Attachment 1 - ACAD 161676 - Rehabilitate Eagle Lake Carriage Rd - Final Specifications - 2020-06-15.pdf

PDF 3 MB Posted

Attached to
ACAD 161676 - Rehabilitate Eagle Lake Carriage Roa
Solicitation number
140P2020R0038
Issued by

About this file

This solicitation is for the rehabilitation of the Eagle Lake Carriage Road within Acadia National Park. The work includes mobilization and demobilization, installation and maintenance of traffic and erosion control measures, construction of a temporary access road including three 24" culverts, rehabilitation of the existing carriage road surface and drainage features, replacement of selected culverts and one 18" RCP culvert, rehabilitation of dry-laid stone masonry structures, rehabilitation and replacement of bridges, reconstruction of stone retaining walls, replacement of two access gates, and slope stabilization including drilled micropiles. The solicitation is for a fixed-price contract to be awarded by the National Park Service. The response due date is not provided.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACADIA NATIONAL PARK

Hancock County, Maine

REHABILITATE EAGLE LAKE CARRIAGE ROAD

ACAD PMIS NO. 161676

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE

ACADIA NATIONAL PARK

ACAD-161676 TOC-1

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work

01 26 01 Contract Modification Procedures

01 27 00 Definition of Contract Line Items

01 31 00 Project Management and Coordination

01 32 16 Construction Schedule

01 32 33 Photo Documentation

01 33 23 Submittal Procedures

01 35 23 Safety Requirements

01 35 13.22 Archeological Protection

01 40 00 Quality Requirements

01 42 00 References

01 50 00 Temporary Facilities and Controls

01 56 39 Temporary Tree and Plant Protection

01 57 19.12 Noise & Acoustics Management

01 57 23 Temporary Storm Water Pollution Prevention

01 67 00 Product Requirements

01 73 40 Execution

01 74 19 Construction Waste Management and Disposal

01 77 00 Closeout Procedures

01 81 13 Sustainable Design Requirements for Non-LEED Projects

DIVISION 02 – SITE WORK

02 27 00 Scour Protection

02 27 01 Shore Protection

02 54 14 Broken Stone Roads

02 72 20 Culverts and Storm Drains

02 72 22 Underdrain

DIVISION 03 – CONCRETE

03 30 53 Cast in Place Concrete

03 30 98 Precast Structural Concrete

03 30 99 Structural Concrete Repair

DIVISION 04 – MASONRY

04 40 30 Dry-Laid Stone Masonry

DIVISION 09 – FINISHES

09 97 10 Painting Steel Beams

DIVISION 11 – VEHICLE AND PEDESTRIAN EQUIPMENT

11 12 33 Parking Gates

ACAD-161676 TOC-2

DIVISION 13 – SPECIAL CONSTRUCTION

13 20 00 Lead-based Paint Abatement

13 99 98 Slope Stabilization Earthwork

13 99 99 Drilled Micropiles

DIVISION 31 – EARTHWORK

31 25 00 Erosion and Sedimentation Control

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 91 19.14 Aggregate Topsoil Course

32 92 20 Seeding

DIVISION 01 - GENERAL

REQUIREMENTS

ACAD-161676 01 11 00 - 1

SUMMARY OF WORK

SECTION 01 11 00 - SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Contractor use of premises.

3. Public use of site.

4. Work Restrictions.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location: Eagle Lake Carriage Road Loop in Acadia National Park on Mount Desert Island in Hancock County, Maine.

B. The Work of this contract consists of rehabilitation of the approximately 6 miles of historic Carriage Road around Eagle Lake within Acadia National Park. The major elements of work include:

1. Mobilization and demobilization.

2. Installation, maintenance and removal of maintenance of traffic and erosion control measures.

3. Construction of a temporary construction access road from Liscomb Pit to the Eagle Lake

Carriage Road for construction access along the existing old woods road. Liscomb Pit is located on Fire Road 200 off Route 233 near Eagle Lake. Construction of the temporary construction access road includes all required tree removal, clearing, grubbing, excavation, roadway materials and installation of three 24” HDPE culverts. Construction of the temporary construction access road may include installation of a precast concrete open-bottom box culvert instead of installation of three 24” HDPE culverts if Bid Option 1 is awarded.

4. Rehabilitation of the existing Carriage Road wearing surface and subgrade.

5. Rehabilitation of existing drainage features including roadside ditches, stone-lined drainage channels, and back drain channels.

6. Replacement of selected culverts of various types at several locations, including several deteriorated corrugated metal pipe culverts.

7. Replacement of the existing 18” RCP culvert in the causeway east of Carriage Road intersection 6 with an open-bottom precast concrete box culvert.

8. The project may include installation of a precast concrete open-bottom box culvert in

Carriage Road segment 6-7 at approximately Station 96+50 instead of installation of one 18” HDPE culvert if Bid Option 1 is awarded.

9. Rehabilitation of selected dry-laid stone masonry box culverts, including several inlet and outlet wingwalls.

10. Rehabilitation of the three Eagle Lake Little Bridges.

ACAD-161676 01 11 00 - 2

11. Rehabilitation of the three-cell concrete and stone box culvert known as the Beaver Pool Bridge near Eagle Lake Carriage Road intersection seven.

12. Reconstruction of several sections of 4-foot high or shorter dry-laid stone masonry retaining walls.

13. Replacement of two steel Carriage Road access gates at the Route 233 entrance to Eagle Lake Carriage Road.

14. The project may also include construction of approximately 250 LF of dry-laid stone erosion protection along the south edge of the Eagle Lake Carriage Road in segment 6-7 from approximately station 3+00 to 5+50 to protect the Carriage Road and the adjacent shore of Eagle Lake from further erosion, if Bid Option 2 is awarded.

15. The project may also include stabilization of an approximately 100’ long section of rock slide slope above the Eagle Lake Carriage Road at the south end of the Eagle Lake loop, including resetting of existing placed stone slope protection at the base of the rock slide adjacent to the Carriage Road, if Bid Option 3 is awarded.

C. Project will be constructed under a single prime contract.

1.3 CONTRACTOR USE OF SITE

A. General: Contractor’s use of the site for construction operations during the construction period will be limited by parking restrictions noted herein. Contractor's use of the site is also limited by the Government's right to perform work or to retain other contractors on portions of Project. The Contractor shall coordinate his/her work with other contractors working within the project area.

The Contractor shall allow other contractors hired by the Government access and use of the project area insofar as this access does not directly impede the Contractor’s immediate plan of operations.

B. Storage of Materials: The Contractor will be allowed to use the Park’s Liscomb Pit as a staging and materials storage area. Liscomb Pit is located on Fire Road 200 off Route 233 near Eagle Lake. Confine storage of materials in Liscomb Pit to locations mutually acceptable to the Contractor and the Contracting Officer. Access to the Eagle Lake Carriage Road loop from Liscomb Pit shall be via the temporary construction access road constructed by the Contractor.

C. Preservation of Natural Features:

1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

2. Provide temporary barriers as necessary to protect existing trees, plants, and root zones.

3. Do not remove, prune, injure, or destroy trees or other plants without prior approval.

Consult with Contracting Officer and remove agreed-on roots and branches that interfere with construction.

4. Do not fasten ropes, cables, or guys to existing trees.

5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

6. Do not operate machinery off of existing road surfaces without approval of the contracting officer and without first placing timbers to protect ground cover from compaction and disturbance.

D. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

ACAD-161676 01 11 00 - 3

1. Schedule deliveries to minimize use of driveways and entrances.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

E. Construction Camp: Establishment of a camp within the park will not be permitted.

F. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.

G. Refueling: Refuel all dump trucks and personnel vehicles outside of the Park. Utilize the Liscomb Pit staging and materials storage area for refueling of other construction equipment to the extent practical. Backhoes, excavators, graders and other similar equipment may be refueled while on the Carriage Roads to avoid the additional impacts associated with frequent travel back to the Liscomb Pit staging area, provided standard spill prevention precautions, including on-site spill kits, are taken.

1.4 PUBLIC USE OF SITE

A. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public.

The Contractor’s Traffic Control Plans shall discuss/address ways to minimize impacts to the traveling public and Park visitors.

1.5 CONDUCT OF OPERATIONS

A. At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.

B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed without prior consent from the Contracting Officer. Submit requests 72 hours in advance of the work to the Contracting Officer for approval.

C. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

1.6 WORK RESTRICTIONS

A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7 a.m. to 6 p.m., Monday through Friday, except when otherwise indicated.

1. Weekend and NPS Holiday Hours: No work shall be performed on the weekends and NPS holidays without prior approval.

2. Early Morning Hours: No work shall be performed before 7 a.m. unless approved by the Contracting Officer.

ACAD-161676 01 11 00 - 4

B. Existing Utilities

1. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.

2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify Contracting Officer not less than 48 hours in advance of any proposed utility interruptions.

2. Do not proceed with any utility interruptions without Contracting Officer’s written permission.

3. Disruptions to facilities outside the project limits shall be prevented by investigation of existing utilities and protection during construction. Contractor shall be responsible for all costs associated with remedy of accidental disruptions to facilities outside the project limits. Maximum utility interruption shall be four hours.

1.7 SPECIAL CONSTRUCTION REQUIREMENTS

A. Construction Camp: Establishment of a camp within the Park will not be permitted.

B. All construction signing, fencing, erosion control measures, and traffic control measures shall be in place before starting construction.

C. A Carriage Road segment is a portion of the Carriage Road system between numbered intersections. Each Carriage Road segment on the Eagle Lake Carriage Road loop shall be closed to the public during construction on that segment. Only one Carriage Road segment may be closed at a time. The Contractor shall complete work on that segment and open it to traffic before starting work at another segment. The sequence of construction for the Carriage Road segments shall be:

1. CR segment 7-8

2. CR segment 9-8

3. CR segment 9-6

4. CR segment 6-7

D. If Bid Option 3 is awarded, the existing rock slide slope may not be disturbed between June 1 and July 31 to avoid disturbance of any Northern Long-eared Bats that may be present.

E. All construction traffic entering the Carriage Road system shall use the temporary construction access road from Liscomb Pit and use the most direct route to the segment of Carriage Road currently under construction, unless otherwise approved by the Contracting Officer.

F. The Contractor shall use caution when moving vehicles and equipment on the Carriage Roads, especially on segments open to the public. The maximum speed limit on Carriage Roads is 15 mph. All Contractor vehicles and equipment shall yield to and bicycles. The Contractor shall at all times conduct operations to ensure the least inconvenience to the public.

ACAD-161676 01 11 00 - 5

G. No employee personal vehicles or unmarked Contractor vehicles will be allowed on the Carriage Roads. Acadia National Park (ANP) will approve and issue passes for all motorized vehicles using the Carriage Roads. ANP may inspect vehicles for safety, leakage, etc. at any time. This will be strictly enforced. Violations will be subject to citation and removal from the Park.

H. Areas of the Park damaged by the movement of the Contractor's vehicles and equipment, or other construction operations, shall be restored as approved by the Contracting Officer, at no additional expense to the Government.

I. The Contractor’s access to the Carriage Road system will be limited to approximately April 15 to November 15 in each construction season. The actual starting and stopping dates will be dependent on weather and existing Carriage Road conditions and shall be subject to the approval of the Contracting Officer.

J. All work of this contract shall be completed by November 15, 2021. A 48 hour notice is required for any changes in the approved work schedule.

K. Equipment when not in use shall be shut off to minimize noise and air-pollution.

L. Eagle Lake is a public water supply for the Town of Bar Harbor. The Contractor shall perform the work of this project using best management practices to prevent increasing turbidity or otherwise impacting the water quality in Eagle Lake as specified in Section 01 57 23 – Temporary Storm Water Pollution Prevention. NPS will monitor the water quality in Eagle Lake before, during and after construction to ensure that construction operations do not impair the water quality. It the Contractor’s construction operations are determined to be impairing the Eagle Lake water quality at any point during construction the Contractor shall take immediate action to correct the situation.

1.8 SOILS INVESTIGATION REPORT

A. No soils investigation reports are available for this project.

1.9 SALVAGE OF NATIVE STONE AND EXCAVATED MATERIAL

A. All blasted ledge, native stones and all other excavated material suitable for reuse shall remain property of the Park. Separate stones from other excavated material. Transport all salvage materials to Park storage area at Liscomb Pit, Fire Road 200 off Route 233 near Eagle Lake. Place in storage piles as directed by Contracting Officer.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 11 00

ACAD - 161676 01 26 01 - 1

031414 CONTRACT MODIFICATION PROCEDURES

SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. The work of this section consists of administrative and procedural requirements for contract modifications.

1.2 DEFINITIONS AND ALLOWANCES

A. Home Office Overhead: Those costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):

1. Rent

2. Utilities

3. Furnishings

4. Office equipment

5. Executive and management staff not exclusively assigned to the project

6. Support, accounting, and administrative staff

7. Preparation of cost proposals, estimating, and schedule analyses connected with

Modifications

8. Estimating and preconstruction services

9. Mortgage costs

10. Real estate and corporate taxes

11. Automobile maintenance and travel costs for home office personnel

12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.

13. Depreciation of equipment and other assets

14. Home office supplies (paper, staples, etc.)

15. Legal services

16. Accounting and data processing

17. Professional fees/registration

B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with the preparation of modifications will not be allowed. The costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:

1. Project Manager, Assistant Project Manager

2. Superintendent, Assistant Superintendent

3. Quality Control, Safety Officer, Environmental Manager, etc.

4. Engineers

5. Travel, lodging, and per diem (as established by Federal Travel Regulations)

ACAD - 161676 01 26 01 - 2

6. Scheduling

7. Field Office Trailers and associated temporary utilities

8. Field office supplies

a. Mailing and couriers

b. Reproduction costs

c. Storage

d. Phones

e. Computers

f. Copiers

9. Personal vehicles i.e. Superintendent Pickup trucks

C. General Requirements: These are costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate. The following items, if applicable, are considered allowable costs for calculating General Requirements:

1. Hoisting

2. Material handling

3. Temporary fencing

4. Port-a-lets

5. Trash removal, dumpsters

6. Barricades

7. Small tools

8. Safety supplies

9. Scaffolding

10. Daily cleaning

11. Traffic control

12. Temporary signage

13. Temporary heating and power

D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on the project site. Modification costs for salaried workers are only allowed within the structure of a 40 hour week and no overtime or holiday pay will be allowed.

1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:

a. Base Rate: This is the hourly rate paid directly to the worker

b. Labor Burden: Employer payments of all applicable burdens, this includes insurance and taxes that the business must pay on behalf of the worker to government entities and educational forums , such as:

1) Social Security

2) Medicare

3) Workers Compensation– Policy and company calculation to be made available.

4) FUTA– Cap Rate and percentage to be proportionally allocated over one year.

5) SUTA– Cap Rate and percentage to be proportionally allocated over one year.

ACAD - 161676 01 26 01 - 3

6) Union agreement costs – Other costs required under an enforceable collective bargaining agreement.

c. Fringe Benefits: Various non-wage compensations provided to employees such as:

1) Health Care Insurance Premiums

2) Cell Phone

3) Clothing

4) 401K and Pensions

5) Vehicle allowances

6) Gas allowance

7) Life insurance premiums

8) Disability insurance

9) Other Fringe Benefits required under an enforceable collective bargaining agreement

E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.

F. General Liability Insurance: An insurance policy that protects the contractor from claims resulting from bodily injury or property damage to a third party. Include this as a separate line item within all modification proposals and provide a current insurance quote upon request.

G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees that the contractor will pay the labor and material costs they have incurred. Banks and Insurance companies charge a premium for each individual project based on a sliding scale which relates to the size of the project. Include this as a separate line item in modification proposals and provide current company bonding rates upon request.

H. Builder’s Risk Insurance: This covers the contractor’s loss due to fire, high winds, or other natural forces. This is not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.

1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS

A. General:

1. Your proposal must be received in the format and within the time frame specified in the Request for Proposal letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.

2. The proposal must be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed that that they are included in the hourly rate shown, or contractor is not requesting reimbursement.

Contractor may utilize the government provided Contractor Estimate Form, or their http://en.wikipedia.org/wiki/Employee http://en.wikipedia.org/wiki/Surety_bond http://en.wikipedia.org/wiki/Insurance http://en.wikipedia.org/wiki/Bank http://www.nps.gov/dscw/publicforms.htm

ACAD - 161676 01 26 01 - 4

own form, provided that it contains the same information and level of detail as the Gov’t provided form.

3. Requests for extensions of contract time as a result of this change must be justified with a Time Impact Analysis (TIA). Refer to Specification 01 32 16, “Construction Schedule”, for time impact analysis requirements. TIA and associated costs must be received with the proposal by the date shown within the Request for Proposal letter.

Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving the right for additional time and no time extension will be allowed.

4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer upon request.

5. Contractor must review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to the NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.

6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.

B. Labor:

1. Contractor shall estimate the cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing the hours required for each craft that will be directly engaged in modification work.

Any work proposed that will require overtime work or premium pay shall be itemized separately. All rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, FICA, FUTA, and other direct costs resulting from Federal, State or local laws.

2. Itemize labor costs for equipment operators separate from equipment costs.

3. The labor cost for foremen shall only be costs for related work required for the modification.

C. Materials:

1. The estimated cost for materials shall include quotes from multiple sources. Material prices must include all applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.

2. No markup shall be applied to any material provided by the NPS.

D. Equipment:

1. Equipment used for the project must be appropriately sized for the work being performed.

2. Do not include costs for “miscellaneous tools and equipment”, in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 must be broken out separately.

3. Regardless of ownership, the rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:

a. U.S. Army Corps of Engineers , Ownership and Operating Expense Schedule (use latest edition and applicable region)

b. Construction Blue Book

ACAD - 161676 01 26 01 - 5

c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.

4. The estimated equipment rates shall include the operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires & tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per FAR 31.105(d)(2)), depreciation, storage, insurance, and all incidentals.

Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.

5. Estimate the full rate for equipment only for the duration that the equipment will be utilized to accomplish the work of the modification.

6. Standby unit rates used are to be in accordance with paragraph 1.3, D, 2, above. If the US Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then ½ of the equipment costs minus any operating costs, major repair and overhaul will be accepted.

7. If equipment is in standby mode due solely to a documented NPS delay, the established standby rate shall apply from the first day of the delay.

8. Equipment that is not used and on the jobsite for up to five consecutive days may be classified at standby rates, provided that the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work. Equipment that is still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.

9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.

10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.

E. Establishment and Application of Overhead and Profit Percentages:

1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.

Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:

Overhead…………10% Profit………………4.75%

2. Total aggregate limit of markup (OH&P) for contractor and subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.

3. If contractors form a partnership, than the partnership may only receive home office overhead and profit in the same amount as an individual contractor (refer to par 1.3,E,1 above). It is the responsibility of the partners to decide on the division of revenue.

4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, the overhead and profit mark-ups are required on the net increases and deducted on net decreases.

5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.

ACAD - 161676 01 26 01 - 6

PART 2 - PRODUCTS

PART 3 - EXECUTION

END OF SECTION 01 26 01

ACAD-161676 01 27 00 - 1

DEFINITION OF CONTRACT LINE ITEMS

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS

PART 1 - GENERAL

1.1 SUMMARY

A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.

B. If no contract line item exists for a portion of the work, include the costs in a related item.

C. Any estimated quantities of major elements of the work shown in the Contract Plans are approximate. It is the Contractor’s responsibility to visit the project site prior to bid to identify existing conditions that will affect the work and determine the quantities of all materials required to complete the work at each location.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 LIST OF CONTRACT LINE ITEMS

A. Contract Line Item No. 1 – Base Proposal: Fixed price, lump sum, that includes all the work of this project except for the work included in Bid Options 1, 2 and 3. With the exception of the work included in Bid Options 1, 2 and 3, the base proposal includes all work shown in the Contract Drawings and called for in the Specifications, including, but not limited to, the following major items:

1. Mobilization and demobilization.

2. Installation, maintenance and removal of maintenance of traffic and erosion control measures.

3. Construction of a temporary construction access road from Liscomb Pit to the Eagle Lake

Carriage Road for construction access along the existing old woods road. Liscomb Pit is located on Fire Road 200 off Route 233 near Eagle Lake. Construction of the temporary construction access road includes all required tree removal, clearing, grubbing, excavation, roadway materials and installation of three 24” HDPE culverts. Construction of the temporary construction access road may include installation of a precast concrete open-bottom box culvert instead of installation of three 24” HDPE culverts if Bid Option 1 is awarded.

4. Rehabilitation of the existing Carriage Road wearing surface and subgrade.

5. Rehabilitation of existing drainage features including roadside ditches, stone-lined drainage channels, and back drain channels.

6. Replacement of selected culverts of various types at several locations, including several deteriorated corrugated metal pipe culverts.

7. Replacement of the existing 18” RCP culvert in the causeway east of Carriage Road intersection 6 with an open-bottom precast concrete box culvert.

ACAD-161676 01 27 00 - 2

8. Rehabilitation of selected dry-laid stone masonry box culverts, including several inlet and outlet wingwalls.

9. Rehabilitation of the three Eagle Lake Little Bridges.

10. Rehabilitation of the three-cell concrete and stone box culvert known as the Beaver Pool

Bridge near Eagle Lake Carriage Road intersection seven.

11. Reconstruction of several sections of 4-foot high or shorter dry-laid stone masonry retaining walls.

12. Replacement of two steel Carriage Road access gates at the Route 233 entrance to Eagle

Lake Carriage Road.

13. Stabilization of an approximately 100’ long section of rock slide slope above the Eagle

Lake Carriage Road at the south end of the Eagle Lake loop, including:

a. Construction and removal of temporary working pad for equipment on existing

Carriage Road.

b. Excavation of material from rock slide slope, including salvaging of existing stone for placement back on slope.

c. Installation of drilled micropiles.

d. Placement of salvaged existing stone on slope, including over the exposed anchor block at the head of each drilled micropile.

e. Resetting of salvaged existing placed stone slope protection at the base of the rock slide adjacent to the Carriage Road.

B. Contract Line Item No. 2 – Bid Option 1, Parts A and B: Fixed price, lump sum, that includes all the work required to complete:

1. Part A- the installation of a precast concrete open-bottom box culvert instead of installation of three 24” HDPE culverts in the temporary construction access road from Liscomb Pit to the Eagle Lake Carriage Road.

2. Part B- the installation of a precast concrete open-bottom box culvert in Carriage Road segment 6-7 at approximately Station 96+50 instead of installation of one 18” HDPE culvert.

3. This bid option includes all work shown in the Contract Drawings and called for in the Specifications for installation of both precast concrete open-bottom box culverts, including, but not limited to, the following major items:

a. Mobilization and demobilization.

b. Installation, maintenance and removal of maintenance of traffic and erosion control measures.

c. Designing, manufacturing, furnishing, and installing precast structural concrete box culverts and appurtenances, including reinforced concrete precast or cast-in-place footings.

d. All joint wrap/waterproofing, excavation, backfill and removal of existing culverts required to complete the work.

C. Contract Line Item No. 3 – Bid Option 2: Fixed price, lump sum, that includes all work shown in the Contract Drawings and called for in the Specifications for construction of approximately 250 LF of dry-laid stone erosion protection along the south edge of the Eagle Lake Carriage Road in segment 6-7 from approximately station 3+00 to 5+50 to protect the Carriage Road and the adjacent shore of Eagle Lake from further erosion, including, but not limited to, the following major items:

1. Mobilization and demobilization.

2. Installation, maintenance and removal of maintenance of traffic and erosion control measures.

ACAD-161676 01 27 00 - 3

3. All work to select, transport, shape and place Park-supplied stone required to complete the work.

D. Contract Line Item No. 4 – Bid Option 3: Fixed price, lump sum, that includes all work shown in the Contract Drawings and called for in the Specifications for stabilization of an approximately 100’ long section of rock slide slope above the Eagle Lake Carriage Road at the south end of the Eagle Lake loop, including, but not limited to, the following major items:

1. Mobilization and demobilization.

2. Construction and removal of temporary working pad for equipment on existing Carriage

Road.

3. Excavation of material from rock slide slope, including salvaging of existing stone for placement back on slope.

4. Installation of drilled micropiles.

5. Placement of salvaged existing stone on slope, including over the exposed anchor block at the head of each drilled micropile.

6. Resetting of salvaged existing placed stone slope protection at the base of the rock slide adjacent to the Carriage Road.

END OF SECTION 01 27 00

ACAD-161676 01 31 00 - 1

PROJECT MANAGEMENT AND COORDINATION

SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Definitions

2. Construction Coordination.

3. Submittals

4. Requests for Information (RFIs).

5. NPS/DSC SharePoint Project Website.

6. Project meetings.

7. Environmental Coordination.

8. Permits

B. Related Requirements:

1. Section 01 32 16 “Construction Schedule” for preparing and submitting Contractor’s construction schedule.

2. Section 01 73 40 “Execution” for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

3. Section 01 77 00 “Closeout Procedures” for coordinating closeout of the Contract.

1.2 DEFINITIONS

A. Agency with Jurisdiction B. Construction Permits – Contractor Provided C. Government Furnished Permits

1.3 CONSTRUCTION COORDINATION

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components with other Contractors to ensure maximum accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

http://www.nps.gov/dscw/definitionsdc_a.htm http://www.nps.gov/dscw/definitionsdc_c.htm http://www.nps.gov/dscw/definitionsdc_g.htm

ACAD-161676 01 31 00 - 2

4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical.

5. Properly plan construction operations to include permit requirements. Allow enough time to execute permit provisions to maintain work schedule, site visits, inspections, and reporting deadlines.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule.

2. Preparation of the Schedule of Values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Permit requirements.

7. Pre-installation conferences.

8. Commissioning activities.

1.4 SUBMITTALS

A. Division 01 documents: The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference.

1. Letter designating Project Superintendent.

2. Construction Schedule.

3. A comprehensive breakdown of the Schedule of Values.

4. Accident Prevention Plan.

5. A list of Subcontractors for this project.

6. Written statements from subcontractors certifying compliance with applicable labor standard clauses.

7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the

Contactor and all subcontractors.

8. Waste Management Plan.

9. Quality Control Plan.

10. Temporary Storm Water Pollution Prevention Plan.

11. List of Required Construction Permits. Include the following information for each permit:

a. Name of Permit.

b. The Agency(ies) with Jurisdiction issuing the permit.

c. Information required from the Government to complete the permit application.

ACAD-161676 01 31 00 - 3

1.5 REQUESTS FOR INFORMATION (RFIs)

A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI utilizing the form created on the NPS/DSC SharePoint Project website.

1. CO will not respond to RFIs submitted by other entities controlled by Contractor.

2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. RFI number, numbered sequentially.

2. Date.

3. RFI subject.

4. Specification Section number and title and related paragraphs, as appropriate.

5. Drawing number and detail references, as appropriate.

6. Field dimensions and conditions, as appropriate.

7. Contractor's suggested resolution. If Contractor's suggested resolution impacts the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

8. Contractor's signature.

9. Requested date for response.

10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

C. RFI Form: Utilize the RFI form that can be downloaded from the Workflows website at http://www.nps.gov/dscw/con_rfi217.htm or Software-generated form with substantially the same content as indicated above, approved by the CO.

1. Attachments shall be electronic files in Adobe Acrobat PDF format.

2. Enter the general information at the top of the form.

3. Under the “Action” section at the bottom of the form, select “Question” then select “CMR” in the drop-down of the “Send to” box.

4. Enter the details of the question and attach related documents.

5. Select “Submit Form” at the bottom of the page.

D. Contracting Officer’s Action: CO will review each RFI, determine action required, and respond.

CO will determine the critical nature of each RFI and issue a response accordingly.

1. The following are not considered to be RFIs and will receive no action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for approval of Contractor's means and methods.

d. Requests for coordination information already indicated in the Contract Documents.

e. Requests for adjustments in the Contract Time or the Contract Sum.

http://www.nps.gov/dscw/con_rfi217.htm

ACAD-161676 01 31 00 - 4

f. Incomplete RFIs or inaccurately prepared RFIs.

2. CO's action may include a request for additional information, in which case time for response will date from time of receipt of additional information.

3. CO's action on RFIs may result in the need for a change to the Contract Time or the Contract Sum. All contract changes will be processed following the terms and conditions of the contract.

1.6 PROJECT MEETINGS

A. Preconstruction Conference: Before start of construction, Contracting Officer will arrange an on-site meeting with Contractor. The meeting agenda will include the following as a minimum:

1. Roles & Responsibilities/ Lines of Authority.

2. Park rules and regulations.

3. Jobsite Safety.

4. Resolution of comments on required Division 01 documents.

5. Coordination of Subcontractors.

6. Labor law application.

7. Modifications.

8. Payments to Contractor.

9. Payroll reports.

10. Contract time.

11. Liquidated damages.

12. Contractor Performance Evaluation.

13. Display of Hotline posters.

14. Notice to proceed.

15. Correspondence procedures.

16. NPS/DSC SharePoint Project website.

17. Acceptance/rejection of work.

18. Progress meetings.

19. Submittal procedures.

20. NPS Final Accessibility Inspection.

21. Environmental requirements.

22. Permit requirements.

23. As-constructed drawings

24. Saturday, Sunday, holiday and night work.

25. Reference materials.

26. Value engineering.

27. Schedule of Values.

B. Progress Meetings: The Contracting Officer will schedule weekly meetings with the Contractor.

1. Attendees: In addition to Government Representatives, each Contractor, Subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with the Project and authorized to conclude matters relating to the Work.

ACAD-161676 01 31 00 - 5

2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. The meeting agenda will include but will not be limited to the following:

a. Approval of minutes of previous meetings.

b. Submittal status.

c. Requests for information (RFI) and other issues.

d. Modifications.

e. Work in progress and projected.

1) Status of required inspections (Special Inspections, Accessibility, etc.)

f. Inspections of work in progress and projected (Special inspections,

g. Construction Schedule update (provide updated CPM).

h. Status of Project Record Drawings

i. Other business relating to work.

j. Permit requirements.

3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.

4. Reporting: Distribute minutes of the meeting to each party present and to other parties requiring information.

5. Do not proceed with installation if the conference cannot be successfully concluded.

Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.

1.7 ENVIRONMENTAL COORDINATION

A. Contractor’s Environmental Manager: Designate an on-site party responsible for overseeing the Contractor’s conformance to environmental goals for the project and implementing procedures for environmental protection.

1. Qualifications: Minimum 3 years Construction experience on projects of similar size and scope; with environmental procedures similar to those of this project; must be familiar with environmental regulations applicable to construction operations.

B. Contractor’s Environmental Training Program: Contractor shall provide environmental training for workers performing work on the project site. Training shall include the following:

1. Overview of environmental issues related to the Project.

2. Review of site specific procedures and management plans:

a. Construction Waste Management.

b. Temporary Storm Water Pollution Prevention.

3. Pollution Prevention (P2) practices.

4. Compliance with environmental regulations: As specified in Regulatory Requirements.

Submit Contractor 40 CFR employee training records upon request of Contracting Officer.

C. Provide documentation for environmental procedures as specified herein and in accordance with approved Waste Management Plan, and Storm Water Pollution Prevention Plan.

ACAD-161676 01 31 00 - 6

1.8 PERMITS

A. General:

1. Permits and Responsibilities: The Contractor shall, without additional expense to the

Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor’s fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the work.

2. For the purpose of this contract the Contractor will not be considered an agent of the Government. Therefore the Contractor will comply with the appropriate Federal, State and local laws.

B. Government Furnished Permits: During the development of the project’s design the permits listed below were negotiated and agreed to by the Government. The terms and provisions of these permits shall be adhered to for the duration specified in each permit.

1. A permit was acquired for a Natural Resources Protection Act (NRPA) Tier 1 Permit and

Water Quality Certification with identification number L-28231-TB-A-N. The Agency with Jurisdiction for this permit is the Maine Department of Environmental Protection.

2. A permit was acquired for a US Army Corps of Engineers Category I Permit with identification number NAE-2016-1294. The Agency with Jurisdiction for this permit is US Army Corps of Engineers.

C. Other Potential Permits: It is the responsibility of the contractor to determine means and methods, and obtain any other required permits. It is the responsibility of the Contractor to obtain all permits required to legally conduct the work.

D. Coordination with Agency(ies) with Jurisdiction Issuing Permits

1. Coordination: Contact the Agency(ies) with Jurisdiction as needed and sufficiently in advance to avoid delaying the work: Coordinate meetings, reporting requirements, inspections, or any other requirements.

E. Administrative Procedures:

1. Coordinate scheduling and timing of required administrative provisions of project permits with Agency(ies) with Jurisdiction, Construction Manager, and Park to avoid conflicts and to ensure orderly execution of the Work.

2. Supply all needed information to Agency(ies) with Jurisdiction issuing permits, pay any fees required and provide all material needed to comply with the permit’s conditions and provisions.

3. Upload any additional permits obtained to the NPS/DSC SharePoint project website when the permits are obtained.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 31 00

ACAD-161676 01 32 16 - 1

CONSTRUCTION SCHEDULE

SECTION 01 32 16 – CONSTRUCTION SCHEDULE

PART 1 - GENERAL

1.1 SUMMARY

A. This Section consists of Construction Schedule requirements including but not limited to the following:

1. Schedule of Values

2. Construction Schedule Requirements.

3. Construction Schedule Updates.

4. Time Impact Analysis.

B. Purpose: The purpose of the Construction Schedule is to ensure adequate planning, coordination, scheduling, and reporting during execution of the work by the Contractor. The Construction Schedule will assist the Contractor and Contracting Officer in monitoring the progress of the work, evaluating proposed changes, and processing the Contractor's monthly progress payment.

1.2 DEFINITIONS

A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. Activities included in a construction schedule consume time and resources.

1. Critical activities are activities on the critical path. They must start and finish on the planned early start and finish times.

2. Predecessor Activity: An activity that precedes another activity in the network.

3. Successor Activity: An activity that follows another activity in the network.

B. Cost Loading: The allocation of the Schedule of Values for the completion of an activity as scheduled. The sum of costs for all activities must equal the total Contract Sum, unless otherwise approved by the Contracting Officer.

C. CPM: Critical path method, which is a method of planning and scheduling a construction project where activities are arranged based on…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .