This is a Requirements and Specifications document for atomic clocks procured by the National Institute of Standards and Technology (NIST), Acquisition Management Division, under Solicitation Number NB688000-26-02391. NIST intends to construct two ensemble time scales—one for Gaithersburg and one for Boulder—to serve as resilient sources of time and frequency signals and as backup implementations of UTC(NIST), the NIST realization of Coordinated Universal Time. Each ensemble will consist of at least five independent atomic clocks whose outputs are intercompared and averaged to reduce bias, noise, and dependency on any single clock.
The requirement specifies the procurement of 10 atomic clock systems total (5 for each location). The performance goal for each ensemble is time dispersion in holdover of less than 1.2 nanoseconds per day as random walk. The document indicates that Specification 1.1 addresses short-term stability of all output signals, though the full specifications are not fully detailed in the provided excerpt. This solicitation is being issued as a Request for Quotation (RFQ), and all communications and documents must reference the solicitation number NB688000-26-02391.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2391 RFQ Combined Synopsis-Sol BV.docx | DOCX document | |
| ATTACHMENT 3- Past Performance Questionnaire .pdf | ||
| ATTACHMENT 2- 2391 RFQ Provisions and Clauses.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements / Specification Document
Use this document to detail specifications/requirements for an item and/or ancillary services.
TITLE: Atomic clocks for ensemble time scales Requesting Lab/Division/Group: PML/688.40/Time Realization and Distribution Group General Statement of Need NIST intends to construct two ensemble time scales to serve as resilient sources of time/frequency signals and as “backup” implementations of UTC(NIST), NIST’s realization of Coordinated Universal Time. An ensemble time scale consists of several independent atomic clocks, whose outputs are intercompared and usefully averaged together in a way that reduces bias, noise, and dependency on any one clock. The ensembles will consist of at least five atomic clocks each; the performance goal for each ensemble is for time dispersion in holdover less than 1.2 ns/day as random walk.
Items and/or Ancillary Services
Item 1: Atomic clock Quantity: 10 Specifications: Specification 1.1: Short term stability of all output signals, <= 1e-11 Allan Deviation (ADEV) at 1 s averaging interval. Specification 1.2: Long term stability of all output signals, <= 2.7e-14 Allan Deviation (ADEV) for averaging intervals longer than 100,000 s (or, equivalently, <= 2.9e-14 ADEV at one day interval). Specification 1.3: At least one output signal at 10 MHz nominal frequency, amplitude >= 1 Vrms (or +13 dBm) into a 50 ohm terminated load. Specification 1.4: At least one output of a pulse-per-second (PPS) signal, amplitude > 1.5 V into a 50 ohm load. Specification 1.5: Accepts an input pulse-per-second (PPS) signal for coarse synchronization (<= 100 ns). Specification 1.6: Accepts AC power input of either 120V or 208V (60 Hz). Specification 1.7: Accepts 24V dc as an auxillary power source. Specification 1.8: Contains a battery backup providing at least 30 minutes of operation, or accepts an external battery pack via connector. Specification 1.9: Power consumption < 100 W. Specification 1.10: digitial system control and monitor interface, as serial (RS232), ethernet, or similar standard interface. Specification 1.11: digital interface reports warning/alarm/error status. Specifiaction 1.12: device compatible with EIA-compliant equipment racks, width < 482.6 mm. Specification 1.13: operational temperature range 15°C – 45°C. Specification 1.14: specified temperature coefficient (averaged over operational temperature range) < 3e-15/°C. Specification 1.15: sensitivity to magnetic field change < 4e-14 / G. Specification 1.16: demonstrated mean time between failures (MTBF) > 10 years (or 87,600 hours).
Separately Priced Options and Services:
Item 2: [List minimum specifications.
Quantity: [Enter quantity here.] Specifications: [Enter quantity here.]
**DELIVERY IS FOR TWO SEPARATE LOCATIONS, SEE SCHEDULE
Service Requirements / Item Specifications
| Section |
| Requirements/Specifications |
Planning Considerations ☒ N/A ☐ List any visits required to allow potential vendors to see site specific constraints.
[Explain requirement here] ☐ US citizen required on-site (foreign nationals require preregistration 30 days prior) ☐ Vendor rep on-site more than three days ☐ Other considerations: [List other considerations to ensure an accurate quote]
Shipping & Delivery ☐ N/A [Enter shipping and delivery information by item here.] Shipping criteria:
☐ Partial delivery acceptable ☐ Direct delivery to building required [Explain need for requirement here] Building has: ☐ Loading dock ☐ Containerization preference: [Choose container] Other requirements: Delivery of quantity 5 units to NIST-Boulder campus (325 Broadway, Boulder, CO 80305). Delivery of quantity 5 units to NIST-Gaithersburg campus (100 Bureau Drive, Gaithersburg, MD 20899).
Delivery date criteria:
☒ Delivery of goods, installation, and training shall be completed no later than: 12-18 weeks ARO ☐ Deliver no earlier than: [Insert date here] ☐ Other:
Electronic Media ☒ N/A [Enter electronic media requirements by item here.] ☐ Software ☐ Electronic manuals ☐ License Key ☐ Other: [List any other Electronic Media requirements here] [Enter email address for software delivery here]
Installation ☒ N/A [Enter installation requirements by item here.] ☐ Vendor technician on site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of packaging material ☐ Equipment set up ☐ Start-up services ☐ Turn key installation ☐ Other [Enter details here.] Note: When installation is required, TPOC or COR shall be the coordination point.
Facility / Utility Considerations ☒ N/A [List site specific utility considerations by item here.] ☐ OFPM Work Order Number(s) [List any Work Order Number(s) here] ☐ Power available Voltage: [Enter voltage here] (V) Max Current: [Enter max current draw here] (A) Phase: [Choose phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter plug type here] (i.e.: NEMA L5-20P) Environment: [Choose environment] Other power consideration: [List any other power considerations here] ☐ Utility connections: [List relevant available utilities, pressure(s), and flowrate(s)] ☐ Other considerations: [List other considerations to ensure an accurate quote]
Warranty ☐ N/A Base Manufacturer Warranty is acceptable [If you require an Extended Manufacturer Warranty, describe the warranty requirements per item here.] What is included?
☐ Labor ☐ Parts ☐ Travel ☐ Cost and liability for returns ☐ Other: [Enter other requirements here] ☐ Warranty length: [Enter warranty length here] Period Length:[Ex. month, 6 month, year etc.]
Training ☒ N/A [Training requirements (who, when, what, where) here. If on-site, is travel necessary?] ☐ On-site ☐ Off-site location: [Enter location(s) here] ☐ Number of trainees: [Enter number of trainees here] Scope of training:
☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other: [Enter other scope requirements here] ☐ Training materials to be provided: [Describe requirement here] ☐ Other: [Enter other training requirements here] Note: When training is required, TPOC or COR shall be the coordination point.
Inspection and Acceptance ☐ N/A [Enter inspection requirements per item here] ☒ Planned government acceptance testing (7 business days) ☐ Gov’t acceptance expected to take longer than 7 business days: [Duration] ☐ Inspection and acceptance plan: [Explain here] ☐ Other: [Enter other requirements here]
Maintenance ☒ N/A [Describe your maintenance requirements per item here] Period Length: [Ex. month, 6 month, year etc.] What is included?
☐ Labor ☐ Spare parts ☐ Consumables ☐ Travel ☐ Cost and liability for returns ☐ Software updates ☐ Manuals ☐ Service plan length: [Enter service plan length here] ☐ Other: [Enter other requirements here] ☐ Requirements: [Enter requirements here] (i.e.: onsite within 72 hours, etc.)
| ☐ Option Period 1 |
| ☐ Option Period 2 |
| ☐ Option Period 3 |
| ☐ Option Period 4 |
Government Furnished Material / Equipment ☒ N/A [List any government furnished material/equipment per item here] ☐ Samples for testing ☐ Government equipment which will leave gov't site (TPOC must coordinate with division property custodian) Serial Number: [Enter Serial Number here] Description: [Enter description here] NIST property number: [Enter NIST property number here] ☐ Other: [Enter other details here]
Travel ☒ N/A [Describe any travel requirements per item here] ☐ Explain: [Explain here] ☐ Other: [Enter other requirements here] Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.). Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.
Provide suggestions to improve this form by clicking here.