Attachment 04 - Standardized Proposal Breakdown.xls
XLS spreadsheet 45 KB Posted
- Attached to
- BIL-Funded Elevator Modernization and Preventive Service Maintenance at Southern California TRACON
- Solicitation number
- 697DCK-24-R-00088
About this file
This standardized proposal breakdown template is to be used for submitting proposals to modernize and provide preventive maintenance services for elevators at the Southern California Terminal Radar Approach Control facility. Vendors should enter component costs for modernization requirements including electronics, controls, electrical systems, mechanical components, safety equipment and interior finishes. Construction and installation costs should also be broken out along with any after-hours work variances. Annual maintenance fees and monitoring costs for base and option years must be specified. The related federal contract opportunity is solicitation number 697DCK-24-R-00088 issued by the Department of Transportation Federal Aviation Administration Southwestern Region to modernize elevators and provide ongoing maintenance at its Southern California TRACON location. Proposals using this standardized template are due in response to the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Modernization
| Standardized Proposal Breakdown | DATE PREPARED: MMM DD - YYYY | |||
| PROJECT: | ||||
| VENDOR: | ||||
| PREPARER: | PREPARER'S CONTACT INFORMATION: | |||
| ITEM | EQUIPMENT COSTS - $ | LABOR COSTS - $ | OTHER COSTS - $ | TOTAL ITEM COST - $ |
| TOTAL | TOTAL | TOTAL | ||
| Modernization Requirements: | ||||
| Electronics/Controls/Software | thiat | $ - 0 | $ - 0 | |
| Electrical | $ - 0 | $ - 0 | $ - 0 | |
| Mechanical/Drives/Sheaves/Traveling Cable | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Cab Interior/Finishes | $ - 0 | $ - 0 | $ - 0 | |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | |
| Construction/Install: | ||||
| Mobilization/Demobilization | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Removal/Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Installation | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Permits | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| After Hours Variance: | ||||
| Modernization/Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Profit | $ - 0 | $ - 0 | ||
| Overhead | $ - 0 | $ - 0 | ||
| MODERNIZATION TOTAL | $ - 0 | |||
| Performance Maintenance: | ||||
| Maintenance Fee (monthly) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Maintenance Monitoring (as required) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Profit | $ - 0 | $ - 0 | ||
| Overhead | $ - 0 | $ - 0 | ||
| MAINTENANCE TOTAL (Annual) Base Year | $ - 0 | |||
| Instructions For Use: Enter the component cost in the white cells only. The pink cells have embedded formulas. Entering data directly into these cells will overwrite the embedded formulas. Include a narrative description of the modernization effort along with your technical proposal and standardized proposal breakdown. |
File details come from the government source that posted it. Updated .