This is a proposal checklist document for RFP N0017426R1003, a Manufacturing & Services Acquisition (MASA) Manufacturing Support contract issued by the Naval Sea Systems Command. The checklist serves as a suggested guide to ensure offerors submit all required documentation and is not mandatory for use.

The checklist outlines three required proposal volumes: Volume 1 (Technical), Volume 2 (Past Performance), and Volume 3 (Small Business Subcontracting Plan, if applicable). Volume 1 must include a detailed technical approach addressing the Statement of Work and sample Technical Data Package (TDP), a Quality Assurance Plan demonstrating compliance with ANSI/ASQC Q9000-Q9004 standards or equivalent, accreditation certificates, quality and process controls for TDP compliance, and documentation procedures for non-conforming material and in-process rejects for hardware manufacturing tasks. Volume 1 must also address facilities and equipment for testing, lab analysis, parts fabrication, and loading by identifying Prime and subcontractor facility locations and sizes, demonstrating facility availability at award, and documenting how at least 25% of proposed task amounts will be allocated to small business concerns with meaningful task assignments. Volume 2 requires past performance information for the Prime and subcontractors from the last five years demonstrating relevance to the SOW, with three references if available, including either a completed Past Performance Questionnaire or CPARS records. Volume 3 requires a Small Business Subcontracting Plan for applicable tasks (1, 4, or 5) in accordance with FAR clause 52.219-9. Additionally, offerors must complete all RFP fill-ins and submit a cover letter with solicitation number, company contact information, authorized personnel names, a statement of consent to all terms and conditions, and an Organizational or Personal Conflict of Interest Certification or Mitigation Plan per NAVSEA requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0017426R1003 Attachment 04

MASA RFP

Proposal Checklist *This document is not required for use, only suggested for use, should offerors desire to utilize it. The intention of this document is to ensure that offerors are submitting all requested documentation as outlined in Sections L and M of this RFP document.

1. Did you prepare the Cover Letter as outlined in Section L?

☐ Solicitation Number and Company Contact Information ☐ Names of personnel authorized to negotiate and sign the proposal ☐ Statement that the Offeror consents, meets and agrees with all terms, conditions, requirements, provisions, and amendments included in the solicitation ☐ Organizational or Personal Conflict of Interest (OCI) Certification/Mitigation Plan: Certify compliance with L-209-H009 Notification of Potential Organizational or Personal Conflict(s) of Interest (NAVSEA) (APR 2022)

2. Did you prepare the three (3) separate Volumes as outlined in Section L?

☐ Volume 1: Technical ☐ Volume 2: Past Performance ☐ Volume 3: Small Business Subcontracting Plan (as applicable)

3. Does Volume 1: Technical contain all requested information?

Element A: Technical Approach ☐ Detailed description of the Offeror’s approach to perform the requirements listed in the SOW and sample TDP ☐ Copy of the Offeror’s Quality Assurance Plan, including sufficient detail to allow the Government to ascertain if the quality system meets the requirements of ANSI/ASQC Q9000 through Q9004 industry standards, or an equivalent quality system ☐ Copies of ANSI/ASQC Q9000 through Q9004 accreditation certificates ☐ Identify the quality and process controls that will be used to ensure that the sample TDP end item will be in compliance with the applicable drawing, specifications, SOW and contract requirements ☐ In the case of hardware manufacturing (Tasks 1, 2, 4, and 5), describe the type of documentation that will be used to identify, record and dispose of non-conforming material, in-process rejects and characteristic discrepancies.

Element B: Facilities and Equipment ☐ Detailed description of proposed Prime and subcontractor facilities and equipment for testing, lab analysis, parts fabrication and loading, as applicable to tasks being proposed ☐ Provide information as to the location and size of their (Prime and subcontractor) facility(ies).

☐ Demonstrate plan to ensure the facility(ies) are available at time of award ☐ Demonstrate how the Offeror will provide at least 25% of the proposed total estimated amount of its respective Task(s) to small business concerns. Provide sufficient information to demonstrate that the tasks assigned to the selected small business subcontractors are meaningful in the overall success of the program.

4. Does Volume 2: Past Performance contain all requested information?

☐ Provide past performance information, for the Prime and any subcontractors, in accordance with Attachment 01 - Past Performance Reference, which shall reflect recent experience performed within the last five years and demonstrates experience relevant to the solicitation's SOW.

☐ Describe how the past performance references are relevant including details about how it is similar in scope and complexity to this solicitation's SOW ☐ Provide three past performance references, if available ☐ Describe how the past performance references are relevant including details about how it is similar in scope and complexity to this solicitation's SOW ☐ Submit one of, or both of, the following as applicable:

· If there is not a CPARS record, the Offeror shall submit one (1) Past Performance Questionnaire (Attachment 02 in Section J)

· If there is a CPARS record, the Offeror shall provide up to three references listed on the past performance reference sheet (Attachment 01 in Section J)

5. Does Volume 3: Small Business Subcontracting Plan contain all requested information?

☐ If applicable to the Task (1, 4 or 5) and/or Offeror, submit a Small Business Subcontracting Plan in accordance with FAR clause 52.219-9 Small Business Subcontracting Plan

6. Did the Offeror complete all RFP fill-ins, to include:

☐ Completed first page of RFP ☐ All applicable fill-in clauses throughout RFP document