Attachment 03 - Chiller Plant Diagram.pdf

PDF 881 KB Posted

Attached to
Water-to-Water Heat Pump and Chilled Water Pump Replacement
Solicitation number
1232SA25Q0304
Issued by

About this file

This document is a detailed mechanical engineering diagram for a chiller plant floor plan and section, specifically for the USDA Pacific Basin Agricultural Research Center in Hilo, Hawaii. The diagram depicts a comprehensive layout of mechanical systems including cooling towers, water pumps, expansion tanks, chemical treatment tanks, motor control centers, and various piping configurations for chilled water and reheat water systems. The plan shows phased equipment installation, with Phase 1 equipment clearly marked, and includes provisions for future Phase 2 connections and equipment. Key technical elements include structural steel tower supports, neoprene pad isolators, water circulation paths, pump strainers, and control panels. The diagram provides a precise schematic of interconnected mechanical systems with specific pipe sizes, flow directions, and equipment locations, designed to support the facility's mechanical infrastructure.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COOLING TOWER

� STRUCTURAL STEEL TOWER SUPPORT

i--,r---------,::""-'1/....,,..__

13 ( 1/2") NEOPRENE PAD ISOLATOR (lYP)

�Mi�� Ml

�EIGHT WrrH GRAVllY RETURN TO PUMP AND GRAVllY FLOW TO DRAIN

COOLING TOWER SECTION

NOT TO SCALE

254 <10") SUPPCY tROM CHI RS

COOLING TOWER

254 (10")

RETU�N TO PUMP

COOLING TOWER BASIN

2") -51 l 1\LVE FOR FUTURE COOLING TOWER

POC IN FIELD -------

76 (3")

PUMP STRAINER

51 (2") VALVE FOR FUTURE COOLING

(3")

SEPARATOR

POC IN FIELD_/

� 00 cc I 00 - I") N �

TOWER CLEANING SYSTEM SCHEMATIC

NOT TO SCALE (REFER TO SHEET M1-5.10)

i

TOP OF CONC. BEAM

TOP OF SLAB

203 (81

CllllER 1-1A

EVAPORATOR SECTION

CONDENSER SECTION

2·

PUMPS #1

PACKAGED

(PHASE I) ...--

_,,.-- EMCS PANEL SIZED FOR ALL PHASE 1 11-IRU 5

MOTOR CONTROL CENTER (MCC)

203 (81 CHWR---+--r--------------E:lt+--<E------------, --->--.i;----=2·_L -(8-1 !WH �;i,��-(4-..

R

HW

-----E>tt-----+---------, □n

REFER TO SHEET M 1-1. 12 FOR EMERGENCY

GENERATOR ROOM FLOOR PLAN

-;qr- / --

CHILLED WATE

,---17 : ,_,I� -- -+:-�--��= ! ! I C I I FEEDER. REr1�N----tV-------1

SHEET M 1-5. -----+--"

,� ��, � r----Q-4-��----- �i :

I I

I I ,, --

I

I

I I

I CHILLED WATER EXPANSION

TANK -----------r t�s u tTi) 1

1 _ c:_-- --- EHEATI qc�1dN TJK:

I

NOTE:

-REHEAT WATE PUMIP '- / I I I

I

1 1 � 1 L __ __jj=-- 71 (PHASE I) I 1 � 1 I I I \J I I!::" ' � I I ( '\ I I I

203 (81 CHW �VE L • _J L '- / J I I1 L 7 _ _ j O

- � =�- ----= =L=- -� I FUTURE REHE T WATER- - 1

I r-- �����8 v i-:=-x�� �filR��E DIMENSIONS - - - - - .J I 8 °' MP PHASE II) I

I COORDINATE bEPll-1 WITH PIP INSTALLATION I I �

203 (81 J 1 � REFER TO DETAIL ON SHEET -5.4.

--'-�(1----203 -(a-1 -CH-W v-�VE- ; POT FEEDER FOR HOT WATE� c,,.

l<"tr-M

2 3 (81 �� � I WATER/WATER l------0 �

1 r VALVES FOR PHAS,1 E 1

���0 bop 3048 (10') : I 2 3 �;:�

181 N---:1;::5.::.2 ....!(.:..5 n-----,-15

1-

1.__20-3 ca1

( 4

• I I L__ __ ...::::======t===:2roo 33 7(8jcc:HHWRWR-====�--l:=:·==:: ::::::��-:+--E-�-- JoM BUILDING 203 (81 CHWR�������f==¥�����!:::==:::e��� r- �-+-----...:.:::�I �H-Jj : I L 203 (81 CHWS------�I _ . ; TO BUILDING 203 (81 CHWS

SPACE 11-IERMOSTAT

SET AT 85 DEG F.

I 203 (81 Vl'J...VE .e I 102

(4") 0 LL_ 102 (41 RHWR - -- - -- -+--.L

- <- FROM BUILDING 102 (41RHWR

t I � 1

102 (4") - __ _ _ _ _ _ _ _ _ _ _ _ _ --- -- - -- - -- 102 (41 RHWS --- - ----+--:: , ,-z � : - - ---c> �O BUILDING 102 (41RHWS TI t203 (B

(FUTURE bop 3048 (10'0 � bop 2438 (8'0") :

I - -�--------- - -7 • • • • \ :

c=========-1 I PHASE II) Aie\ I I

�' � c)- -M---fT- - - - - -1752 "{&") 203 8 \EV 102 4")1 I I

I

- * 1� -c;ro 1 �-=-=

JI.

-J j 52 (6")1:---r-0---w-----1 1 1 I t�s u tTiJ I

1tN��Jt: (lYP

VALVES

FOR PHASE 5

I I I 152 (6") - - - - - - -203 j(B")

254 ( +-"-lt-+IX:t-+,-C:T-=---, --+--� : :

I

I I CHILLER PLANT �

(1YP

6") VALVES FOR PHASE 5 CONNECTION

OBVD (lYP)

I I r:;iv,7 L

- - ""L I

- - ::.5-EX CONNECTION (1YP)

I (FUTURE � 1 T

l �

(6?p- _!HAS_:_ '2_ __

1_ 152 t")j 25 ir �� _ 7 254 (10") 4

� ---M-- i_ �--- ---,_- ----J 152 (�")Cjr I E) �- - 54 (10") NO [ == _J LJ_l � 1 L ___ _J

1;� (6") -

14x35

- 102 (41 BALANCI G VALVIE ���

u tT1) CWP

BALANCIN

1- 36x14 ER) fi�l&u) (FUTURE bop 3048

.c==!:::::::::,J��f=:::!s:;�

P�ASE�I) �-�

L _ _J I

ONTROL PANEL

203 (81

80 (3")

� 1 Ox 6 EXH DUCT DOWN (24x 161------�

�, / O�GE MASK

-' COO I G TOWER VFD

102 (4") FSO

SEE PLUMBING DWGS

� -- -- - -�'KAGEIJ7'0WE IN

PROVIDE FOR SPACE TEMPERATURE/11-IERMOSTAT

CONTROL OF PRV (EMCS).

102 (41

WATER/WATER

l'J HEAT PUMP l'J

REFRIG MONITORING ALARM

REFRIG MONITORING CONTROL PANEL

REFER TO SYSTEM SCHEMATIC DIAGRAM

SHEET M 1-5.6

203 (8")

CHEMICAL TREATMENT TANKS

CLEANING SYSTEM

SHEET M 1-5. 1,..----�

REFER TO SHEET M 1-5.10 (lYP. OF 2)

A CHILLER PLANT FLOOR PLAN

SCALE: 1:250 [3/16" = 1'-01 (ADDmVIE ALTERNATE #1)

NOTE: PRIMARY AND SECONDARY CHILLED WATER PUMPS

SHALL BE PACKAGED AND ITS CONTROLS SHALL BE INTERFACED

Will-I 11-IE EMCS.

NOTE: A PRESSURE DIFFERENTIAL SENSOR SHALL BE

PROVIDED TO CONTROL 11-IE SPEED OF 11-IE SECONDARY PUMPS. �� H.�

o" �

� LICENSED :;< PROFESSIONAL �

a: ENGINEER >

,tc No. �II * -S: :------: 'f"" "1�/ I, u�·

1IIS MR< WAS PREPARED BY IIE

OR INlER IIY Sl.l'ERWIIOII AND CONSIRUCllCN OF lHIS PRO,ECT

WU IE UNDER MY OBSERVA110N.

FOR FUTURE COOLING TOWER LEGEND

I

I I I I I I I

I I I I

PHASE 1 EQUIP�ENT

I I I I

---- 203 (81 CHWR-- PHASE 1 CHILl,ED WATER RETURN PIPING I

---- 203 (81 CHWS-- PHASE 1 CHILl/fD WATER SUPPLY PIPING

- -- - 102 (41 RHWR -- PHASE 1 REH�T WATER RETURN PIPING

PHASE 1 REHEAT WATER SUPPLY PIPING ----102 (41 RHWS --

,------7

I I I I

L ______ _J

I I I I I

PHASE 2 EQ�IPMENT

I

I

PHASE 2 PIPING

I I I I

I I I I I

I

RECO�D DOCUMENT

atANGES N01ED II 11£ RECORD DRAalGS ARE BASED ON AEl),-,IIAAICEI AS-IIULT-- PROIIIIE) BY 11£ C0N1RACRlR.

JULY 15, 2009 - ...

RICHARD MATSUNAGA

. &ASSOCIATES 1----+---+---1---------------1

ARCHITECTS INC. 1-;;;;:-""t'�;;-1-;;;--1------;;;;;;;;;;;;;;;;;---1I NO. DAlE BY LUCHl'II'"'

RE\'ISIONS

A-E FIRM USDA

PRO,ECT IIANAGER EPII

U ms Agricultural

Research Service t-::===-==----t=-,-------1 s PACIFIC BASIN AGRICULTURAL RESEARCH CENTER

H. LEONG R.CARRION

DElllGNER RPR

J. OKITA/ M. ANDRADE D. GONSALVES

Q£CICED BY SAFETY & HEAl.lH

D HILO, HAWAII- PHASE 1, LABORATORY

A

CHILLER PLANT FLOOR PLAN (ADDITIVE ALTERNATE #1)

saJaTAllCII NO. DWII. NO

B CHILLER PLANT SECTION H. LEONG T. ROARK 09-3K15-05 USDA,ARS,AFM,FD ,IJII 30, :mo.

1-1.15601 SUNNYSIDE AVENUE

SCALE: 1 :250 [3/16" = 1 '-01 REAL HttftR IT DAlE DRAIN BY BELTSVILLE, MD 20705 APR 30, 2010 A. LI E. REILLY JUNE 30, 2004

OF 263

Title
T1-0.1 Project Team, Vicinity & Location Maps, General Notes, Code Information
T1-0.2 Index of Drawings
Civil
C1-0.1 Notes
C1-0.2 Notes
C1-1.1 Master Site Plan
C1-1.2 Site Plan
C1-2.1 Grading Plan
C1-3.1 Utility Plan
C1-4.1 Details
C1-4.2 Details
C1-4.3 Details
C1-4.4 Details
C1-4.5 Details
C1-4.6 Details
C1-5.1 Profile
C1-5.2 Profile
C1-5.3 Typical Section
C1-5.4 Profile
Landscape
L1-0.1 Landscape Irrigation List
L1-0.2 Plant List and Notes (Basic Bid)
L1-0.3 Plant List and Notes (Additive Alternate)
L1-1.1 Landscape Irrigation Plan - 1 (Basic Bid)
L1-1.2 Landscape Irrigation Plan - 1 (Additive Alternate)
L1-1.3 Landscape Irrigation Plan - 2 (Basic Bid)
L1-1.4 Landscape Irrigation Plan - 3 (Basic Bid)
L1-2.1 Landscape Planting Plan - 1 (Basic Bid)
L1-2.2 Landscape Planting Plan - 1 (Additive Alternate)
L1-2.3 Landscape Planting Plan - 2 (Basic Bid)
L1-2.4 Landscape Planting Plan - 3 (Basic Bid)
L1-3.1 Landscape Details
Architectural
A1-0.1 Architectural Abbreviations, Architectural Legend, Architectural Material Symbols
A1-1.1 Master Site Plan
A1-1.2 Site Plan
A1-1.3 Building Column Layout Plan
A1-1.4 Ground Level Floor Plan
A1-1.5 Ground Level Reflected Ceiling Plan
A1-1.6 Mezzanine Level Floor and Lower Roof Plan
A1-1.7 Mezzanine Level Reflected Ceiling Plan
A1-1.8 Upper Roof Plan
A1-1.9 Electrical Building Plans
A1-1.10 Mechanical Building Plans (Additive Alternate #1)
A1-1.11 Entry Sign Plan, Elevation, Details
A1-2.1 Partial Floor Plan
A1-2.2 Partial Reflected Ceiling Plan
A1-2.3 Partial Floor Plan
A1-2.4 Partial Reflected Ceiling Plan
A1-2.5 Partial Floor Plan
A1-2.6 Partial Reflected Ceiling Plan
A1-2.7 Partial Floor Plan
A1-2.8 Partial Reflected Ceiling Plan
A1-2.9 Partial Floor Plan
A1-2.10 Partial Reflected Ceiling Plan
A1-2.11 Partial Floor Plan
A1-2.12 Partial Reflected Ceiling Plan
A1-2.13 Partial Floor Plan
A1-2.14 Partial Floor and Reflected Ceiling Plan
A1-2.15 Stair Plans and Sections
A1-2.16 Restroom Floor Plans
A1-2.17 Cylinder Storage Shed Floor, Ceiling and Roof Plans, Elevations, and Sections
A1-3.1 Exterior Elevations
A1-3.2 Exterior Elevation & Building Section
A1-3.3 Building Sections
A1-3.4 Wall Sections
A1-3.5 Wall Sections
A1-3.6 Wall Sections
A1-3.7 Wall Sections
A1-4.1 Interior Elevations
A1-4.2 Interior Elevations
A1-4.3 Interior Elevations
A1-4.4 Interior Elevations
A1-5.1 Room Finish Schedule
A1-5.2 Room Finish Schedule
A1-5.3 Color and Material Schedule
A1-5.4 Floor Finish Plan and Details
A1-5.5 Standard Toilet Stall Plan & Mounting Heights
A1-5.6 Sign Schedule & Details
A1-5.7 Sign Types
A1-5.8 Ground Level Door and Window Schedule Plan
A1-5.9 Mezzanine Level Door and Window Schedule Plan
A1-5.10 Door Schedule
A1-5.11 Door Details
A1-5.12 Window Types, Louver Types, Details
A1-6.1 Finish Details
A1-6.2 Casework Details
A1-6.3 Casework Details
A1-6.4 Wall Types
A1-6.5 Column Types
A1-6.6 Ceiling Details
A1-6.7 Roof Details
A1-6.8 Roof Details & Misc Framing Details
A1-6.9 Miscellaneous Details
Lab
LF1-1.1 Laboratory Furnishings Key Sheet - Phase 1
LF1-2.1 Laboratory Furnishings Lab Building Partial Floor Plan - Phase 1
LF1-2.2 Laboratory Furnishings Lab Building Partial Floor Plan - Phase 1
LF1-2.3 Laboratory Furnishings Lab Building Partial Floor Plan - Phase 1
LF1-2.4 Laboratory Furnishings Lab Building Partial Floor Plan - Phase 1
LF1-2.5 Laboratory Furnishings Lab Building

Mezzanine Flr Plan - Phase 1

LF1-3.1 Laboratory Furnishings Fittings Sheet No. 1 - Phase 1
LF1-3.2 Laboratory Furnishings Fittings Sheet No. 2 - Phase 1
LF1-3.3 Laboratory Furnishings Fume Hood Details - Phase 1
LF1-3.4 Laboratory Furnishings Lab Detail Sheet - Phase 1
LF1-3.5 Laboratory Furnishings Lab Detail Sheet - Phase 1
LF1-3.6 Laboratory Furnishings Lab Detail Sheet - Phase 1
LF1-3.7 Laboratory Furnishings Lab Detail Sheet - Phase 1
LF1-3.8 Laboratory Furnishings Lab Detail Sheet - Phase 1
LF1-4.1 Laboratory Furnishings Laboratory Schedule - Phase 1
LP1-1.1 Laboratory Plumbing Laboratory Schedule - Phase 1
LP1-2.1 Laboratory Plumbing Lab Building Partial Floor Plan - Phase 1
LP1-2.2 Laboratory Plumbing Lab Building Partial Floor Plan - Phase 1
LP1-2.3 Laboratory Plumbing Lab Building Partial Floor Plan - Phase 1
LP1-2.5 Laboratory Plumbing Lab Building Partial Floor Plan - Phase 1
LP1-3.1 Laboratory Plumbing Details - Phase 1
LP1-3.2 Laboratory Plumbing Details - Phase 1
LP1-3.3 Laboratory Plumbing Details - Phase 1
LE1-1.1 Laboratory Electrical Key Sheet
LE1-2.1 Laboratory Electrical Lab Building Partial Floor Plan - Phase 1
LE1-2.2 Laboratory Electrical Lab Building Partial Floor Plan - Phase 1
LE1-2.3 Laboratory Electrical Lab Building Partial Floor Plan - Phase 1
LE1-2.4 Laboratory Electrical Lab Building Partial Floor Plan - Phase 1
LE1-3.1 Laboratory Electrical Details
LE1-4.1 Laboratory Electrical Panel Schedules
LE1-4.2 Laboratory Electrical Panel Schedules
LE1-4.3 Laboratory Electrical Panel Schedules
Structural
S1-0.1 General Notes
S1-0.2 Typical Grade Slab Details
S1-0.3 Typical CMU Wall Details
S1-0.4 Typical Wall Footing Details
S1-0.5 Typical Steel Beam Connection Details, Bolting and Welding Schedule
S1-0.6 Typ Steel Beam to Cross Bracing Connection Details
S1-0.7 Phase 1 Lab Building Roof Uplift Pressure Diagram
S1-0.8 Phase 1 Lab Building Typical Steel joist Connection Details
S1-1.1

Phase 1 Lab Building Foundation Plan

S1-1.2 Phase 1 Lab Building Mezzanine Floor Framing Plan
S1-1.3 Phase 1 Lab Building Lower Roof Framing Plan
S1-1.4 Phase 1 Lab Building Upper Roof Framing Plan
S1-2.1 Phase 1 Lab Building Foundation Details
S1-2.2 Phase 1 Lab Building Foundation Details
S1-2.3 Phase 1 Lab Building Foundation Details
S1-2.4 Phase 1 Lab Building Typ CMU Wall Ftg Details/Column Sched
S1-2.5 Phase 1 Lab Building Typ CMU Wall Ftg Details/Column Sched
S1-3.1 Phase 1 Lab Building Building Elevation
S1-3.2 Phase 1 Lab Building Building Elevation
S1-3.3 Phase 1 Lab Building Building Elevation
S1-3.4 Phase 1 Lab Building Building Elevation
S1-3.5 Phase 1 Lab Building Building Elevation
S1-3.6 Phase 1 Lab Building Building Sections
S1-4.1 Phase 1 Lab Building Section and Details
S1-4.2 Phase 1 Lab Building Connection Details
S1-4.3 Phase 1 Lab Building Connection Details
S1-4.4 Phase 1 Lab Building Connection Details
S1-4.5 Phase 1 Lab Building Connection Details
S1-4.6 Phase 1 Lab Building Connection Details
S1-4.7 Phase 1 Lab Building Connection Details
S1-4.8 Phase 1 Lab Building Section and Details
S1-4.9 Phase 1 Lab Building Section and Details
S1-4.10 Phase 1 Wall Section Details
S1-4.11 Phase 1 Wall Section Details
S1-5.1 Phase 1 Lab Building Moment Frames Sections & Connection Details
S1-5.2 Phase 1 Lab Building Stair Details
S1-5.3 Phase 1 Lab Building Stair Details
S1-5.4 Phase 1 Lab Building Stair Details
S1-5.5 Phase 1 Lab Building Stair Details
S1-6.1 Electrical Building Foundation and Roof Framing Plans
S1-6.2 Mechanical Building Foundation and Roof Framing Plans
S1-7.1 Phase 1 Lab Building Gas Cylinder Storage Shed & Dumpster
Mechanical
M1-1.0 General Notes, Mechanical Legend
M1-1.1 Overall Mechanical Floor Plan - Ground Floor
M1-1.2 Partial Mechanical Floor Plan - Ground Floor (Sector 1)
M1-1.3 Partial Mechanical Floor Plan - Ground Floor (Sector 2)
M1-1.4 Partial Mechanicl Floor Plan - Ground Floor (Sector 3)
M1-1.5 Partial Mechanical Floor Plan - Ground Floor (Sector 4)
M1-1.6 Partial Mechanical Floor Plan - Ground Floor (Sector 5)
M1-1.7 Partial Mechanical Floor Plan - Ground Floor (Sector 6)
M1-1.8 Partial Mechanical Floor Plan - Mezzanine Floor
M1-1.9 Partial Mechanical Floor Plan - Mezzanine Floor
M1-1.10 Partial Reheat Piping Floor Plan - Ground Floor (Sector 3)
M1-1.11 Partial Reheat Piping Floor Plan - Ground Floor (Sector 4)
M1-1.12 Chiller Plant Floor Plan (Base Bid)
M1-1.13 Overall Mechanical Site Plan
M1-1.14 Chiller Plant Floor Plan (Additive Alternate #1)
M1-1.15 Partial Electrical Building Mechanical Plan
M1-2.1 Partial Plumbing Floor Plan - Ground Floor (Sector 2)
M1-2.2 Partial Plumbing Floor Plan - Ground Floor (Sector 3)
M1-2.3 Partial Plumbing Floor Plan - Ground Floor (Sector 4)
M1-2.4 Partial Plumbing Floor Plan - Ground Floor (Sector 5)
M1-2.5 Partial Plumbing Floor Plan - Ground Floor (Sector 6)
M1-2.6 Partial Plumbing Floor Plan - Lab Utilities (Sector 3)
M1-2.7 Partial Plumbing Floor Plan - Lab Utilities (Sector 4)
M1-2.8 Partial Plumbing Floor Plan - Mezzanine Floor
M1-2.9 Partial Plumbing Floor Plan - Lab Utilities (Sector 6)
M1-2.10 Mechanical Building Plumbing Floor Plan, Sanitary and Water Piping Diagrams (Additive Alternate #1)
M1-3.1 Mechanical Sections
M1-3.2 Mechanical Sections
M1-4.1 Mechanical Equipment Schedule
M1-4.2 Mechanical Equipment Schedule (Additive Alternate #1)
M1-4.3 Mechanical Equipment Schedule
M1-5.1 Control Diagrams, Details
M1-5.2 Details
M1-5.3 Details
M1-5.4 Details
M1-5.5 Details
M1-5.6 Details
M1-5.7 EMCS Points List
M1-5.8 Control Diagrams
M1-5.9 Control Diagrams, Details
M1-5.10 Details
M1-5.11 Details
M1-5.12 Reverse Osmosis/Tank/Polisher Piping/Control Diagram
M1-1.13 Details
M1-6.1 Partial Sanitary Piping Diagram
M1-6.2 Partial Sanitary Piping Diagram
M1-6.3 Partial Water and Laboratory Utility Piping Diagram
M1-6.4 Partial Water and Laboratory Utility Piping Diagram
M1-6.5 Reheat Water Piping Diagram
M1-6.6 Mechanical Plant Piping Diagram
M1-6.7 Mechanical Plant Piping Diagram (Additive Alternate #1)
M1-6.8 Chilled Water Piping Diagram - Interior
Fire
FP1-0.1 Fire Protection Notes, Abbreviations, and Details
FP1-1.1 Fire Suppression Plan - Laboratory
FP1-1.2 Fire Suppression Plan - Laboratory Mezzanine and Electrical Building
FP1-1.3 Fire Suppression and Alarm Plans - Mechanical Building (Add Alternate #1)
FP1-2.1 Fire Alarm Plan - Laboratory
FP1-2.2 Fire Alarm Plan - Laboratory Mezzanine and Electrical Building
FP1-4.0 Fire Alarm Riser Diagram and Sequence of Operations
FP1-4.1 Fire Protection Details
Electrical
E1-0.1 Electrical Symbols, General Notes
E1-0.2 Lighting Fixture Schedule
E1-1.1 Site Electrical Plan
E1-1.2 Site Lighting Plan
E1-2.1 Electrical Distribution Plan
E1-2.2 Electrical Distribution Plan - Mezzanine
E1-2.3 Mechanical Bldg Electrical Distribution Plan - Chiller Plant, Electrical Building - Lighting Plan
E1-2.3A Mechanical Bldg Electrical Distribution Plan - Chiller Plant, Lighting Plan (Additive Alternate No. 1)
E1-2.4 Lab Ground Level Lighting Plan
E1-2.5 Lab Mezzanine Lighting Plan
E1-2.6 Lab Ground Level Power Plan
E1-2.7 Lab Ground Level Security Plan
E1-3.1 Electrical Building One Line Diagram
E1-3.1A Electrical Building One Line Diagram Additive Alternate No. 1
E1-3.2 Lab One Line Diagram
E1-3.3 Partial One Line Diagram (MCC's and DP's)
E1-3.3A Partial One Line Diagram (MCC's and DP's) Additive Alternate No. 1
E1-3.4 CCTV Wiring Diagram, Typical Pan/Tilt/Zoom/Fixed Camera Wiring Diagrams
E1-3.5 Night Light/Curfew Light Wiring Diagram
E1-4.1 Unit Substation Elevation, Electrical/Generator Bldg Electrical Distribution Plan
E1-4.2 Main Elec Rm - Lab (Center Mezzanine), Submain Elec Rm - Lab (South Side), Main Lab Switchboard
E1-5.1 Panel Schedules
E1-5.2 Panel Schedules
E1-5.3 Panel Schedules
E1-6.1 Pendant Cable Support Connection Detail, Parking Area Light Detail
E1-6.2 Duct Sections
E1-6.3 Concrete Pullbox, Handhole Details
E1-6.4 Miscellaneous Details
Telecom
TC1-1.01 Symbol List
TC1-1.02 Cable Mounting Details
TC1-1.03 110 Terminal Details
TC1-1.04 Comm Wiring - Typical Detail
TC1-2.01 Laboratory Building - Comm Distribution Plan
TC1-2.02 Comm Distribution Plan - Mezz
TC1-4.01 Laboratory Building - Detailed MDF Comm Room Layout
TC1-4.02 Laboratory Building - MDF Comm Room Rack Elevations
TC1-4.03 Conceptual IDF Comm Room Layouts
TC1-4.04 Laboratory Building - Riser Diagram

File details come from the government source that posted it. Updated .