Attachment 05-CSC-21010 BID FORMS.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Project: CSC-21010 Maintenance & Repair Building 20, FY 21
Solicitation number
SP4702-21-R-0015
Issued by

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BID FORM
PROJECTCSC-21010SHEET1OF5
Project Title: M & R TO BUILDING 20 FY21DATE PREPARED
LOCATIONCLIN-0001ESTIMATOR
Building and/or Description: BUILDING 20 M & R ITEM-Cleaning & Inspection Services for WindowsCHECKED BY
NARRATIVE / DATA SOURCE[EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request.
BID ITEMSSUB CONTRACT COSTPRIME CONTRACT COSTTOTAL DIRECT COST
No. / Div.DescriptionQTY.Unit
1General Requirements1LS
2Existing Conditions1LS
3Concrete1LS
4Masonry1LS
5Metals1LS
6Wood, Plastics, and Composites1LS
7Thermal and Moisture Protection1LS
8Openings1LS
9Finishes1LS
10Specialties1LS
11Equipment1LS
12Furnishings1LS
13Special Construction1LS
14Conveying Equipment1LS
21Fire Suppression1LS
22Plumbing1LS
23Heating, Ventilating, and Air Conditioning1LS
26Electrical1LS
27Communications1LS
28Electronic Safety and Security1LS
31Earthwork1LS
32Exterior Improvements1LS
33Utilities1LS
34Transportation1LS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
BID FORM
PROJECTCSC-21010SHEET2OF5
Project Title: M & R TO BUILDING 20 FY21DATE PREPARED
LOCATIONCLIN-0002ESTIMATOR
Building and/or Description: BUILDING 20 M & R ITEM-Joint Sealant Replacement of WindowsCHECKED BY
NARRATIVE / DATA SOURCE[EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request.
BID ITEMSSUB CONTRACT COSTPRIME CONTRACT COSTTOTAL DIRECT COST
No. / Div.DescriptionQTY.Unit
1General Requirements1LS
2Existing Conditions1LS
3Concrete1LS
4Masonry1LS
5Metals1LS
6Wood, Plastics, and Composites1LS
7Thermal and Moisture Protection1LS
8Openings1LS
9Finishes1LS
10Specialties1LS
11Equipment1LS
12Furnishings1LS
13Special Construction1LS
14Conveying Equipment1LS
21Fire Suppression1LS
22Plumbing1LS
23Heating, Ventilating, and Air Conditioning1LS
26Electrical1LS
27Communications1LS
28Electronic Safety and Security1LS
31Earthwork1LS
32Exterior Improvements1LS
33Utilities1LS
34Transportation1LS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
BID FORM
PROJECTCSC-21010SHEET3OF5
Project Title: M & R TO BUILDING 20 FY21DATE PREPARED
LOCATIONCLIN-0003ESTIMATOR
Building and/or Description: BUILDING 20 M & R ITEM-Perform Integrity Tests to Antifragmentation FilmsCHECKED BY
NARRATIVE / DATA SOURCE[EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request.
BID ITEMSSUB CONTRACT COSTPRIME CONTRACT COSTTOTAL DIRECT COST
No. / Div.DescriptionQTY.Unit
1General Requirements1LS
2Existing Conditions1LS
3Concrete1LS
4Masonry1LS
5Metals1LS
6Wood, Plastics, and Composites1LS
7Thermal and Moisture Protection1LS
8Openings1LS
9Finishes1LS
10Specialties1LS
11Equipment1LS
12Furnishings1LS
13Special Construction1LS
14Conveying Equipment1LS
21Fire Suppression1LS
22Plumbing1LS
23Heating, Ventilating, and Air Conditioning1LS
26Electrical1LS
27Communications1LS
28Electronic Safety and Security1LS
31Earthwork1LS
32Exterior Improvements1LS
33Utilities1LS
34Transportation1LS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
BID FORM
PROJECTCSC-21010SHEET4OF5
Project Title: M & R TO BUILDING 20 FY21DATE PREPARED
LOCATIONCLIN-0004ESTIMATOR
Building and/or Description: BUILDING 20 M & R ITEM-Replacement of Trees at Pod A South SideCHECKED BY
NARRATIVE / DATA SOURCE[EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request.
BID ITEMSSUB CONTRACT COSTPRIME CONTRACT COSTTOTAL DIRECT COST
No. / Div.DescriptionQTY.Unit
1General Requirements1LS
2Existing Conditions1LS
3Concrete1LS
4Masonry1LS
5Metals1LS
6Wood, Plastics, and Composites1LS
7Thermal and Moisture Protection1LS
8Openings1LS
9Finishes1LS
10Specialties1LS
11Equipment1LS
12Furnishings1LS
13Special Construction1LS
14Conveying Equipment1LS
21Fire Suppression1LS
22Plumbing1LS
23Heating, Ventilating, and Air Conditioning1LS
26Electrical1LS
27Communications1LS
28Electronic Safety and Security1LS
31Earthwork1LS
32Exterior Improvements1LS
33Utilities1LS
34Transportation1LS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
BID FORM
PROJECTCSC-21010SHEET5OF5
Project Title: M & R TO BUILDING 20 FY21DATE PREPARED
LOCATIONCOST SUMMARYESTIMATORM. Rustam Ali
Building and/or Description: BUILDING 20 M & R ITEMSCHECKED BY
NARRATIVE / DATA SOURCE[EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request.
BID ITEMSSUB CONTRACT COSTPRIME CONTRACT COSTTOTAL COST INCL. OH, PROFIT & BOND COSTS
CLIN NODescriptionQTY.Unit
1Cleaning & Inspection Services for Windows1LS
2Joint Sealant Replacement of Windows1LS
3Perform Intigrity Tests to Antifragnentation Films1LS
4Replacvement of Trees at Pod A South Side1LS

SUB-TOTAL COST

TOTAL COST FOR THIS PROJECT

File details come from the government source that posted it. Updated .