Attachment 04 - APPENDIX C Environmental Protection Plan Guidance.pdf
PDF 104 KB Posted
- Attached to
- Repair Sprung City Parking Lot on Tyndall AFB
- Solicitation number
- FA481922R0022
About this file
This document provides guidance for an Environmental Protection Plan required for a federal contract to repair a parking lot at Tyndall Air Force Base in Florida. The plan must designate personnel responsible for environmental compliance and oversight. It must include erosion and sediment control measures, plans to mark work area boundaries and protect preserved areas, and procedures for responding to spills of regulated substances. The plan should also outline disposal of non-hazardous solid waste, including identifying transporters and disposal sites; provide recycling and waste minimization efforts; and describe measures to control airborne debris and dust. Additionally, it requires identification of any potentially hazardous substances used on site and contaminant prevention precautions for storage and handling in compliance with applicable laws and regulations.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX - C
ENVIRONMENTAL PROTECTION PLAN
GUIDANCE
REQUEST FOR PROPOSAL
For
REPAIR PARKING LOT,
SPRUNG CITY
TYNDALL AFB, FLORIDA
PROJECT #: XLWU 21-8131
The Environmental Protection Plan must be current and maintained onsite by the Contractor. Include in the environmental protection plan, but not limit it to, the following:
1. Name(s) of person(s) within the Contractor's organization who is(are) responsible for ensuring adherence to the Environmental Protection Plan.
2. Name(s) and qualifications of person(s) responsible for training the Contractor's environmental protection personnel.
3. Description of the Contractor's environmental protection personnel training program.
4. An erosion and sediment control plan which identifies the type and location of the erosion and sediment controls to be provided. The plan must include monitoring and reporting requirements to assure that the control measures are in compliance with the erosion and sediment control plan, Federal, State, and local laws and regulations. A Storm Water Pollution Prevention Plan (SWPPP) may be substituted for this plan.
5. Work area plan showing the proposed activity in each portion of the area and identifying the areas of limited use or nonuse. Plan should include measures for marking the limits of use areas including methods for protection of features to be preserved within authorized work areas.
6. Include in the Spill Control plan the procedures, instructions, and reports to be used in the event of an unforeseen spill of a substance regulated by 40 CFR 68, 40 CFR 302, 40 CFR 355, and/or regulated under State or Local laws and regulations. Include in the plan:
a. The name and qualifications of the individual who will be responsible for implementing and supervising the containment and cleanup.
b. Training requirements for Contractor's personnel and methods of accomplishing the training.
c. A list of materials and equipment to be immediately available at the job site, tailored to cleanup work of the potential hazard(s) identified.
d. The names and locations of suppliers of containment materials and locations of additional fuel oil recovery, cleanup, restoration,
e. The methods and procedures to be used for expeditious contaminant cleanup
f. A listing of all materials in containers of 55 gallons or more in volume that hold a regulated substance (40 CFR 68 40 CFR302 and 40 CRF 355).
g. A basic site map showing the proposed location for the 55 gallon or greater containers and identifying the inlets to sanitary, stormwater or wetlands that need to be protected.
h. Containers greater than 55 gallons shall have a passive form of secondary containment (berms, diking, curbing, retention area ) that will contain a release without active intervention.
7. A non-hazardous solid waste disposal plan identifying methods and locations for solid waste disposal including clearing debris and schedules for disposal. The non-hazardous solid waste disposal plan must describe the methods used to conduct and record Hazardous Waste Determinations that comply with 40 CFR 262.11 for all Solid Wastes generated by this contract.
a. Identify any subcontractors responsible for the transportation and disposal of solid waste. Submit licenses or permits for solid waste disposal sites that are not a commercial operating facility.
b. Evidence of the disposal facility's acceptance of the solid waste must be attached to this plan during the construction. Attach a copy of each of the Non-hazardous Solid Waste Diversion Reports to the disposal plan. Submit the report for the previous quarter on the first working day after the first quarter that non-hazardous solid waste has been disposed and/or diverted (e.g. the first working day of January, April, July, and October).
c. Indicate in the report the total amount of waste generated and total amount of waste diverted in cubic yards or tons along with the percent that was diverted.
d. A recycling and solid waste minimization plan with a list of measures to reduce consumption of energy and natural resources. Detail in the plan the Contractor's actions to comply with and to participate in Federal, State, Regional, and local government sponsored recycling programs to reduce the volume of solid waste at the source.
8. An air pollution control plan detailing provisions to assure that dust, debris, materials, trash, etc., do not become air borne and travel off the project site.
9. A contaminant prevention plan that: identifies potentially hazardous substances to be used on the job site; identifies the intended actions to prevent introduction of such materials into the air, water, or ground; and details provisions for compliance with Federal, State, and local laws and regulations for storage and handling of these materials.
File details come from the government source that posted it. Updated .