Attachment 04_StandardSpecList.pdf
PDF 125 KB Posted
- Solicitation number
- 1240LT25R0024
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Standard Specification List (FP-14) for the San Juan Williams Creek Road and Spur Resurfacing project. The table of contents outlines specifications across six primary divisions: General Requirements, Project Requirements, Earthwork, Aggregate and Base Courses, Incidental Construction, and Materials. Key sections include contract administration (Sections 101-109), project-specific requirements like mobilization and quality control (Sections 151-156), earthwork and excavation (Section 204), aggregate course preparation (Sections 301-303), temporary traffic control (Section 635), and material specifications for subbase, base, and surface course aggregate (Section 703.05). The comprehensive specification list provides detailed technical guidelines for the road reconstruction project, covering everything from bid processes and work control to material standards and construction methodologies.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1240LT25R0024_A0001.pdf | ||
| Attachment 05_FS Supplemental Specs.pdf | ||
| Attachment 02_Schedule of Items.xlsx | XLSX spreadsheet | |
| Attachment 01_Statement of Work.pdf | ||
| Attachment 03_Williams Creek CG Roads - Signed.pdf | ||
| Attachment 06_WD_CO20250012.pdf | ||
| 1240LT25R0024_Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD SPECIFICATION LIST FP-14 FOR SAN JUAN WILLIAMS CREEK ROAD AND SPUR RESURFACING
TABLE OF CONTENTS
DIVISION 100 GENERAL REQUIREMENTS
Section 101. — TERMS, FORMAT, AND DEFINITIONS Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT Section 103. — SCOPE OF WORK Section 104. — CONTROL OF WORK
Section 105. — CONTROL OF MATERIAL Section 106. — ACCEPTANCE OF WORK Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC Section 108. — PROSECUTION AND PROGRESS Section 109. — MEASUREMENT AND PAYMENT
DIVISION 150 PROJECT REQUIREMENTS
Section 151. — MOBILIZATION
Section 153. — CONTRACTOR QUALITY CONTROL Section 154. — CONTRACTOR SAMPLING AND TESTING Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS Section 156. — PUBLIC TRAFFIC
DIVISION 200 EARTHWORK
Section 204. — EXCAVATION AND EMBANKMENT
DIVISION 300 AGGREGATE AND BASE COURSES
Section 301. — UNTREATED AGGREGATE COURSES
Section 303. – ROAD RECONDITIONING
DIVISION 600 INCIDENTAL CONSTRUCTION
Section 635. – TEMPORARY TRAFFIC CONTROL
DIVISION 700 MATERIAL
Section 703. — AGGREGATE
703.05 Subbase, Base, and Surface Course Aggregate
File details come from the government source that posted it. Updated .