This document is a detailed mechanical engineering diagram for a chiller plant floor plan and section, specifically for the USDA Pacific Basin Agricultural Research Center in Hilo, Hawaii. The diagram depicts a comprehensive layout of mechanical systems including cooling towers, water pumps, expansion tanks, chemical treatment tanks, motor control centers, and various piping configurations for chilled water and reheat water systems. The plan shows phased equipment installation, with Phase 1 equipment clearly marked, and includes provisions for future Phase 2 connections and equipment. Key technical elements include structural steel tower supports, neoprene pad isolators, water circulation paths, pump strainers, and control panels. The diagram provides a precise schematic of interconnected mechanical systems with specific pipe sizes, flow directions, and equipment locations, designed to support the facility's mechanical infrastructure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COOLING TOWER
� STRUCTURAL STEEL TOWER SUPPORT
i--,r---------,::""-'1/....,,..__
13 ( 1/2") NEOPRENE PAD ISOLATOR (lYP)
�Mi�� Ml
�EIGHT WrrH GRAVllY RETURN TO PUMP AND GRAVllY FLOW TO DRAIN
COOLING TOWER SECTION
NOT TO SCALE
254 <10") SUPPCY tROM CHI RS
COOLING TOWER
254 (10")
RETU�N TO PUMP
COOLING TOWER BASIN
2") -51 l 1\LVE FOR FUTURE COOLING TOWER
POC IN FIELD -------
76 (3")
PUMP STRAINER
51 (2") VALVE FOR FUTURE COOLING
(3")
SEPARATOR
POC IN FIELD_/
� 00 cc I 00 - I") N �
TOWER CLEANING SYSTEM SCHEMATIC
NOT TO SCALE (REFER TO SHEET M1-5.10)
i
TOP OF CONC. BEAM
TOP OF SLAB
203 (81
CllllER 1-1A
EVAPORATOR SECTION
CONDENSER SECTION
2·
PUMPS #1
PACKAGED
(PHASE I) ...--
_,,.-- EMCS PANEL SIZED FOR ALL PHASE 1 11-IRU 5
MOTOR CONTROL CENTER (MCC)
203 (81 CHWR---+--r--------------E:lt+--<E------------, --->--.i;----=2·_L -(8-1 !WH �;i,��-(4-..
R
HW
-----E>tt-----+---------, □n
REFER TO SHEET M 1-1. 12 FOR EMERGENCY
GENERATOR ROOM FLOOR PLAN
-;qr- / --
CHILLED WATE
,---17 : ,_,I� -- -+:-�--��= ! ! I C I I FEEDER. REr1�N----tV-------1
SHEET M 1-5. -----+--"
,� ��, � r----Q-4-��----- �i :
I I
I I ,, --
I
I
I I
I CHILLED WATER EXPANSION
TANK -----------r t�s u tTi) 1
1 _ c:_-- --- EHEATI qc�1dN TJK:
I
NOTE:
-REHEAT WATE PUMIP '- / I I I
I
1 1 � 1 L __ __jj=-- 71 (PHASE I) I 1 � 1 I I I \J I I!::" ' � I I ( '\ I I I
203 (81 CHW �VE L • _J L '- / J I I1 L 7 _ _ j O
- � =�- ----= =L=- -� I FUTURE REHE T WATER- - 1
I r-- �����8 v i-:=-x�� �filR��E DIMENSIONS - - - - - .J I 8 °' MP PHASE II) I
I COORDINATE bEPll-1 WITH PIP INSTALLATION I I �
203 (81 J 1 � REFER TO DETAIL ON SHEET -5.4.
--'-�(1----203 -(a-1 -CH-W v-�VE- ; POT FEEDER FOR HOT WATE� c,,.
l<"tr-M
2 3 (81 �� � I WATER/WATER l------0 �
1 r VALVES FOR PHAS,1 E 1
���0 bop 3048 (10') : I 2 3 �;:�
181 N---:1;::5.::.2 ....!(.:..5 n-----,-15
1-
1.__20-3 ca1
( 4
• I I L__ __ ...::::======t===:2roo 33 7(8jcc:HHWRWR-====�--l:=:·==:: ::::::��-:+--E-�-- JoM BUILDING 203 (81 CHWR�������f==¥�����!:::==:::e��� r- �-+-----...:.:::�I �H-Jj : I L 203 (81 CHWS------�I _ . ; TO BUILDING 203 (81 CHWS
SPACE 11-IERMOSTAT
SET AT 85 DEG F.
I 203 (81 Vl'J...VE .e I 102
(4") 0 LL_ 102 (41 RHWR - -- - -- -+--.L
- <- FROM BUILDING 102 (41RHWR
t I � 1
102 (4") - __ _ _ _ _ _ _ _ _ _ _ _ _ --- -- - -- - -- 102 (41 RHWS --- - ----+--:: , ,-z � : - - ---c> �O BUILDING 102 (41RHWS TI t203 (B
(FUTURE bop 3048 (10'0 � bop 2438 (8'0") :
I - -�--------- - -7 • • • • \ :
c=========-1 I PHASE II) Aie\ I I
�' � c)- -M---fT- - - - - -1752 "{&") 203 8 \EV 102 4")1 I I
I
- * 1� -c;ro 1 �-=-=
JI.
-J j 52 (6")1:---r-0---w-----1 1 1 I t�s u tTiJ I
1tN��Jt: (lYP
VALVES
FOR PHASE 5
I I I 152 (6") - - - - - - -203 j(B")
254 ( +-"-lt-+IX:t-+,-C:T-=---, --+--� : :
I
I I CHILLER PLANT �
(1YP
6") VALVES FOR PHASE 5 CONNECTION
OBVD (lYP)
I I r:;iv,7 L
- - ""L I
- - ::.5-EX CONNECTION (1YP)
I (FUTURE � 1 T
l �
(6?p- _!HAS_:_ '2_ __
1_ 152 t")j 25 ir �� _ 7 254 (10") 4
� ---M-- i_ �--- ---,_- ----J 152 (�")Cjr I E) �- - 54 (10") NO [ == _J LJ_l � 1 L ___ _J
1;� (6") -
14x35
- 102 (41 BALANCI G VALVIE ���
u tT1) CWP
BALANCIN
1- 36x14 ER) fi�l&u) (FUTURE bop 3048
.c==!:::::::::,J��f=:::!s:;�
P�ASE�I) �-�
L _ _J I
ONTROL PANEL
203 (81
80 (3")
� 1 Ox 6 EXH DUCT DOWN (24x 161------�
�, / O�GE MASK
-' COO I G TOWER VFD
102 (4") FSO
SEE PLUMBING DWGS
� -- -- - -�'KAGEIJ7'0WE IN
PROVIDE FOR SPACE TEMPERATURE/11-IERMOSTAT
CONTROL OF PRV (EMCS).
102 (41
WATER/WATER
l'J HEAT PUMP l'J
REFRIG MONITORING ALARM
REFRIG MONITORING CONTROL PANEL
REFER TO SYSTEM SCHEMATIC DIAGRAM
SHEET M 1-5.6
203 (8")
CHEMICAL TREATMENT TANKS
CLEANING SYSTEM
SHEET M 1-5. 1,..----�
REFER TO SHEET M 1-5.10 (lYP. OF 2)
A CHILLER PLANT FLOOR PLAN
SCALE: 1:250 [3/16" = 1'-01 (ADDmVIE ALTERNATE #1)
NOTE: PRIMARY AND SECONDARY CHILLED WATER PUMPS
SHALL BE PACKAGED AND ITS CONTROLS SHALL BE INTERFACED
Will-I 11-IE EMCS.
NOTE: A PRESSURE DIFFERENTIAL SENSOR SHALL BE
PROVIDED TO CONTROL 11-IE SPEED OF 11-IE SECONDARY PUMPS. �� H.�
o" �
� LICENSED :;< PROFESSIONAL �
a: ENGINEER >
,tc No. �II * -S: :------: 'f"" "1�/ I, u�·
1IIS MR< WAS PREPARED BY IIE
OR INlER IIY Sl.l'ERWIIOII AND CONSIRUCllCN OF lHIS PRO,ECT
WU IE UNDER MY OBSERVA110N.
FOR FUTURE COOLING TOWER LEGEND
I
I I I I I I I
I I I I
PHASE 1 EQUIP�ENT
I I I I
---- 203 (81 CHWR-- PHASE 1 CHILl,ED WATER RETURN PIPING I
---- 203 (81 CHWS-- PHASE 1 CHILl/fD WATER SUPPLY PIPING
- -- - 102 (41 RHWR -- PHASE 1 REH�T WATER RETURN PIPING
PHASE 1 REHEAT WATER SUPPLY PIPING ----102 (41 RHWS --
,------7
I I I I
L ______ _J
I I I I I
PHASE 2 EQ�IPMENT
I
I
PHASE 2 PIPING
I I I I
I I I I I
I
RECO�D DOCUMENT
atANGES N01ED II 11£ RECORD DRAalGS ARE BASED ON AEl),-,IIAAICEI AS-IIULT-- PROIIIIE) BY 11£ C0N1RACRlR.
JULY 15, 2009 - ...
RICHARD MATSUNAGA
. &ASSOCIATES 1----+---+---1---------------1
ARCHITECTS INC. 1-;;;;:-""t'�;;-1-;;;--1------;;;;;;;;;;;;;;;;;---1I NO. DAlE BY LUCHl'II'"'
RE\'ISIONS
A-E FIRM USDA
PRO,ECT IIANAGER EPII
U ms Agricultural
Research Service t-::===-==----t=-,-------1 s PACIFIC BASIN AGRICULTURAL RESEARCH CENTER
H. LEONG R.CARRION
DElllGNER RPR
J. OKITA/ M. ANDRADE D. GONSALVES
Q£CICED BY SAFETY & HEAl.lH
D HILO, HAWAII- PHASE 1, LABORATORY
A
CHILLER PLANT FLOOR PLAN (ADDITIVE ALTERNATE #1)
saJaTAllCII NO. DWII. NO
B CHILLER PLANT SECTION H. LEONG T. ROARK 09-3K15-05 USDA,ARS,AFM,FD ,IJII 30, :mo.
1-1.15601 SUNNYSIDE AVENUE
SCALE: 1 :250 [3/16" = 1 '-01 REAL HttftR IT DAlE DRAIN BY BELTSVILLE, MD 20705 APR 30, 2010 A. LI E. REILLY JUNE 30, 2004
OF 263
| Title |
| T1-0.1 Project Team, Vicinity & Location Maps, General Notes, Code Information |
| T1-0.2 Index of Drawings |
| Civil |
| C1-0.1 Notes |
| C1-0.2 Notes |
| C1-1.1 Master Site Plan |
| C1-1.2 Site Plan |
| C1-2.1 Grading Plan |
| C1-3.1 Utility Plan |
| C1-4.1 Details |
| C1-4.2 Details |
| C1-4.3 Details |
| C1-4.4 Details |
| C1-4.5 Details |
| C1-4.6 Details |
| C1-5.1 Profile |
| C1-5.2 Profile |
| C1-5.3 Typical Section |
| C1-5.4 Profile |
| Landscape |
| L1-0.1 Landscape Irrigation List |
| L1-0.2 Plant List and Notes (Basic Bid) |
| L1-0.3 Plant List and Notes (Additive Alternate) |
| L1-1.1 Landscape Irrigation Plan - 1 (Basic Bid) |
| L1-1.2 Landscape Irrigation Plan - 1 (Additive Alternate) |
| L1-1.3 Landscape Irrigation Plan - 2 (Basic Bid) |
| L1-1.4 Landscape Irrigation Plan - 3 (Basic Bid) |
| L1-2.1 Landscape Planting Plan - 1 (Basic Bid) |
| L1-2.2 Landscape Planting Plan - 1 (Additive Alternate) |
| L1-2.3 Landscape Planting Plan - 2 (Basic Bid) |
| L1-2.4 Landscape Planting Plan - 3 (Basic Bid) |
| L1-3.1 Landscape Details |
| Architectural |
| A1-0.1 Architectural Abbreviations, Architectural Legend, Architectural Material Symbols |
| A1-1.1 Master Site Plan |
| A1-1.2 Site Plan |
| A1-1.3 Building Column Layout Plan |
| A1-1.4 Ground Level Floor Plan |
| A1-1.5 Ground Level Reflected Ceiling Plan |
| A1-1.6 Mezzanine Level Floor and Lower Roof Plan |
| A1-1.7 Mezzanine Level Reflected Ceiling Plan |
| A1-1.8 Upper Roof Plan |
| A1-1.9 Electrical Building Plans |
| A1-1.10 Mechanical Building Plans (Additive Alternate #1) |
| A1-1.11 Entry Sign Plan, Elevation, Details |
| A1-2.1 Partial Floor Plan |
| A1-2.2 Partial Reflected Ceiling Plan |
| A1-2.3 Partial Floor Plan |
| A1-2.4 Partial Reflected Ceiling Plan |
| A1-2.5 Partial Floor Plan |
| A1-2.6 Partial Reflected Ceiling Plan |
| A1-2.7 Partial Floor Plan |
| A1-2.8 Partial Reflected Ceiling Plan |
| A1-2.9 Partial Floor Plan |
| A1-2.10 Partial Reflected Ceiling Plan |
| A1-2.11 Partial Floor Plan |
| A1-2.12 Partial Reflected Ceiling Plan |
| A1-2.13 Partial Floor Plan |
| A1-2.14 Partial Floor and Reflected Ceiling Plan |
| A1-2.15 Stair Plans and Sections |
| A1-2.16 Restroom Floor Plans |
| A1-2.17 Cylinder Storage Shed Floor, Ceiling and Roof Plans, Elevations, and Sections |
| A1-3.1 Exterior Elevations |
| A1-3.2 Exterior Elevation & Building Section |
| A1-3.3 Building Sections |
| A1-3.4 Wall Sections |
| A1-3.5 Wall Sections |
| A1-3.6 Wall Sections |
| A1-3.7 Wall Sections |
| A1-4.1 Interior Elevations |
| A1-4.2 Interior Elevations |
| A1-4.3 Interior Elevations |
| A1-4.4 Interior Elevations |
| A1-5.1 Room Finish Schedule |
| A1-5.2 Room Finish Schedule |
| A1-5.3 Color and Material Schedule |
| A1-5.4 Floor Finish Plan and Details |
| A1-5.5 Standard Toilet Stall Plan & Mounting Heights |
| A1-5.6 Sign Schedule & Details |
| A1-5.7 Sign Types |
| A1-5.8 Ground Level Door and Window Schedule Plan |
| A1-5.9 Mezzanine Level Door and Window Schedule Plan |
| A1-5.10 Door Schedule |
| A1-5.11 Door Details |
| A1-5.12 Window Types, Louver Types, Details |
| A1-6.1 Finish Details |
| A1-6.2 Casework Details |
| A1-6.3 Casework Details |
| A1-6.4 Wall Types |
| A1-6.5 Column Types |
| A1-6.6 Ceiling Details |
| A1-6.7 Roof Details |
| A1-6.8 Roof Details & Misc Framing Details |
| A1-6.9 Miscellaneous Details |
| Lab |
| LF1-1.1 Laboratory Furnishings Key Sheet - Phase 1 |
| LF1-2.1 Laboratory Furnishings Lab Building Partial Floor Plan - Phase 1 |
| LF1-2.2 Laboratory Furnishings Lab Building Partial Floor Plan - Phase 1 |
| LF1-2.3 Laboratory Furnishings Lab Building Partial Floor Plan - Phase 1 |
| LF1-2.4 Laboratory Furnishings Lab Building Partial Floor Plan - Phase 1 |
| LF1-2.5 Laboratory Furnishings Lab Building |
Mezzanine Flr Plan - Phase 1
| LF1-3.1 Laboratory Furnishings Fittings Sheet No. 1 - Phase 1 |
| LF1-3.2 Laboratory Furnishings Fittings Sheet No. 2 - Phase 1 |
| LF1-3.3 Laboratory Furnishings Fume Hood Details - Phase 1 |
| LF1-3.4 Laboratory Furnishings Lab Detail Sheet - Phase 1 |
| LF1-3.5 Laboratory Furnishings Lab Detail Sheet - Phase 1 |
| LF1-3.6 Laboratory Furnishings Lab Detail Sheet - Phase 1 |
| LF1-3.7 Laboratory Furnishings Lab Detail Sheet - Phase 1 |
| LF1-3.8 Laboratory Furnishings Lab Detail Sheet - Phase 1 |
| LF1-4.1 Laboratory Furnishings Laboratory Schedule - Phase 1 |
| LP1-1.1 Laboratory Plumbing Laboratory Schedule - Phase 1 |
| LP1-2.1 Laboratory Plumbing Lab Building Partial Floor Plan - Phase 1 |
| LP1-2.2 Laboratory Plumbing Lab Building Partial Floor Plan - Phase 1 |
| LP1-2.3 Laboratory Plumbing Lab Building Partial Floor Plan - Phase 1 |
| LP1-2.5 Laboratory Plumbing Lab Building Partial Floor Plan - Phase 1 |
| LP1-3.1 Laboratory Plumbing Details - Phase 1 |
| LP1-3.2 Laboratory Plumbing Details - Phase 1 |
| LP1-3.3 Laboratory Plumbing Details - Phase 1 |
| LE1-1.1 Laboratory Electrical Key Sheet |
| LE1-2.1 Laboratory Electrical Lab Building Partial Floor Plan - Phase 1 |
| LE1-2.2 Laboratory Electrical Lab Building Partial Floor Plan - Phase 1 |
| LE1-2.3 Laboratory Electrical Lab Building Partial Floor Plan - Phase 1 |
| LE1-2.4 Laboratory Electrical Lab Building Partial Floor Plan - Phase 1 |
| LE1-3.1 Laboratory Electrical Details |
| LE1-4.1 Laboratory Electrical Panel Schedules |
| LE1-4.2 Laboratory Electrical Panel Schedules |
| LE1-4.3 Laboratory Electrical Panel Schedules |
| Structural |
| S1-0.1 General Notes |
| S1-0.2 Typical Grade Slab Details |
| S1-0.3 Typical CMU Wall Details |
| S1-0.4 Typical Wall Footing Details |
| S1-0.5 Typical Steel Beam Connection Details, Bolting and Welding Schedule |
| S1-0.6 Typ Steel Beam to Cross Bracing Connection Details |
| S1-0.7 Phase 1 Lab Building Roof Uplift Pressure Diagram |
| S1-0.8 Phase 1 Lab Building Typical Steel joist Connection Details |
| S1-1.1 |
Phase 1 Lab Building Foundation Plan
| S1-1.2 Phase 1 Lab Building Mezzanine Floor Framing Plan |
| S1-1.3 Phase 1 Lab Building Lower Roof Framing Plan |
| S1-1.4 Phase 1 Lab Building Upper Roof Framing Plan |
| S1-2.1 Phase 1 Lab Building Foundation Details |
| S1-2.2 Phase 1 Lab Building Foundation Details |
| S1-2.3 Phase 1 Lab Building Foundation Details |
| S1-2.4 Phase 1 Lab Building Typ CMU Wall Ftg Details/Column Sched |
| S1-2.5 Phase 1 Lab Building Typ CMU Wall Ftg Details/Column Sched |
| S1-3.1 Phase 1 Lab Building Building Elevation |
| S1-3.2 Phase 1 Lab Building Building Elevation |
| S1-3.3 Phase 1 Lab Building Building Elevation |
| S1-3.4 Phase 1 Lab Building Building Elevation |
| S1-3.5 Phase 1 Lab Building Building Elevation |
| S1-3.6 Phase 1 Lab Building Building Sections |
| S1-4.1 Phase 1 Lab Building Section and Details |
| S1-4.2 Phase 1 Lab Building Connection Details |
| S1-4.3 Phase 1 Lab Building Connection Details |
| S1-4.4 Phase 1 Lab Building Connection Details |
| S1-4.5 Phase 1 Lab Building Connection Details |
| S1-4.6 Phase 1 Lab Building Connection Details |
| S1-4.7 Phase 1 Lab Building Connection Details |
| S1-4.8 Phase 1 Lab Building Section and Details |
| S1-4.9 Phase 1 Lab Building Section and Details |
| S1-4.10 Phase 1 Wall Section Details |
| S1-4.11 Phase 1 Wall Section Details |
| S1-5.1 Phase 1 Lab Building Moment Frames Sections & Connection Details |
| S1-5.2 Phase 1 Lab Building Stair Details |
| S1-5.3 Phase 1 Lab Building Stair Details |
| S1-5.4 Phase 1 Lab Building Stair Details |
| S1-5.5 Phase 1 Lab Building Stair Details |
| S1-6.1 Electrical Building Foundation and Roof Framing Plans |
| S1-6.2 Mechanical Building Foundation and Roof Framing Plans |
| S1-7.1 Phase 1 Lab Building Gas Cylinder Storage Shed & Dumpster |
| Mechanical |
| M1-1.0 General Notes, Mechanical Legend |
| M1-1.1 Overall Mechanical Floor Plan - Ground Floor |
| M1-1.2 Partial Mechanical Floor Plan - Ground Floor (Sector 1) |
| M1-1.3 Partial Mechanical Floor Plan - Ground Floor (Sector 2) |
| M1-1.4 Partial Mechanicl Floor Plan - Ground Floor (Sector 3) |
| M1-1.5 Partial Mechanical Floor Plan - Ground Floor (Sector 4) |
| M1-1.6 Partial Mechanical Floor Plan - Ground Floor (Sector 5) |
| M1-1.7 Partial Mechanical Floor Plan - Ground Floor (Sector 6) |
| M1-1.8 Partial Mechanical Floor Plan - Mezzanine Floor |
| M1-1.9 Partial Mechanical Floor Plan - Mezzanine Floor |
| M1-1.10 Partial Reheat Piping Floor Plan - Ground Floor (Sector 3) |
| M1-1.11 Partial Reheat Piping Floor Plan - Ground Floor (Sector 4) |
| M1-1.12 Chiller Plant Floor Plan (Base Bid) |
| M1-1.13 Overall Mechanical Site Plan |
| M1-1.14 Chiller Plant Floor Plan (Additive Alternate #1) |
| M1-1.15 Partial Electrical Building Mechanical Plan |
| M1-2.1 Partial Plumbing Floor Plan - Ground Floor (Sector 2) |
| M1-2.2 Partial Plumbing Floor Plan - Ground Floor (Sector 3) |
| M1-2.3 Partial Plumbing Floor Plan - Ground Floor (Sector 4) |
| M1-2.4 Partial Plumbing Floor Plan - Ground Floor (Sector 5) |
| M1-2.5 Partial Plumbing Floor Plan - Ground Floor (Sector 6) |
| M1-2.6 Partial Plumbing Floor Plan - Lab Utilities (Sector 3) |
| M1-2.7 Partial Plumbing Floor Plan - Lab Utilities (Sector 4) |
| M1-2.8 Partial Plumbing Floor Plan - Mezzanine Floor |
| M1-2.9 Partial Plumbing Floor Plan - Lab Utilities (Sector 6) |
| M1-2.10 Mechanical Building Plumbing Floor Plan, Sanitary and Water Piping Diagrams (Additive Alternate #1) |
| M1-3.1 Mechanical Sections |
| M1-3.2 Mechanical Sections |
| M1-4.1 Mechanical Equipment Schedule |
| M1-4.2 Mechanical Equipment Schedule (Additive Alternate #1) |
| M1-4.3 Mechanical Equipment Schedule |
| M1-5.1 Control Diagrams, Details |
| M1-5.2 Details |
| M1-5.3 Details |
| M1-5.4 Details |
| M1-5.5 Details |
| M1-5.6 Details |
| M1-5.7 EMCS Points List |
| M1-5.8 Control Diagrams |
| M1-5.9 Control Diagrams, Details |
| M1-5.10 Details |
| M1-5.11 Details |
| M1-5.12 Reverse Osmosis/Tank/Polisher Piping/Control Diagram |
| M1-1.13 Details |
| M1-6.1 Partial Sanitary Piping Diagram |
| M1-6.2 Partial Sanitary Piping Diagram |
| M1-6.3 Partial Water and Laboratory Utility Piping Diagram |
| M1-6.4 Partial Water and Laboratory Utility Piping Diagram |
| M1-6.5 Reheat Water Piping Diagram |
| M1-6.6 Mechanical Plant Piping Diagram |
| M1-6.7 Mechanical Plant Piping Diagram (Additive Alternate #1) |
| M1-6.8 Chilled Water Piping Diagram - Interior |
| Fire |
| FP1-0.1 Fire Protection Notes, Abbreviations, and Details |
| FP1-1.1 Fire Suppression Plan - Laboratory |
| FP1-1.2 Fire Suppression Plan - Laboratory Mezzanine and Electrical Building |
| FP1-1.3 Fire Suppression and Alarm Plans - Mechanical Building (Add Alternate #1) |
| FP1-2.1 Fire Alarm Plan - Laboratory |
| FP1-2.2 Fire Alarm Plan - Laboratory Mezzanine and Electrical Building |
| FP1-4.0 Fire Alarm Riser Diagram and Sequence of Operations |
| FP1-4.1 Fire Protection Details |
| Electrical |
| E1-0.1 Electrical Symbols, General Notes |
| E1-0.2 Lighting Fixture Schedule |
| E1-1.1 Site Electrical Plan |
| E1-1.2 Site Lighting Plan |
| E1-2.1 Electrical Distribution Plan |
| E1-2.2 Electrical Distribution Plan - Mezzanine |
| E1-2.3 Mechanical Bldg Electrical Distribution Plan - Chiller Plant, Electrical Building - Lighting Plan |
| E1-2.3A Mechanical Bldg Electrical Distribution Plan - Chiller Plant, Lighting Plan (Additive Alternate No. 1) |
| E1-2.4 Lab Ground Level Lighting Plan |
| E1-2.5 Lab Mezzanine Lighting Plan |
| E1-2.6 Lab Ground Level Power Plan |
| E1-2.7 Lab Ground Level Security Plan |
| E1-3.1 Electrical Building One Line Diagram |
| E1-3.1A Electrical Building One Line Diagram Additive Alternate No. 1 |
| E1-3.2 Lab One Line Diagram |
| E1-3.3 Partial One Line Diagram (MCC's and DP's) |
| E1-3.3A Partial One Line Diagram (MCC's and DP's) Additive Alternate No. 1 |
| E1-3.4 CCTV Wiring Diagram, Typical Pan/Tilt/Zoom/Fixed Camera Wiring Diagrams |
| E1-3.5 Night Light/Curfew Light Wiring Diagram |
| E1-4.1 Unit Substation Elevation, Electrical/Generator Bldg Electrical Distribution Plan |
| E1-4.2 Main Elec Rm - Lab (Center Mezzanine), Submain Elec Rm - Lab (South Side), Main Lab Switchboard |
| E1-5.1 Panel Schedules |
| E1-5.2 Panel Schedules |
| E1-5.3 Panel Schedules |
| E1-6.1 Pendant Cable Support Connection Detail, Parking Area Light Detail |
| E1-6.2 Duct Sections |
| E1-6.3 Concrete Pullbox, Handhole Details |
| E1-6.4 Miscellaneous Details |
| Telecom |
| TC1-1.01 Symbol List |
| TC1-1.02 Cable Mounting Details |
| TC1-1.03 110 Terminal Details |
| TC1-1.04 Comm Wiring - Typical Detail |
| TC1-2.01 Laboratory Building - Comm Distribution Plan |
| TC1-2.02 Comm Distribution Plan - Mezz |
| TC1-4.01 Laboratory Building - Detailed MDF Comm Room Layout |
| TC1-4.02 Laboratory Building - MDF Comm Room Rack Elevations |
| TC1-4.03 Conceptual IDF Comm Room Layouts |
| TC1-4.04 Laboratory Building - Riser Diagram |