Attachment 04 - Itemized Cost Breakdown - 1 page.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Renovate Interventional Radiology Suites (Construction Services)
Solicitation number
36C24826R0038
Issued by

About this file

This is an itemized cost breakdown template for a Department of Veterans Affairs (VA) construction project to renovate Interventional Radiology Suites. The Excel spreadsheet provides a structured format for offerors to detail project costs across 34 construction divisions, including labor and material expenses. The template requires contractors to break down costs for areas such as General Requirements, Concrete, Masonry, Electrical, HVAC, and Utilities, with designated columns for Labor Cost, Material Cost, and Total Cost. Additionally, the template includes sections for calculating Overhead, Profit, and Bond percentages, with the goal of providing a comprehensive price analysis for the government.

The associated federal contract opportunity (Solicitation Number 36C24826R0038) is managed by the Veterans Health Administration Veterans Integrated Service Network 8, seeking construction services for renovating Interventional Radiology Suites using a Bid-Build services approach. The cost breakdown template is designed to help potential contractors systematically present their pricing structure, enabling the VA to conduct a detailed price evaluation for the proposed renovation project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title

Edward L Roy: VA assigned Project Title

Project Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoid lump sum, etc. This price offer breakdown is the overall base ofer price for Government price analysis

File details come from the government source that posted it. Updated .