Attachment_1_Backpack_Invasive_Plant_Contract-2026_SOW_V2.pdf

PDF 160 KB Posted

Attached to
Invasive Plant Treatment- Backpack for Grand Teton
Solicitation number
140P1426Q0064
Issued by

About this file

This is a Statement of Work for backpack invasive plant treatments at Grand Teton National Park in Wyoming.

The contractor is required to conduct ground-based survey and herbicide treatment of noxious weeds in defined non-motorized areas within the park using backpack spraying, truck handgun with long hoses, or similar ground-operated equipment. The contractor must furnish all necessary items including herbicides, adjuvants, materials, equipment, labor, licensing, supervision, and transportation. Work includes surveying assigned acreage for noxious weeds, mixing and applying specified herbicides, submitting daily treatment records on government-provided forms, and collecting electronic data via GPS including track logs for all surveying and treatment activities. The contract is performance-based with an IDIQ structure offering a one-year base period (June 1, 2026–May 31, 2027) and two optional 12-month renewal periods. Work is estimated to occur between June 1 and July 15 annually during daylight hours Monday through Friday. The government will exercise line items totaling a minimum of $2,500 but not exceeding $299,000 across the contract's life. Estimated acreage to be treated ranges from 50 to 450 acres per contract period for backpack treatments.

Key requirements include: contractor and employees must hold current Wyoming Commercial Pesticide Applicators licenses and possess two years of noxious weed management experience; a designated site manager with supervisory authority must be on-site; personnel must be proficient in plant identification and herbicide application; 90 percent minimum treatment efficacy is required, with monitoring plots used to verify results; electronic data and treatment records must be submitted within 14 days of completion; equipment must be weed-free and inspected before mobilization; and all work must comply with herbicide label recommendations and federal, state, and local regulations. Water is available at no cost at two locations (Headquarters Campus in Moose and Moran Junction Administrative Site), with a third location at Beaver Creek Chemical Shed. The contractor must develop a Quality Control Plan within 30 days of award and conduct daily self-inspections with weekly submission of records. Government final inspection occurs at least 14 days after work completion and focuses on signs of herbicide damage to plants.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Backpack Invasive Plant Treatments Grand Teton National Park

Statement of Work

1.1 Scope of Work

Backpack Spot Treatments This item includes defined areas where motorized survey and treatment methods are not allowed. Motorized access to jobsite and staging areas will be approved and available;

however, survey and treatment will be conducted by non-motorized methods such as backpack spraying. Treatment with truck handgun and long hoses that can reach into the interior of a given project area may be allowed, depending on jobsite, and will be described in individual order/line item. Price per acre reflects the cost of survey and application of herbicide (treatment), herbicide used, as well as collection of electronic data. This is a requirement for the ground-based survey and application of herbicide to control targeted noxious weeds in Grand Teton National Park, Wyoming.

Equipment to be utilized and treatment methods will vary by site. The Contractor shall furnish all necessary items but not limited to herbicides and adjuvants, materials, equipment, labor, licensing, supervision, transportation, operating supplies and incidentals necessary to safely survey assigned acreage and apply herbicides using ground-operated equipment, in strict compliance with the herbicide labels. Common herbicides and adjuvants may be used and will be described in the scope of work (SOW) for each line. Contractors should submit a list of herbicides to be used to the park before work begins.

Work to be performed by the Contractor includes but not limited to: (a) survey assigned acreages (Sites) for noxious weeds; b) mix and apply specified herbicide(s) to the target weed(s); (c) complete and submit Government provided daily herbicide treatment records;

and (d) the collection of electronic data, which includes track logs that capture travel routes while both surveying and applying herbicide. The individual orders/line items will provide further specifics on the daily herbicide treatment records. Orders/line items will be issued by the Government for work ordered under this contract. Orders/line items will include site-specific descriptions and maps for the work to be accomplished, specify herbicides, adjuvants, and rates to be used, as well as provide additional details that will inform the Contractor of access points, water sources, and other details.

This work is 'performance-based' with multiple contract awards (IDIQ, Base Year and Two Option Years). 'Performance-based' means the Contractor is responsible for an end product/result. If an end product/result is not provided in compliance with the Performance Work Statement (PWS) and contract terms and conditions, rework will be required where possible and/or a payment reduction may result (reference the Quality Assurance Surveillance Plan (QASP) (Attached).

1.2 Period of Performance

The period of performance shall be for one (1) Base Year of 12 months and two (3) 12-month option years. The Period of Performance reads as follows:

Base Year: June 1, 2026 – May 31, 2027 Option Year I: June 1, 2027 – May 31, 2028 Option Year II: June 1, 2028 – May 31, 2029

1.3 Schedule

Individual line items will identify specific start work and completion dates. Start work dates may vary depending on treatment method, as well as site-specific and/or environmental conditions. Work shall commence in a time period when target plants are actively growing, and weather conditions make them susceptible to herbicide effects as per the manufacturers' recommendations. It is estimated that work will be performed between June 1 and July 15 of each year.

1.4 Place of Performance

Project areas that are included under this contract are all National Park Service lands within Grand Teton National Park. Line items will include maps and descriptions of project areas.

1.5 Hours of Operation

Work is conducted during daylight hours, Monday through Friday. Work during weekends, holidays, or outside of daylight hours must be approved in advance by the Contracting Officer.

1.6 Estimated Acres to be Treated

The following table contains the range of estimated acres to be treated; it is not a guarantee of minimum or maximum numbers of acres to be awarded.

NOTE: Specific information on backpack treatments will be provided with the individual line items.

Treatment type Applicable Contract Period

Estimated Minimum Acres Per Period

Estimated Maximum Acres Per Period

Backpack Treatments Base and Each Option Year

50 450

1.7 Information Related to All Invasive Plant Treatment Types All weed treatment and pesticide application shall be in strict conformance with the product manufacturer's recommendations and product labeling, in addition to complying with all applicable Federal, State, and local regulations. The Contractor shall conduct surveys to include the entirety of the defined site(s) and treat the invasive vegetation found within, unless otherwise described. In any particular project area, to exact location and the precise number of acres of any given noxious weed infestation will be unknown. The number of acres to be surveyed and/or treated, as well as the project areas, may vary from year to year; estimated acreage and project areas will be outlined in the individual line items.

1.8 Minimum and Maximum Contract Amounts

The Government shall exercise line items totaling a minimum of $2,500.00 for the work specified (Backpack Spot Treatments), but not more than $299,000.00 collectively over the life of the contract (Base and two Option Years).

2.0 Description of Survey and Treatment (Project) Areas

2.1 General

Survey and treatment sites may include, but are not limited to, front country areas such as restoration sites, grass or sagebrush dominated rangeland, disturbed construction sites.

Access to project sites will generally be straightforward. Treatment methods may include motorized or non-motorized depending on site, which may include backpack, UTV handgun, truck hose and handgun, and will be determined on a site-specific basis. UTV and truck handgun options only available if the vehicles remain on the roadside and hose is pulled into project site.

2.3 Terrain

Terrain will vary from gentle to steep and may change within a project site; however, most project sites will contain gentle to low/moderate slopes. Treatment locations may contain fences, irrigation ditches, or other features or obstructions that require situational awareness and attentiveness to hazards to conduct work safely and efficiently.

2.4 Weed Densities {Estimate)

Invasive vegetation densities vary across potential project sites. Estimates indicate most sites will be in a 1-10% range, with isolated patches approaching 20% or greater. These estimates are provided to provide useful information to the Contractor. The Government will not be responsible for on the ground weed densities that vary from these numbers.

2.5 Project Site Access

Front country treatment sites will generally have road access to project locations and/or project staging areas. Roads may be paved or unpaved and may require 4-wheel drive to access. In front country project areas, there is expected to be non-motorized survey and treatment areas. Within these areas, the Government shall select a method of treatment that meets the contract requirements. Detailed maps will be provided with the SOW showing site location, access roads, and staging areas. Further details on treatment site(s) and methods, weed densities, access, and/or target weed species are described below, and/or will be described in the line item SOW.

3.0 Pay Items

All weed treatment and pesticide application shall be in strict conformance with the product manufacturer's recommendations and product labeling, in addition to complying with all applicable Federal, State, and local regulations. The Contractor shall conduct surveys to include the entirety of the defined site(s) and treat the invasive vegetation found within, unless otherwise described. In any given project area, the exact location and the exact acres of any given noxious weed infestation is unknown. Acreage to be surveyed and/or treated may vary from year to year; estimated acreage will be stated at the time of the line item being exercised.

4.0 Requirements and Conditions

4.1 Contractor Representative

The Contractor shall provide a contract representative for the performance of work. The name of this person and an alternate(s) who can act for the Contractor when the Contractor is absent shall be designated in writing to the Contracting Officer.

4.2 Site Manager

If the Contractor is to be absent from the jobsite at any time, a Site Manager shall be designated in advance who will directly supervise subordinate employees and oversee operations in the Contractors absence. Site Manager must have Wyoming Commercial Pesticide Applicators license and must have two (2) years of experience in noxious weed management and personnel supervision. Site Manager may also be the Contractor Representative. The name of this person shall be designated in writing to the Contracting Officer.

4.2.1 Certification and Personnel Requirements

The Contractor and employees shall be experienced in noxious weed and invasive weed management, plant identification, and herbicide application. Regardless of area, the Contractor and employees shall be proficient in identifying target and nontarget species in all stages of development. The Contractor performing herbicide mixing or application operations under this contract must hold a current Wyoming Commercial Pesticide Applicators License. Personnel employed by the Contractor must be briefed and trained in application and safety techniques. The Contractor shall provide a list of all employees with a copy of their certifications prior to issuance of the Notice to Proceed (NTP) with each line item exercised. Personnel employed by the Contractor must be under the direct supervision of a licensed applicator at all times in the Park. Personnel should have experience in GPS capability including point and line recording.

4.3 Safety Requirements and Related Provisions

4.3.1 General

The Government is not responsible for the safety of the Contractor nor any operators or assistants. The Contractor shall provide and maintain work procedures which will safeguard the public and Government personnel, as well as the Contractor's own personnel. The Contractor shall be expected to use reasonable safety procedures and equipment while operating on National Park lands. The Contractor and all application personnel are required to review, understand, and follow the herbicide label recommendations, requirements, precautions, and prohibitions. The Contractor shall carry and have within easy access during all spraying operations, a label and MSDS for the herbicides being used. The Contractor will keep spray rigs and equipment appearing neat, professional and organized. Dye stains on the rigs, tanks, and employee clothing will be kept to a minimum by regular cleaning. It is important to project a professional image and to demonstrate that the herbicide applications are performed carefully, professionally and without spillage.

4.3.2 Animal Presence

Domestic animals (cattle, horses) as well as wildlife (bison, elk, antelope, bear, birds, etc.)

may be present at project sites. The Contractor and employees are expected to conduct themselves appropriately in situations where animals are present. See Wildlife Regulations in Attachments. The Government reserves the right to alter or relocate treatment operations if wildlife conflicts occur or are expected to occur.

4.3.3 Weather

The Contractor is required to be aware of and regularly monitor weather conditions.

Spraying shall not occur while it is raining or snowing. The Contractor shall take all reasonable precautions to avoid spraying if it appears that precipitation sufficient to wash herbicide(s) off target species or into open water may occur within the label specified rain fast period of herbicides used. The Contractor is responsible for knowing these time periods and is responsible for retreatment of weeds that were initially treated within the applicable time period.

4.3.4 Triple Rinsing

The Contractor shall ensure that containers or tanks used for herbicide application are not washed within 150 feet of open water: springs, ditches, streams, ponds, or lakes. The Contractor will follow all State, Federal and label regulations involving rinsing and washing procedures.

4.3.5 Chemical Transport

A tight fitting and secure lid is mandatory on all spray tanks and herbicide containers.

Transport concentrate containers only in a manner that will prevent spills. Transport herbicides and additives in a compartment that is isolated from food, clothing and safety equipment. The Contractor will inspect equipment daily for leaks and suspend operations until all leaks are repaired.

4.3.6 Chemical Spill

All spray operations and herbicide transport vehicles will have standard adequate spill containment and cleanup materials and equipment. Contractors and their employees will be trained in responding to and dealing with any spills of herbicide. Should a significant spill of concentrated herbicide occur, the Contractor will immediately follow standard and label stated procedures. The Contractor will then attempt to contact the Contracting Officer Representative (COR) and Contracting Officer (CO). If neither can be reached, then Teton Interagency Dispatch (307-739-3301), who will attempt to reach the COR or CO.

4.4 Scouting of Noxious Weeds in the Project Area

The Contractor is required to cover all of the project area as described in a line-item SOW to find the weed infestations. In any given project area, the exact location and the exact acres of any given noxious weed infestation is unknown. The Government will give the Contractor an estimated number of acres at the time of the line being exercised.

4.5 Herbicide Treatment Standards

The Contractor shall provide all herbicides and adjuvants. Contractor will treat all targeted weeds with the appropriate herbicide at prescribed rate. The Government will identify which herbicide(s) to use, and at what rate, for each treatment area within each line item being exercised. At a minimum, 90% of the weeds treated (for each species) and acreage claimed will show mortality or physical signs of herbicide treatment such as wilting, curling or discoloration. Contract inspections will allow sufficient time for target plants to exhibit herbicide effects. Intermittent and spot spraying will occur where target species densities are discontinuous and light to moderate. Broadcast application is appropriate for dense continuous stands of targeted weeds or where specified on the line item being exercised.

Otherwise, avoid broadcast herbicide application where target species occur only sporadically in a dominant cover of non-target plants. A water-based dye or other approved color marking system will be used when determined appropriate. The Government will determine herbicides or tank mixes for each area.

4.6 Electronic Data Collection

Electronic data collection is defined as the collection of spatial and tabular data of the work being performed using GPS hardware and software. The Contractor is required to provide the electronic data to the Government. The Contractor shall utilize a GPS unit capable of recording tracks and points, which must be collected using the coordinate system of NAD 83. Track logs must be recorded for every employee performing survey and treatment. Point data to be recorded, if required, will be specified in the appropriate SOW for each line item being exercised. The final submitted product will contain track logs, or point data if specified, for the for the entire area in which inventory and treatment was conducted, as defined in the SOW for each line item exercised, with date collected for every employee working on site. The Contractor will submit electronic data within fourteen

(14) days of completing on-site treatment.

4.7 Monitoring and Record Keeping Requirements for Treatments Federal and State laws require record keeping for all applications of pesticides on Park Service lands. The Contractor shall provide complete, accurate, and detailed daily records throughout the duration of the contract and provide the Government with legible, readable copies of such records on Government provided forms (see Daily Treatment Records in attachments). The Contractor will submit completed, hard copy treatment records within fourteen (14) days of completing on-site treatment.

4.8 Weed Free Equipment

The Contractor is required to furnish weed-free equipment. The Contractor shall mobilize all vehicles, trailers, and equipment to the job site in a condition that is free of mud, dirt, and plant material. Pressure washing (or similar cleaning method) of equipment, prior to transport, will be necessary in order to comply with this requirement. Livestock will be free of burrs/seedpods on animal or tack, will have been on weed free forage for two weeks prior to work, and only weed free feed will be used if feed is brought in with livestock. Stock trailers will meet the same requirements as listed above, will be free of any outside material and will not be cleaned out on Park Service lands. Prior to beginning work or transporting equipment to project site, the Contractor shall make equipment available for a Government inspection at an agreed upon location and shall obtain verbal approval to proceed from the CO or the COR. Equipment that is determined to be in non-compliance after inspection will be re-cleaned, re-inspected, and approved or rejected, at no cost to the Government, prior to use. All subsequent move-ins shall be treated the same as the initial move-in.

4.9 Equipment Maintenance

The Contractor shall be solely responsible for repair and maintenance of all equipment used in performance of the work, including the costs of repair parts. Furthermore, any delay caused by equipment malfunction or break down shall be the responsibility of the Contractor.

4.10 Availability of Water

Water for mixing herbicide is available at no cost to the Contractor at two locations: 1) Headquarters Campus, Moose, WY; 2) Moran Junction Administrative Site, Moran WY).

Both locations are several miles from potential project sites and are accessible by paved roads. Water sources include municipal sources such as fire hydrant or 1.5" valve. The Contractor is responsible for providing necessary fittings and hose and must provide and use an approved back flow prevention device or utilize an air gap of twice (2x) the diameter of the fitting being used. Contractor is responsible for transportation of water to jobsite.

Water sources in backcountry, non-motorized treatment areas will be limited, however municipal sources as listed above will be available.

5.0 Government Provided Property

5.1 Water Sources

Two locations are available and are situated several miles from potential project sites, accessible by paved roads.

Three locations are available and are situated several miles from potential project sites, accessible by paved roads.

1) Headquarters Campus, Moose, Wyoming; and/or

2) Moran Junction Administrative Site, Moran, Wyoming

3) Beaver Creek Chemical Shed

Water sources include municipal sources such as fire hydrant or 1/5" valve. The Contractor is responsible for providing necessary fittings and hose and must provide and use an approved back flow prevention device or utilize and air gap of twice (2x) the diameter of the fitting being used. Contractor is responsible for transportation of water to jobsite. Water sources in backcountry, non-motorized treatment areas will be limited, however, municipal sources as listed above will be available.

6.0 Weed List

Species to be treated include all those listed on the Grand Teton National Park Invasive Plant Priority List, Teton County Declared Weed List, and Wyoming State Designated Weeds list (see Attachments). The Contractor shall be thoroughly familiar with native and nonnative plant species common to the intermountain west, as well as those species found on the attached noxious weeds lists.

7.0 Performance Requirements Summary

7.1. Contractor Quality Control

The Contractor is responsible for management and quality control actions to meet the terms and conditions outlined herein. The role of the Government is quality assurance to ensure contract standards are met. A Quality Control Plan shall be provided by the Contractor within thirty (30) days of contract award. The Plan shall demonstrate how the Contractor will monitor and inspect the work performed by the Contractor. Once work for a line item has commenced, Quality Control self-inspections will be conducted by the Contractor daily, and records of such must be submitted to the Government weekly.

Records of Quality Control inspections shall be kept and made available to the Government throughout the performance period and for the period after contract completion until final settlement of any claims under this contract.

7.2 Government Inspection and Acceptance

The Government will inspect completed work on each line item by reviewing the self-inspection records and by verifying information in the field. The COR or designated Inspectors may conduct periodic inspections at discretionary times and locations while work is being carried out by Contractor. If, as a result of these periodic inspections, the COR or Inspector has concerns about the Contractor's ability to meet defined Quality Standards, these concerns will be communicated to the Contractor. The Government will conduct a final inspection at the treatment sites at least fourteen (14) days following completion of SOW defined in the line item. The final inspection will be used to look for signs of herbicide damage to the plants (wilting, color change, or stunted growth). A determination of acceptance will be based on discoloration and wilt of the plants through ocular easements within the treatment or inventory area. If initial ocular inspection during the final inspection suggests treatment efficacy of less than 90 percent, monitoring plots will be utilized in order to determine whether quality standards have been met. If it is determined the Contractor has failed to meet the minimum 90 percent affected targeted plants, the Contractor shall rework the area. The SOW will not be accepted until 90 percent of the targeted species show signs of herbicide damage. Failure to meet the 90 percent or greater quality standard will result in reduced payment or non-acceptance (See Sections

7.3 - 7.5).

Additionally, daily treatment logs and electronic data must be submitted within fourteen

(14) days after the completion of the line-item SOW and prior to invoicing. These records and data will be reviewed by the Government to determine accuracy and completeness prior to final acceptance. If monitoring plots are utilized, the location within the treatment area will be at the discretion of the Government. Circular p lots will have a radius of 29.5 feet, which is equivalent to 1/16 acre. The number of plots to be used will be determined on a case by case. Weed kill count within this plot will be determined by ocular estimation of total percent of live versus dead weeds. These observations will be recorded on a monitoring sheet.

7.3 Government Quality Assurance

The purpose of the Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the contract. The QASP explains what will be monitored, how monitoring will take place, who will conduct the monitoring and how the monitoring will be reported. The Government's role and responsibility shall be to oversee and coordinate the monitoring activities among the Contracting Officer, Contracting Officer's Representative and the Inspector(s). The Contractor representative(s) shall at a minimum provide an onsite contract manager (Site Manager), who shall be responsible for all contract requirements and who fully represents the Contractor on all matters relating to the operation of this contract.

Grand Teton National Park
Statement of Work
1.1 Scope of Work
Backpack Spot Treatments
1.2 Period of Performance
1.4 Place of Performance
1.5 Hours of Operation
1.6 Estimated Acres to be Treated
1.7 Information Related to All Invasive Plant Treatment Types
1.8 Minimum and Maximum Contract Amounts
2.0 Description of Survey and Treatment (Project) Areas
2.1 General
2.4 Weed Densities {Estimate)
2.5 Project Site Access
3.0 Pay Items
4.0 Requirements and Conditions
4.1 Contractor Representative
4.2 Site Manager
4.2.1 Certification and Personnel Requirements
4.3 Safety Requirements and Related Provisions
4.3.1 General
4.3.2 Animal Presence
4.3.3 Weather
4.3.4 Triple Rinsing
4.3.5 Chemical Transport
4.3.6 Chemical Spill
4.4 Scouting of Noxious Weeds in the Project Area
4.5 Herbicide Treatment Standards
4.6 Electronic Data Collection
4.7 Monitoring and Record Keeping Requirements for Treatments
4.8 Weed Free Equipment
4.9 Equipment Maintenance
4.10 Availability of Water
5.0 Government Provided Property
5.1 Water Sources
6.0 Weed List
7.0 Performance Requirements Summary
7.1. Contractor Quality Control
7.2 Government Inspection and Acceptance
7.3 Government Quality Assurance