Attachment 1-BOM.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- 12760425Q0022
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Bill of Materials (BOM) for a PEPRO Communications Shelter procurement for Boot Mountain in the Rio Grand National Forest. The BOM specifies a Dual Micro shelter with 20-foot tower, DC layout with 12Vdc solar system, interior components including battery tray and two equipment racks, passive ventilation, and specialized tower equipment with ANT150f2 antennas. The project requires CLP-2 frame anchoring with 27 steel ballasts (100 lbs each), four Ufer grounded concrete pads, roof-mounted solar hardware, and various cable entry components sized for LMR600.
The delivery location is 1055 9th Street, Del Norte, CO 81132, with helicopter installation required at the remote site coordinates N37°55'13.54", W106°32'28.93" at 12,436 feet elevation. The scope includes transportation to Region 2, helicopter fly-in installation, backhaul and disposal of the existing 6'x6' building (1,200 lbs), mobilization/demobilization, and a 3% contract management fee. Key contacts include Project POC George Herandez (541-371-1354), Technical Contact Patrick Lamb (307-214-0203), COR Ernesto DeLeon (970-837-6103), and IAS Approver Joe Bonaparte. The BOM shows line items without pricing, indicating this is a template for vendor quote preparation under solicitation 12760425Q0022.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| SITE | Region | BOM Amount | IAS Approver | BOC | Job Code | Unit | CIO Override/Job Code |
| Boot Mtn. Communication Building Replacement | 2 | $ - 0 | Joe Bonaparte | 3220 | N/A | 0209 | 2505/ITJVAA25 |
| Total: | $ - 0 |
R2 Boot Mtn.
Bill of Materials
| Shipping Information: Use one sheet per shipping location. | ||
| Unit Name to Ship to: | Rio Grand NF | |
| Point of Contact (Local SAT): | George Herandez | |
| Phone (Local SAT): | 541-371-1354 | |
| Street Address: | 1055 9th St. | |
| City, State: | Del Norte, CO | |
| Zip: | 81132 | |
| Additional Information needed for request. | ||
| Project Point of Contact (name and phone): | George Herandez, 541-371-1354 | |
| Additional Technical Contact (name and phone), if applicable: | Partick Lamb, 307-214-0203 | |
| WR# or Incident Number: | 20254791 | |
| Override/Job Code: | 2505/ITJVAA25 | |
| Q-Code | N/A | |
| IAS PMO | Joe Bonaparte | |
| UAI | N/A | |
| BOC | 3290 | |
| AAP# | RPSH | |
| POW Line Item # and Project Description | Boot Mtn. Communication Building Replacement | |
| COR, if applicable: | Ernesto DeLeon 970-837-6103 | |
| Comments: | Site Lat N37⁰ 55' 13.54", Long W106⁰ 32' 28.93", Elevation 12436 ft. Door location: East & West, Tower: North. |
| LINE | |||||
| ITEM | DESCRIPTION | Manufacturers Part Number | Unit of Issue | QTY | UNIT |
| PRICE | TOTAL |
PRICE
| 1 | SHELTER DESCRIPTION | ||||
| 2 | Dual Micro w/ 20' tower | EA | 1 | $ - 0 | |
| 3 | INTERIOR LAYOUT | ||||
| 4 | DC Layout - Solar system voltage 12Vdc, Single DC Input | EA | 1 | $ - 0 | |
| 5 | Battery Tray | EA | 1 | $ - 0 | |
| 6 | Equipment Rack | EA | 2 | $ - 0 | |
| 7 | Rack Mounted Bussbar (Closest to Solar entry) | EA | 1 | $ - 0 | |
| 8 | VENTILATION | ||||
| 9 | Passive | EA | 1 | $ - 0 | |
| 10 | TOWER | $ - 0 | |||
| 11 | 20' (1) ANT150f2@20', & (1)Inverted ANT150F2@20' | EA | 1 | $ - 0 | |
| 12 | ANCHORING | ||||
| 13 | CLP-2 Frame | EA | 1 | $ - 0 | |
| 14 | Steel Ballast (100#'s each) | EA | 27 | $ - 0 | |
| 15 | Ufer Grounded Concrete Pad | EA | 4 | $ - 0 | |
| 16 | SOLAR MOUNTING HARDWARE | ||||
| 17 | Roof Mount | EA | 1 | $ - 0 | |
| 18 | Solar Bracket | EA | 1 | $ - 0 | |
| 19 | JVJ | ||||
| 20 | JVJ 4" 180⁰ | EA | 2 | $ - 0 | |
| 21 | STANDOFFS | ||||
| 22 | Single 18" | EA | 2 | $ - 0 | |
| 23 | CABLE ENTRY | ||||
| 24 | Cable Entry Glands - Sized for LMR600, (2) holes per gland | EA | 1 | $ - 0 | |
| 25 | Cable Entry Covers | EA | 2 | $ - 0 | |
| 26 | Ice Shield | EA | 1 | $ - 0 | |
| 27 | Site Specific Drawing | EA | 1 | $ - 0 | |
| 28 | Transportation to R2 | EA | 1 | $ - 0 | |
| 29 | Delivery Address: 1055 9th st. Del Norte, CO 81132 | EA | 1 | $ - 0 | |
| 30 | Helicopter Costs | EA | 1 | $ - 0 | |
| 31 | Fly in Installation: Site Lat N37⁰ 55' 13.54", Long W106⁰ 32' 28.93", Elevation 12436 ft. Door location: East & West, Tower: North. | EA | 1 | $ - 0 | |
| 32 | Backhaul of old building: 6'X6' 1200 pounds. 5'x5'x5'. Dispose at landfill. | EA | 1 | $ - 0 | |
| 33 | Mob & Demob | EA | 1 | $ - 0 | |
| 34 | Contract Management Fee | Percentage: | 3% | $ - 0 | |
| 35 | GRAND TOTAL | $ - 0 |