This document is an Attachment 03 - Price Matrix for the federal contract opportunity "Y1DA--FY25: NRM (PROJ: 573-24-700) DB - Upgrade Electrical System - Kitchen". The opportunity is a solicitation issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8 with a proposal due date of 12/06/2024. The Price Matrix template provides a format for prospective offerors to submit pricing information for the electrical system upgrade project in the kitchen. It includes line items for equipment, materials, labor, and other costs. Offerors will be required to complete this pricing template as part of their proposals for the contract award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Construction Cost
| CONSTRUCTION COST PROGRAM - ESTIMATE WORKSHEET | DATE: | 12/31/99 | ||||||||
| PROJECT NO. | PROJECT TITLE | LOCATIONs | DATE: | |||||||
| 0 | 0 | 0 | $0.00 | |||||||
| ESTIMATOR | TOTAL CONSTRUCTION COST SUMMARY | BUILDING NO(S) | DRAWING NOs. | $0.00 | ||||||
| 0 | 0 | 0 | $0.00 | |||||||
| NRM | LABOR (w/ equip) | MATERIALS | ||||||||
| CODE | CSI # | The Start | SYSTEMS/SUBSYSTEM | QTY | UNIT | $/UNIT | TOTAL | $/UNIT | TOTAL | TOTAL |
| 16 DIV. CONSTRUCTION COST | $0 | |||||||||
| TOTAL CONSTRUCTION COST (Low Bid) | $0 | |||||||||
| $0 | ||||||||||
| Subtotal | $0 | |||||||||
| Impact Cost with R.O.P | ||||||||||
| Subtotal | $0 | |||||||||
| Subtotal | $0 | |||||||||
| TOTAL PROJECT COSTS | $0 |
&RSHEET NO &P OF &N
Detail Base Offer Cost Breakdown
"FOR OFFICIAL USE ONLY"
| ESTIMATE WORKSHEET | ||||||||||
| Project Number | Location | PROJECT NAME | DATE: | |||||||
| TYPE OF ESTIMATE: | ESTIMATOR: | BUILDING NO./LOCATION: | ||||||||
| LABOR | MATERIALS/EQUIPMENT | TOTAL COST BY ITEM | ||||||||
| CODE: | The Start | SYSTEM/SUBSYSTEM | QTY | UNIT | $/UNIT | TOTAL | $/UNIT | TOTAL | ||
| 1 | GENERAL CONDITIONS | $0.00 | ||||||||
| 1 | Mobilization/Demobilization | |||||||||
| 2 | Permits/Environmental Regulations Compliance | |||||||||
| 3 | Safety Requirements | |||||||||
| 4 | Maintenance of Traffic (MOT) | |||||||||
| 2 | Existing Conditions | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Removal of Wood Floor System | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | Removal of Metal Floor System and Connections | ea | $0.00 | $0.00 | $0.00 | |||||
| 3 | Paint Removal | ea | $0.00 | $0.00 | $0.00 | |||||
| 4 | Chain-Link Fabric Removal | ea | $0.00 | $0.00 | $0.00 | |||||
| 5 | Miscellaneous Removal (signs, wiring,conduits, etc. | ea' | $0.00 | $0.00 | $0.00 | |||||
| 3 | CONCRETE | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Cracks Repairs at Concrete Ramps | ea | $0.00 | $0.00 | $0.00 | |||||
| 4 | METALS | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Retrofit of Existing Structural Connections | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | New Floor System | ea | $0.00 | $0.00 | $0.00 | |||||
| 3 | New Connections for Floor System | ea | $0.00 | $0.00 | $0.00 | |||||
| 5 | FINISHES | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Protective Paint Coating (Epoxy) | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | Finish Paint Coating | ea | $0.00 | $0.00 | $0.00 | |||||
| 6 | SPECIALTIES | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | New Vinyl Coated Chain Link Fabric | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | New Green Chain Link Fence Privacy Slats | ea | $0.00 | $0.00 | $0.00 | |||||
| 3 | New Signage | ea | $0.00 | $0.00 | $0.00 | |||||
| 7 | ELECTRICAL | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Electrical Conduits, Wiring, Junctions, Lighting | ea | $0.00 | $0.00 | $0.00 | |||||
| 8 | BRIDGE MODIFICATIONS | ea | $0.00 | $0.00 | $0.00 | |||||
| 1 | Lightning Protection System | ea | $0.00 | $0.00 | $0.00 | |||||
| 2 | Structure Adaptations (To comply with current codes) | $0.00 | $0.00 | $0.00 | ||||||
| 3 | Roof Cover | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| Subtotal | $0.00 | $0.00 | $0.00 | |||||||
| Overhead % | ||||||||||
| Profit % | ||||||||||
| Bond % | $$ | |||||||||
| Overhead/Profit Subtotals: | $0.00 | $0.00 | $0.00 | |||||||
| Total Base Offer Cost |