Attachment 1 - BRISTOL BAY (WTGB 140) SoSS.xls
XLS spreadsheet 77 KB Posted
- Attached to
- USCGC Bristol Bay DS Repairs FY26
- Solicitation number
- 70Z08526QIBCT0027
About this file
This is a Schedule of Supplies and Services (SoS&S) pricing template for dockside repairs to the USCGC Bristol Bay (WTGB-140), a 140-foot Class River Buoy Tender Cutter homeported in Detroit, Michigan. The pricing schedule contains 42 line items (CLINs D-001 through D-042) organized into definite and optional items, with all unit prices currently set at $0.00 pending contractor quotation. The scope of work encompasses fire prevention requirements, tank cleaning and inspection (water mist, hydraulic oil, potable water, lube oil, ballast, and waste tanks), accessible void inspections, commercial cleaning of exhaust piping and vent ducts across engine rooms, galleys, and other spaces, circuit breaker testing, compressed air system maintenance, deck equipment inspection and service (capstans, davits, pelican hooks), piping system flushing, and various hull fitting inspections. Additional items cover barge-specific work and specialized equipment overhaul such as gypsy winches.
The template includes provisions for composite labor rates by geographic location (ranging from Baltimore, Maryland at $62/hour to Seattle, Washington at $48/hour, with Houston, Texas as the median rate at $55/hour), with assumed G&A and profit factors of 15% and 10% respectively. Contractors must provide detailed cost estimate breakdowns itemizing direct labor by skill category (Engineering Technician, Machinist/Pipe Fitter, Electrician, Shipfitter, Welder, Firewatch, Insulator/Lagger, Painter, General Labor), material and subcontractor costs, and total labor hours per line item. The contract is structured as an Indefinite Delivery Requirement (IDR) contract under FAR Part 12 as a total small business set aside (NAICS 336611 - Ship Repair, 1,300-employee size standard) with a performance period of June 2 through July 13, 2026 (42 days), and laydays are estimated at 5 days with associated daily rates to be provided by the contractor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC BRISTOL BAY (WTGB-140) DOCKSIDE AVAILABILITY FY2026 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Fire Prevention Requirements «TYPE» | JOB | $0.00 | ||
| D-002 | Tank (Water Mist), Clean And Inspect | JOB | $0.00 | ||
| D-003 | Tanks, Hydraulic Oil Stowage and Service, Clean and Inspect | JOB | $0.00 | ||
| D-004 | Tanks, Potable Water, Clean and Inspect | JOB | $0.00 | ||
| D-005 | Tanks, Lube Oil, Clean and Inspect | JOB | $0.00 | ||
| D-006 | Tanks, Ballast, Clean and Inspect | JOB | $0.00 | ||
| D-007 | Voids, Accessible, Clean and Inspect | JOB | $0.00 | ||
| D-008 | Tanks, Dirty Oil and Waste, Clean and Inspect | JOB | $0.00 | ||
| D-009 | Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean | JOB | $0.00 | ||
| D-010 | Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean | JOB | $0.00 | ||
| D-011 | Boiler Exhaust Stack Uptakes, Commercial Clean | JOB | $0.00 | ||
| D-012 | Bubbler Diesel Engine Exhaust Piping, Commercial Clean | JOB | $0.00 | ||
| D-013 | Circuit Breakers (60 Hz), Inspect and Test | JOB | $0.00 | ||
| D-014 | Vent Ducts, Engine And Motor Room, All, Commercial Cleaning | JOB | $0.00 | ||
| D-015 | Vent Ducts, Galley and Pantry Room, All, Commercial Cleaning | JOB | $0.00 | ||
| D-016 | Vent Ducts, All Other, Commercial Cleaning | JOB | $0.00 | ||
| D-017 | Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift | JOB | $0.00 | ||
| D-018 | Vertical Capstan, Inspect and Service | JOB | $0.00 | ||
| D-019 | Hull Fittings (Mooring and Towing), Inspect and Test - Barge | JOB | $0.00 | ||
| D-020 | Single Point Davit, Inspect and Service | JOB | $0.00 | ||
| D-021 | Hydraulic Release Pelican Hook, Inspect and Service - Tender | JOB | $0.00 | ||
| D-022 | Grey Water Holding Tanks, Clean and Inspect | JOB | $0.00 | ||
| D-023 | Sewage Holding Tanks, Clean and Inspect | JOB | $0.00 | ||
| D-024 | Grey Water Piping, Clean and Flush | JOB | $0.00 | ||
| D-025 | Sewage Piping, Clean and Flush | JOB | $0.00 | ||
| D-026 | Tanks, MP Fuel Service, Clean and Inspect - Barge | JOB | $0.00 | ||
| D-027 | Tanks, Potable Water, Clean and Inspect - Barge | JOB | $0.00 | ||
| D-028 | Tanks, Ballast, Clean and Inspect - Barge | JOB | $0.00 | ||
| D-029 | Voids, Accessible, Clean and Inspect - Barge | JOB | $0.00 | ||
| D-030 | Boiler Exhaust Stack Uptakes, Commercial Clean - Barge | JOB | $0.00 | ||
| D-031 | Vent Ducts, Galley and Pantry Room, All, Commercial Cleaning - Barge | JOB | $0.00 | ||
| D-032 | Vent Ducts, All Other, Commercial Cleaning - Barge | JOB | $0.00 | ||
| D-033 | Hull Fittings, Weight Handling Rigging Hardware, Inspect and Test - Barge | JOB | $0.00 | ||
| D-034 | Mechanical Chain Stoppers, Inspect and Service | JOB | $0.00 | ||
| D-035 | Anchor Winch, Inspect and Service - Barge | JOB | $0.00 | ||
| D-036 | Traction Winches, Inspect and Service - Barge | JOB | $0.00 | ||
| D-037 | Gypsy Winches (Appleton Model AMD-865), Overhaul - Barge | JOB | $0.00 | ||
| D-038 | Grey Water Holding Tanks, Clean and Inspect - Barge | JOB | $0.00 | ||
| D-039 | Sewage Holding Tanks, Clean and Inspect - Barge | JOB | $0.00 | ||
| D-040 | Deck Covering, Electrical Matting, Renew | JOB | $0.00 | ||
| D-041 | Firemain Valves, Overhaul or Renew | JOB | $0.00 | ||
| D-042 | Hull Fiitings (Moorning and Towing) | JOB | $0.00 | ||
| O-00A | Composite Labor Rate | Hour | 0 | 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $0.00 | JOB | $0.00 | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(2/19/2026) Rev-2 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .