Text version
8.3 Compartmentation.
The telecommunications facility shall be separated from other occupancies within the building by fire‐resistance‐rated construction, which is commensurate with the exposure but not less than 1 hour.
8.3.2.1 Doors.
Doors shall be fire tested under positive pressure to NFPA 252 and shall be installed in accordance with NFPA 80.
8.3.2.1.1 The fire rating of the door assemblies shall correspond to the fire rating of the partition assemblies as follows:
(1) One‐hour partition shall have 1‐hour fire‐resistance‐rated door assembly.
(2) Two‐hour partition shall have 1 ½ ‐hour fire‐resistance‐rated door assembly.
(3) Three‐hour partition shall have 3‐hour fire‐resistance‐rated door assembly.
VOLTAGE FLA MCA
MOCP
A/POLE CONDUIT SWITCH DISCONNECT AT UNIT CIRCUIT
CONNECTION
NOTES
IU 3-1 208V, 1 PHASE .28 A (2) #12 THWN & (1) #12 GND 3/4" 1
OU 3-1 208V, 1 PHASE 11A 15/1 (2) #10 THWN & (1) #10 GND 3/4" 30A, 3-POLE, NONFUSED, WP 11-3-PP-6, 22/24 1
CONNECTION NOTES:
MECHANICAL ELECTRICAL CONNECTION SCHEDULE
VERIFY EXACT OVER CURRENT PROTECTION/DISCONNECT REQUIREMENTS (PER N.E.C. #440) WITH EQUIPMENT MANUFACTURER NAMEPLATE DATA UPON RECEIPT AT JOB SITE. CONTACT ENGINEER WITH ANY DISCREPANCIES. ELECTRICAL CONTRACTOR TO MAKE ALL FINAL ELECTRICAL POWER CONNECT
1. INSTALL MOTOR RATED TOGGLE/LOCKABLE SWITCH AT EACH UNIT LOCATION FOR LOCAL DISCONNECTING MEANS.
UNIT GROUNDED AND UNGROUNDED
CONDUCTORS
NOTE:
A/POLE CONDUIT SWITCH DISCONNECT AT UNIT CIRCUIT
CONNECTION
NOTES
AC 11-6-1 120V, 1 PHASE 8.00 A 10.00 A 15/1 (2) #12 THWN & (1) #12 GND 3/4" 1P MOTOR RATED TOGGLE SWITCH 11-6-PP-1, 11 1
CONNECTION NOTES:
MECHANICAL ELECTRICAL CONNECTION SCHEDULE
VERIFY EXACT OVER CURRENT PROTECTION/DISCONNECT REQUIREMENTS (PER N.E.C. #440) WITH EQUIPMENT MANUFACTURER NAMEPLATE DATA UPON RECEIPT AT JOB SITE. CONTACT ENGINEER WITH ANY DISCREPANCIES. ELECTRICAL CONTRACTOR TO MAKE ALL FINAL ELECTRICAL POWER CONNECT
1. INSTALL MOTOR RATED TOGGLE/LOCKABLE SWITCH AT EACH UNIT LOCATION FOR LOCAL DISCONNECTING MEANS.
UNIT GROUNDED AND UNGROUNDED
A/POLE CONDUIT SWITCH DISCONNECT AT UNIT CIRCUIT
CONNECTION
NOTES
IU 7-1 208V, 1 PHASE .28 A (2) #12 THWN & (1) #12 GND 3/4" 1
OU 7-1 208V, 1 PHASE 11A 15/1 (2) #10 THWN & (1) #10 GND 3/4" 30A, 3-POLE, NONFUSED, WP 11-7-PP-1, 29/31 1
CONNECTION NOTES:
MECHANICAL ELECTRICAL CONNECTION SCHEDULE
VERIFY EXACT OVER CURRENT PROTECTION/DISCONNECT REQUIREMENTS (PER N.E.C. #440) WITH EQUIPMENT MANUFACTURER NAMEPLATE DATA UPON RECEIPT AT JOB SITE. CONTACT ENGINEER WITH ANY DISCREPANCIES. ELECTRICAL CONTRACTOR TO MAKE ALL FINAL ELECTRICAL POWER CONNECT
1. INSTALL MOTOR RATED TOGGLE/LOCKABLE SWITCH AT EACH UNIT LOCATION FOR LOCAL DISCONNECTING MEANS.
UNIT GROUNDED AND UNGROUNDED
A/POLE CONDUIT SWITCH DISCONNECT AT UNIT CIRCUIT
CONNECTION
NOTES
IU 9-1 208V, 1 PHASE .28 A (2) #12 THWN & (1) #12 GND 3/4" 1
OU 9-1 208V, 1 PHASE 11A 15/1 (2) #10 THWN & (1) #10 GND 3/4" 30A, 3-POLE, NONFUSED, WP 11-9-LP-1, 12/14 1
CONNECTION NOTES:
MECHANICAL ELECTRICAL CONNECTION SCHEDULE
VERIFY EXACT OVER CURRENT PROTECTION/DISCONNECT REQUIREMENTS (PER N.E.C. #440) WITH EQUIPMENT MANUFACTURER NAMEPLATE DATA UPON RECEIPT AT JOB SITE. CONTACT ENGINEER WITH ANY DISCREPANCIES. ELECTRICAL CONTRACTOR TO MAKE ALL FINAL ELECTRICAL POWER CONNECT
1. INSTALL MOTOR RATED TOGGLE/LOCKABLE SWITCH AT EACH UNIT LOCATION FOR LOCAL DISCONNECTING MEANS.
UNIT GROUNDED AND UNGROUNDED
| SHT 1 OF 21 - 3-1711 G-001 - COVER SHEET.pdf |
| SHT 2 OF 22 - 3-1711 G-002 - GENERAL NOTES.pdf |
| SHT 3 OF 21 - 3-1711 A-101 - LOCATION MAP.pdf |
| SHT 4 OF 21 - 3-1711 A-102 - DEMOLITION PLAN - SECT. 3 & 6.pdf |
| SHT 5 OF 21 - 3-1711 A-103 - DEMOLITION PLAN - SECT. 7 & 9.pdf |
| SHT 6 OF 21 - 3-1711 A-104 - NEW WORK PLAN - SECT. 3 & 6.pdf |
| SHT 7 OF 21 - 3-1711 A-105 - NEW WORK PLAN - SECT. 7 & 9.pdf |
| SHT 8 OF 21 - 3-1711 A-106 - DOOR SCHEDULE.pdf |
| SHT 9 OF 21 - 3-1711 A-107 - DETAILS.pdf |
| SHT 10 OF 21 - 3-1711 A-108 - BUILDING 11 SECTION 3 & 6 RCP.pdf |
| SHT 11 OF 21 - 3-1711 A-109 - BUILDING 11 SECTION 7 & 9 RCP.pdf |
| SHT 12 OF 21 - 3-1711 EP-101 - POWER PLAN 11-3.pdf |
| SHT 13 OF 21 - 3-1711 EP-102 - POWER PLAN 11-6.pdf |
| SHT 14 OF 21 - 3-1711 EP-103 - POWER PLAN 11-7.pdf |
| SHT 15 OF 21 - 3-1711 EP-104 - POWER PLAN 11-9.pdf |
| SHT 16 OF 21 - 3-1711 M-101 - NEW MECHANICAL WORK PLAN 11-3.pdf |
| SHT 17 OF 21 - 3-1711 M-102 - NEW MECHANICAL WORK PLAN 11-6.pdf |
| SHT 18 OF 21 - 3-1711 M-103 - NEW HVAC WORK PLAN 11-7.pdf |
| SHT 19 OF 21 - 3-1711 M-104 - NEW MECHANICAL WORK PLAN 11-9.pdf |
| SHT 20 OF 21 - 3-1711 M-501 - MECHANICAL WORK DETAILS.pdf |
| SHT 21 OF 21 - 3-1711 M-601 - MECHANICAL WORK SCHEDULES.pdf |