This is a combined synopsis and solicitation for bulk water delivery services to support drought relief efforts for the Havasupai Tribe. The Bureau of Reclamation seeks to award a 100% small business set-aside contract to deliver a total of 10.9 acre feet of water per year over a base year and one option year. The contractor will transport water in three separate delivery windows to tanks located on the Havasupai Reservation. Pricing is requested for line items covering each delivery period. Quotes are due by August 10, 2022 and the contract is expected to be awarded shortly thereafter. Site visits to the delivery location have been scheduled for potential offerors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140R3022Q0060 – Bulk Water Delivery – Havasupai Tribe Drought Assistance Project Combined Synopsis/Solicitation
(i) This is a combined synopsis/solicitation (CSS) for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.
(ii) Solicitation number 140R3022Q0060 is being issued as a request for quotation.
(iii) This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular number 2022-06.
(iv) This requirement is Restricted to 100% Small Business Set-Aside. The North American Industry Classification System (NAICS) Code for this acquisition is: 484220, Specialized Freight (except Used Goods) Trucking, Local and the Small Business Size Standard is $30.0 Million.
(v) Line item 0010 – Base Year, Bulk Water Delivery. The Statement of work (SOW) provides more detailed information about the requirement and is attached to the CSS as well as the schedule. Quantity:
1,334,053 Gallons of Water (Period of Performance October 1, 2022 – December 31, 2022)
Line item 0020 – Base Year, Bulk Water Delivery. The Statement of work (SOW) provides more detailed information about the requirement and is attached to the CSS as well as the schedule. Quantity: 889,369 Gallons of Water (Period of Performance, January 1, 2023 – March 31, 2023)
Line item 0030 – Base Year, Bulk Water Delivery. The Statement of work (SOW) provides more detailed information about the requirement and is attached to the CSS as well as the schedule. Quantity:
1,334,053 Gallons of Water (Period of Performance, April 1, 2023 – June 30, 2023)
Line item 0110 – Option Year 1, Bulk Water Delivery. The Statement of work (SOW) provides more detailed information about the requirement and is attached to the CSS as well as the schedule. Quantity:
1,334,053 Gallons of Water (Period of Performance October 1, 2023 – December 31, 2023)
Line item 0120 – Option Year 1, Bulk Water Delivery. The Statement of work (SOW) provides more detailed information about the requirement and is attached to the CSS as well as the schedule. Quantity:
889,369 Gallons of Water (Period of Performance, January 1, 2024 – March 31, 2024)
Line item 0130 – Option Year 1, Bulk Water Delivery. The Statement of work (SOW) provides more detailed information about the requirement and is attached to the CSS as well as the schedule. Quantity:
1,334,053 Gallons of Water (Period of Performance, April 1, 2024 – June 30, 2024)
(vi) The Bureau of Reclamation, Lower Colorado Regional Office has a requirement for bulk water delivery for the Havasupai Tribe Reservation, Arizona to mitigate drought conditions in the area. This water will be used as temporary water relief for livestock, wildlife, and feral horses to the Pasture Wash Grazing Unit on its tribal lands. This contract will consist of a base contract with one option year to deliver 10.9 acre feet of water per year for two years. The SOW provides the details of the locations of the work to be performed.
(vii) Total price includes all applicable fees and taxes. FOB: Destination: Line item 0010, Line item 0020, Line item 0030, Line item 0110, Line item 0120 and Line item 0130 Procure and deliver water to the 4 tanks on the Havasupai Reservation.
THE FOLLOWING CLAUSES AND PROVISIONS ARE APPLICABLE TO THIS COMMERCIAL
SERVICE ACQUISITION:
(viii) FAR provision 52.212-1, Instructions to Offerors - Commercial Products and Commercial Services is applicable to this CSS. The following addendum is also applicable to this CSS.
--Addendum to FAR 52.212-1
This addendum replaced the term “offer” with “quote” within the provision 52.212-1.
In addition to the requirements of the Instructions to Offerors-Commercial Items provision of this solicitation, each quoter shall submit a quote in accordance with the instructions contained in this provision.
Quote Submission Instructions
A. To assure timely and equitable evaluation of quotes, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The response shall consist of the Price Quote.
B. The Contracting Officer is the Government’s sole point of contact for this acquisition. Address any questions or concerns you may have to the Contracting Officer. Written requests for clarification may be sent to the Contracting Officer. The Government reserves the right to revise or amend the performance work statement or the solicitation prior to the quote closing time. Such revisions or amendments will be communicated by amendments to the CSS and posted in SAM.Gov website (www.sam.gov). If such amendments require material changes in quantities or prices, the quote closing date may be postponed by enough days to enable offerors to revise their quotes. In such cases, the amendment will include an announcement of the new closing date and time. Quoters MUST acknowledge all amendments in their quote by providing signed copies of the amendments with their quote, or by separate letter which includes a reference to the solicitation and amendment numbers. If a quoter believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the quoter shall immediately notify the Contracting Officer in writing with supporting rationale as well as the remedies the quoter is asking the Contracting Officer to consider as related to the omission or error. The quoter is reminded that the Government reserves the right to award this effort based on the initial quote, as received, without discussion. This reservation includes matters of additional or substitute pages of the initial quote.
C. The Contracting Officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial quotes, the Contracting Office will review this determination and if, in the Contracting Officer’s opinion, adequate price competition exist no additional cost information will be requested. However, if at any time during this competition the Contracting Officer determines that adequate price competition no longer exists; quoters may be required to submit information to the extent necessary for the Contracting Officer to determine the reasonableness and affordability of the price.
D. Documents submitted in response to this CSS must be fully responsive to and consistent with the following:
1. Requirements of the CSS (CLINs & SOW) and government standards and regulations pertaining to the SOW.
2. Quotes must be emailed to Maribel Ruble at mruble@usbr.gov by the date and time specified on the CSS. Submissions by fax will NOT be permitted.
All responses shall be clearly marked in the subject line with the Solicitation No.
140R3022Q0060.
3. Quote Acceptance Period: Quoters must agree to hold the quoted prices in response to this solicitation as “firm” for 60 days after the date on the quote.
4. Potential quoters are reminded they must: Be registered in the System for Award Management (SAM) at www.sam.gov with a current registration to be eligible for award; ensure that all representations and certifications are completed in SAM for the applicable FAR provisions; and submit representations and certifications information with the proposal to the Contracting Officer if applicable.
E. Specific Instructions:
1. Price Quote-
a. Written signed quotes on company letterhead with all of the above Line Items in section (v) of this combined synopsis/solicitation listed and priced individually.
b. Provide Unique Identity ID (formerly DUNS Number)
c. Provide Quoter E-mail address
52.204-07, System for Award Management 52.204-16, Commercial and Government Entity Code Reporting 52.204-24, Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment
1452.215-71, Use and Disclosure of Proposal Information
(a) Definitions. For the purposes of this provision and the Freedom of Information Act (5 U.S.C. 552), the following terms shall have the meaning set forth below:
(1) 'Trade Secret' means an unpatented, secret, commercially valuable plan, appliance, formula, or process, which is used for making, preparing, compounding, treating or processing articles or materials which are trade commodities.
(2) Confidential commercial or financial information' means any business information (other than trade secrets) which is exempt from the mandatory disclosure requirement of the Freedom of Information Act, 5 U.S.C. 552. Exemptions from mandatory disclosure which may be applicable to business information contained in proposals include exemption (4), which covers 'commercial and financial information obtained from a person and privileged or confidential,' and exemption (9), which covers 'geological and geophysical information, including maps, concerning wells.'
(b) If the offeror, or its subcontractor(s), believes that the proposal contains trade secrets or confidential commercial or financial information exempt from disclosure under the Freedom of Information Act, (5 U.S.C. 552), the cover page of each copy of the proposal shall be marked with the following legend:
'The information specifically identified on pages _______ of this proposal constitutes trade secrets or confidential commercial and financial information which the offeror believes to be exempt from disclosure under the Freedom of Information Act. The offeror requests that this information not be disclosed to the public, except as may be required by law. The offeror also requests that this information not be used in whole or part by the Government for any purpose other than to evaluate the proposal, except that if a contract is awarded to the offeror as a result of or in connection with the submission of the proposal, the Government shall have the right to use the information to the extent provided in the contract.
(c) The offeror shall also specifically identify trade secret information and confidential commercial and financial information on the pages of the proposal on which it appears and shall mark each such page with the following legend:
'This page contains trade secrets or confidential commercial and financial information which the offeror believes to be exempt from disclosure under the Freedom of Information Act and which is subject to the legend contained on the cover page of this proposal.'
(d) Information in a proposal identified by an offeror as trade secret information or confidential commercial and financial information shall be used by the Government only for the purpose of evaluating the proposal, except that (i) if a contract is awarded to the offeror as a result of or in connection with submission of the proposal, the Government shall have the right to use the information as provided in the contract, and (ii) if the same information is obtained from another source without restriction it may be used without restriction.
(e) If a request under the Freedom of Information Act seeks access to information in a proposal identified as trade secret information or confidential commercial and financial information, full consideration will be given to the offeror's view that the information constitutes trade secrets or confidential commercial or financial information. The offeror will also be promptly notified of the request and given an opportunity to provide additional evidence and argument in support of its position, unless administratively unfeasible to do so. If it is determined that information claimed by the offeror to be trade secret information or confidential commercial or financial information is not exempt from disclosure under the Freedom of Information Act, the offeror will be notified of this determination prior to disclosure of the information.
(f) The Government assumes no liability for the disclosure or use of information contained in a proposal if not marked in accordance with paragraphs (b) and (c) of this provision. If a request under the Freedom of Information Act is made for information in a proposal not marked in accordance with paragraphs (b) and (c) of this provision, the offeror concerned shall be promptly notified of the request and given an opportunity to provide its position to the Government. However, failure of an offeror to mark information contained in a proposal as trade secret information or confidential commercial or financial information will be treated by the Government as evidence that the information is not exempt from disclosure under the Freedom of Information Act, absent a showing that the failure to mark was due to unusual or extenuating circumstances, such as a showing that the offeror had intended to mark, but that markings were omitted from the offeror's proposal due to clerical error.
(End Provision)
(ix) FAR provision 52.212-2, Evaluation – Commercial Products and Commercial Services –
(a) The Government will award a contract resulting from this solicitation to the responsible quoter whose quote conforming to the solicitation will be most advantageous to the Government based lowest price technically acceptable.
Factor 1 – Technical Approach Evaluation Criteria: The Offeror shall demonstrate a complete and thorough understanding of all features of work required under this solicitation/contract and shall demonstrate the requisite knowledge to successfully deliver the required quantity of water within the stated performance period. At a minimum, the technical proposal shall include:
(i) Explanations of proposed approaches to performing and accomplishing the work, including a specific outline of the actual tasks proposed to be performed in order to complete the work within the stated performance period, including the following:
a. A proposed milestone schedule which demonstrates how the work is divided or phased and how it will be accomplished within the allotted timeframes. Include available equipment and proposed delivery schedule showing proposed trip time and water source.
b. Proposed delivery schedules for the three delivery windows. Include discussion of makeup/catch up deliveries in the event of unforeseen circumstances i.e. mechanical failure, unviable operators, etc.
• October to December: 1,334,053 gallons
• January to March: 889,369 gallons
• April to June: 1,334,053 gallons
(ii) Limit this section to no more than 5 pages excluding any project milestone schedules and tabulations.
Factor 2 – Experience
Evaluation Criteria: The Offeror shall demonstrate the level of experience similar to those requested in the Statement of Work. All reported experience is related to water deliveries to remote locations. Major work features to be included are as follows:
Delivery of water over unimproved/semi-improved roads.
Ongoing deliveries of water over an extended period of time.
The Offeror shall demonstrate their experience by providing a list of no less than 2 projects but no more than 5 projects similar in size, scope and complexity to the work required under this solicitation which the Offeror has/have completed during the last five (5) years from the closing date of the solicitation. For each project, include:
Name of the project;
Contract number, date, and type;
Detailed description of work;
Project scheduled completion date, actual completion date, and an explanation for the difference;
Safety Record – Provide Total Case Incident Rate (TCIR) and report of any major safety incidents, defined as a “Recordable Injury” by OSHA as “any work-related fatality”, “any work-related injury or illness that results in loss of consciousness, days away from work, restricted work, or transfer to another job”, or “any work-related injury or illness requiring medical treatment”;
References—Provide the name and address of the acquiring Government agency or commercial customer, and the name(s) and telephone number(s) of point(s) of contact that were directly involved with your company during the period of performance who may be contacted for further information; Limit the description of each project to no more than 1 page, excluding Safety Record.
The Government will consider subcontractors’ experience as well as the Offeror’s experience, if provided. For the Government to consider the relevance of a subcontractor’s experience, the Offeror shall include a Letter of Commitment. The Letter of Commitment shall be signed by both the Offeror and subcontractor and shall demonstrate the commitment of both parties to this project.
(b) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror with the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after receipt, unless a written notice of withdrawal is received before award.
(x) FAR provision 52.212-3, Offeror Representations and Certifications - Commercial Products and Commercial Services. Offerors are advised include with their offer, a completed copy of the provision 52.212-3, or indicate completion of the provision online. Offerors may complete the annual representations and certifications online at https://www.sam.gov/.
(xi) FAR clause 52.212-4, Contract Terms and Conditions - Commercial Products and Commercial Services. Addendum to FAR Clause 52.212-4 Contract Terms and Conditions – Commercial Products and Commercial Services – 52.204-04, Printed or Copied Double-Sided on Postconsumer Fiber Content Paper 52.204-13, System for Award Management Maintenance 52.232-40, Providing Accelerated Payments to Small Business Subcontractors 52.242-15, Stop-Work Order
52.217-08 Option to Extend Services (Nov 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 15 days.
52.217-09 Option to Extend the Term of the Contract (March 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days from contract ending; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed two (2) years.
DIAR 1452.201-70 Authorities and Delegations (Sep 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.
The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The
COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.
Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph
(d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
(End of Clause)
DOI-AAAP-0028, Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP)
APR 2013)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
'Payment request' means any request for contract financing payment or invoicing payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4
Contract Terms and Conditions-Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the NO documents/and or attachments are required to be submitted to IPP.
The Contractor shall submit an electronic copy of the IPP invoice to the Contract specialist/Contracting Officer at mruble@usbr.gov BEFORE the invoice has been submitted to IPP. Failure to email the invoice may cause significant delay or possible rejection of your payment request.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3-5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
DOI-AAAP-0050 Contractor Performance Assessment Reporting System (Dec 2015)
a. FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
b. The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
c. We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
d. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
e. Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
1. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.
2. Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
3. All information provided should be reviewed for accuracy prior to submission.
4. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating No comment in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
5. Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
6. If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: -The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment-
f. The following guidelines apply concerning your use of the past performance evaluation:
1. Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
2. Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
3. Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
g. If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
h. A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
(End of Local Clause)
WBR 1452.201-80 Contracting Officer’s Representative’s Authorities And Limitations -- Bureau of Reclamation (MAY 2018)
(a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:
(1) Inspecting and accepting or rejecting work performed under the contract.
(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.
(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.
(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR’s authority to act on behalf of the Contracting Officer.
(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract; therefore, the COR does not have the authority to, and may not, issue any technical direction that -
(1) Constitutes a direction of additional work outside the Contract requirements;
(2) Constitutes a change as defined in the contract clause entitled “Changes;”
(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;
(4) Changes any of the expressed terms, conditions or specifications of the contract; or
(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.
(d) All technical direction shall be issued in writing by the COR.
(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause.
If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -
(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or
(2) Advise the Contractor that the Government will issue a written change order.
(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”
(End of Clause)
WBR 1452.223-81 Safety and Health -- Bureau of Reclamation (AUG 2021)
(a) The Contractor shall not require any person employed in the performance of this contract (including subcontracts) to work under conditions which are unsanitary, hazardous, or dangerous to the employee's health or safety.
(b) Contractor shall comply with the most current version of the Bureau of Reclamation, Reclamation Safety and Health Standards (RSHS) and, if applicable, the requirements of the Accident Prevention Clause (FAR 52.236-13).
The RSHS manual shall be obtained at http://www.usbr.gov/ssle/safety/RSHS/rshs.html
(c) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part 1910 from the Occupational Safety and Health Administration, U.S. Department of Labor, www.osha.gov.
(d) In the event there is a conflict between the requirements contained in paragraphs (b) and (c) referenced herein, the more stringent requirement shall prevail.
(e) The Contractor shall submit a written proposed safety program as prescribed in the RSHS and the written specifications.
(f) The Contractor shall maintain an accurate record of, and shall report to the Contracting Officer (or authorized representative) in the manner prescribed by the Contracting Officer, all cases of death, occupational diseases, or traumatic injury to employees or the public involved, and property damage in accordance with the RSHS and OSHA guidelines.
(g) The rights and remedies of the Government provided in this clause are in addition to any other rights and remedies provided by law or under this contract.
(h) If the RSHS is updated or amended by Reclamation during the course of this contract, the contractor will be notified in writing. The contractor shall comply with the current RSHS immediately upon written notification. Should the contractor feel that the updated version of RSHS constitutes a substantive change to the contract, affecting price or time (or both), the contractor may request an equitable adjustment in the contract price. Any such requests shall include a price proposal submitted in compliance with Contract Clause WBR 1452.243-80, Modification Proposals - Bureau of Reclamation, and in sufficient detail to allow meaningful analysis of labor, equipment and material.
(End of clause)
WBR 1452.237-80 Security Requirements--Bureau of Reclamation (MAR 2022)
(a) General Security Requirements:
(1) This clause addresses security requirements, including general procedural requirements, information security requirements, contractor employee suitability requirements, identification card requirements, site security requirements, and information technology security requirements. Within this clause, COR means Contracting Officer's Representative. If there is no COR appointed and identified to the Contractor, the term instead will mean the Program Manager or any other authorized individual responsible for technical oversight under the contract. "Work site" means the Government facility, office, construction site, and any other area within the Government office or facility that the Contractor must access to accomplish work under this contract.
(2) The work performed under this contract shall only be accomplished by individuals (in the employment of the Contractor or any subcontractors) whose conduct and behavior is consistent with the efficiency of the Federal Service and the requirements of this contract, and who are acceptable to the contracting officer. If Reclamation finds a Contractor employee to be unsuitable or unfit for his or her assigned duties, the contracting officer will direct the Contractor to remove the individual from the contract and access to the Federal facility at which the contract activities are occurring.
(3) The Contractor's employees governed by this contract may need access to sensitive information and/or sensitive areas. The Federal Government (Government) reserves the right, in its sole discretion, to determine suitability of Contractor personnel and deny access to any sensitive information or project specific area to any personnel for any cause.
(4) The Contractor is responsible for informing and ensuring compliance by its employees with any applicable security procedures of the Government facility where work may be performed under this contract.
(5) Any Contractor employee that will have access to a Federally-controlled facility or information system will be required to have a Government-issued identification card, consisting of a Personal Identity Verification (PIV) Card, a temporary identification card, or a visitor badge. During performance of the contract, the Contractor shall keep the COR apprised of any changes in personnel, or changes in personnel access or duration, to ensure that performance is not delayed by compliance with credentialing processes.
(6) A Contractor employee will not be provided access to a Government facility or information system until a Government PIV Card, temporary identification card, or visitor identification badge has been issued to the Contractor employee. For those individuals that will be receiving a PIV Card, the Government may, at its discretion, issue a temporary identification card or visitor identification badge after the electronic background investigation forms have been received and the investigation is initiated
(7) All Contractor employees shall access the facility via the facility's entry screening system and visibly display the Government-issued PIV Card, temporary identification card, or visitor identification badge at all times. Contractor employees must visibly wear the Government-issued identification card at all times they are on Government facilities. Contractor employees are responsible for the safekeeping of all Government-issued identification cards, whether on-site or off-site. Cards that have been lost, damaged, or stolen must be reported to the COR within 24 hours. The Contractor shall return all identification cards and card keys and any other Government property and information upon completion of performance or when personnel depart permanently or for a period of 7 days or more. The Contractor may be required to turn in access control cards or identification cards on a daily basis.
(8) Misuse or loss of access control or identification cards, or failure to comply with required surrender of such cards may, at Government discretion, result in Contractor personnel being denied access to the work site, at no cost to Government. The Contractor may be charged up to $500 for each occurrence for any required replacement of Government-issued access control or identification cards due to loss or misuse.
At the end of contract performance, or when a Contractor employee is no longer working under this contract, the Contractor shall ensure that all access control and identification cards are returned to the
COR.
(9) All Contractor personnel, including subcontractor personnel, with access to the work site shall be U.S.
citizens or foreign individuals legally residing in, or legally admitted to, the U.S. For all non-U.S.
citizens working under this contract, the Contractor shall provide to the COR, legible and valid copies of the individual's passport and visa (unless individual is on the Visa Waiver Program) a minimum of 14 calendar days prior to beginning work or arriving at the facility. A driver's license is not acceptable identification. In addition, a completed form I-94 shall be submitted to the COR upon the individual's arrival at the work facility and prior to beginning work.
(10) The Contractor shall report all contacts with entities, individuals, and counsel/representatives (including foreign entities and foreign nationals) who seek in any way to obtain unauthorized access to sensitive information or areas. The Contractor shall report any violations of contract provisions, laws, executive orders, regulations, and guidance to the contracting officer. The Contractor shall report any information raising a doubt as to whether an individual's eligibility for continued employment or access to sensitive information is consistent with the interests of National Security and the Public Trust.
(11) Unsanctioned, negligent, or willful inappropriate action on the part of the Contractor (or its employees) may result in termination of the contract or removal of some Contractor employees from Reclamation facilities at no cost to the Government. These actions include, but are not limited to, exploration of a sensitive system and/or information, introduction of unauthorized and/or malicious software, or failure to follow prescribed access control policies and/or security procedures. Failure to comply with Reclamation policies, procedures, or other published security requirements may result in termination of the contract or removal of some contracted employees from Reclamation buildings and/or facilities at no cost to the Government.
(12) All provisions of this clause shall equally apply to all subcontractors. The Contractor shall incorporate the substance of this clause in all subcontracts.
(13) These security requirements apply to all sections of this Contract including Contract Drawings and other Contract Specifications as applicable. Related documents include other general provisions of Construction or Operations and Maintenance type Contracts, including FAR clauses by reference or as amended by related documents.
(b) Information Security Requirements.
(1) Sensitive Information. The term “sensitive information” means any information which warrants a degree of protection and administrative control as defined by Reclamation or that meets the criteria for exemption from public disclosure set forth under Sections 552 and 552a of Title 5, United States Code:
the Freedom of Information Act and the Privacy Act. Sensitive information is generally categorized as FOR OFFICIAL USE ONLY (FOUO) information or CONTROLLED UNCLASSIFIED INFORMATION (CUI), but in some cases may include other unclassified information. (The protection of National Security information is beyond the scope of this clause. If any work on National Security information is required under this contract, it is addressed under other contract clauses.) The Contractor shall protect this type of information from unauthorized release into public domain, or to unauthorized persons, organizations, or subcontractors. Information which, either alone or in aggregate, is deemed sensitive by Reclamation shall be handled and protected in accordance with Reclamation directives and standards for identifying and safeguarding sensitive information (SLE 02-01), which is available from the COR or at http://www.usbr.gov/recman/DandS.html#sle.
(i) Any Government-furnished information or material does not become the property of the Contractor and may be withdrawn at any time. Upon expiration or termination of the contract, all documents released to the Contractor and any material created using data from such documents shall be returned to the COR for final disposition. Government-furnished information residing on any electronic systems (laptops, servers, desktops, media) shall be deleted from those systems using a COR-approved data erasure solution. Only with prior authorization from the CO may the Contractor retain the material.
The Contractor or subcontractor shall not disclose or release the materials provided to the Contractor to any individuals of the Contractor's organization not directly engaged in providing services under the contract or that do not have a valid need-to-know. All technical data provided to the Contractor by the Government shall be protected from public or private disclosure in accordance with the markings printed on them. All other information relating to the items to be delivered or the services to be performed under this contract shall not be disclosed by any means without prior approval of the CO. Prohibited dissemination or disclosure includes, but is not limited to: permitting access to such information by foreign nationals or by immigrant aliens who may be employed by the Contractor, publication of technical or scientific papers, advertising, disclosure to Contractor staff not investigated and deemed acceptable at the appropriate information sensitivity level, and any other public release. The Contractor shall maintain, and furnish upon request of the CO, records of the names of individuals who have access to sensitive material in its custody. All questions regarding information security, access, and control shall be referred to the COR.
(ii) The Contractor shall not release to anyone outside the Contractor’s organization any sensitive, or otherwise protected information, regardless of medium in which it is contained (for example, film, tape, document, electronic), pertaining to any part of this contract or any Reclamation program or activity, unless the CO has given prior written approval. This includes, but is not limited to, news releases, marketing promotions, articles, interviews, reports, social media posts, and any other media releases.
Requests for approval shall identify the specific information to be released, the medium to be used, the purpose for the release, and a description of the need-to-know. The Contractor shall submit its request to the CO ten business days before the proposed date for release. Subcontractors shall submit requests for authorization to release through the prime Contractor to the CO.
(iii) The Contractor shall notify the COR immediately when known or suspected loss/compromise of sensitive information or other documents, notes, drawings, sketches, reports, photographs, exposed film or similar information which may affect the security interests of Government has occurred. This requirement extends to employees and other personnel working on behalf of the Contractor, and expands responsibility to include prompt reporting of security issues, including observed or subsequently discovered efforts by unauthorized persons to gain unauthorized access to sensitive information.
(2) Classified Information.
(i) The disclosure of U.S. Government documents by third parties can result in damage to our national security. While this contract may not deal directly with classified information, each contractor is obligated to protect classified information pursuant to all applicable laws and to use Government information technology systems in accordance with agency procedures so that the integrity of such systems is not compromised.
(ii) Unauthorized disclosures of classified documents (whether in print, on a blog, or on websites, or other electronic or non-electronic media) do not alter the documents' classified status or automatically result in declassification of the documents. To the contrary, classified information, whether or not already posted on public websites or disclosed to the media, remains classified, and must be treated as such by Federal employees and contractors, until it is declassified by an appropriate U.S. Government authority.
Executive Order 13526, Classified National Security Information (December 29, 2009), Section 1.1.(c) states, 'Classified Information shall not be declassified automatically as a result of any unauthorized disclosure of identical or similar information.' Although the Department has taken steps to prevent access to publicly disclosed classified materials from Departmental computers, it is important to understand our continuing duties and responsibilities in this regard.
(iii) Contractors (which include all employees of the contractor, as well as subcontractors and its employees performing work for the contractor) are reminded of the following obligations with respect to the treatment of classified information and the use of unclassified government information technology systems:
(iv) Except as authorized by agency procedures, the contractor shall not, while using Government issued computers or other devices (such as Blackberries or Smart Phones) access the web on non-classified Government systems, or access documents that are marked classified (including classified documents made publicly available by a third party), as doing so risks that material still classified will be placed onto non-classified systems. This requirement applies to access that occurs either through agency or contractor computers, or through employee or contractor personally owned computers that access non-classified Government systems. This requirement does not restrict contractor access to non-classified, publicly available news reports (and other non-classified material) that may in turn discuss classified material, as distinguished from access to underlying documents that themselves are marked classified (including if the underlying classified documents are available on public Web sites or otherwise in the public domain).
(v) Contractors are reminded that only Department of Defense (DoD) facility clearances and personnel with appropriate security clearances will be issued for any bureau or office entering into a contract where classified information may be obtained. Only those personnel granted a security clearance by DoD will be acceptable to the Department of the Interior for access to classified information.
Consequently, any classified contracts will be coordinated through the Reclamation Chief Security Officer, or for IT requirements, the Bureau Chief Information Security Officer (BCISO). Therefore, no contractor shall access classified information unless proper clearances have been obtained.
(vi) Classified information shall not be removed from official premises or disclosed without proper authorization..
(vii) Contractors who believe they may have inadvertently accessed or downloaded classified or sensitive information on computers that access the web via non-classified government systems, or without prior authorization, should contact their Contracting Officer immediately.
(c) Reserved
(d) Reserved
(e) Reserved
(f) Reserved
(End of Clause)
WBR 1452.242-80 Postaward Conference – Bureau of Reclamation (MAR 2022)
(a) Prior to the contractor starting work, a postaward conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The contractor's project manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.
(b) The conference will be held at Via teleconference.
(c) The contracting officer and the contractor will agree to the date and time of the conference after award of the contract. In event of a conflict in schedules, the contracting officer shall establish the date for the conference.
(d) The…