTEM

O o

C

CCL

CCW

CD

CFH

CFM

CH

CHWP

CHWR

CHWS

CLR

CMPR

CR

CRU

CT

CU

CU.FT.

CU.IN.

CV

CW

CWP

CWR

CWS

COOLING COIL

COUNTERCLOCKWISE

CONDENSATE DRAIN

CUBIC FEET PER HOUR

CUBIC FEET PER MINUTE

CHILLER

CHILLER WATER PUMP

CHILLED WATER RETURN

CHILLED WATER SUPPLY

CLOSED CIRCUIT COOLER

COMPRESSOR

CONDENSATE RETURN

COMPUTER ROOM UNIT

COOLING TOWER

CONDENSING UNIT

CUBIC FEET

CUBIC INCH

CONSTANT VOLUME

CLOCKWISE

CONDENSER WATER PUMP

CONDENSER WATER RETURN

CONDENSER WATER SUPPLY

K

KHE

kW

KWH

INSIDE DIAMETER

INCH

INCHES of WATER GAGE

INFRARED HEATER

R R R-22 R/A

RCVR

RD

RE: 1/M-xx

RECIRC

RF

RH

RL

RPM

RPS

RS

RTU

RV

WITH

WITHOUT

WATTS

WATER COLUMN

WATER GAUGE

WET BULB

WET BULB TEMPERATURE

WEIGHT

VOLTS

VOLT AMPERE

VACUUM

VARIABLE

VARIABLE AIR VOLUME

VELOCITY

VENTILATION

VERTICAL

VARIABLE FREQUENCY DRIVE

VOLUME

VELOCITY PRESSURE

VENT THROUGH ROOF

DECIBEL

DRAIN

DRY BULB TEMPERATURE

DIRECT CURRENT

DIRECT DIGITAL CONTROL

DEGREE

DENSITY

DIAMETER

DIFFERENCE or DELTA

DOWN

DEEP

DEW POINT TEMPERATURE

U U U/C

UG

UH

U.N.O.

UV

SECOND

SOUND ATTENUATOR

SUPPLY AIR

SATURATION

SINGLE DUCT TERMINAL UNIT

SUPPLY FAN

SPECIFIC GRAVITY

"SHEET METAL and AIR CONDITIONING

CONTRACTORS NATIONAL ASSOCIATION"

STATIC PRESSURE

SPECIFICATION

SQUARE FEET

SUCTION

PRIMARY

PRESSURE

POUNDS PER SQUARE INCH

"PSI, ABSOLUTE"

"PSI, GAGE"

PRESSURE/TEMPERATURE TAP

O C

Q

THERMAL RESISTANCE

REFRIGERANT-22

RETURN AIR

RECEIVER

ROOF DRAIN

"REFER TO DETAIL NO.1, SHEET M-xx"

RECIRCULATE

RETURN FAN

RELATIVE HUMIDITY

REFRIGERANT LIQUID

REVOLUTIONS PER MINUTE

REVOLUTIONS PER SECOND

REFRIGERANT SUCTION

ROOFTOP UNIT

RELIEF VENT

O C

S s

SA

S/A

SAT

SDTU

SF

SG

SMACNA

G

GAL.

GPH

GPM

GR

ID

IN.

IN.W.G.

IRH

B B

BARO

BAROPR

BAS

BF

BFC

BHP

BLW

BOD

BOM

BOP

BTU

P

PCV

PD

PH

PPM

O D

FAHRENHEIT

FAN COIL UNIT

FLOOR

FLAT ON BOTTOM

FLAT ON TOP

FEET PER MINUTE

FEET PER SECOND

FAN POWERED TERMINAL UNIT

FURNACE

FEET

FEET of WATER GAGE

FACE VELOCITY

Location Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter Blvd., San Antonio, Texas

O

OAD

OD

O/A

OSA

OSHA

OZ

O C o

O C o

San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com Texas Registered Architectural Firm

O 0 -

+ CO

F F

FCU

FLR.

FOB

FOT

FPM

FPS

FPTU

FRN

FT

FT.W.G.

FVEL

L L-#

LAT

LBS.

LIQ

LPS

LWT

O C o

Q C o o

(D C o

(D C o o

O o

O o

Q o

Y

YCO

YD

YR

O o

Q o

Q o

C s

Drawing Title

GENERAL NOTES AND ABBREVIATIONS

Vakr 2.

7 - 71117 to-5 lsiCe ‘evlcy-= caloboted8Mev2o%‘

Co)) ax vekr2.

zaceeseea “gMe202% Approved: Chief of StaffApproved: Service Chief

Elk Consortium + WestEast Design Group JV, LLC

200 E. Grayson Street, Suite 207

JV

San Antonio, Texas 78215 210.530.0755 www. westeastdesign .com Texas Registered Architectural Firm

DateRevisions:

Approved: Service Chief Approved: Service Chief

100% CD FINALARCHITECT:

Approved: Project Director

PROJECT MANAGER, MARIA HERNANDEZ

Drawing Title

KEYPLAN

Concur M & O Approved: Service Chief

CONSULTANTS:

Concur Bio-Med Approved: Service Chief

Concur Safety Approved: Service Chief

Drawn

HG

Checked

EG

Date

NOV. 08, 2024

Project Title

Repair Heating and AC Dampers

Location Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter Blvd., San Antonio, Texas

1 1 11 1

.MOOD. 2 AM IOO.I AM 101.2/M102.1/M103.1

/1 STAIR 10

STAIR 6

11 1 =

MOO1.1 AM 101.4AM 102.3

C

WAREHOUSE

CJ

STAIR 11 nz 1 1 1 1 1 1

STAIR 7 ,M 103.2 AM 104.1 AM 105.1 AM 106.1 AM 107.1M108

IMAIN BLDG B

J 1

XISTAIR 3

1FLLr 1FLL it d I7< •1) STAIR 4

1 [1 1

JIMO01 .2 AM101.5 AM1 02.4

I

E TOWERSTAIR 5

3Hl rS J——L J—— J—l L)III C

LDSTAIR 4 MAIN BLDG A

I1 =l MAIN BLDG C [ fln 1 1 11 1 1JL—L ILLL —L—L ILL 4 it if IF LF SERVICE ELEVATOR M000.3/M001.0/M100.2 AM 101.3 AM102.2 AM 1 03.3

HOSPITALJBL

00STAIR 8

STAIR 1STAR 25 1ttl1—LLr 1—LLr J21 I Ar31 I 1

[ 3I

J=STAIR 1 ———— a...s...a □O' HT U-O-E TIr 1—T "-=I-=L-=LI=LFL-=LLu 1— I—r—1I u

— I ISTAIR 9STAIR 2CLC BLDG1 1

M 100.0 AM 100.4, L

— J I1LLLD< 0

J1—00—ur —O—uar —Ouar —E —f r SD D 0 UU •—UU •—U UU IT U U U •—□—U U U IT •—□—□—□—u u uVIJr

- 1KIrI KJ

STAIR T2

a

CANTEEN 1n-

M101.671 POLYTRAUMAB

STAIR T1-

r STAIRC-16h£] STAIR 3 XLI Vr[

KEYPLAN1 1/32” = T-O”SCALE:

lllilllllll

IIIEIIIIII

SERVICE

ELEVATOR

I I I

ACCESS TO X

UNIVERSITY

D

I

I-

M

“L=L”=L==E1 A a n

TEST

N A N A

V0 0

( 1

2STAIRD019

( 9 E

E ■

F •

6■ a IMC (SPINAL CORD) 1 1

MO00.1/M101.1

■ El E ■

1 -

I

Department of Veterans Affairs

Office of Facilities

Management

M-000.0 Dwg. 3 of 32

Project Number

671 -22-133 Building Number

Bldg. 1 Drawing Number

M100.3

WestEastELK

2 3 4 5 6 7 8 91

VA FORM 08-6231, OCT 1978

7 3 4 5 6 7 8 91

A

C

D

E

PL

AN

N O

R

TH

J

6” ei gh th in ch th re e qu ar te rs in ch th re e in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e ha lf in ch on e fo ot

C O on e 0 on e fo ot on e in ch

6” e on e th re e ei gh th s e e fo ot on e qu ar te r i nc h

Co),10IC.VSV

EDWARD GARCIA

M/ASTC.0.4 ‘hs/owLo.--Purga 8Me«2o2% ekr 2.

100% CD FINALARCHITECT:

Elk Consortium + WestEast Design Group JV, LLC

200 E. Grayson Street, Suite 207

JV

San Antonio, Texas 78215 210.530.0755 www.westeastdeslgn.com Texas Registered Architectural Firm

Approved: Project Director

PROJECT MANAGER, MARIA HERNANDEZ

Drawing Title

GROUND FLOOR PIPE SPACE PLAN -

IMC (SPINAL CORD)

Approved: Service Chief Approved: Service Chief

Approved: Service Chief Approved: Chief of Staff

Date

Concur M & O Approved: Service Chief

CONSULTANTS:

Concur Bio-Med Approved: Service Chief

Concur Safety Approved: Service Chief

Project Title

Repair Heating and AC Dampers

Checked

EG

Drawn

HG

Location Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter Blvd., San Antonio, Texas

Date 1

NOV. 08, 2024 E Department of Veterans Affairs

Office of Facilities

Management

M-000.1 Dwg. 4 of 32

Project Number

671 -22-133 Building Number

Bldg. 1 Drawing Number

*The estimated time is not the time the contractor should use to estimate the total repair. It is only the air-conditioning down time.

AHU-PS-1D

AHU-PS-2D DAMPER REPAIR/REPLACEMENT NOTES: LEGEND:

1. 1HR FIRE RATED

STAIR D019

S 4 I

2.N

P_ tT

IMC (SPINAL CORD)

i

— i LI I L

WAREHOUSE

B

3MAIN H

] C TOWERAcL 1CLC

CANTEEN/)UPILYTRUMA

t J

KEYPLAN

[T

THE USE OF THE WORD "NONE" ON THE SCHEDULE REFERS TO THE EXISTING DAMPER NOT

INCLUDING AN AUTOMATIC ACTUATOR ON THE DAMPER SHAFT. ONLY A MANUAL LOCKING QUADRANT

IS INSTALLED.

THE USE OF THE WORDS "INTERIOR" AND "EXTERIOR" WHEN USED ON THE DRAWING

SCHEDULES,REFERS TO WHETHER THE DAMPER COULD BE ACCESSED FROM OUTSIDE THE DUCT

(EXTERIOR) FOR THE REPAIR OR IF THE CONTRACTOR WOULD NEED TO EITHER ENTER OR

DISASSEMBLE THE DUCT TO ACCESS INSIDE (INTERIOR) OF THE DUCT FOR THE REPAIR.

MECHANICAL

ROOM

ELEC. SWITCH

ROOM

GROUND FLOOR PIPE SPACE PLAN - IMC (SPINAL CORD)

SCALE: 1/16” = T-O”

□SPITAL

A

GENERATOR & FUEL

' STORAGE

2) /----- -

MAIN ENTRANCE

WestEastELK

DAMPER REPAIR/REPLACEMENT SCHEDULE

*Actuator *Estimated RepairsAir Handler Damper Damper Actuator

Floor Bldg. Required Repairs and Remarks Additional Repairsand RemarksSpace Type Configuration Condition Shutdown NeededLocationID Type

Actuator Condition

Replace 85"x20" DamperBelimo Operable Not NotedFrozen YesReturn AHU-PS-1D 8 Hr

Replace 85"x20" DamperOutside Air Belimo Operable Not NotedFrozen Yes Pipe Space Pipe Space

Replace 85"x20" Damper and Belimo ActuatorN/A Not NotedReturn Frozen None Yes AHU-PS-2D 8 HrVAV

Replace 85"x20" Damper and Belimo ActuatorN/AOutside Air Not NotedFrozen None Yes

Installation of electrical power and controls by others

IMC (Spinal Cord)

2 3 4 3 6 7 8 9

7 3 4 3 6 7 3 91

A

C

D

E o o

E

0) o

CO

O o o o o o

O O

O D

O C o o

Q 0)

O C

O C o

O o

O o

Q o

O o

E

(O

CO

Revisions:

VA FORM 08-6231, OCT 1978

o o

O C

O C o

II

C s O

OC o o tn is s”

PL

AN

N O

R

TH

6” th re e qu ar te rs th re e in ch es on e fo ot on e an d on e ha lf in ch es in ch

C O on e e e e

EDWARD GARCIA

M/ASTC.0.4 ‘hs/owLo.--Purga8Me«2o2% ekr 2.

100% CD FINALARCHITECT:

Elk Consortium + WestEast Design Group JV, LLC

200 E. Grayson Street, Suite 207

JV

San Antonio, Texas 78215 210.530.0755 www.westeastdeslgn.com Texas Registered Architectural Firm

Approved: Project Director

PROJECT MANAGER, MARIA HERNANDEZ

Drawing Title

GROUND FLOOR PIPE SPACE PLAN -

WAREHOUSE

Approved: Service Chief Approved: Service Chief

Approved: Service Chief Approved: Chief of Staff

Date

Concur M & O Approved: Service Chief

CONSULTANTS:

Concur Bio-Med Approved: Service Chief

Concur Safety Approved: Service Chief

Project Title

Repair Heating and AC Dampers

Checked

EG

Drawn

HG

Location Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter Blvd., San Antonio, Texas

Date 1 NOV. 08, 2024 E Department of

Veterans Affairs

Office of Facilities

Management

M-000.2 Dwg. 5 of 32

Project Number

671 -22-133 Building Number

Bldg. 1 Drawing Number

*The estimated time is not the time the contractor should use to estimate the total repair. It is only the air-conditioning down time.

DAMPER REPAIR/REPLACEMENT NOTES:

1.

2.

STAIR 10 □>I T

Jr1

AC-PS-1G

N ]

INSULATION SHOP

J3 r

P & H

E NGINEERING

E 002.1

AC-PS-2G

E 001

J_L EP&H OFFICE

E 002 CHAIN LINK FENCE TYPICAL

WAREHOUSE

CHAIN LINK FENCE TYPICAL

I17 T

AE 003.1

nL

STAIR 11

[E 7

6.1 7.1 8 3.1) (9.1) (10) 10.1) 11 1 .2. 12V )/

—L

XSTAIR

STAIR 3D □

I I■//■ -//-

B

3MAIN H

1 C

TOWER4 ?CLC

CANTEEN

PILYTRUMA

1 J

KEYPLAN

SERVICE

E 004

P&H

PIPE

FITTERS

E 013

THE USE OF THE WORDS "INTERIOR" AND "EXTERIOR" WHEN USED ON THE DRAWING

SCHEDULES,REFERS TO WHETHER THE DAMPER COULD BE ACCESSED FROM OUTSIDE THE DUCT

(EXTERIOR) FOR THE REPAIR OR IF THE CONTRACTOR WOULD NEED TO EITHER ENTER OR

DISASSEMBLE THE DUCT TO ACCESS INSIDE (INTERIOR) OF THE DUCT FOR THE REPAIR.

THE USE OF THE WORD "NONE" ON THE SCHEDULE REFERS TO THE EXISTING DAMPER NOT

INCLUDING AN AUTOMATIC ACTUATOR ON THE DAMPER SHAFT. ONLY A MANUAL LOCKING QUADRANT

IS INSTALLED.

IMC

SPINAL CORD

P&H

ASBESTOS

SHOP

E 004

BIOMEDICAL

E 009

1 P&H

TOOL ROOM

E 003

P&H

SHEET METAL SHOP

E016

INTERIOR

DESIGN/EMS

E 008

2) /----- -

MAIN ENTRANCE

□SPITAL

A

CARPENTER SHOP

E 017

P&H

PAINT SHOP

E 005

P&H

WELDING SHOP

E 015

GROUND FLOOR PIPE SPACE PLAN - WAREHOUSE

SCALE: 1/16” = T-O”

CONTRACTOR

EO11

P&H ELECTRONICS

E 010

P&H

PLUMBING SHOP

E006

P&H

SHOP STORAGE

E 017.1

—TV=

WestEastELK

(6)

DAMPER REPAIR/REPLACEMENT SCHEDULE

*Actuator *Estimated RepairsAir Handler Damper Damper Actuator

Floor Bldg. Required Repairs and Remarks Additional Repairsand RemarksSpace Type Configuration Condition Shutdown NeededLocationID Type

Actuator Condition

Not OperableReturn Frozen Pneumatic Exterior 8 Hr Yes

AC-PS-1G CV

N/ROutside Air Operable Not OperableWarehousePipe Space Pipe Space Pneumatic Exterior Yes

2 Dampers in Good Condition. Replace w/Belimo Installation of electrical power andReturn N/RNot OperableAC-PS-2G CV Exterior Yes controls by others.ActuatorOutside Air

Operable

Operable

1 Pneumatic Lnkd to Both

Add access door, Installation of electrical power and controls by others.

Replace 54.5"x22.5" Damper. Remove Pneumatic Actuator & Tubing. Install Belimo Actuator Damper in Good Condition. Remove Pneumatic Actuator & Tubing. Install Belimo Actuator

7 3 4 5 6 7 7 9

7 3 4 5 6 7 3 91

A

C

7:

E o o

E

0) o

CO

E

O o o o o o

O O

O D

O C o o

Q O

O C

O C o

O o

O o

O o

Q o

(O co

Revisions:

VA FORM 08-6231, OCT 1978

o o

O C

O C o

II

C s O

OC o o tn is s”

PL

AN

N O

R

TH

L o 6” th re e qu ar te rs th re e in ch es on e fo ot on e an d on e ha lf in ch es in ch

C O on e e e e

Co),10 IC.VSV

EDWARD GARCIA

M/ASTC.0.4 ‘hs/owLo.--Purga 8Me«2o2% ekr 2.

Approved: Service Chief

Approved: Chief of Staff

Approved: Service Chief

Approved: Service Chief

Elk Consortium + WestEast Design Group JV, LLC

200 E. Grayson Street, Suite 207

JV

San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com Texas Registered Architectural Firm

DateRevisions:

100% CD FINALARCHITECT:

Approved: Project Director

PROJECT MANAGER, MARIA HERNANDEZ

Drawing Title

GROUND FLOOR PIPE SPACE PLAN

MAIN BUILDING A

Concur M & O Approved: Service Chief

CONSULTANTS:

Concur Bio-Med Approved: Service Chief

Concur Safety Approved: Service Chief

Air Handler Floor Bldg. Space

ID

AC-PO-1

AC-PS-IB

Pipe Space Main Pipe Space VAV Outside Air Operable BelimoHV-PS-1A

VAV Outside Air Operable BelimoHV-PS-2A

VAV Outside Air Operable BelimoHV-PS-3A

STAIR 4STAIR 3D □ 1 LAai i i 1 i II-----//- L

Xsoas SLO44

— K.1

TOWER

PlenumL

SLO46 SLO45

1 HL

R ESPI TOR Y rCHAIN LINK FENCE TYPICAL-

BIOMEDICAL VERDICT NUCLEAR MEDICINE

— Up-HIG 011.1G 012G 013

[1 GL 047°

LFCOD & NUTRITIONMAIN BLDG G 007

-ICANTEEN SERVI DE Up

029 DG 006 L

Lr ELECTRICAL STORAGE

CHAIN LINK FENCE TYPICAL P INTSHOIPL 013.2

LO12I RM 3REPAIR

G 008

S 12 DUp

NTERIOF

PD

J XISMO G 008.3

DE9

SERVICE ELEVATOR

M&O SECTION

PBX 003

P3P2 I

— c

LSTAIR 2 STAIR 1X P 1 P4

L005 J T

1 AC-PO-1 IT

V

—B.5)SL001

K SL002 Up$1004C-PS-1B HV-PS-3AA HV-PS-1A HV-PS-2A

SL003POOL fl BC [

SL005

SL 003.2

A I I I I I I I I I I I I

TI I I I II

I I I I I

(3)(3) (83) (13 (3)9 0.5 9.4

GROUND FLOOR PIPE SPACE PLAN - MAIN BUILDING A

1/16” = 1’-0”SCALE:

FISCAL

PBX 009

SECONDARY

SWITCH GEAR

CANTEEN

PBX 002

DESIGN

PBX 006 PM & RS

PBX 007

CARE

G 014

SIGN SHOP

PBX 006

A FG

G 011

M&O L 013.1

M&O G 008.2

S P D G 010

M&O L 013.3

DENTAL

LOW

PAO

L011

P & PLMS

L008

X L001

STORAGE

SLO42

P& PLMS

L007

RECREATION

PBX 005

UMP ROOM

M 003

X L 004.1 x E 007

I

NEUROLOGY

L003

I I

I I

I I

TUMOR REGISTRY

PBX 008

CANTEEN

X

ENGINEERING STORAGE

L 002

PLENUM W/STORAGE

L002

PHARMACY CACHE

L003

INFECTION CONTROL

L006

EMERGENCY GENERATOR

L 002.2

(2)(3)(8) 03) (0) (23 (33 I I

HRMS

G 015

E

0)

O

CO

O o

(O co

VA FORM 08-6231, OCT 1978

2 3 4 5 6 o o o o

O D o o

O C

Q 0)

O O

O C

Q C o o

O C o

O o

Q o

O o

F

C s

0.5

6.9

WestEastELK

7 3 9

DAMPER REPAIR/REPLACEMENT SCHEDULE

* Actuator *Esti mated RepairsDamper Damper

Required Repairs and Remarks Additional Repairs and RemarksType Configuration Condition Location Shutdown Needed

*The estimated time is not the time the contractor should use to estimate the total repair. It is only the air-conditioning down time.

N/RVAV Outside Air Operable Belimo Operable Damper & Actuator in Good ConditionExterior No

N/ROperable Damper & Actuator in Good ConditionExterior No 100% Outside Air

N/ROperable Damper & Actuator in Good ConditionExterior No 100% Outside Air A N/ROperable Damper & Actuator in Good ConditionExterior No 100% Outside Air

DAMPER REPAIR/REPLACEMENT NOTES:

1.

2.

F

C

D

E

WAREHOUSE

B

MAIN H

5 C

AcL 1CLC

CANTEEN/)UPILYTRUMA

1 J

KEYPLAN

Project Title

Repair Heating and AC Dampers

Drawing Number

M-000.3

Dwg. 6 of 32

8 9

Actuator Condition

Actuator

Type

Department of Veterans Affairs

THE USE OF THE WORDS "INTERIOR" AND "EXTERIOR" WHEN USED ON THE DRAWING

SCHEDULES,REFERS TO WHETHER THE DAMPER COULD BE ACCESSED FROM OUTSIDE THE DUCT

(EXTERIOR) FOR THE REPAIR OR IF THE CONTRACTOR WOULD NEED TO EITHER ENTER OR

DISASSEMBLE THE DUCT TO ACCESS INSIDE (INTERIOR) OF THE DUCT FOR THE REPAIR.

THE USE OF THE WORD "NONE" ON THE SCHEDULE REFERS TO THE EXISTING DAMPER NOT

INCLUDING AN AUTOMATIC ACTUATOR ON THE DAMPER SHAFT. ONLY A MANUAL LOCKING QUADRANT

IS INSTALLED.

IMC

SPINAL CORD

Location Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter Blvd., San Antonio, Texas

Project Number

671 -22-133 Office of Facilities

Management

Building Number

Bldg. 1

Date

NOV. 08, 2024

9 /—°

MAIN ENTRANCE

Checked

EG

Drawn

HG

Manual None No

VAV No

Exterior No

Damper & Actuator in Good Condition

Damper & Actuator in Good Condition

Damper & Actuator in Good Condition

Belimo

Belimo

N/R

N/R

N/R

Operable

Operable

Operable

Operable

Operable

2 Supply

Return

Outside Air

N/A

Exterior tn is s”

PL

AN

N O

R

TH

C

HOI J

6” th re e qu ar te rs th re e in ch es on e fo ot on e an d on e ha lf in ch es in ch on e fo ot on e ha lf in ch rn on e e e on e

1A BO1

2£2£2££2222222222222222222222222222

5777777

MAIN BLDG

7222272727772722222777777777722222222222222777/2,222227 22 222222222222222222222222222222222222222222222222222222222

SERVICE ELEVATOR

1 IfIIIIII X□ □ □ □ — □

STAIR 1STAIR 2

J J

22272222222222222222

2/MECH, RM

22227222222

HV-B-2AAC-B-3BHV-B-1B AC-B-3AAC-B-2B AC-PR-1 AC-B-2A HV-B-1AAC-B-1B AC-B-1A

(11.5) 02.5) (13.5)(7.5) 8 (8.5) ( 9 (9.5) (10 13 15

(9.4)

I

I

I

I I

I I

I I

I I

I I

) I I

GROUND FLOOR INTERSTITIAL PLAN - MAIN BUILDING A

SCALE: 1/16” = T-O”

(03 I I

I I

I I

I I

I I

I I

I I

...22222)2222222222/ ._22222%2222/222222222222222// 2PPPP77////

J

DAMPER REPAIR/REPLACEMENT NOTES:

1.

H 2.

G

F

E

D

0.5

B.5

WAREHOUSE

-B) B

MAIN H

1 C

4 7CLC

A

CANTEEN/C)UPILYTRUMA

1 I

MAIN ENTRANCE

KEYPLAN

THE USE OF THE WORDS "INTERIOR" AND "EXTERIOR" WHEN USED ON THE DRAWING

SCHEDULES,REFERS TO WHETHER THE DAMPER COULD BE ACCESSED FROM OUTSIDE THE DUCT

(EXTERIOR) FOR THE REPAIR OR IF THE CONTRACTOR WOULD NEED TO EITHER ENTER OR

DISASSEMBLE THE DUCT TO ACCESS INSIDE (INTERIOR) OF THE DUCT FOR THE REPAIR.

THE USE OF THE WORD "NONE" ON THE SCHEDULE REFERS TO THE EXISTING DAMPER NOT

INCLUDING AN AUTOMATIC ACTUATOR ON THE DAMPER SHAFT. ONLY A MANUAL LOCKING QUADRANT

IS INSTALLED.

IMC

SPINAL CORD

*The estimated time is not the time the contractor should use to estimate the total repair. It is only the air-conditioning down time.

( 8 ) (10.1) 12.5 13.5 15

STAIR 3 STAIR 4

(14) F(14.5)

14.514(10)(8.1) (9.1)

(12)

(11)

2 3 4 5 6 7 7 91

DAMPER REPAIR/REPLACEMENT SCHEDULE

*Actuator *Estimated RepairsAir Handler Damper Damper Actuator

Floor Bldg. Required Repairs and Remarks Additional Repairs and RemarksSpace Type Configuration Condition Shutdown NeededLocationID Type

Actuator Condition

Project TitleConcur M & 0 Approved: Service Chief

CONSULTANTS: 100% CD FINALARCHITECT:

Concur Bio-Med Approved: Service Chief Repair Heating and AC DampersSOM Concur Safety Approved: Service Chief Elk Consortium +

WestEast Design Group JV, LLCEDWARD GARCIA Approved: Service Chief Approved: Service Chief 200 E. Grayson Street, Suite 207

M-001.0.ASTC.06‘hs/owLo.--

JVApproved: Service Chief Approved: Chief of Staff

Dwg. 7 of 32Revisions: Date

ELK WestEast

Department of Veterans Affairs

San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com Texas Registered Architectural Firm

Office of Facilities

Management

Project Number

671 -22-133

Approved: Project Director

PROJECT MANAGER, MARIA HERNANDEZ

Location Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter Blvd., San Antonio, Texas

Building Number

Bldg. 1 Drawing Number

Date

NOV. 08, 2024

Checked

EG

Drawn

HG

Vakr 2.

Drawing Title

GROUND FLOOR INTERSTITIAL PLAN -

MAIN BUILDING A

N/ROperable Belimo OperableReturn Exterior No

HV-B-1B VAV

N/ROutside Air Operable Belimo Operable Exterior No

N/A N/A N/A N/RAC-B-3B CV None None No

N/RSupply Operable Manual Not Operable Repair or Replace Damper & Manual Handle Fabricate and install Motor Cover GuardNone Yes

AC-B-2B

N/R Dampers & Actuators in Good ConditionOperable Belimo Operable3 Return Exterior No

N/RSupply Not OperableAC-B-1B Pneumatic ExteriorCV Frozen Yes Interstitital

Mech Rm 1B BOI N/A Replace 50"x34" DamperCV Supply Manual Not OperableAC-B-3A 8 HrFrozen Yes

N/A N/RManual None NoSupply Operable

HV-B-4A CV

N/AOperable Belimo Not OperableOutside Air Exterior Yes

MainGI N/R Part No. NFB24-SROperable Belimo Not OperableReturn Interior Yes

AC-PR-1 VAV

N/R Part No. LF24-SR-SOutside Air Operable Belimo Not Operable Interior Yes

N/ROutside Air Operable Belimo Not Operable Model No. NF120HV-B-2A CV Interior Yes

Interstitial N/R Damper & Actuator in Good ConditionCV Operable Belimo OperableReturn Exterior No Mech Rm 1A B02 AC-B-2A

N/ROutside Air Operable Belimo Not Operable Damper in Good Condition. Replace ActuatorExterior Yes

N/ASupply ManualFrozen None 4 Hr Yes

HV-B-1A CV

N/ROperable Belimo OperableReturn Exterior No

N/ROutside Air Operable Belimo Operable Interior No

N/ROutside Air Operable Belimo Not Operable Damper in Good Condition. Replace Actuator Belimo Part No. NF120AC-B-1A Interior Yes

Replace 48"x34" Damper. Remove Pneumatic Actuator & Tubing. Install Dpr & Belimo Actuator

Damper & Actuator in Good Condition

Damper & Actuator in Good Condition

Damper & Actuator in Good Condition

Damper & Actuator in Good Condition

Installation of electrical power and controls by others.

Damper in Good Condition. Replace Belimo Damper in Good Condition. Replace Belimo Actuator

Ensure actuator signal and power prior to replacing with Part No. NFB24-SR.

Damper in Good Condition. Replace Belimo Actuator

Damper & Manual Actuator in Good Condition

Damper in Good Condition Repair/Restore Electrical Power

May need to Replace 36"x38" Damper w/Manual Handle

Verify if Current position needs to be changed before replacing

Interstitial Mech Rm 1A BOI

Interstitial

Mech Rm 1B B02

VA FORM 08-6231, OCT 1978

7 3 4 5 6 7 7 9

PL

AN

N O

R

TH

LU

LU

6” on e ei gh th in ch th re e qu ar te rs in ch th re e in ch es on e fo ot on e an d on e ha lf in ch es on e fo ot on e fo ot rn on e e e e fo ot on e e re e ei gh th s

0 "_ F_ on e gu ar te r i nc h on e ha lf

I

AC-B-5C

AC-B-4C

AC-B-3C

MECH. RM 1D B01

L6

5.5

I

L2

6 6.1 i r

N.5

N

M.5

STAIR 7

2.5

STAIR 6

I

I

I

H

4 4.5 5(3.5)2

1.5

J

AC-B-1C

AC-B-2C

i i i i

GROUND FLOOR INTERSTITIAL PLAN - MAIN BUILDING B

(M.5)

M.1 —

1/16” = r-oSCALE:

Co),10IC.VSV

EDWARD GARCIA

M/ASTC.0.4 ‘hs/owLo.--aurga 8Me«2o2% ekr 2.

M

100% CD FINALARCHITECT:

Elk Consortium + WestEast Design Group JV, LLC

200 E. Grayson Street, Suite 207

JV

San Antonio, Texas 78215 210.530.0755 www.westeastdeslgn.com Texas Registered Architectural Firm

Approved: Project Director

PROJECT MANAGER, MARIA HERNANDEZ

Drawing Title

GROUND FLOOR INTERSTITIAL PLAN -

MAIN BUILDING B

DAMPER REPAIR/REPLACEMENT NOTES:

1.

2.

THE USE OF THE WORDS "INTERIOR" AND "EXTERIOR" WHEN USED ON THE DRAWING

SCHEDULES,REFERS TO WHETHER THE DAMPER COULD BE ACCESSED FROM OUTSIDE THE DUCT

(EXTERIOR) FOR THE REPAIR OR IF THE CONTRACTOR WOULD NEED TO EITHER ENTER OR

DISASSEMBLE THE DUCT TO ACCESS INSIDE (INTERIOR) OF THE DUCT FOR THE REPAIR.

THE USE OF THE WORD "NONE" ON THE SCHEDULE REFERS TO THE EXISTING DAMPER NOT

INCLUDING AN AUTOMATIC ACTUATOR ON THE DAMPER SHAFT. ONLY A MANUAL LOCKING QUADRANT

IS INSTALLED.

Approved: Service Chief Approved: Service Chief

Approved: Service Chief Approved: Chief of Staff

Date

Concur M & O Approved: Service Chief

CONSULTANTS:

Concur Bio-Med Approved: Service Chief

Concur Safety Approved: Service Chief

Project Title

Repair Heating and AC Dampers

Checked

EG

Drawn

HG

Location Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter Blvd., San Antonio, Texas

Date 1

NOV. 08, 2024

WAREHOUSE

B

IMC

SPINAL CORD

E Department of Veterans Affairs

Office of Facilities

Management

M-001.1 Dwg. 8 of 32

Project Number

671 -22-133 Building Number

Bldg. 1 Drawing Number

*The estimated time is not the time the contractor should use to estimate the total repair. It is only the air-conditioning down time.

MAIN H

C

TOWER

1 y/C CANTEEN

PILYTRUMA

1 I

MAIN ENTRANCE

KEYPLAN

□SPITAL

A

4CLC

P }

WestEastELK

(1)

( J )

(N.5)

( N )

(K.1)

DAMPER REPAIR/REPLACEMENT SCHEDULE

*Actuator *Estimated RepairsAir Handler Damper Damper Actuator

Floor Bldg. Required Repairs and Remarks Additional Repairsand RemarksSpace Type Configuration Condition Location Shutdown NeededID Type

Actuator Condition

N/ROperable Not OperablePneumatic ExteriorReturn Yes

AC-B-1C

N/ROutside Air Operable Not OperablePneumatic Exterior Yes

Operable Pneumatic Non Operable ExternalReturn Yes

AC-B-2C

Outside Air Operable Non Operable ExternalPneumatic Yes

N/ROperable Not OperableReturn Pneumatic Exterior Yes AC-B-5CGI Main

N/ROutside Air Operable Not OperablePneumatic Exterior Yes

N/ROperable Not OperableReturn Pneumatic Exterior Yes

AC-B-4C

N/ROutside Air Operable Not OperablePneumatic Exterior Yes

N/ROperable Not OperableReturn Pneumatic Exterior Yes

AC-B-3C

N/ROutside Air Operable Not OperablePneumatic Exterior Yes

Interstitial

Mech Rm Damper ok; Replace Actuator

Damper ok; Replace Actuator

N/R

N/R

Installation of electrical power and controls by others

Installation of electrical power and controls by others

Installation of electrical power and controls by others

Installation of electrical power and controls by others

Installation of electrical powerand controls by others

29"xl6" Dampers in Good Condition. Remove Pneumatic Actuators & Tubing. Replace w/Belimo Actuators

56"xl8" Dampers in Good Condition. Remove Pneumatic Actuators & Tubing. Replace w/Belimo Actuators

56"xl8" Dampers in Good Condition. Remove Pneumatic Actuators & Tubing. Replace w/Belimo Actuators

50"xl6" Dampers in Good Condition. Remove Pneumatic Actuators & Tubing. Replace w/Belimo Actuators

Interstitial

Mech Rm ID BOI

2 3 4 5 6 7 8 9

7 3 4 5 6 7 3 91

A

C

D

E o o

E

0) o

CO

O o o o o o

O O

O D

O C o o

Q O

O C

O C o

O o

O o

Q o

O o

E

(O co

Revisions:

VA FORM 08-6231, OCT 1978

o o

O C

O C o

II

C s O

OC o o

I

U l0)

I I

I I

PL

AN

tn is s”

6” th re e qu ar te rs in ch th re e in ch es on e fo ot on e an d on e ha lf in ch es

C O on e e e e

STAIR 5

MECH. RM 1E B01

•T AC-B-5EAC-B-4EI

□AC-B-3E ■

MECH .RM 1E B02

AC-B-2E

7777777

2/////////44422

MECH. RM 1E B03

L LU U L L[ L

AC-B-1E AC-B-6E

i i i i i i i i

I i

I i i i i I i

I

STAIR 9

I

I

I

I I I

© G 6 6.5 6.9( (

(23)

I

1.5

1 I I r 7 T i i i

I i

I i

I i

(D.5)

GROUND FLOOR NTERST T AL PLAN - MA N BU LD NG C

(C.8)— IIIIII

STAIR 8

(B.9)

B.4

A.4

■I

Co.)N1’0IC.VSV

EDWARD GARCIA

M/ASTC.0.4 ‘hs/owro.--aurga 8Me«2o2% ekr2.

1/16” = r-oSCALE:

100% CD FINALARCHITECT:

Elk Consortium + WestEast Design Group JV, LLC 200 E. Grayson Street, Suite 207

JV

San Antonio, Texas 78215 210.530.0755 www.westeastdeslgn.com Texas Registered Architectural Firm

Approved: Project Director

PROJECT MANAGER, MARIA HERNANDEZ

Drawing Title

GROUND FLOOR INTERSTITIAL PLAN -

MAIN BUILDING C

Approved: Service Chief Approved: Service Chief

Approved: Service Chief Approved: Chief of Staff

Date

Concur M & O Approved: Service Chief

CONSULTANTS:

Concur Bio-Med Approved: Service Chief

Concur Safety Approved: Service Chief

AC-B-4E

AC-B-5E

AC-B-3E

AC-B-2E

AC-B-1E

N/A

Operable

AC-B-6E

Not Operable

DAMPER REPAIR/REPLACEMENT NOTES:

1.

2.

THE USE OF THE WORDS "INTERIOR" AND "EXTERIOR" WHEN USED ON THE DRAWING

SCHEDULES,REFERS TO WHETHER THE DAMPER COULD BE ACCESSED FROM OUTSIDE THE DUCT

(EXTERIOR) FOR THE REPAIR OR IF THE CONTRACTOR WOULD NEED TO EITHER ENTER OR

DISASSEMBLE THE DUCT TO ACCESS INSIDE (INTERIOR) OF THE DUCT FOR THE REPAIR.

THE USE OF THE WORD "NONE" ON THE SCHEDULE REFERS TO THE EXISTING DAMPER NOT

INCLUDING AN AUTOMATIC ACTUATOR ON THE DAMPER SHAFT. ONLY A MANUAL LOCKING QUADRANT

IS INSTALLED.

Interstitial

Mech Rm IE B02

Interstitial

Mech Rm IE BOI

Interstitial

Mech Rm IE B03

Project Title

Repair Heating and AC Dampers

Checked

EG

Drawn

HG

Location Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter Blvd., San Antonio, Texas

Date 1

NOV. 08, 2024

2 Supply Operable Manual

Operable2 Return

Outside Air PneumaticFrozen

#1Belimo- #2Pne.N/O

GI Main

X

E Department of Veterans Affairs

Office of Facilities

Management

M-001.2 Dwg. 9 of 32

Project Number

671 -22-133 Building Number

Bldg. 1 Drawing Number

4 Supply Operable Belimo Operable Exterior

Operable Belimo Operable2 Return Exterior

2 Outside Air Operable Belimo #1 NotOpr Exterior

None

Exterior

Exterior

BelimoReturn

Outside Air Belimo

Operable

Operable

Operable

Operable

*The estimated time is not the time the contractor should use to estimate the total repair. It is only the air-conditioning down time.

N/A N/RSupply Operable Manual None No

N/RNot OperablePneumatic ExteriorReturn Frozen Yes

Manual Non Operable2 Outside Air Frozen YesNone 4 Hr

N/A N/R2 Supply ManualFrozen None Yes

N/R Existing duct sizes 26/20 & 28/10Operable Operable2 Return Pneumatic Exterior Yes

N/R Existing duct sizes 28/10 & 24/122 Outside Air Operable Not OperablePneumatic Exterior Yes

No

No

Replace #1 Belimo # NFB24-MFTYes

No

No

N/R No

N/R Existing duct size 16/16Yes

4 Hr Yes

WAREHOUSE

B

TOWER

A CLCLC

TCuCANTEEN

PILYTRUMA

1 J

MAIN ENTRANCE

KEYPLAN

Dampers & Actuators in Good Condition

Dampers & Actuators in Good Condition

Dampers & #2 Actuator in Good Condition

Damper & Actuator in Good Condition

Damper & Actuator in Good Condition

N/R

N/R

N/R

IMC

SPINAL CORD

Dampers & Actuators in Good Condition

Remove Pneumatic Actuator & Tubing. Replace w/Belimo Actuator

Replace 24"x20" Damper. Remove Pneumatic Actuator & Tubing. Replace w/Belimo Actuator

Damper in Good Condition.

Replace 28"x20" Damper. Remove Pneumatic Actuator & Tubing. Replace w/Belimo Actuator

Replace 30"xl8" & 24"xl0" Dampers.

Replace 26"xl8" & 28"xl2" Dampers w/ Manual Handles

Dampers in Good Condition. Remove Pneumatics. Replace Pneumatic Actuator w/Belimo Actuator Dampers in Good Condition. Remove Pneumatics. Replace Pneumatic Actuator w/Belimo Actuator Mechanical Room

□SPITAL

A

Belimo Exterior No

Belimo Exterior No

Operable

Operable

Dampers & Actuators in Good Condition

Damper & Actuator in Good Condition

N/R

N/R

3 Supply

Outside Air

Operable

Operable

WestEastELK

4.9

(F.1

(E.1

5.5

(G.1

( H )

DAMPER REPAIR/REPLACEMENT SCHEDULE

*Actuator *Estimated RepairsAir Handler Damper Damper Actuator

Floor Bldg. Required Repairs and Remarks Additional Repairsand RemarksSpace Type Configuration Condition Shutdown NeededLocationID Type

Actuator Condition

2 3 4 5 6 7 8 9

7 3 4 3 6 7 3 91

A

C

D

E o o

E

0) o

CO

O o o o o o

O O

O D

O C o o

Q O

O C

O C o

O o

O o

Q o

O o

E

(O co

Revisions:

VA FORM 08-6231, OCT 1978

o o

O C

O C o

II

C s O

O C o o tn is s”

PL

AN

6” th re e qu ar te rs th re e in ch es on e fo ot on e an d on e ha lf in ch es in ch

C O on e e e e

EDWARD GARCIA

M/ASTC.0.4 ‘hs/owLo.--Purga 8Me«2o2% ekr 2.

100% CD FINALARCHITECT:

Elk Consortium + WestEast Design Group JV, LLC

200 E. Grayson Street, Suite 207

JV

San Antonio, Texas 78215 210.530.0755 www.westeastdeslgn.com Texas Registered Architectural Firm

Approved: Project Director

PROJECT MANAGER, MARIA HERNANDEZ

Drawing Title

CLC FIRST FLOOR /GROUND FLOOR PLAN

Approved: Service Chief Approved: Service Chief

Approved: Service Chief Approved: Chief of Staff

Date

Concur M & O Approved: Service Chief

CONSULTANTS:

Concur Bio-Med Approved: Service Chief

Concur Safety Approved: Service Chief

Project Title

Repair Heating and AC Dampers

Checked

EG

Drawn

HG

Location Audie L. Murphy Memorial Veterans Hospital 7400 Merton Minter Blvd., San Antonio, Texas

Date 1

NOV. 08, 2024 E Department of Veterans Affairs

Office of Facilities

Management

M-100.0 Dwg. 10 of 32

Project Number

671 -22-133 Building Number

Bldg. 1 Drawing Number

*The estimated time is not the time the contractor should use to estimate the total repair. It is only the air-conditioning down time.

CORRIDOR

Dn

DAMPER REPAIR/REPLACEMENT NOTES: LEGEND:

STAIR 4 1. 1HR FIRE RATED

A [T 4 AL RDDM sDaGE

—I LXXX

[ ]EH

201.82SF

2.VT DTI 1B10

] 1B11] jlB112.il |GERIATRI

SR

V DIREC

I 1B106 I 4 Dl • r

L1B

-al

] IP! ROOM

[ ] [ ]HB16— 1 10L- 4

D D

[ [ 4 1B112

DERI 5

L-= I IT

L1B ]

1B102 EL Zi11B11, E- 4CORRIDOR

JSE1 STDRAC ROOM

]1B1 ]

Y

[[ ] GERIARI

] IF dal82 AHU-NH1

3[ ] RM 1A107

STAIR 1 di 31A107

L EalV STAIR 2

= ‘===‘ 1u—n—m 1—n—m un—P i—a□ 1

E 5 TIENTITIN PATIENT ROONROOM ED 1] 1A112 ] L1A1] [ ] 1A116 ] [ 1A119[ ] a a a E 177.25 SF

[ ] L 1 1 1 1 1

BEVERAGE

L1A1 1A119A1A109- •ul - [ m AD g□ DEE [ AT IEin

T[ ]1 BEDS NHO [ ]CLC BLDG D A

IE I I IL7- X[ ]

WOMEI

1A131 m (1A1 i SHDWER ROIM g PEEBE\ [ ]11A132 I MT ROONMT ROOM L1A1‘Be r ][ ]LECIRCA □s L1A1 L1A1B ]a 3010 1 Jul 2 0 LrE’u L/ 1/1A1361[ ] E

LL [ 1

E- Ur

DEF

10100.1

[ 0

HE

i

J(

TREATMENT REI F TREATMENT RUDI

[ ] Co ]

FT

[[ 4

IW

lmL

'LL'

I —4 E| IL 11 ]

F TREATMENT RDEF

10109[

F l E

Lez" LAL-W n~~n

10113

WAREHOUSE[ ] □B[ 15

r=RSn

3MAIN H

/ CENEEREN

- cm 2 c]

TOWER

Co ]

I t /C CANTEENE ]

STAIR 3175.87 SF

PILYTRUMA

1 J

MAIN ENTRANCE

KEYPLAN

CLC FIRST FLOOR/ GROUND FLOOR PLAN1 1/16” = r-o”SCALE:

Illi Illi

OFFICE

1B101

DAYROOM

1A108

OFFICE

I 1B112.1 |

OFFICE

1A104

I

□FFICE

[1B112.8

THE USE OF THE WORD "NONE" ON THE SCHEDULE REFERS TO THE EXISTING DAMPER NOT

INCLUDING AN AUTOMATIC ACTUATOR ON THE DAMPER SHAFT. ONLY A MANUAL LOCKING QUADRANT

IS INSTALLED.OFFICE

I 1B108

THE USE OF THE WORDS "INTERIOR" AND "EXTERIOR" WHEN USED ON THE DRAWING

SCHEDULES,REFERS TO WHETHER THE DAMPER COULD BE ACCESSED FROM OUTSIDE THE DUCT

(EXTERIOR) FOR THE REPAIR OR IF THE CONTRACTOR WOULD NEED TO EITHER ENTER OR

DISASSEMBLE THE DUCT TO ACCESS INSIDE (INTERIOR) OF THE DUCT FOR THE REPAIR.

□FFICE

1A104.1

E

BiE I

C1151

DFFIC

1A106

I L

•L

IMC

SPINAL CORD

ECTION

im—

TH

rm-Fn

186.29 SF

WAITING PDGM

L1c1o1

1A311

□SPITAL

A pr r

W r

LE

M.S.A, 483.C

Len N

A4

LET

a

LDCKER ROOM

L1A130

RDDM \

1D

JDM

5]

OFFICE

B112.4A]

OFFICE

1B115

RDDM □

WestEastELK

DAMPER REPAIR/REPLACEMENT SCHEDULE

*Actuator *Estimated RepairsDamper Damper

Floor Bldg. Required Repairs and Remarks Additional Repairsand RemarksSpace Type Configuration Condition Shutdown NeededLocation

Actuator Condition

Actuator

Type

Air Handler

ID

N/ROperable OutdatedVAV Pneumatic YYesesExteriorReturn

CLC (ECTC) Mech Rm 1A 107 AHU-NHl1 Outside Air OutdatedPneumatic ExteriorFrozen 8 Hr Yes

Installation of electrical power and controls by others

Installation of electrical power and controls by others

Remove Pneumatic Actuator & Tubing. Replace w/Belimo Actuator Replace 117" x48" Louver screen. Replace 117"x48" Damper. Remove 2- Pneumatic Actuators & Tubing. Replace w/2-Belimo Actuator

2 3 4 5 6 7 8 9

7 3 4 5 6 7 3 91

A

C

D

E o o

E

0) o as

O o o…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .