Attachment 1- 648-25-100 Scope Of Work.pdf
PDF 126 KB Posted
- Solicitation number
- 36C26026R0020
About this file
This Scope of Work details a medical gas outlet replacement project for the VA Medical Center in Vancouver, WA (Project 648-25-100). The project requires replacing existing medical air (MA), medical vacuum (MV), and oxygen (O2) outlets in Building 11, E-wing, with new outlets. The work will be completed in two phases over 5 weeks, with construction occurring between 8:00 am and 5:00 pm daily, while maintaining continuous medical center operations.
Key requirements include the contractor providing an ASSE 6010 Certified Installer and 6030 Certified Verifier, ensuring unimpeded medical center activities, and meeting Class 4 ICRA requirements. The VA will provide alternative patient devices and oxygen tanks during the outlet replacements. The contractor must use negative air machines in each patient room, route exhaust outside windows, and take precautions for fire safety due to wooden stud framing. Work will not commence until all submittals are complete and materials are on-site, and the contractor must purge and certify main/branch lines according to specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 6- E-wing head wall 4.jpg | JPG image | |
| Attachment 5- E-wing head wall 3.jpg | JPG image | |
| Attachment 1- Questions and Answers site visit for Project 648-25-100.docx | DOCX document | |
| 36C26026R0020 0001.docx | DOCX document | |
| Attachment 4- E-wing head wall 2.jpg | JPG image | |
| Attachment 2- Sign in sheet 648-25-100.pdf | ||
| Attachment 3-E-wing head wall 1.jpg | JPG image | |
| Attachment 5-Past Performance Questionnaire.pdf | ||
| Attachment 3- 648-25-100 Project Specifications.pdf | ||
| Attachment 2- 648-25-100 Drawing sheets.pdf | ||
| 36C26026R0020.pdf | ||
| Attachment 6- VAAR 852.219-75.docx | DOCX document | |
| Attachment 4- Wage Determination.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work/Synopsis
Project 648-25-100 Bldg. 11 E-wing Medical Gas Outlet Replacement
Vancouver WA
The project will include:
All work to occur after 8:00 am and finish by 5:00 pm Monday through Sunday. All medical center activities will remain open throughout the duration of the construction. Contractor to ensure that all medical center activities remain unimpeded by construction activities. Contractor to provide ASSE 6010 Certified Installer & 6030 Certified Verifier.
Contractor to provide all labor, materials, certifications, equipment and devices to replace existing medical air (MA), medical vacuum (MV), and oxygen (O2) outlets with new. This project will occur in two phases. Patients and VA staff will occupy all other spaces in building 11, E-wing.
VA will provide E-wing patients with devices and oxygen tanks throughout the duration of this project. This will allow the contractor to lock out/tag out the E-wing MA, MV and O2 that supplies services to each patient room. This is for safety.
The contractor will have 2 weeks to complete phase 1. The VA will inspect the work and when approved will take 1 week to move patients into the phase 1 rooms with their devices and tanks. The contractor will then have 2 weeks to finish phase 2. VA expects the work to be completed within 5 weeks. Work will not start until all submittals are complete and all materials are on hand/site.
Contractor shall purge the main/branch lines and certify according to the specifications. Refer to the specifications for all work required for successful completion.
Contractor shall ensure that all Class 4 ICRA requirements are met according to the permit. Provide a negative air machine in each patient room per phase. Route the exhaust outside the window. Secure with plywood to prevent unauthorized access into the rooms. Ensure that smoke is exhausted outside of the facility. VA FMS uses Anteroom by hepacart to satisfy the Class 4 ICRA requirements. Contractor shall provide/rent/use something equivalent for this project. VA FMS will not provide these for this project.
E-wing has wooden stud framing so contractor must take all precautions to prevent fire hazards. See specifications for additional requirements related to Fire and Life Safety.