This document is a Schedule of Items/Price Schedule Spreadsheet associated with a federal contract opportunity for the Glenwood and Pedlar Ranger District Vault/Septic Pumping and Portable Toilet Rental. The contractor is responsible for providing all necessary labor, materials, equipment, supplies, water, chemicals, incidentals, transportation, records, and supervision to pump and dispose of domestic sewage and debris from multiple septic tanks and holding vaults across the Glenwood and Pedlar Ranger Districts. The contract also includes renting and servicing one portable toilet at the Sherando Lake Entrance Station from April to October annually. The contract has a base year and four one-year option periods. The Schedule of Items spreadsheet lists the specific tank/vault locations, capacities, and unit pricing for the pumping services. The federal contract opportunity is being solicited by the Department of Agriculture Forest Service R8-Southern Region.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT (WITH OPTION YRS)
FILL OUT THE COLUMNS SHADED BLUE BELOW
SCHEDULE OF ITEMS
George Washington & Jefferson NFs/ Glenwood & Pedlar RD/ Recreation PROJECT TITLE: GP-CON-Sherando and Crabtree Falls Vault Pumping WORKPLAN ACQUISITION PLAN/REQUISITION NO: 667197
| SCHEDULE OF ITEMS | |||||||||
| In the event that a location contains multiple tanks/vaults, the $ Price / gallon may be charged for individual tanks when pumping additional "partial" tanks. The Total Price will not exceed the $ Max Per Unit price. | |||||||||
| Period of Performance Base Year: 04/22/2024 or date of award, whichever is later | |||||||||
| ITEM | |||||||||
| NUMBER | DESCRIPTION | Septic Tank / SST Vault Capacity | PAY UNIT | QTY | $ Per Gallon | $ Max Per Unit | Total Max Price | ||
| CT1 | Crabtree Lower Lot - Hwy 56 - SST(s) Holding Tank | 750 gals / ea | SST | 2 | $0.00 | $0.00 | $0.00 | ||
| CT2 | Crabtree Meadows - SST Holding Tank | 750 gals | SST | 1 | $0.00 | ||||
| SL1 | Lower Damm SST - holding tank | 800 gals | SST | 1 | $0.00 | ||||
| SL2 | Lower A Loop Restroom | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL3 a | Dump Station - front tank | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL3 b | Dump Station - rear tank | 750 gals | Tank | 1 | $0.00 | ||||
| SL4 a | Beach Bathhouse - women's 1st tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL4 b | Beach Bathhouse - women's 2nd tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL4 c | Beach Bathhouse - men's 1st tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL4 d | Beach Bathhouse - men's 2nd tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL5 | Fill Station Restroom | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL6 | Williams Branch Restroom | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL7 a | C - Loop Bathhouse - 1st tank | 2,000 gals | Tank | 1 | $0.00 | ||||
| SL7 b | C - Loop Bathhouse - 2nd tank | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL8 a | B - Loop Bathhouse - 1st tank | 2,000 gals | Tank | 1 | $0.00 | ||||
| SL8 b | B - Loop Bathhouse - 2nd tank | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL9 | CCC Kitchen SST Holding Tank | 1,000 gals | SST | 1 | $0.00 | ||||
| SL10 | Group SST - holding tank | 800 gals | SST | 1 | $0.00 | ||||
| SL11 | Group Bathhouse | 1,250 gals / ea | Tank | 2 | $0.00 | ||||
| SL12 | Volunteer Village - Main Tank | 750 gals | Tank | 1 | $0.00 | ||||
| SL13 | Volunteer Village - Behind Site V1 | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL14 | Upper A Loop Restroom | 1,250 gals | Tank | 1 | $0.00 | ||||
| SL15 a | Lower A Loop Bathhouse - Uphill Tank | 1,250 gals | Tank | 1 | $0.00 | ||||
| SL15 b | Lower A Loop Bathhouse - Lower Tank | 2,000 gals | Tank | 1 | $0.00 | ||||
| SL16 | Staff House | 750 gals | Tank | 1 | $0.00 | ||||
| Total Units | 27 | Sub-Total for Base Year: | $0.00 | ||||||
| SL17 | Provide 1 Portable Toilet to Sherando Gatehouse - service weekly | Pay Units | Qty | $ Monthly Price | Total Price | ||||
| 1 portable toilet | Month | 7 | $0.00 | $0.00 | |||||
| Base Year: Grand Total For Pumping + Portable Toilet | $0.00 |
| Period of Performance - Option Year 1: 04/22/2025 – 04/21//2026 | |||||||||
| ITEM | |||||||||
| NUMBER | DESCRIPTION | Septic Tank / SST Vault Capacity | PAY UNIT | QTY | $ Per Gallon | $ Max Per Unit | Total Max Price | ||
| CT1 | Crabtree Lower Lot - Hwy 56 - SST(s) Holding Tank | 750 gals / ea | SST | 2 | $0.00 | $0.00 | $0.00 | ||
| CT2 | Crabtree Meadows - SST Holding Tank | 750 gals | SST | 1 | $0.00 | ||||
| SL1 | Lower Damm SST - holding tank | 800 gals | SST | 1 | $0.00 | ||||
| SL2 | Lower A Loop Restroom | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL3 a | Dump Station - front tank | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL3 b | Dump Station - rear tank | 750 gals | Tank | 1 | $0.00 | ||||
| SL4 a | Beach Bathhouse - women's 1st tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL4 b | Beach Bathhouse - women's 2nd tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL4 c | Beach Bathhouse - men's 1st tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL4 d | Beach Bathhouse - men's 2nd tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL5 | Fill Station Restroom | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL6 | Williams Branch Restroom | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL7 a | C - Loop Bathhouse - 1st tank | 2,000 gals | Tank | 1 | $0.00 | ||||
| SL7 b | C - Loop Bathhouse - 2nd tank | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL8 a | B - Loop Bathhouse - 1st tank | 2,000 gals | Tank | 1 | $0.00 | ||||
| SL8 b | B - Loop Bathhouse - 2nd tank | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL9 | Volunteer Village/CCC Kitchen | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL10 | Group SST - holding tank | 800 gals | SST | 1 | $0.00 | ||||
| SL11 | Group Bathhouse | 1,250 gals / ea | Tank | 2 | $0.00 | ||||
| SL12 | Volunteer Village - Main Tank | 750 gals | Tank | 1 | $0.00 | ||||
| SL13 | Volunteer Village - Behind Site V1 | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL14 | Upper A Loop Restroom | 1,250 gals | Tank | 1 | $0.00 | ||||
| SL15 a | Lower A Loop Bathhouse - Uphill Tank | 1,250 gals | Tank | 1 | $0.00 | ||||
| SL15 b | Lower A Loop Bathhouse - Lower Tank | 2,000 gals | Tank | 1 | $0.00 | ||||
| SL16 | Staff House | 750 gals | Tank | 1 | $0.00 | ||||
| Total Units | 27 | Sub-Total for Base Year: | $0.00 | ||||||
| SL17 | Provide 1 Portable Toilet to Sherando Gatehouse - service weekly | Pay Units | Qty | $ Monthly Price | Total Price | ||||
| 1 portable toilet | Month | 7 | $0.00 | $0.00 | |||||
| Option Year 1 : Grand Total For Pumping + Portable Toilet | $0.00 |
| Period of Performance - Option Year 2: 04/22/2026 – 04/21/2027 | |||||||||
| ITEM | |||||||||
| NUMBER | DESCRIPTION | Septic Tank / SST Vault Capacity | PAY UNIT | QTY | $ Per Gallon | $ Max Per Unit | Total Max Price | ||
| CT1 | Crabtree Lower Lot - Hwy 56 - SST(s) Holding Tank | 750 gals / ea | SST | 2 | $0.00 | $0.00 | $0.00 | ||
| CT2 | Crabtree Meadows - SST Holding Tank | 750 gals | SST | 1 | $0.00 | ||||
| SL1 | Lower Damm SST - holding tank | 800 gals | SST | 1 | $0.00 | ||||
| SL2 | Lower A Loop Restroom | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL3 a | Dump Station - front tank | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL3 b | Dump Station - rear tank | 750 gals | Tank | 1 | $0.00 | ||||
| SL4 a | Beach Bathhouse - women's 1st tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL4 b | Beach Bathhouse - women's 2nd tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL4 c | Beach Bathhouse - men's 1st tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL4 d | Beach Bathhouse - men's 2nd tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL5 | Fill Station Restroom | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL6 | Williams Branch Restroom | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL7 a | C - Loop Bathhouse - 1st tank | 2,000 gals | Tank | 1 | $0.00 | ||||
| SL7 b | C - Loop Bathhouse - 2nd tank | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL8 a | B - Loop Bathhouse - 1st tank | 2,000 gals | Tank | 1 | $0.00 | ||||
| SL8 b | B - Loop Bathhouse - 2nd tank | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL9 | Volunteer Village/CCC Kitchen | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL10 | Group SST - holding tank | 800 gals | SST | 1 | $0.00 | ||||
| SL11 | Group Bathhouse | 1,250 gals / ea | Tank | 2 | $0.00 | ||||
| SL12 | Volunteer Village - Main Tank | 750 gals | Tank | 1 | $0.00 | ||||
| SL13 | Volunteer Village - Behind Site V1 | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL14 | Upper A Loop Restroom | 1,250 gals | Tank | 1 | $0.00 | ||||
| SL15 a | Lower A Loop Bathhouse - Uphill Tank | 1,250 gals | Tank | 1 | $0.00 | ||||
| SL15 b | Lower A Loop Bathhouse - Lower Tank | 2,000 gals | Tank | 1 | $0.00 | ||||
| SL16 | Staff House | 750 gals | Tank | 1 | $0.00 | ||||
| Total Units | 27 | Sub-Total for Base Year: | $0.00 | ||||||
| SL17 | Provide 1 Portable Toilet to Sherando Gatehouse - service weekly | Pay Units | Qty | $ Monthly Price | Total Price | ||||
| 1 portable toilet | Month | 7 | $0.00 | $0.00 | |||||
| Option Year 2 : Grand Total For Pumping + Portable Toilet | $0.00 |
| Period of Performance - Option Year 3: 04/22/2027 – 43/21/2028 | |||||||||
| ITEM | |||||||||
| NUMBER | DESCRIPTION | Septic Tank / SST Vault Capacity | PAY UNIT | QTY | $ Per Gallon | $ Max Per Unit | Total Max Price | ||
| CT1 | Crabtree Lower Lot - Hwy 56 - SST(s) Holding Tank | 750 gals / ea | SST | 2 | $0.00 | $0.00 | $0.00 | ||
| CT2 | Crabtree Meadows - SST Holding Tank | 750 gals | SST | 1 | $0.00 | ||||
| SL1 | Lower Damm SST - holding tank | 800 gals | SST | 1 | $0.00 | ||||
| SL2 | Lower A Loop Restroom | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL3 a | Dump Station - front tank | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL3 b | Dump Station - rear tank | 750 gals | Tank | 1 | $0.00 | ||||
| SL4 a | Beach Bathhouse - women's 1st tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL4 b | Beach Bathhouse - women's 2nd tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL4 c | Beach Bathhouse - men's 1st tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL4 d | Beach Bathhouse - men's 2nd tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL5 | Fill Station Restroom | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL6 | Williams Branch Restroom | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL7 a | C - Loop Bathhouse - 1st tank | 2,000 gals | Tank | 1 | $0.00 | ||||
| SL7 b | C - Loop Bathhouse - 2nd tank | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL8 a | B - Loop Bathhouse - 1st tank | 2,000 gals | Tank | 1 | $0.00 | ||||
| SL8 b | B - Loop Bathhouse - 2nd tank | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL9 | Volunteer Village/CCC Kitchen | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL10 | Group SST - holding tank | 800 gals | SST | 1 | $0.00 | ||||
| SL11 | Group Bathhouse | 1,250 gals / ea | Tank | 2 | $0.00 | ||||
| SL12 | Volunteer Village - Main Tank | 750 gals | Tank | 1 | $0.00 | ||||
| SL13 | Volunteer Village - Behind Site V1 | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL14 | Upper A Loop Restroom | 1,250 gals | Tank | 1 | $0.00 | ||||
| SL15 a | Lower A Loop Bathhouse - Uphill Tank | 1,250 gals | Tank | 1 | $0.00 | ||||
| SL15 b | Lower A Loop Bathhouse - Lower Tank | 2,000 gals | Tank | 1 | $0.00 | ||||
| SL16 | Staff House | 750 gals | Tank | 1 | $0.00 | ||||
| Total Units | 27 | Sub-Total for Base Year: | $0.00 | ||||||
| SL17 | Provide 1 Portable Toilet to Sherando Gatehouse - service weekly | Pay Units | Qty | $ Monthly Price | Total Price | ||||
| 1 portable toilet | Month | 7 | $0.00 | $0.00 | |||||
| Option Year 3 : Grand Total For Pumping + Portable Toilet | $0.00 |
| Period of Performance - Option Year 4: 04/22/2028 – 04/21/2029 | |||||||||
| ITEM | |||||||||
| NUMBER | DESCRIPTION | Septic Tank / SST Vault Capacity | PAY UNIT | QTY | $ Per Gallon | $ Max Per Unit | Total Max Price | ||
| CT1 | Crabtree Lower Lot - Hwy 56 - SST(s) Holding Tank | 750 gals / ea | SST | 2 | $0.00 | $0.00 | $0.00 | ||
| CT2 | Crabtree Meadows - SST Holding Tank | 750 gals | SST | 1 | $0.00 | ||||
| SL1 | Lower Damm SST - holding tank | 800 gals | SST | 1 | $0.00 | ||||
| SL2 | Lower A Loop Restroom | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL3 a | Dump Station - front tank | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL3 b | Dump Station - rear tank | 750 gals | Tank | 1 | $0.00 | ||||
| SL4 a | Beach Bathhouse - women's 1st tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL4 b | Beach Bathhouse - women's 2nd tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL4 c | Beach Bathhouse - men's 1st tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL4 d | Beach Bathhouse - men's 2nd tank | 1,500 gals | Tank | 1 | $0.00 | ||||
| SL5 | Fill Station Restroom | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL6 | Williams Branch Restroom | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL7 a | C - Loop Bathhouse - 1st tank | 2,000 gals | Tank | 1 | $0.00 | ||||
| SL7 b | C - Loop Bathhouse - 2nd tank | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL8 a | B - Loop Bathhouse - 1st tank | 2,000 gals | Tank | 1 | $0.00 | ||||
| SL8 b | B - Loop Bathhouse - 2nd tank | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL9 | Volunteer Village/CCC Kitchen | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL10 | Group SST - holding tank | 800 gals | SST | 1 | $0.00 | ||||
| SL11 | Group Bathhouse | 1,250 gals / ea | Tank | 2 | $0.00 | ||||
| SL12 | Volunteer Village - Main Tank | 750 gals | Tank | 1 | $0.00 | ||||
| SL13 | Volunteer Village - Behind Site V1 | 1,000 gals | Tank | 1 | $0.00 | ||||
| SL14 | Upper A Loop Restroom | 1,250 gals | Tank | 1 | $0.00 | ||||
| SL15 a | Lower A Loop Bathhouse - Uphill Tank | 1,250 gals | Tank | 1 | $0.00 | ||||
| SL15 b | Lower A Loop Bathhouse - Lower Tank | 2,000 gals | Tank | 1 | $0.00 | ||||
| SL16 | Staff House | 750 gals | Tank | 1 | $0.00 | ||||
| Total Units | 27 | Sub-Total for Base Year: | $0.00 | ||||||
| SL17 | Provide 1 Portable Toilet to Sherando Gatehouse - service weekly | Pay Units | Qty | $ Monthly Price | Total Price | ||||
| 1 portable toilet | Month | 7 | $0.00 | $0.00 | |||||
| Option Year 4 : Grand Total For Pumping + Portable Toilet | $0.00 | ||||||||
| Total for Base Year: | $0.00 | ||||||||
| To unlock sheet formatting - GlenPed24 | Total for Option Year 1: | $0.00 | |||||||
| Total for Option Year 2: | $0.00 | ||||||||
| Total for Option Year 3: | $0.00 | ||||||||
| Total for Option Year 4: | $0.00 | ||||||||
| Total Price: | $0.00 |