Attachment 1 - Bill of Quantities.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Compound Wall Fall Protection, Rome, Italy Federal contract opportunity
Solicitation number
191T7026Q0020
Issued by
Department of State

About this file

This is a Bill of Quantities (BOQ) document outlining the scope of work and cost estimation for compound wall fall protection improvements at the U.S. Embassy compound in Rome, Italy, under Solicitation Number 191T7026Q0020. The project encompasses site preparation, excavation, paving installation, drainage systems, and safety infrastructure improvements. Key work items include construction site safety setup with bollards and fencing (lump sum); vegetation removal and site grading across approximately 45 square meters; hand excavation to 2 meters depth; archaeological oversight by a certified professional from the Archaeological Superintendency of Rome; soil preparation and compaction; porphyry cube paving installation across 55 square meters in geometric patterns matching existing features; joint sealing; French drain system installation including geotextile fabric and perforated drainage pipes; leveling of grids and manholes; cleaning and grouting of travertine coping; and construction of reinforced concrete plinths (14 units, 60x30x100 cm) with anchor bolts for parapet installation. Additional items include supply and installation of decorated railing with hot-dip galvanization and powder coating, plain vertical railing elements, waste removal and landfill transport, and supply of handcrafted terracotta pots with Pittosporum tobira nanum plants.

The BOQ indicates a fixed safety cost of EUR 5,000.00 as the only priced line item, with all other quantities and unit costs listed as EUR 0, suggesting this document serves as a template awaiting pricing input from potential contractors. The Department of State is the federal agency overseeing this Request for Quotation (RFQ), which focuses on structural safety improvements and fall protection systems for the diplomatic facility in Rome.

View the file

Other files for this federal contract opportunity

Other files attached to Compound Wall Fall Protection, Rome, Italy, newest first.
File Type Posted
Questions and Answers.pdf PDF
SF-1442.pdf PDF
Attachment 2 - Technical Specifications.pdf PDF
Prospective Offerors Cover Letter.pdf PDF
Attachment 4 - Material Datasheets.pdf PDF
Attachment 3 - Drawings.pdf PDF
191T7026Q0020.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOQ

Compound Wall Fall Protection
No.DESCRIPTIONUMQTYUNIT COST €TOTAL COST €
1Construction site area using of bollards and / or fences, orsogrill or equivalent collective safety devices. Temporary safety railing must be installed. Included: electrical construction panel, equipment and tools needed to carry out the work safely.lump sum1€ - 0
2Removal of vegetation of any species and size, both shrub and herbaceous, using light mechanical and manual equipment, including removal of root systems, disposal of resulting material, and transport to landfill. Mechanical weed control, including an initial cutting of shrubs, undergrowth, and heterogeneous trees, as well as raking and leveling of the cleared area. Formation of a graded surface by general leveling of the area, excavation, and soil compaction, in order to achieve the elevations indicated in the project.sqm45€ - 0
3Hand Excavation with a fixed cross-section to a depth of 2 m from the ground level, in soil with a resistance of less than 8 N/mm², both in dry and wet conditions, including leveling and shaping of the bottom, and removal of excavated material to the edge of the excavation or to a safe location.cm82.5€ - 0
4Archaeologist certified by the Archaeological Superintendency of Rome and approved by the United States Embassy present during the entire excavation period and carrying out the bureaucratic procedures for the Superintendency.lump sum1€ - 0
5Soil preparation and compaction of the laying surface. After these operations the laying surface shall be perfectly flat. Supply on site on the entire surface of a bed of gravel or crushed stone 4/8 of 5-7 cm thick compacted. To level, spread a dusting of cement on the gravel and wet the surfaces with a light jet of water. The verification by typing of the laying plans and possible modification of the slopes is included for a correct disposal of the water towards the existing manholes.sqm55€ - 0
6Construction of porphyry cube paving laid in a geometric pattern matching the existing, including all costs for interruptions around trees, manholes, and slopes, as well as bedding material, hand tamping, joint sealing, and any other work necessary to deliver the finished job in a workmanlike manner.sqm55€ - 0
7Sealing joints of the new pavers flooring with Mapestone GR-ECO as per technical instructions.sqm55€ - 0
8Creation of a French drain system: deep drainage by means of a narrow trench excavation approximately 30 cm wide and 80 cm deep; supply and installation of geotextile fabric, 110 mm diameter perforated drain pipe laid on gravel, including connections to the collector; backfilling with gravel up to40 cm from the finished surface, and final covering with stone-free soil or other clean fill up to the original ground level, compacted after suitable wetting.lump sum1€ - 0
9Leveling of grids, manholes, and related covers of any shape and type to be carried out in the affected area, including: removal of the frame, formation of the new laying surface, installation of the frame and cover, and perimeter sealing with fiber-reinforced, thixotropic, and anti-shrinkage structural mortar. Includes verification of the integrity of the water discharge pipelines and, if necessary, their replacement. Also included are the removal of any existing irrigation systems, modification of existing water pipes, and modification of existing inspection chambers.lump sum1€ - 0
10Cleaning of the existing travertine coping and all parts covered by travertine slabs with a low-pressure cleaner and grouting where necessary.lump sum1€ - 0
11Construction of reinforced concrete plinths, dimensions 60x30x100 cm, including anchor bolts made of round steel bars threaded at the top, 80 cm in length, equipped with a concrete anchoring system and umbrella or U-shaped terminal, for the installation of the new parapet as specified in the Statement of Work (SOW). The item includes supply and installation of all materials, formwork, reinforcement, anchor bolts, concrete casting, curing, and all operations necessary to deliver the work in a workmanlike manner, complete and in accordance with project specificationseach14€ - 0
12Supply and installation of decorated railing, including hot-dip galvanization and powder coating, as specified in the SOW. The item includes all materials, finishes, labor, and operations necessary to deliver the work complete and in accordance with project specifications.lump sum1€ - 0
13Supply and installation of railing with plain vertical elements, as specified in the project documentation. The item includes all materials, finishes, labor, and operations necessary to deliver the work complete and in accordance with the SOW specifications.lump sum1€ - 0
14Loading and transport to landfills and/or authorized plants which must certify a copy of the waste identification form.a transported according to current regulations, by any means, of material coming from demolitions and excavations, even if wet, including loading carried out with means mechanical or by hand and the subsequent unloading. Excluding landfill charges: including hand loadingsqm55€ - 0
15Landfill chargeslump sum1
16Costs for Safetylump sum1€ 5,000.00
Total
17Supply of handcrafted terracotta pot festooned with Pittosporum tobira nanum plants planted in mixed soil of peat and clay -see the exsting oneseach1€ - 0
Total€ 5,000.00

File details come from the government source that posted it. Updated .