Attachment 04 Combined Specifications.pdf
PDF 1 MB Posted
- Attached to
- GP-20-G26 Crow Creek Scattered Water and Sewer
- Solicitation number
- 75H70122R00071
About this file
This is a solicitation notice for construction project 75H70122R00071 issued by the Indian Health Service. The project scope involves installing individual water and sewer services at multiple homes in South Dakota. The anticipated contract value is between $250,000 to $500,000. The solicitation is set aside for small businesses under NAICS 237110 with a size standard of $39.5 million. The period of performance is 114 days from notice to proceed. Offerors must submit proposals by August 29, 2022 via email. The evaluation will use lowest price technically acceptable procedures, with price as the determining factor among eligible offers. The contract type will be firm fixed price. The notice provides contact information for questions and states that all dates are subject to change by amendment.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Great Plains Area Indian Health Service Revised 04/2022
Summary 01100-1
SECTION 01100 – SUMMARY
PART 1 - GENERAL
SUMMARY
The work to be performed under this contract shall consist of furnishing the following to perform the work outlined in these specifications and as indicated by Project Drawings:
Tools Equipment Materials Labor Supplies Manufactured articles All transportation to complete the work Temporary facilities
Location of Work: Crow Creek Reservation, Crow Creek Sioux Tribe, Buffalo and Hughes County, South Dakota
Incidentals Items: All work, materials, and services not expressly listed as being provided by others or not expressly called for in the contract but are necessary for the completion of the work in good faith, shall be furnished, installed, and performed by the contractor.
SUMMARY OF WORK TO BE DONE BY CONTRACTOR
The scope of the Work includes furnishing, on a requirements basis, all labor, equipment, and materials to construct individual and community facilities to serve individual home sites.
ADDITIONAL INFORMATION
For information regarding the technical aspects of the project, contact the Project Engineer:
Susan Mihalyi, EIT
Indian Health Service 420 South Garfield Avenue, Suite 200 Pierre, SD 57501
Telephone: 605-224-1644 Fax: 605-224-1704
Email: Susan.Mihalyi@ihs.gov mailto:Susan.Mihalyi@ihs.gov
Summary 01100-2
For information regarding contracting information, contact the Contracting Officer Representative for this project:
Jason Petersen
Senior Engineer Consultant Indian Health Service 420 South Garfield Avenue, Suite 200 Pierre, SD 57501 Telephone: 605-224-1644 Fax: 605-224-1704 Email: Jason.Petersen@ihs.gov
For information regarding utilities on the Crow Creek Indian Reservation, contact the Crow Creek Utility Manager:
Don Big Eagle Crow Creek Tribal Utility Manager
P.O. Box 497 Fort Thompson, SD 57339
Telephone: 605-730-4388 Email: ccstutility@gmail.com
For information regarding tribal employment services on the Crow Creek Reservation, contact the Tribal Employment Rights Officer (TERO):
Alfonso Drapeau Crow Creek TERO
P.O. Box 50 Fort Thompson, SD 57339
Telephone: 605-245-2228 Telephone: 605-245-2221
For information regarding tribal historic services on the Crow Creek Indian Reservation, contact the Tribal Historic Preservation Officer (THPO):
Merle Marks Crow Creek THPO
P.O. Box 50 Fort Thompson, SD 57339
Telephone: 605-245-2221 Email: cchistory@midstatesd.net
Comply with all Tribal regulations related to the completion of the work including the acquisition of necessary permits and the payment of Tribal taxes.
PERFORMANCE TIME(S)
Mobilize and commence work on-site within twenty (20) calendar days after receipt of each work order.
mailto:Jason.Petersen@ihs.gov mailto:ccstutility@gmail.com mailto:cchistory@midstatesd.net
Summary 01100-3
Time allowed shall be calculated as the sum of the time provided to mobilize and commence work plus the following time schedule for each type of work including all appurtenances necessary to complete the item:
Water Supply:
a. Individual Pump, Pressure System, and Two Days
Water Service – Complete
b. Cistern System Two Days
c. Community Water Service Two Days
d. Rural Water Line Construction Service Line Length < 500 L.F. Two Days Service Line Length 501 L.F. – 1,000 L.F. Three Days Service Line Length 1,001 L.F. – 2,000 L.F. Four Days
e. Road Boring Two Days
Waste Disposal:
a. Septic Tank and Drainfield Two Days
b. Septic Tank and Sand Filter Two Days
c. Community Sewer Service Two Days
d. Individual Lift Station Five Days
END OF SECTION
Great Plains Area Indian Health Service Revised 07/2022
Price and Payment 01270 - 1
SECTION 01270 – PRICE AND PAYMENT
GENERAL
SUMMARY
Work covered by this section includes method of measurement and basis of payment for all divisions included.
Payment for the various items of the Bid Schedules shall include all compensation to be received by the Contractor for furnishing all tools, equipment, materials, labor, supplies, manufactured articles, transportation, and temporary facilities required to complete the work in accordance with contract documents including incidentals.
Respective prices and payment shall constitute full compensation for all work completed including incidentals.
All items not expressly listed as being provided by others that are necessary for the completion of work shall be furnished and installed by the Contractor.
ESTIMATED QUANTITIES
All quantities stipulated in the bid schedule or other contract documents are approximate and are to be used: (1) as a basis for estimating the probable cost of the work and (2) for the purpose of comparing the bids submitted.
The Contractor shall be paid for actual quantities installed based on the quantities measured in the field. The actual amounts of work completed and materials furnished may differ from estimated quantities. The Contractor shall make no claim for damages, anticipated profits, or otherwise, on account of differences between the estimated amounts and the actual amount of work performed and materials furnished.
SURVEY AND MEASUREMENTS
All quantity measurements shall be the responsibility of the Contractor and will be verified by the Contracting Officers Representative.
All measurements and subsequent payments will be based on completed and accepted work performed in strict accordance with the plans, specifications, and other contract documents.
BID SCHEDULE ITEMS
GENERAL
Payment shall be full compensation to complete the work items in good faith, including incidental work.
Price and Payment 01270 - 2
In addition to the basis of payment described under each item, the unit price bid shall be full compensation for all of the following:
General requirements in Division 01, but not limited to the following.
a. Submittals.
b. Record drawings.
c. Warranties.
Specific requirements in Division 02 through 16, including but not limited to the following (unless otherwise expressly defined as a line item in the bid schedule):
a. Erosion control.
b. Clearing and grubbing.
c. Removal and replacement of obstructions.
d. Associated trenching, excavation and backfill including the removal of any nuisance water, bedding, haunching, and compaction.
e. Disposal of any excess material.
f. Traffic control.
g. Rough grading.
h. Finish work, where called for, including finish grading, topsoiling, and landscaping.
BID ITEMS
A. Schedule A – Water Service
1. 1-inch PE 200 Water Service Line (7’ Minimum Bury)
a. Measurement: By the lineal foot based on the horizontal length installed and measured over the centerline of the pipe.
b. Basis of Payment: Includes all pipe, elbows, fittings, labor, tools, equipment and materials required to construct the water service line, including excavation, trenching, laying and jointing pipe, backfill and compaction, flushing, disinfection, pressure testing, detectable warning tape, removal and replacement of fences, culverts, protection and/or replacement or repair of utilities which may be impaired by work, disposal of excess excavated material, thrust restraints, preparation of seed bed and seeding, and all other incidentals required to complete the work as specified.
2. 1-inch PE 250 Water Service Line (7’ Minimum Bury) excavation, trenching, laying and jointing pipe, backfill and compaction, flushing, disinfection, pressure testing, detectable warning tape, removal and replacement of fences, culverts, protection and/or replacement or repair of utilities which may be impaired by work, disposal of excess excavated
Price and Payment 01270 - 3
3. 1-inch Corporation Stop w/Saddle
a. Measurement: By each installed.
b. Basis of Payment: Includes all labor, tools, equipment, excavation, backfill and compaction, corporation stop, couplings, service clamps or saddles and all other incidentals required to complete the work as specified.
4. 1-inch Curb Stop w/Box and compaction, curb stop, box, stationary rod, one combination key, one pentagon wrench and all other incidentals required to complete the work as specified.
5. 2-inch SDR 17 PVC Water Service Line (7’ Minimum Bury), > 1000’ excavation, trenching, laying and jointing pipe, backfill and compaction, flushing, disinfection, pressure testing, detectable warning tape, removal and replacement of fences, culverts, protection and/or replacement or repair of utilities which may be impaired by work, disposal of excess excavated
6. 2-inch Gate Valve w/Valve Box
a. Measurement: By each installed
b. Basis of Payment: Includes labor, tools, equipment, excavation, backfill and compaction, gate valve, extension stem, gate valve box, centering device, valve box adapter, locking lid, polyethylene encasement, utility markers and all other incidentals required to complete the work as specified. Provide one pentagon key and one socket wrench for valve extension stem to the utility department under each contract.
7. 3/4-inch PEX Tubing w/Heat Tape
a. Measurement: By the lineal foot of pipe installed measured over the centerline of the pipe.
Price and Payment 01270 - 4
b. Basis of Payment: Includes all labor, tools, equipment, PEX tubing, fittings, heat tape, extension cord (if required), thermostat, insulation, and all other
8. Freezeless Riser and compaction, riser, fittings, extension cord, all other incidentals required to complete the work as specified.
9. Meter Pit, Complete and compaction, meter pit, inlet angle shut-off, remote readout, double check valve, regulator, coiled polybutylene tubing, insulation pad, locking lid, fittings, external connections and all other incidentals required to complete the work as specified.
10. Cistern System – Manual Fill
b. Basis of Payment: Includes all labor, tools, equipment, excavation, backfill and compaction, cistern tank, vent pipe, fill pipe with cover, manways, outlet piping and fittings, outlet bulkhead, polystyrene insulation, free flowing granular backfill and bedding, filling of tank, disinfection and all other incidentals required to complete the work as specified.
11. Cistern Pump
b. Basis of Payment: Includes all labor, tools, equipment, pump, connections to the electrical and piping systems, valves, fittings, adapters, 5 feet of in-house tubing and all other incidentals required to complete the work as specified. In-house tubing in excess of 5 feet will be paid for at the unit price in the bid schedule.
12. Haul Tank
a. Measurement: By each provided.
b. Basis of Payment: Includes haul tank, fittings, ball valve, discharge hose and all other incidentals required to complete the work as specified.
Price and Payment 01270 - 5
13. 4-inch SDR-21 Yelomine Casing Pipe, Road Bore
b. Basis of Payment: Includes all materials, labor, and equipment used for the excavation, boring, installing the encasement pipe, casing spacers, end seals, backfilling, preparation of seed bed and seeding. The carrier pipe shall be paid for separately at the per lineal foot price listed on the bid schedule for the size and type of pipe installed.
14. 6” x 2” Connection to Existing System (Reducing Tee)
a. Measurement: By the job.
b. Basis of Payment: Includes labor, tools, equipment, excavation, backfill and compaction, tee, gate valve, valve box, thrust block, preparation of seed bed and seeding and all other incidentals required to complete the work as
15. Stainless Steel Centrifugal Separator Sand Removal System w/Heated
Enclosure
b. Basis of Payment: Includes labor, tools, removal and disposal of existing box, gravel, concrete pad, stainless steel sand separator, mounting brackets, heated enclosure, electrical wiring, pipe, elbows, fittings, tees, and all other incidentals which may be required to complete the work as specified.
B. Schedule B – Sewer Service
1. 4-inch Schedule 40 Pipe (Inlet Piping, Outlet Piping, Daylight Piping)
b. Basis for Payment: Includes excavation, backfill and compaction, labor, tools, equipment, pipe, elbows, fittings, tees, polystyrene insulation, preparation of seed bed and seeding, ductile iron sleeve and rodent guard on daylight pipe, and all other incidentals which may be required to complete the work as
2. 4-inch Double Cleanout equipment, sewer wye, all vertical piping and fittings, frame, cover, and all other incidentals which may be required to complete the work as specified.
Price and Payment 01270 - 6
3. 1,000 Gallon Septic Tank w/Effluent Filter equipment, concrete septic tank in accordance with plans and specifications, inlet baffle/tee, outlet gas baffle, effluent filter, 70-pound concrete plug, polystyrene insulation, testing of tank and all other incidentals which may be
4. 1,250 Gallon Septic Tank w/Effluent Filter equipment, concrete septic tank in accordance with plans and specifications, inlet baffle/tee, outlet gas baffle, effluent filter, 70-pound concrete plug, polystyrene insulation, testing of tank and all other incidentals which may be
5. Septic Tank Access Riser
a. Measurement: By vertical foot installed to the nearest one-half foot from the top of the tank to the final finished ground surface.
equipment, inlet access riser, outlet access riser, all other incidentals which may be required to complete the work as specified.
6. Distribution Box w/Access Riser and Cover equipment, box, riser, cover and all other incidentals required to complete the work as specified.
7. Presby AES System 6.5’ wide, 4 Parallel Legs (To 5’ depth)
a. Measurement: By lineal foot installed.
b. Basis of Payment: Includes full compensation for installing influent AES pipes, effluent drain pipes, filter sand, gravel, filter fabric, landscaping, vent pipe, stainless steel vent pipe screen, and all other incidentals required to complete the work as specified.
8. Presby AES System 6.5’ wide, 4 Parallel Legs (> 5’ depth)
a. Measurement: By lineal foot installed.
Price and Payment 01270 - 7
b. Basis of Payment: Includes full compensation for installing influent AES pipes, effluent drain pipes, filter sand, gravel, filter fabric, landscaping, vent pipe, stainless steel vent pipe screen, and all other incidentals required to complete
9. Absorption Bed for Presby AES System
a. Measurement: By square foot installed.
b. Basis of Payment: Includes full compensation for installing specified fine gravel, coarse gravel, perforated drain pipe, and geotextile fabric, and all other
10. Insulation, 4’ Wide x 2” Thick
a. Measurement: By the lineal foot installed.
b. Basis of Payment: Includes excavation, backfill and compaction, labor, tools, equipment, insulation, and all other incidentals which may be required to complete the work as specified.
11. 1-inch PE Discharge Piping
a. Measurement: By the linear foot installed.
and materials required to construct the discharge line, including excavation, trenching, laying and jointing pipe, backfill and compaction, flushing, pressure testing, detectable warning tape, removal and replacement of fences, culverts, protection and/or replacement or repair of utilities which may be impaired by work, disposal of excess excavated material, thrust restraints, preparation of seed bed and seeding and all other incidentals required to complete the work as specified.
12. Septic Tank Effluent Lift Station and Pump
b. Basis for Payment: Includes labor, tools, equipment, excavation, backfill and compaction, casted in riser-to-tank adapter, riser and lid, pump vault, effluent filter, discharge hose and valve assembly, float switch assembly, effluent pump, electrical splice, box, controls and alarms, mounting materials, buried electrical cable, connections to electrical power and all other incidentals which may be required to complete the work as specified.
13. Septic Tank Abandonment
a. Measurement: By each tank abandoned.
equipment, pumping and disposal of contents, disposal fees, crushing of
Price and Payment 01270 - 8 tank, site clearing and cleanup, and all other incidentals required to complete
14. 8-inch Wye Branch and Connection to Sewer Main
b. Basis of Payment: Includes excavation, backfill and compaction, labor, tools, equipment, sewer wye branches and all other appurtenances necessary to make the wye connection to the sewer main completing the work as
15. House Sewer Connection equipment, transition fittings, and elbows required to connect the sewer service line to a trailer house, modular home, or home with a crawl space that requires the Contractor to work in a confined space as specified. All horizontal piping required shall be paid for at the unit price in the bid schedule for the size indicated on plans or listed in bid schedule.
C. Schedule C – Miscellaneous
1. Gravel Road Restoration
a. Measurement: By the lineal foot of gravel road surface removed, measured at the centerline of the pipe.
b. Basis for Payment: Includes gravel, compaction and all other incidentals which may be required to complete the work as specified.
2. Backhoe Time w/Mobilization
a. Measurement: By the hour.
b. Basis for Payment: Includes time to travel to and from location of equipment to the site, all excavation, inspection of existing facilities, and repairs as directed by the Tribe, backfilling, site cleanup and all other incidentals required to complete the work as specified. No separate mobilization or demobilization is paid for.
3. Site Mobilization
a. Measurement: Lump sum payment per each individual site served under this contract per delivery order.
b. Basis of Payment: Includes cost associated with mobilizing equipment and material to the individual sites and includes payment of applicable Tribal Taxes, fees, and permits, and payment of all applicable state and federal
Price and Payment 01270 - 9 taxes and duties. Payment shall be made after the work at the applicable site has been substantially completed and the as-built drawing has been provided.
PART 3 – EXECUTION (N/A)
Project Management And Coordination 01310 - 1
SECTION 01310 – PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
SUMMARY
Section includes the preconstruction conference, construction schedule, working hours/days, coordination requirements and progress meetings.
PRE-CONSTRUCTION CONFERENCE
Required after award of contract and prior to start of construction.
Representatives from the following shall attend.
Prime Contractor Subcontractor(s) Project Engineer and/or Technical Representative Owner’s Representative Appropriate State/Federal Agencies or other Funding Agencies TERO Representative, if applicable
The Project Engineer will arrange a date that is mutually acceptable to all parties planning to attend.
Contractor shall notify subcontractors of time and date of meeting.
CONSTRUCTION SCHEDULE
Project Engineer will present Contractor with a proposed date for the initial work order.
Contractor will present a proposed submittal schedule to Project Engineer, ensuring all materials will be submitted and approved prior to starting construction on the initial work order.
Notify the Project Engineer three full working days in advance of any construction. In addition, Contractor is required to notify the Project Engineer of construction plans on a daily basis during the time frame while the construction of an issued Work Order is completed.
Communicate major changes to the schedule of any Work Order to the Project Engineer in writing.
WORKING HOURS/DAYS
Perform all work during regularly scheduled working hours, unless approved by Project Engineer.
Project Management And Coordination 01310 - 2
Working hours shall be defined as 7 AM to 5 PM Monday through Friday, with the exception of holidays.
No work will be allowed on Saturday, Sunday, Federal holidays, and Tribal holidays without the Project Engineer’s consent.
Holidays include, but are not limited to, New Year’s Day, President’s Day, Martin Luther King Jr Day, Memorial Day, Juneteenth Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day and Christmas Day, or on any other holidays declared by the Project Engineer.
Holidays that fall on Saturday will be observed on the preceding Friday; holidays that fall on Sunday will be observed on the following Monday. No construction will be permitted on those days.
Project Engineer has the option to approve overtime or holiday work upon the Contractor’s request not less than 48 hours in advance of the work to be performed. Overtime and holiday requests that exceed a ten (10) hour work shift for a time period exceeding two days will not be approved by the Project Engineer.
COORDINATION WITH OTHER REQUIREMENTS
Coordinate work with other contractors (i.e. roads, building, etc.) in the area as necessary to complete the work specified.
Coordinate work with local utilities (i.e. water and sewer, power, telephone). All buried utilities may not be shown on the plans.
Contractor is responsible for having utilities marked prior to construction and field verify utility location.
PROGRESS MEETINGS
Project Engineer will make arrangements for meetings, prepare agenda with copies for participants, and preside at meetings.
Progress meetings will be scheduled throughout progress of the Work at maximum monthly intervals. Frequency of meetings will be determined from Work meeting construction schedule or when Project Engineer deems it necessary.
Representatives from the following shall attend:
Prime Contractor Subcontractor(s) Project Engineer and/or Technical Representative Owner’s Representative
Submittal Procedures 01330 - 1
SECTION 01330 – SUBMITTAL PROCEDURES
PART 1 - GENERAL
SUMMARY
This section includes information on submittal procedures. Materials requiring a submittal are listed in the appropriate specification section.
SUBMITTAL PROCEDURES
Submit one electronic pdf copy or three paper hard copies of submittals to the Project Engineer, unless requested otherwise.
Attach an acceptable submittal cover sheet for all submittal packages.
List all submittals included in the package in the appropriate location.
Signed cover sheet indicating all submittals have been reviewed prior to submission.
Identify each cut sheet or shop drawing with the following information:
Contract number Supplier Pertinent specification section number Pertinent drawing and detail number
Submit the following information, as applicable:
Manufacturer’s cut sheets indicating compliance with references (e.g. applicable ASTM, AWWA standards).
Laboratory results, as applicable.
Dimensional drawings or shop drawings, as applicable.
Other information necessary for the Project Engineer to determine compliance with the specifications.
Identify variations from the contract documents and product or system limitations that may be detrimental to successful performance of the completed work.
Revise and resubmit submittals as required and identify all changes made since previous submittal.
Distribute copies of reviewed submittals to concerned parties (i.e. suppliers, sub-contractors). Instruct parties to promptly report inability to comply with requirements.
Submit written communication of any inability to comply with the Project Engineer’s comments.
Submittal Procedures 01330 - 2
Submit information to the Project Engineer at least three weeks in advance of the work to be performed.
Approval of submittals must be provided by the Project Engineer prior to installation of materials and process of any payments for the materials.
Approval of any submittal does not relieve responsibility for completion of the work in accordance to the plans and specifications.
Quality Requirements 01430 - 1
SECTION 01430 – QUALITY REQUIREMENTS
PART 1 - GENERAL
SUMMARY
This section includes prerequisites and procedures, installer qualifications, control of installation, and manufacturers’ field services to ensure the quality of the work.
SUBMITTALS
Contractor Name and License Number
Subcontractor(s) Name and License Number
Name or names of the “Competent Person” in charge of safety on the jobsite, as defined by the OSHA Industry Standard 29 CFR 1926.
INSTALLER QUALIFICATIONS
Perform Work under the direction of personnel licensed by the state and/or reservation having jurisdiction.
If Work being completed is not regulated by the state and/or reservation, submit literature from the manufacturer, independent representative of the manufacturer, and/or supplier indicating the Contractor or Subcontractor’s ability to complete installation based on past experience or formal training.
CONTROL OF INSTALLATION
Review materials for acceptability, in accordance with the approved submittals, when delivered to the site.
Store and handle materials to prevent damage.
Review materials, services, and workmanship to ensure that Work is performed in accordance with the specifications.
Comply fully with manufacturers’ instructions.
Should manufacturers’ instructions conflict with contract documents, request clarification from Project Engineer before proceeding.
Should the finished product or method of completion differ in any way from the manufacturer’s written instructions or the specifications, request approval in writing from the Project Engineer before proceeding.
Correct defective Work to the satisfaction of the Project Engineer.
Quality Requirements 01430 - 2
MANUFACTURER’S FIELD SERVICES
Provide reports on observations and documentation of workmanship to the Project Engineer within 30 days of visit for review where manufacturers’ field services are provided.
WARRANTY
Provide a minimum one (1) year warranty for all materials and labor, covering defects in the materials or deficiencies resulting from contractor installation.
Provide additional warranties as required under other sections.
Warranty takes affect starting the date of substantial completion.
Staking and Construction Surveying 01720 - 1
SECTION 01720 – STAKING AND CONSTRUCTION SURVEYING
PART 1 - GENERAL
SUMMARY
This section outlines the staking and surveying work related to provide reference points in the field. Section clarifies staking provided to the Contractor and Contractor’s responsibilities.
Construction Surveys establish “control stakes” for basic line and grade used for project construction.
Control stakes are used to check work for contract compliance.
Set supplemental “working stakes” from control stakes when needed.
Working stakes are used to perform the work and are provided by the contractor.
STAKING PROVIDED TO THE CONTRACTOR
Water Main, Force Main and Appurtenance Staking
Offset of Horizontal or Centerline staking (approximately every 100 feet).
Appurtenance (gate valve, fittings, fire hydrant, etc.) staking on center.
Sewer Main and Appurtenance Staking.
Manhole staking on center with two offsets including elevations.
Project Benchmarks
Hubs for vertical control will be placed at various points throughout project.
Hubs for horizontal control (at least one per project).
CONTRACTOR’S RESPONSIBILITY
Notify the Project Engineer at least fourteen (14) calendar days in advance of the times and places that staking will be needed.
Set supplementary staking, grade staking, offsets, cut stakes, temporary bench marks, and control points necessary for contractor to complete the work in accordance with the plans and specifications.
Provide all staking materials for contractor supplementary staking to include hubs, lath, flagging, paint and other material needed to provide construction staking.
Staking and Construction Surveying 01720 - 2
Request clarification from the Project Engineer regarding conflicts before proceeding with installation of facilities.
Preserve all offset and reference staking, until such time as the pipeline or other facilities are installed.
Reference stakes needing replacement due to Contractor error or negligence must be replaced by Contractor, at no cost to the contract.
All permanent survey points/markers (i.e. property corners) and bench marks not directly in the line of work shall be preserved.
Replace all permanent survey markers disturbed or destroyed using a Professional Land Surveyor, at no cost to the contract.
Provide evidence of reestablishment of permanent survey markers to the Project Engineer and copy of stamped and approved monument re-establishment documentation from the appropriate jurisdiction (state, BIA, etc.).
Closeout Procedures 01770 - 1
SECTION 01770 – CLOSEOUT PROCEDURES
PART 1 - GENERAL
SUMMARY
Section includes information on substantial completion, closeout procedures, final inspection and final payment.
SUBSTANTIAL COMPLETION
Water Main: Water main construction is considered substantially complete once the work has been installed in accordance with the specifications, backfilled and compacted in place, successfully pressure tested, and passed bacteriological testing, at which point the completed system is connected to the existing system and ready to be consumed.
Water Service Line: Water Service Line construction is considered substantially complete once the work has been installed in accordance with the specifications, backfilled and compacted in place, connection has been made to the main line, and the line has been successfully pressure tested, and passed bacteriological testing, at which point it is connected to the completed system and ready for end user consumption.
Sewer Main: Sewer main construction is considered substantially complete once the work has been installed in accordance with the specifications, backfilled and compacted in place, and the sewer mains and manholes have been successfully tested, connections made to the existing facilities at which point sewage would be allowed to flow through the system.
Sewer Service lines: Sewer service line construction is considered substantially complete once the work has been installed in accordance with the specifications, backfilled and compacted in place, connection has been made to the sewer main, and the service line has been successfully tested, connected to the end user at which point sewage would be allowed to flow through the system.
Sewage Forcemain: Sewage Forcemain is considered substantially complete once the work has been installed in accordance with the specifications, backfilled and compacted in place, connection has been made to its beginning and ending point, successfully passed the pressure test, at which point sewage is allowed to flow through the system.
Sewage Lift Station: Sewage Lift Station is considered substantially complete once the work has been installed in accordance with the specifications, backfilled and compacted in place, permanent connection has been made to the system, successfully passed pressure testing, startup has been successfully conducted and the facility has been secured from unauthorized access.
Closeout Procedures 01770 - 2
Sewage Lagoon: Sewage lagoon is considered substantially complete once the work, including all structures and rip-rap, has been installed in accordance with the specifications. All required testing has been completed and determined to be compliant, cell if prefilled to predetermined level and the system is ready to accept sewage flow.
Water Reservoir: Water reservoir is considered substantially complete once all the work has been installed in accordance with the specifications. Water reservoir is to be tested and disinfected in accordance with the specifications and pass the required bacteriological testing making it ready to be put into service and consumed by the end user.
On-Site Septic System: On-Site septic systems are considered substantially complete once all components associated with the system are installed in accordance with the specifications, backfilled and compacted in place, connection has been made to the home, final grading is complete, and the system has been put into service.
Individual Well: Individual wells are considered substantially complete once the well has been, drilled, cased and sealed in accordance with the specifications. The well is to be disinfected, tested and have the well log, chemical analysis and satisfactory bacteriological analysis submitted to the appropriate individuals making the well ready to be connected and consumed by the end user.
Individual Pressure System: Individual pressure systems are considered substantially complete once the work has been installed in accordance with the specifications. System needs to be tested and disinfected, be leak free and ready to be connected and consumed by the end user.
CLOSEOUT PROCEDURES
Submit a written request to Owner and Engineer that the work is substantially complete and request that the Engineer through the Owner issue a certificate of substantial completion.
At the same time submit to the Owner and Engineer an initial draft of punch list items to be completed or corrected before payment.
Provide warranties, approved Operation & Maintenance Manuals, and approved record documents (e.g. as-built drawings) to the Project Engineer within ten (10) days after date of substantial completion or 5 working days prior to the pre-final inspection (whichever is sooner).
Submit written certification that work is fully completed in accordance with contract documents and ready for final inspection at least five (5) working days prior to final inspection.
PRE-FINAL CLEANING
Complete pre-final clean-up prior to inspection.
Closeout Procedures 01770 - 3
Remove waste and surplus materials, rubbish, and construction facilities from the site.
PRE-FINAL INSPECTION
A pre-final inspection of the facilities shall be conducted, at a minimum, by the Project Engineer and the Contractor.
Inspect all facilities installed under the Contract.
Complete the requirements listed in Closeout Procedures Section 1.2 prior to the pre-final inspection.
PRE-FINAL PUNCH LIST
Any deficiencies noted at the pre-final inspection will be communicated to the Contractor through a letter from the Contract Manager or the Project Engineer.
After Substantial Completion promptly begin work on the punch list of items to be completed or corrected prior to final inspection.
Correct all deficiencies identified prior to scheduling a Final Inspection.
Full payment will not be made until all requirements of this section are met.
Contractor shall submit written certification that all pre-final punch list items have been completed in accordance to the contract documents and ready for final inspection at least five (5) working days prior to final inspection.
FINAL INSPECTION
Final inspection of all the facilities provided will be conducted, at a minimum, with the Owner, Federal Funding Agency(s), Project Engineer, and the Contractor.
Scheduling of the final inspection will not be allowed until all deficiencies listed in the pre-final punch list are corrected to the Project Engineer’s satisfaction.
FINAL PAYMENT
Deficiencies noted during the pre-final inspection will be communicated to the Contractor through a letter from the Contract Manager or Project Engineer.
Correction of all deficiencies will be required prior to the final payment being processed.
Final Payment will follow the procedures outlined in Section 01270 Price and Payment and require the Contractor to sign a release of claims for the contract.
Project Record Documents 01781 - 1
SECTION 01781 – PROJECT RECORD DOCUMENTS
PART 1 - GENERAL
SUMMARY
This section describes the requirements for closeout submittals including, record drawings, warranty information and general operation and maintenance information.
DELIVERY
Provide all closeout submittals meeting these requirements and any specific requirements of each section.
Closeout submittals must be received prior to final payment
All closeout submittals must be received in a correct and complete manner before final payment can be made. If material is deficient, the deficiencies will be indicated in punch lists.
DEFINITIONS
Record Drawing: A drawing showing the actual installation of facilities, showing changes from the plans, and showing detail enough that future persons can readily locate all objects.
Ties: Measurements from permanent easily located objects to an installed object.
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
RECORD DRAWINGS
Provide record data in one of the following manners:
On a set of project drawings, neatly draw tie measurements and changes from the original design.
On separate 8½ X 11 sheets, neatly draw site sketches, structure sketches, etc., indicating the necessary information.
Provide three (3) swing tie measurements to all buried utility objects that may need to be located in the future, including, but not limited to:
Gate valves Corporation stops
Project Record Documents 01781 - 2
Curb stops Water main fittings Couplings to existing water systems.
Cleanouts Sewer wyes Utility crossings Septic tank manholes and access covers.
Corners of drainfields
Provide offset measurements for buried utilities (e.g. water main) installed parallel to roads or other known utilities.
Provide revised elevation data for all items that have elevations shown on the plan drawings, including, but not limited to, the following:
Manhole inverts (inlet and outlet) Manhole rims Lift station invert Lift station top Lift station pipe penetrations Float elevations Septic tank elevations Depth of installation of Individual septic systems Elevations of pipe entering and leaving structures
Elevation of sewer service line stub (if terminated at right of way) Variations from the minimum depth of bury Other elevations indicated on profiles
Provide installed bid schedule items quantities for individual facilities on 8½ X 11 sheets.
Depending on the type of contract, standard forms may be supplied for use by the Contractor.
WARRANTIES
Submit all warranty information regarding the materials installed in accordance with that products particular section.
OPERATION AND MAINTENANCE INFORMATION
Submit all operation and maintenance information as included in the packaging from the manufacturer regarding the materials installed.
Additional project specific operation and maintenance requirements are listed in applicable sections.
Site Clearing 02230 - 1
SECTION 02230 – SITE CLEARING
PART 1 - GENERAL
SUMMARY
This section covers clearing, stripping and grubbing within the proposed areas of the Work.
RELATED WORK
Section 02300 – Earthwork
Section 02315 – Excavation, Trenching and Backfill
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
CLEARING AND GRUBBING
Obtain necessary permit from Owner prior to cutting any trees or brush (if applicable).
Consult with the Project Engineer and Owner to designate a temporary area for stockpiling all cleared brush and trees.
Ensure all stockpiled material does not adversely affect drainage nor cause damage to abutting property.
Remove all ground vegetation and other extraneous material from the construction area to a depth of 6 inches and stockpile in the designated area.
Remove and dispose of all trees, stumps, brush, debris, and all other obstructions as needed in an approved manner off site.
Do not burn, bury, and/or leave debris within the Work areas.
If possible within right-of-way and property lines, extend clearing and grubbing a minimum of 10 feet beyond all proposed structures unless otherwise directed by the Engineer.
Earthwork 02300 - 1
SECTION 02300 – EARTHWORK
PART 1 - GENERAL
SUMMARY
This section includes rough and finished site grading of all areas disturbed during construction.
RELATED WORK
Section 02230 – Site Clearing
Section 02315 – Excavation, Trenching and Backfill
Section 02370 – Temporary Erosion and Sediment Control
Section 02920 – Topsoiling, Seeding, Fertilizing, and Mulching
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
ROUGH GRADING
Grade the area in the vicinity of the excavation to prevent surface water from flowing into the excavation.
Maintain existing drainage.
FINISH GRADING
Grade site to true grades as specified on the plans after all structures and piping have been installed.
Provide a smooth transition between adjacent existing grades and new grades.
Grade sites for effective drainage away from structures and to prevent ponding.
Dress and trim all slopes.
Drag all disturbed areas utilizing a box drag or by another attachment or method submitted to and approved by the Project Engineer.
Hand rake areas inaccessible to mechanical means.
Earthwork 02300 - 2
Remove all objectionable foreign matter, wood, metal, and stones over 2-inches in diameter and dispose of by an approved method off site.
Excavation, Trenching, and Backfill 02315 - 1
SECTION 02315 – EXCAVATION, TRENCHING AND BACKFILL
PART 1 - GENERAL
SUMMARY
This section includes excavation, trenching and backfill necessary for the construction of the facilities as indicated on the plans including, but not limited to:
water mains and service lines, sewer mains and service lines, concrete manholes, septic tanks, and other structures.
RELATED WORK
Section 02230 – Site Clearing
Section 02240 – Dewatering
Section 02300 – Earthwork
Section 02316 – Rock Excavation
Section 2320 – Waste Stabilization Pond
Section 2400 – Boring, Jacking & Directional Drilling
Section 02510 – Water Distribution
Section 02511 – Water Service Lines
Section 02512 – Individual Household Water Systems
Section 02530 – Sanitary Sewerage
Section 02531 – Sanitary Sewer Service Lines
Section 02532 – Sanitary Sewer Manholes
Section 02534 – Septic Tank Effluent Lift Station and Pump
Section 02536 – Effluent Force Main
Section 02540 – Concrete Septic Tank and Piping
Section 02545 – Drainfields and Gravelless Chamber Systems
Section 02547 – Sand Filters
Section 02548 – Individual Lagoon System
Excavation, Trenching, and Backfill 02315 - 2
Section 02549 – Presby AES Drainfield
Section 02705 – Road Restoration
Section 02920 – Topsoiling, Seeding, and Mulching
REFERENCES
Manual on Uniform Traffic Control Devices
ASTM D698 – Test Methods for Moisture Density Relations of Soils and Soil- Aggregate Mixtures Using 5.5 lb. Rammer and 12-in. Drop [Standard Proctor Test]
ASTM D2321 – Underground Installation of Flexible Thermoplastic Sewer Pipe
ASTM D2487 – Classification of Soils for Engineering Purposes [Unified Soil Classification System]
SUBMITTALS
Imported Bedding Sieve Analysis
Polystyrene Insulation
Compaction Method
Detectable Warning Tape
DEFINITIONS
Bedding, Haunching and Initial Backfill zones as defined herein and on the standard pipe trench detailed drawing.
Soil Materials as summarized and defined in ASTM D2321 and ASTM D2487.
PART 2 - PRODUCTS
BEDDING, HAUNCHING AND INITIAL BACKFILL MATERIAL
Native material if acceptable to Project Engineer.
Imported Bedding: Consists of sand, sandy gravel, or fine gravel having a maximum size of ¾-inch and a maximum Plasticity Index of 6.
Excavation, Trenching, and Backfill 02315 - 3
INSULATION
Rigid extruded polystyrene insulation board, 2 inches thick, having a minimum compressive strength of 25 psi. Dow Chemical Styrofoam, or approved equal with a minimum R-value of 4.5 per inch.
Width:
4 feet for mains up to 12 inches (nominal diameter).
3 feet for mains and service lines up to 6-inches (nominal diameter).
WARNING TAPE
Detectable 3 inches wide.
Printed with “Caution Buried Water Line Below” for water mains and service lines.
Printed with “Caution Buried Sewer Line Below” for sewer mains, sewer force mains, and service lines.
PART 3 - EXECUTION
GENERAL
Trenching and excavation work shall be done in accordance with proper emphasis on safety as determined by the Contractor to conform to recommended safety standards such as OSHA 1910 and 1926.
A Competent Person, as defined by OSHA 1926, shall be on site at all times when excavation work is being completed.
Provide suitable sheeting, shoring, and bracing as required in conformance with OSHA regulations.
In accordance with the contract, obtain all permits from appropriate road agency for construction within road right of way.
Repair damage resulting from settlement, slides, cave-ins, water pressure, and other causes.
Provide adequate signs, barricades, fences and amber lights and take all necessary precautions to protect the work and the safety of the public in all construction areas.
Placement of construction signs and barricades shall conform to the most current version of the “Manual on Uniform Traffic Control Devices.”
Protect barricades and obstructions at night by amber signal lights that burn from sunset to sunrise. Barricades shall also be of substantial construction, painted white or with reflective paint to increase their visibility at night.
Perform work without obstruction to traffic or inconvenience to the general public and the residents in the vicinity of the work.
Excavation, Trenching, and Backfill 02315 - 4
The maximum open trench allowed during the day at each location shall not exceed 200 feet, with no open trench allowed overnight unless specifically approved.
Road Crossing
Comply with all construction and material requirements of roadway authorities having jurisdiction.
Maintain one lane of traffic open at all times.
Cleared trees, brush, or rocks prior to or during construction is considered incidental to excavation work.
EXCAVATION
Remove trees and stumps from excavation and site.
Remove and stockpile existing topsoil.
Install facilities as staked, centered in excavation, unless otherwise approved by Project Engineer.
Maintain surface drainage away from trenching or excavation.
Remove unsuitable foundation materials from excavation as shown on the plans or as authorized by the Project Engineer.
Maintain a minimum 1-foot clearance between outer surface of structure being installed and wall of excavation.
Rock encountered shall be classified, excavated, and measured in accordance with Section 02316.
TRENCHING
Bottom width:
No less than 12 inches or more than 24 inches wider than the outside diameter of the pipe.
Where a chain or wheel trencher is approved for use in a rural area, the trench width shall be 4 to 6 inches greater than the outside diameter of the pipe.
Depth: Provide minimum cover as specified, or depths shown on plans.
BEDDING
If existing soil cannot provide uniform, stable bearing support, over-excavate a minimum of 4 inches below bottom of pipe or structure and provide imported bedding material as directed by the Project Engineer.
Excavation, Trenching, and Backfill 02315 - 5
If unsuitable soil is encountered a price for imported bedding material will be negotiated if not included in bid schedule.
Unauthorized over excavation shall be backfilled with acceptable bedding material at the Contractor’s expense.
HAUNCHING AND INITIAL BACKFILL
General.
Provide complete and uniform bearing and support for the pipe, including allowance for bell holes, or structure.
Work material under and around the pipe to ensure full pipe support.
Prevent movement of the pipe during placement of material.
Avoid contact between the pipe and mechanical compaction equipment.
Where a trencher is approved, backfill the trench from surface with selected material, free from large clods and all stones larger than 3 inches.
No frozen clods, saturated, foreign, or organic materials will be allowed.
Hand compact in 6-inch lifts from the bottom of the trench to 12 inches above the pipe crown.
BACKFILL & COMPACTION
All buried material shall be inspected by technical representative prior to backfilling.
Backfill remainder of excavation with native material, free from large clods, stones 8 inches or larger, organic material or frost chunks.
All backfill shall be compacted in the specified lifts utilizing mechanical equipment designed for compaction. Compaction methods utilizing mechanical equipment not designed for compaction will not be approved.
All methods of compaction shall be approved prior to construction.
Compact in 6-inch lifts to a density not less than the density of the surrounding undisturbed soil or not less than 90% of the maximum dry density, determined by
ASTM D698.
In cases where the Contractor performs unacceptable methods of compaction, the work on the project will cease until an acceptable method of compaction has been approved. The Owner has the right to delay work until soil samples along the project alignment are taken for the purpose of developing a proctor for testing the compaction of the soil backfilled in the trench.
Conform to Section 02705 for backfill requirements within roadways.
Compact with mechanical tamper, after initial backfill, to a density not less than 95% of the maximum dry density, determined by ASTM D698 for the entire depth of the trench through a roadway or driveway.
Excavation, Trenching, and Backfill 02315 - 6
Backfill and compact around manholes, valve boxes, and other appurtenances in 6-inch lifts.
Compact with a mechanical tamper to a density not less than 90% of the maximum dry density, determined by ASTM D698.
Backfill around septic tanks in 12-inch lifts.
Compact in a manner that will not produce undue strain on the tank.
Repair any trenches improperly backfilled or where settlement occurs, then refill and compact.
Restore surface to the required grade and compaction. Conform to Section 02300 for rough grading, finish grading and site surface drainage.
Remove and dispose of all surplus backfill materials to a location approved by the Project Engineer.
WARNING TAPE INSTALLATION
Install warning tape over water, sewer or force mains and service lines in trench 2 feet below finished grade.
FROST PROTECTION
Place insulation in areas where water main, sewer service lines or water service lines cross a road, driveway, traveled path, or as indicated on the plans.
Center insulation over pipe or appurtenance with 1 foot of compacted fill between the pipe and the insulation.
Grade fill so insulation lays flat.
Insulate with a minimum of one 2-inch layer of polystyrene.
If a minimum bury depth is specified, install one 2-inch-thick layer for each foot of backfill less than the required minimum bury depth.
Install 3-foot-wide for pipes up to 6 inches in diameter and 4 feet wide for pipes up to 12 inches in diameter.
Extend insulation a minimum of 5 feet on each side of the road crossing.
Lap insulation by 6 inches or stagger by 6 inches if composed of two layers.
Minimum thickness for the first lift of backfill over the insulation is 8 inches.
Do not operate construction equipment directly on insulation. Do not compact first lift with backhoe-mounted compactor or any other large compaction equipment.
Compact remaining backfill using normal construction practices.
Excavation, Trenching, and Backfill 02315 - 7
REMOVAL OF NUISANCE WATER
Remove nuisance water entering the trenches.
Nuisance water that can be removed through the use of sump or trash pumps is not considered dewatering.
Keep trenches free from water until waterlines,…