This document contains questions and answers related to the federal contract opportunity for ACAD 161676 - Rehabilitate Eagle Lake Carriage Road at Acadia National Park. The solicitation involves rehabilitating sections of the Eagle Lake Carriage Road, including reclaiming, regrading, and compacting existing road surfaces and middle courses. It will also require replacing a 100 foot section of rockslide, a single box culvert, and removing and resetting several coping stones. The government responses clarify the scope of required vegetation removal and the intended limits for regrading work in relation to coping stones.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACAD 161676
Presolicition Questions & Answers
# Question
In the definition of CLINS, base, number 13 describes the 100 ft section of the rockslide. Is this a mistake?
2 Same as above, confirm that there is 1 box culvert in the base work
As far as reclaiming limits, where there are coping stones on both sides of the road, just confirm that the reclaiming is going inside of the stones if there were requirements for removing the vegetation on the Carriage Roads in the Contract Documents. He asked if the existing vegetation could just be incorporated into the reclaimed material during the reclaiming operation.
In the plans there are several locations to “Remove & Reset # Coping Stones” Some areas are clear you are doing this to be able to do work such as replacing culverts. In other location the intent is not completely clear, is this just to remove the rocks to regrade where they have settled over the years and to realign rocks better?
Did the Govt intend for the “Reclaim, Regrade and Compact Existing Surface and Middle Course” limits shown in the Carriage Road Typical Sections on sheet C3 to extend under the Coping Stones that are not called out for resetting?
Govt. Response
Yes, the AE will revise and we'll post a revised spec via an amendment That is correct
That is correctThe Govt confirms that the Contract Drawings address the vegetation question in General Note 11 on sheet C1:
“11. THE CONTRACTOR SHALL REMOVE VEGETATION WITHIN THE LIMITS OF THE
CARRIAGE ROAD AND BETWEEN COPING STONES AROUND THE ENTIRE EAGLE LAKE
CARRIAGE ROAD LOOP.” We do not want the vegetation to be incorporated into the We removed the coping stone from the Superelevated typical section. Reviewing where superelevations are required by the design (as shown in the profiles), there is only one location where coping stones are present where regrading for superelevation is required. That one location is at the culvert at Station 193+40 on sheet C28 where there are four coping stones on the inside of the curve. The plans call for those four coping stones to be removed and reset due to the culvert replacement so the grading limits there will not need to stop at the inside face of those four coping stones.
Reference Sheet C3 dated (07-14-2020). We have revised the Carriage Road Typical Sections on sheet C3 to clarify the design intent. We intended for the “Reclaim, Regrade and Compact Existing Surface and Middle Course” limits to stop at the inside face of the coping stones that are not called out for resetting. The proposed grade is intended (and designed) to match the existing grade at the face of coping stone in all normal crown sections so no work is required behind the coping stones in these areas.