This is Amendment 0001 to Solicitation 36C25726R0042, issued by the Department of Veterans Affairs Network Contracting Office in San Antonio, Texas. The amendment extends the deadline for receipt of offers to February 23, 2026 at 10:00 AM CST and provides three key attachments: RFI responses, a site visit sign-in sheet, and self-performed work calculations required under VAAR 852.219-75 (Limitations on Subcontracting). The solicitation concerns repair and replacement of HVAC dampers at a San Antonio VA facility (Project 671-22-133). Offerors must calculate their total proposed price, cost of materials, total labor costs excluding materials, amounts projected to be paid to non-VetCert SDVOSBs, and percentages of self-performed versus subcontracted work, with a requirement that no more than 85% of government payment be directed to firms that are not VIP-listed SDVOSBs for general construction work.

The RFI responses clarify critical project parameters: no asbestos abatement is required unless suspected areas are identified; ICRA precautions apply only at Level I if Infection Control determines applicability; no proprietary subcontractors are mandated; work occurs during regular hours (7:00 AM–4:30 PM CST); this is a design-bid-build project with no design services required from the contractor; fire suppression systems remain in place with no modifications; the contractor must survey electrical availability and provide power to damper actuators where service exists; and a single qualified, OSHA-certified individual may serve as both Project Superintendent and Site Safety and Health Officer. Seven days' advance notice is required for any on-site fire watch during demolition.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

TBD

671-26-133 36C671 Department Of Veterans Affairs Network Contracting Office 17 5441 Babcock Road Ste. 302 San Antonio

TX

78240 36C257 Department Of Veterans Affairs Network Contracting Office 17 5441 Babcock Road Ste. 302 San Antonio

TX

78240 To all Offerors/Bidders

36C25726R0042

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 02-23-2026 10AM CST X The purpose of Amendment 0001 is to:

1: Provide the Site Visit Sign In Sheet 2: Provide the RFI's and responses submitted 3: Provide the self-performed calculations

All other terms and conditions remain unchanged.

Rhonda Richardson Contracting Officer Amendment 0001 of 36C25726R0042 Repair HVAC Dampers Project 671-22-133 is being posted to attach the RFI responses, attach the sign in sheet from the site visit and include the Self-Performed calculations Self-performed calculations:

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-75)

OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS

At the time of proposal Offeror’s are required to complete.

a) Offeror’s total proposed price: $ __________

b) Cost of Materials $ __________

c) Total excluding materials (a-b) $ __________

d) Amount projected to be paid on Non-VetCert (SBA.gov) SDVOSBs $__________

e) Offeror’s percentage of estimated Non-VetCert work (d/c X 100 = %) _________%

f) Offeror’s percentage of estimated self-performed work (100 – d = %) _ _________%

General construction. In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.

RFI’s 36C25726R0042 - 671-26-133 - San Antonio VA - Repair & Replace HVAC Dampers

1. Are we to dispose/abate of any asbestos, lead, mold or other hazardous material as part of this project? If so, provide appropriate hazardous material site survey report.

RESPONSE: No. If there is any area suspected to be ACM let the COR know and we can get it tested.

1. What will the ICRA level be for this project?

RESPONSE: This project is contained in the interstitial space between floors and the pipe space beneath the hospital. As such, ICRA should not apply. This said, if the determination is made by Infection Control that it does apply (eg – perhaps the VA allows the GC to lift ceiling tiles to make observation into the Interstitial space), the project should be at the level of lowest risk, or Level I according to the VHA ICRA Form (Category A and Low Risk in the Matrix). At this level, precautions are:

Required Infection Prevention and Control Measures, by Level of Precautions:

1. Perform work activity in a manner that does not create dust.

2. Immediately replace any ceiling tile, close access panels, etc., upon completion of work.

3. Any materials and equipment being brought into the facility must be free of contaminants and loose material.

Minimum Infection Prevention and Control Measures Required Upon Completion of the Activity:

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems to meet original airflow and air exchange design specifications.

Water systems:

1. Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA Directive 1061.

The final arbitrator on this item would be the VA’s Infection Control Team. You may want to touch base with them to confirm this is the case.

1. Are there any required/proprietary subcontractors the general contractor is to hire associated with this project?

RESPONSE: NO

1. Will all work associated with this project able to be performed during regular working hours?

RESPONSE: 7:00am-04:30pm CST

1. It is our understanding that the Solicitation is a negotiated Bid (RFP) design-bid-build project with the Government's AE being responsible for the design portion (providing a full and complete set of Specifications and Plans) and the successful offeror being responsible for bidding and building the project based on the Specifications and Plans provided by the Government's AE. Put another way, the successful offeror will not be required to perform any design-build services as part of the contract - correct?

RESPONSE: There is no design work. This is a damper actuator replacement and damper maintenance work, which includes connecting the missing power connection to the actuators as described in the project documents. The complete documentation is available on the VA website.

1. Are we required to provide a 24 hour/day on-site fire watch during demolition?

RESPONSE: Need 7 days advance notice

1. Please confirm

1) Fire Suppression to be left in place as-is.

RESPONSE: Yes. The fire suppression system is to remain in place as-is. The damper work does not impact or interface with the fire suppression system. No fire suppression work is included as part of this project.

2) Parts of the fire suppression are to be replaced. If so, please specify what is to be replaced.

REPONSE: No. The fire suppression system is to remain in place as-is. The damper work does not impact or interface with the fire suppression system. No fire suppression work is included as part of this project.

3) The entire fire suppression system is to be removed and replaced throughout the entire construction space.

RESPONSE: No. The fire suppression system is to remain in place as-is. The damper work does not impact or interface with the fire suppression system. No fire suppression work is included as part of this project.

1. Spec Section 260511, 260519, 260633 have been provided but no electrical drawings were released, Could we please have clarification of the electrical SOW.

RESPONSE: GC shall be responsible for surveying the existing electrical power availability at each mechanical room, the new HVAC/Air Handler Control system, or the nearby electrical room, and for providing electricity to the Damper Actuators.

Per Drawing Notes 30–35, no new electrical work (wire or conduit) is included unless specifically noted on the schedules. Electrical work is limited to reconnecting power and controls to existing or replacement actuators where electrical service already exists.

Actuators without existing electrical service are not included. When “No” is shown in the Repair/Replace column, the work is either not required or outside the project scope. Some dampers will remain manual unless otherwise noted.

No separate electrical drawings will be issued.

1. Please confirm if a single qualified individual may serve in a dual role as both Project Superintendent and Site Safety and Health Officer (SSHO).

RESPONSE: Yes, The project superintendent can be the site Safety and Health Officer. However, that individual must be OSHA certified.