Attachment 1 BOM.pdf
PDF 100 KB Posted
- Attached to
- RSMeans Online Subscription Software
- Solicitation number
- SP4701-26-Q-0098
- Issued by
-
Defense Logistics Agency
About this file
Bill of Materials (BOM) Summary
This is a Bill of Materials (BOM) document for a federal contract opportunity involving RSMO (Remote System Management Operations) software licenses and training services. The contract is structured with a base period and two option periods, each spanning twelve months. The base period runs from June 1, 2026 through May 31, 2027, with Option 1 covering June 1, 2027 through May 31, 2028, and Option 2 covering June 1, 2028 through May 31, 2029.
The contract includes six Contract Line Item Numbers (CLINs) requiring 50 concurrent RSMO users and 10 online self-paced RSMO training courses. CLINs 0001 and 0003 and 0005 are firm requirements for concurrent user licenses across the base period and both option periods. CLINs 0002, 0004, and 0006 are identified as optional CLINs for online self-paced training with periods of performance to be determined (TBD). Each CLIN 0002, 0004, and 0006 mirrors the timing of their corresponding concurrent user CLINs, with the training component supporting the license deployments across all three contract periods.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_SP4701-26-Q-0098_Rev1.pdf | ||
| RFQ_SP4701-26-Q-0098.pdf | ||
| Attachment 2_JA_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN Qty Product
50 Concurrent RSMO Users
10 Online Self Paced RSMO Training
50 Concurrent RSMO Users
10 Online Self Paced RSMO Training
50 Concurrent RSMO Users
10 Online Self Paced RSMO Training Optional CLIN 0002 Period of Performance: TBD
Base Period of Performance: 1 June 2026 to 31 May 2027
Optional CLIN Period of Performance: TBD
Option 1 Period of Performance: 1 June 2027 to 31 May 2028
Optional CLIN Period of Performance: TBD
Option 2 Period of Performance: 1 June 2028 to 31 May 2029
Attachment 1-BOM
BOM
File details come from the government source that posted it. Updated .