Attachment 1 Capabilities Questionnaire N6247027R0007.docx
DOCX document 33 KB Posted
- Attached to
- Cost Engineering and Related Services
- Solicitation number
- N6247027R0007
About this file
This is a Capabilities Questionnaire form designed for the Sources Sought notice for a Cost Engineering and Related Services IDIQ contract (N6247027R0007) issued by the Department of the Navy Naval Facilities Engineering Command.
The questionnaire requests comprehensive information from interested contractors to assess their qualifications for a $15 million Cost IDIQ contract. Respondents must provide general business information including Unique Entity ID, CAGE code, business registration under NAICS code 541330 (Engineering Services), and proposed Product Service Code C211 (Architect and Engineering—General: Landscaping, Interior Layout, and Designing). The form requires firms to document their staffing capacity, specifically listing personnel in key disciplines including cost engineers, value engineers, schedulers, risk analysts, staff economists, and various engineering specialties (civil, structural, mechanical, electrical, fire protection, and geotechnical). Firms must indicate whether they employ more than 20 full-time personnel and identify their socioeconomic classification (small business, SDVOSB, HUBZone, 8(a), WOSB, or EDWOSB).
The questionnaire evaluates relevant experience over the past five years, including years performing architecture and engineering projects generally and specifically for the U.S. Government, the firm's highest dollar-valued contract, and specific service capabilities such as Military Construction (MILCON) detailed cost estimates, concept and budget estimates for complex facilities, NAVFAC DD Form 1391 documentation, economic analysis, life cycle cost analysis, cost-schedule-risk analysis, value engineering studies, and quality/constructability reviews. Firms must demonstrate capacity to simultaneously manage multiple projects totaling $3 million or more annually and indicate how many $750,000 task orders they can successfully perform concurrently. The form also requires disclosure of the proposed contractor arrangement, including whether the firm will serve as a joint venture, sole contractor, prime contractor with or without subcontractors, or subcontractor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2027 Cost IDIQ Sources Sought.pdf | ||
| Attachment 2 Project Information Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT – COST ESTIMATING IDIQ N6247027R0007
ATTACHMENT 1: CAPABILITIES QUESTIONNAIRE
Use this form to provide general information. The space at the end of the form may be used to clarify any requested information. Please respond to all questions as completely as possible.
SECTION 1. GENERAL
Unique Entity ID: ____________________ CAGE Code: ____________________ A. Business Name: (Insert Business Name) B. Business Address: (Insert Business Address) C. Is your firm registered under the NAICS code 541330? (Yes or No).
a. If not, what NAICS code do you propose for this requirement and why? __________________
b. If so, indicate the business size in relation to the NAICS code 541330 and socioeconomic programs for which the firm qualifies. ___________________________ D. Proposed Product Service Code (PSC) is C211 -- ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING. Does your Firm propose another PSC? If so, please explain ________________________ E. Does your firm employ more than 20 full-time personnel? (Yes or No)
a. Capability (key personnel) to perform such work. Please list the number of personnel listed below on your staff:
| Disciplines (Engineers and Architects that are Registered) |
| # of personnel |
Cost Engineer
Value Engineer
Scheduler
Risk Analyst
Staff Economist
Architect
Civil Engineer
Structural Engineer
Mechanical Engineer
Electrical Engineer
Fire Protection Engineer
Geotechnical Engineer
Planner
Interior Design
F. Responsible Point of Contact:
Name: (Insert Name) Telephone: (Insert Telephone Number) Email: (Insert Email Address) SECTION 2. TYPE OF BUSINESS: (check all that apply) ________Small Business (SB) ________Service Disabled Veteran Owned SB (SDVOSB) ________ SBA certified Historically Underutilized Business Zone (HUBZone) SB ________ SBA certified Section 8(a) SB ________ SBA certified Women-Owned Small Business (WOSB) ________ Economically Disadvantaged Woman-Owned Small Business (EDWOSB) ________Other Than Small Business (Insert Type) ________________________
EXPERIENCE:
1. Number of years/months executing AE projects performing services similar to those anticipated under this contract: ________years ________ months
2. Number of years/months executing US Government AE projects performing services similar to those anticipated under this contract: ________years ________months
3. What is your Firm’s highest dollar valued AE contract within the last five years?
4. The $15M Cost IDIQ may require work as follows. Select all that apply that the Firm has performed within the past five years:
a. Military Construction (MILCON) project detailed construction cost estimates (Yes or No)
b. Concept and budget estimates for complex facilities construction (Yes or No)
c. NAVFAC DD Form 1391 Documentation (Yes or No)
d. Economic analysis, life cycle cost analysis, Total Ownership Costs and other non-present value cost analyses (Yes or No)
e. Charrette facilitation (Yes or No)
f. Cost, Schedule and Risk Analysis (CSRA) (Yes or No)
g. Construction Schedule (Yes or No)
h. Value Engineering Studies (Yes or No)
i. Database and cost estimating tool creation (Yes or No)
j. Quality/Constructability Reviews (Yes or No)
5. Does your Firm have the ability to simultaneously manage multiple projects totaling $3M or more per year? (Yes or No)
6. How many $750K task orders can the firm successfully perform and manage at one time:
a. One task order
b. Two task orders
c. Three task orders
d. Four task orders
e. Five task orders
f. More than five task orders
7. Has the Firm developed multiple concurrent detailed cost estimation documents at least $2M in AE contract value? (Yes or No)
a. If yes, indicate how many, when and locations of the projects.
8. The Firm has performed these types of services within the past 5 years:
a. Military construction cost estimation and value engineering for renovation and repair of facilities and associated infrastructure on a DoD installation (Yes or No)
b. Military construction cost estimation and value engineering for new construction of facilities on a DoD installation (Yes or No)
c. Federal construction cost estimation and value engineering for renovation, repair or new construction of non-DoD facilities (Yes or No)
SECTION 3. CONTRACTOR ARRANGEMENT
Our Firm will most likely be proposing on this IDIQ as a:
____Joint Venture with (Insert business name, business size, and cage code).
Refer to FAR subpart 9.6 for Government policy on teaming arrangements, as well as 8(a)Program regulations described in 13 CFR 124.513, HUBZone Program regulations described in 13 CFR 126.616, and Service-Disabled Veteran-Owned Program regulations described in FAR 19.1403(c) and 13 CFR 125.15(b).)
____Sole Contractor, self-performing 100% of the work ____Prime Contractor (Small Business), self-performing at least 50% of the work ____Prime Contractor (Small Business) performing at least 50% of the work with the following team member subcontractor(s) (Insert business name, business size, cage code, and work which will be subcontracted) (IAW FAR 52.219-14(e)(1), dated Oct 2022) ____Subcontractor, performing less than 50% of the work for (Insert business name, business size, cage code, and work which will be done) ____ Prime Contractor (Large Business) subcontracting more than 50% of the work (Insert business name, business size, cage code, and work which will be subcontracted) ____Other – explain_________________________
File details come from the government source that posted it. Updated .