This is a Statement of Work (SOW) for the procurement and installation of a wire-guided electric forklift vehicle at RAF Lakenheath in the United Kingdom, issued by the 48th Fighter Logistics Readiness Squadron. The document is Revision 2, dated April 2, 2026.

The contractor must provide, deliver, and install one electric programmable forklift to Building 1035, RAF Lakenheath, with the following specifications: 80-volt, 465 amp-hour battery; 12-hour, 3-phase charger; 6500mm mast height and 3750mm closed height; 1500kg lift capacity at 600mm load center; 1100mm adjustable forks; existing rail integration; seat belt, rear view mirrors, beacon, reverse beeper, lift, tilt, and side shift controls; extra stop magnets per aisle; new wires; and minimum two front spotlights. The contractor must provide all personnel, equipment, tools, materials, supervision, transportation, and safety equipment necessary for unloading, installation, and testing. Training must be provided to warehouse operatives at delivery/installation, and complete operator manuals in both print and electronic format must be supplied. The vehicle carries a minimum 5-year warranty on the battery and charger, and 1-year warranty on the vehicle itself. Standard work hours are Monday through Friday, 0800 to 1700 local UK time, excluding US federal holidays and UK bank holidays. The contractor is responsible for contract management, administration, subcontractor management (if applicable), and maintaining a single point of contact with the Government. Shipping from UK vendors shall be FOB Destination with all costs included in the purchase price. For international vendors, three options are available: United States Postal Service (maximum 70 lbs per shipment), commercial small parcel carriers (maximum 300 lbs per shipment), or consolidated shipping points (exceeding 300 lbs). The contractor must manage installation access passes for all personnel working on the contract, submit employee lists within 30 days of award, and collect passes upon contract termination. Safety incidents must be reported to the Contracting Officer within 24 hours.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

(SOW)

Wire Guided Vehicle at Royal Air Force (RAF)

Lakenheath Rev. 2, 2 April 2026

1.0 Introduction

1.1 Mission: The mission of the 48th Fighter Logistics Readiness Squadron is to provide worldwide responsive logistics and support.

1.2 Background: The 48th LRS is responsible for receiving, coordinating, shipping and transporting cargo, equipment and supplies in support of initiatives and programs across RAF Lakenheath, United Kingdom.

1.3 Scope: The scope of this contract is to provide, deliver and install the items listed in Section 3.

2.0 General Requirements

2.1 Business Relations: The Contractor shall successfully integrate and coordinate all activity needed to execute this requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. The Contractor shall promptly identify issues to the Government and take timely corrective action. The Contractor shall seek to ensure mission partner satisfaction and professional and ethical behavior of all contractor personnel.

2.2 Contract Management & Administration

2.2.1 Contract Management: The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of resources assigned to the requirement. The Contractor must maintain continuity between the mission partner and the contractor’s corporate offices.

2.2.2 Contract Administration: The Contractor shall establish processes and assign appropriate resources to effectively administer the contract. The Contractor shall respond to the Governments requests for contractual actions in a timely fashion. The Contractor shall have a single point of contact between the Government and contractor personnel assigned to support the contract. The Contractor shall assign resources in order to maintain proper and accurate records related to this contract.

2.3 Subcontract Management: If applicable, the Contractor shall be responsible for any subcontractor and any subcontractor management necessary to integrated work executed under this contract.

2.4 Hours of Work: Work days are from Monday through Friday excluding US federal holidays and UK bank holidays.

Work hours are from 0800 to 1700 local UK time.

3.0 Product Specifications & Installation Requirements

3.1 The contractor must provide all personnel, equipment, tools, materials, supervision, transportation, safety equipment, any other items and services necessary to provide the following items:

3.2 Delivery to Building 1035, RAF Lakenheath, United Kingdom

4.0 Special Requirements

Vehicle Component Description Government Specifications Man-up truck, so operators can handle- Large sized property Electric Programmable Electric Programmable 80 Volts, 465 Ah 12- hour, must be 3-Phase 6500mm 3750mm

Forklift Type:

Engine:

Transmission:

Battery:

Charger:

Mast:

Closed Height:

Training:

Manual:

Keys (min):

Driver area:

Installation:

Forks:

Lift Capacity:

Rail:

*Warranty (min):

Controls:

External Controls (if existing are not compatible):

Lights:

Additional Requirement:

Removal:

5 years (battery, charger, and 1 Year vehicle)

1100 mm Adjustable 1500kgs at 600mm Load

Center Existing Rail already fitted

Seat Belt Fitted Rear view mirrors Beacon Reverse beeper Lift Tilt Side Shift Extra stop magnets per aisle New Wires

Front spotlights minimum

Vehicle will need to be unloaded, installed, and tested for correct operation Familiarization training to warehouse operatives at the time of delivery/installation Complete operator’s manuals and an electronic copy

4.1 Security & Safety

4.1.1 Operational Security (OPSEC): If any installation is required to take place in a Government facility, the Contractor shall be familiar withthe organizational critical information and indicators list (CIIL) and OPSEC policy of any installation they require access to. The required CIIL can be provided by the Contracting Officer.

Safety: The Contractor and any of its subcontractors (if applicable) shall promptly report pertinent

4.1.2 facts regarding mishaps involving Government property damage or injury to Government/

Contractor personnel that takes place on an installation. The Contractor shall notify the cognizant Contracting Officer within 24 hours of all mishaps or incidents. The Contracting Officer will in-turn notify the Safety Office. The Contractor shall cooperate in any resulting safety investigation.

4.2 Contractor Access to Installations: Access to DoD installations is limited to personnel with a valid installation accesspass. Failure to submit required information to obtain required documentation will result in the exclusion of such employees from the installation until such documentation is obtained. Contractor employees may be subject to personal, and vehicle searched when entering or leaving a DoD installation. If installation access is required, the Government will provide the Contractor with the required information and documents for installation access passes upon award. Subsequently, the Contractor shall provide a list of all employees along working under this contract, along with the required documentation upon receipt of contract award, and no later than 30 days prior to the projected need for any new installation access pass requirements. The Contractor is responsible for maintaining an adequate number of personnel with active installation access passes, and adhering to the timeframes stated in this section. The cognizant mission partner is responsible for the coordination of installation access passes. Upon termination of employment, termination or cancellation of the contract, or expiration of the contract the Contractor is responsible for collecting employee installation access passes and turning them in to the CO, or the cognizant mission partner in a timely fashion.

4.3 Shipping Instructions

4.3.1 For vendors located inside the United Kingdom.

4.3.1.1 Shipment shall be FOB Destination.

4.3.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either include the shipping in the costs of the items, or outline it in a separate line item).

4.3.1.3 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.

4.3.2 For vendors located outside of the United Kingdom.

4.3.2.1 Option One: United States Postal Service.

4.3.2.1.1 Shipping shall be FOB Destination.

4.3.2.1.2

4.3.2.1.3 4.3.2.1.4

All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).

Weight of individual shipments must not exceed 70lbs.

Dimensions of individual shipments must not exceed 119 inches in

4.3.2.1.5 Length, and/or 72 inches in width or height.

4.3.2.1.6 Hazardous material is not submitted.

The Government will provide the APO shipping address as part of the solicitation.

4.3.2.2 Option Two: Commercial small parcel carrier.

4.3.2.2.1 Shipping shall be FOB Destination.

4.3.2.2.2

4.3.2.2.3 4.3.2.2.4

All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).

Weight of individual shipments must not exceed 300lbs.

Dimensions of individual shipments must not exceed 119 inches in Length, and/or 72 inches in width or height.

4.3.2.2.5 The Contractor is responsible for arranging and performing all shipping actions from origin to final destination.

The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.

4.3.2.3 Option Three: Consolidated Shipping Point.

4.3.2.3.1 4.3.2.3.2

4.3.2.3.3 4.3.2.3.4

Shipping shall be FOB Destination.

All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).

Weight of individual shipments must exceed 300lbs.

Dimensions of individual shipments must exceed 72 inches of any one dimensions (length, width, height).

4.3.2.3.5 Hazardous material may be shipped via this method.

4.3.2.3.6 The Contractor must complete a DD Form 1139 “XXX” to determine if the cargo can be shipped via MILAIR. The Contractor shall ensure all cargo is marked “UNITED STATES AIR FORCE” in order to ensure shipments clear customs.

4.3.2.3.7 48 FW logistics points of contact are provided for in 4.3.3.

4.3.3 Contact Information; 48th Logistical Readiness Squadron (48 LRS)

4.3.3.2 48 LRS/Inbound Cargo; 48lrs.inboundcargo@us.af.mil

4.3.3.3 Commercial phone number; +44 01638 525544.

1.0 Introduction
2.0 General Requirements
2.2 Contract Management & Administration
3.0 Product Specifications & Installation Requirements
4.1 Security & Safety
4.3 Shipping Instructions
4.3.2.2.6

File details come from the government source that posted it. Updated .