This is a specification section for mobilization and equipment moving services on National Forest System lands, effective October 2016.

The section defines requirements for moving personnel, equipment, supplies, and incidentals to one or more project sites as listed in the Schedule of Items. Contractors must make equipment available for inspection before use on National Forest System lands and ensure all equipment arrives clean and weed-free. Mobilization is considered complete when the contractor has moved from the current work site to the ordered work site and returned to the previous location. Work locations are specified on the Road Listing, shown on Plans, or ordered by the Contracting Officer. Measurement is based on the total number of completed and accepted units per the Schedule of Items, with miles measured along the shortest feasible route to the nearest one mile from the starting location to the ordered work site. Payment is made at the contract price per unit of measurement for pay item 805(1) – Mobilization, measured in miles. The accepted quantities represent full compensation for work prescribed in this section, with mobilization considered incidental unless specifically ordered for a particular project at a designated time.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

805 MOBILIZATION / EQUIPMENT MOVING (10/16)

1. DESCRIPTION

This Section consists of one or more mobilizations of personnel, equipment, supplies, and incidentals to the project site, or sites listed in the Schedule of Items.

2. REQUIREMENT

a. Make equipment available for inspection before it is used on National Forest System lands.

b. Moving is complete, when the contractor has moved from the present work site to the ordered work site and returned to the previous location.

c. Equipment will be clean and weed free before it arrives on National Forest System lands.

3. LOCATION OF WORK

As specified on roads listed on the Road Listing, Shown on the Plans, or as ordered by the

Contracting Officer.

4. MEASUREMENT

Measurement under this Section will be made by the total number of units for each item listed in the Schedule of Items completed and accepted.

Mile: work activity will be measured along the shortest feasible route to the nearest one (1) mile, from the starting location of the move, to the ordered work site.

5. PAYMENT

a. The accepted quantities will be paid at the contract price per unit of measurement for the

Section 805 pay items listed in the schedule of items. Mobilization is complete when all equipment, personnel, and materials are moved to the project site and work has been started. Payment will be full compensation for the work prescribed in this Section.

Mobilization is incidental unless ordered for a specific project at a specific time.

b. Payment will be made under:

Pay Item Description Pay Unit

805 (1) Mobilization Mile