This file contains photographs and site documentation for an Education Building split system heat pump replacement project at Cass Job Corps Civilian Conservation Center (CCC) in Cass, Arkansas.

The document includes twelve detailed photographs documenting existing HVAC equipment conditions, including attic access points, air handler disconnects, air handler units with visible labeling and electrical components, existing electrical connections with direct panel bus bar connections, heat pump disconnects mounted on exterior brick walls, the outdoor heat pump unit, and thermostats housed in interior lock boxes. The photographs show the mechanical room layout, refrigerant line routing, ductwork insulation, and the Education Building (Building 43) exterior. The document also provides a campus site plan identifying the Education Building location within the Cass Civilian Conservation Center facility and a detailed floor plan of Building 43 showing the layout of academic and non-academic spaces, including classrooms (Math, Reading, Driver's Education), testing areas, GED rooms, media resource center, staff lounge, and mechanical spaces. A critical note at the top of each page states that photos, floorplans, and site plans are provided for general project scoping purposes only and do not absolve the contractor from verifying existing conditions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTE: PHOTOS, FLOORPLAN, AND SITEPLAN ARE PROVIDED FOR GENERAL PROJECT SCOPING AND

DO NOT ABSOLVE THE CONTRACTOR FROM VERIFYING EXISTING CONDITIONS.

EDUCATION BLDG SPLIT SYSTEM HEAT PUMP REPLACMENT PHOTOS

CASS JOB CORPS CCC

Figure 1: ATTIC ACCESS.

Figure 2: AIR HANDLER DISCONNECT.

Figure 3: AIR HANDLER DISCONNECT.

Figure 4: AIR HANDLER.

Figure 5: AIR HANDLER.

Figure 6: ATTIC.

Figure 7: EXISTING ELECTRICAL, DIRECT CONNECTION TO

PANEL BUS BAR.

Figure 8: HEAT PUMP LABEL.

Figure 9: HEAT PUMP DISCONNECT.

Figure 10: EDUCATION BLDG EXTERIOR AND OUTDOOR UNIT

(HEAT PUMP).

Figure 11: THERMOSTAT IN LOCK BOX.

Figure 12: THERMOSTAT LOCK BOX.