Attachment 02 W91QF52B0005 Bid Schedule.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- Installation Pavement Maintenance and Repair
- Solicitation number
- W91QF5-21-B-0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 1409_W91QF5-21-B-0005 PAVING.pdf | ||
| Amendment 0003 W91QF5-21-B-0005-P00003.pdf | ||
| Attachment 02 W91QF52B0005 Bid Schedule - Revised.xlsx | XLSX spreadsheet | |
| Amendment 0002 W91QF5-21-B-0005-Paving.pdf | ||
| Amendment P00001.pdf | ||
| TE 1 Annex J 420 Facility Maint Horizontal to OPORD 18-011.docx | DOCX document | |
| TE 3 Crosswalk Detail.pdf | ||
| TE 2 Publications and Forms.docx | DOCX document | |
| Attachment 01 Statement of Work.docx | DOCX document | |
| Attachment 03 FAR Clause 52.204-24 Telecommunications and Video Surveillance.pdf | ||
| W91QF521B0005 Paving.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| BASE YEAR PRICING WORKSHEET | |||||
| POP: 01 April 2021 through 31 March 2022 (30 day phase-in) | |||||
| Item | Description | QTY | Unit | Unit Price | Total Amount |
| 0001AA | VDOT SM 12.5 A Asphalt Concrete | 3000 | TN | ||
| 0001AB | VDOT SM 9.5 A Asphalt Concrete | 11000 | TN | ||
| 0001AC | VDOT BM 25.0 A Asphalt Concrete | 500 | TN | ||
| 0001AD | CMS2 or CRS Tack Coat | 1000 | Gal | ||
| 0001AE | NTCQS-1HLM Trackless Tack Coat | 1000 | Gal | ||
| 0001AF | NTCRS-1HSP Trackless Tack Coat | 1000 | Gal | ||
| 0001AG | RC 250 Prime Coat | 1000 | Gal | ||
| 0001AH | 21A Base Course | 250 | TN | ||
| 0001AJ | Geotextile Interlayers | 3000 | SY | ||
| 0001AK | Crack Sealing | 500 | LF | ||
| 0001AL | Raise Round Manhole 1"-4" | 1 | EA | ||
| 0001AM | Raise Rectangular/Square Manhole 1"-4" | 1 | EA | ||
| 0001AN | Raise Utility Boxes 1"-4" | 1 | EA | ||
| 0001AP | Cold Milling 2" | 15000 | SY | ||
| 0001AQ | Cold Milling 3" | 5000 | SY | ||
| 0001AR | Cold Milling 4" | 3000 | SY | ||
| 0001AS | Asphalt Slurry B of C | 2000 | SY | ||
| 0001AT | Cape Seal | 5000 | SY | ||
| 0001AU | Surface Treatment (Chip Seal) | 250 | SY | ||
| 0001AV | Excavation and Removal of Soil | 1 | CY | ||
| 0001AW | Fine Grading | 100 | SY | ||
| 0001AX | Parking Lots 4" Wide Lines-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 0001AY | Parking Lots 4" Wide Lines-VDOT Type B, Class III Epoxy | 10000 | LF | ||
| 0001AZ | Detail Layout-Park Lots 4" Wide Lines-VDOT Type B, Class III Epoxy | 5000 | EA | ||
| 0001BA | Broken White or Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 0001BB | Broken White or Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 200 | LF | ||
| 0001BC | Solid White or Yellow Center or Edge 4" Wide Lines (Roadway Length)-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 0001BD | Solid White or Yellow Center or Edge 4" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 5000 | LF | ||
| 0001BE | Solid Double Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 0001BF | Solid Double Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 5000 | LF | ||
| 0001BG | Handicap Spaces 4" Wide Lines with International Symbol of Accessibility- VDOT Type B, Class III Epoxy | 15 | EA | ||
| 0001BH | Parallel Parking Spaces 4" Wide Lines-VDOT Type B, Class III Epoxy | 5 | EA | ||
| 0001BJ | Stop Bar 24" Wide Lines-VDOT Type B, Class III Epoxy | 400 | LF | ||
| 0001BK | Crosswalk 7' Wide with (2) Lateral 6" Wide Lines with Transverse Diagonal 12" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 1500 | LF | ||
| 0001BL | Arrows (Straight, Right, Left)-VDOT Type B, Class III Epoxy | 20 | EA | ||
| 0001BM | Tape Rumble Strips 4" Wide Lines-VDOT Type B, Class VI Thermoplastic | 1 | LF | ||
| 0001BN | White/Yellow Cross Hatch 4" Wide Lines-VDOT Type B, Class III Epoxy | 200 | LF | ||
| 0001BP | White/Yellow Cross Hatch 8" Wide Lines-VDOT Type B, Class III Epoxy | 1 | LF | ||
| 0001BQ | White/Yellow Cross Hatch 12" Wide lines-VDOT Type B, Class III Epoxy | 1 | LF | ||
| 0001BR | Curb/Parking Stops | 1 | EA | ||
| 0001BS | Eradicate 4" Wide Lines | 200 | LF | ||
| 0001BT | Eradicate 8" Wide Lines | 10 | LF | ||
| 0001BU | Eradicate 12" Wide Lines | 10 | LF | ||
| 0001BV | Patch Potholes | 500 | TN | ||
| TOTAL BASE YEAR GRAND TOTAL |
Option Year 1
| OPTION YEAR 1 PRICING WORKSHEET | |||||
| POP: 01 April 2022 through 31 March 2023 | |||||
| Item | Description | QTY | Unit | Unit Price | Total Amount |
| 1001AA | VDOT SM 12.5 A Asphalt Concrete | 3000 | TN | ||
| 1001AB | VDOT SM 9.5 A Asphalt Concrete | 11000 | TN | ||
| 1001AC | VDOT BM 25.0 A Asphalt Concrete | 500 | TN | ||
| 1001AD | CMS2 or CRS Tack Coat | 1000 | Gal | ||
| 1001AE | NTCQS-1HLM Trackless Tack Coat | 1000 | Gal | ||
| 1001AF | NTCRS-1HSP Trackless Tack Coat | 1000 | Gal | ||
| 1001AG | RC 250 Prime Coat | 1000 | Gal | ||
| 1001AH | 21A Base Course | 250 | TN | ||
| 1001AJ | Geotextile Interlayers | 3000 | SY | ||
| 1001AK | Crack Sealing | 500 | LF | ||
| 1001AL | Raise Round Manhole 1"-4" | 1 | EA | ||
| 1001AM | Raise Rectangular/Square Manhole 1"-4" | 1 | EA | ||
| 1001AN | Raise Utility Boxes 1"-4" | 1 | EA | ||
| 1001AP | Cold Milling 2" | 15000 | SY | ||
| 1001AQ | Cold Milling 3" | 5000 | SY | ||
| 1001AR | Cold Milling 4" | 3000 | SY | ||
| 1001AS | Asphalt Slurry B of C | 2000 | SY | ||
| 1001AT | Cape Seal | 5000 | SY | ||
| 1001AU | Surface Treatment (Chip Seal) | 250 | SY | ||
| 1001AV | Excavation and Removal of Soil | 1 | CY | ||
| 1001AW | Fine Grading | 100 | SY | ||
| 1001AX | Parking Lots 4" Wide Lines-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 1001AY | Parking Lots 4" Wide Lines-VDOT Type B, Class III Epoxy | 10000 | LF | ||
| 1001AZ | Detail Layout-Park Lots 4" Wide Lines-VDOT Type B, Class III Epoxy | 5000 | EA | ||
| 1001BA | Broken White or Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 1001BB | Broken White or Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 200 | LF | ||
| 1001BC | Solid White or Yellow Center or Edge 4" Wide Lines (Roadway Length)-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 1001BD | Solid White or Yellow Center or Edge 4" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 5000 | LF | ||
| 1001BE | Solid Double Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 1001BF | Solid Double Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 5000 | LF | ||
| 1001BG | Handicap Spaces 4" Wide Lines with International Symbol of Accessibility- VDOT Type B, Class III Epoxy | 15 | EA | ||
| 1001BH | Parallel Parking Spaces 4" Wide Lines-VDOT Type B, Class III Epoxy | 5 | EA | ||
| 1001BJ | Stop Bar 24" Wide Lines-VDOT Type B, Class III Epoxy | 400 | LF | ||
| 1001BK | Crosswalk 7' Wide with (2) Lateral 6" Wide Lines with Transverse Diagonal 12" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 1500 | LF | ||
| 1001BL | Arrows (Straight, Right, Left)-VDOT Type B, Class III Epoxy | 20 | EA | ||
| 1001BM | Tape Rumble Strips 4" Wide Lines-VDOT Type B, Class VI Thermoplastic | 1 | LF | ||
| 1001BN | White/Yellow Cross Hatch 4" Wide Lines-VDOT Type B, Class III Epoxy | 200 | LF | ||
| 1001BP | White/Yellow Cross Hatch 8" Wide Lines-VDOT Type B, Class III Epoxy | 1 | LF | ||
| 1001BQ | White/Yellow Cross Hatch 12" Wide lines-VDOT Type B, Class III Epoxy | 1 | LF | ||
| 1001BR | Curb/Parking Stops | 1 | EA | ||
| 1001BS | Eradicate 4" Wide Lines | 200 | LF | ||
| 1001BT | Eradicate 8" Wide Lines | 10 | LF | ||
| 1001BU | Eradicate 12" Wide Lines | 10 | LF | ||
| 1001BV | Patch Potholes | 500 | TN | ||
| TOTAL OPTION YEAR 1 GRAND TOTAL |
Option Year 2
| OPTION YEAR 2 PRICING WORKSHEET | |||||
| POP: 01 April 2023 through 31 March 2024 | |||||
| Item | Description | QTY | Unit | Unit Price | Total Amount |
| 2001AA | VDOT SM 12.5 A Asphalt Concrete | 3000 | TN | ||
| 2001AB | VDOT SM 9.5 A Asphalt Concrete | 11000 | TN | ||
| 2001AC | VDOT BM 25.0 A Asphalt Concrete | 500 | TN | ||
| 2001AD | CMS2 or CRS Tack Coat | 1000 | Gal | ||
| 2001AE | NTCQS-1HLM Trackless Tack Coat | 1000 | Gal | ||
| 2001AF | NTCRS-1HSP Trackless Tack Coat | 1000 | Gal | ||
| 2001AG | RC 250 Prime Coat | 1000 | Gal | ||
| 2001AH | 21A Base Course | 250 | TN | ||
| 2001AJ | Geotextile Interlayers | 3000 | SY | ||
| 2001AK | Crack Sealing | 500 | LF | ||
| 2001AL | Raise Round Manhole 1"-4" | 1 | EA | ||
| 2001AM | Raise Rectangular/Square Manhole 1"-4" | 1 | EA | ||
| 2001AN | Raise Utility Boxes 1"-4" | 1 | EA | ||
| 2001AP | Cold Milling 2" | 15000 | SY | ||
| 2001AQ | Cold Milling 3" | 5000 | SY | ||
| 2001AR | Cold Milling 4" | 3000 | SY | ||
| 2001AS | Asphalt Slurry B of C | 2000 | SY | ||
| 2001AT | Cape Seal | 5000 | SY | ||
| 2001AU | Surface Treatment (Chip Seal) | 250 | SY | ||
| 2001AV | Excavation and Removal of Soil | 1 | CY | ||
| 2001AW | Fine Grading | 100 | SY | ||
| 2001AX | Parking Lots 4" Wide Lines-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 2001AY | Parking Lots 4" Wide Lines-VDOT Type B, Class III Epoxy | 10000 | LF | ||
| 2001AZ | Detail Layout-Park Lots 4" Wide Lines-VDOT Type B, Class III Epoxy | 5000 | EA | ||
| 2001BA | Broken White or Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 2001BB | Broken White or Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 200 | LF | ||
| 2001BC | Solid White or Yellow Center or Edge 4" Wide Lines (Roadway Length)-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 2001BD | Solid White or Yellow Center or Edge 4" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 5000 | LF | ||
| 2001BE | Solid Double Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 2001BF | Solid Double Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 5000 | LF | ||
| 2001BG | Handicap Spaces 4" Wide Lines with International Symbol of Accessibility- VDOT Type B, Class III Epoxy | 15 | EA | ||
| 2001BH | Parallel Parking Spaces 4" Wide Lines-VDOT Type B, Class III Epoxy | 5 | EA | ||
| 2001BJ | Stop Bar 24" Wide Lines-VDOT Type B, Class III Epoxy | 400 | LF | ||
| 2001BK | Crosswalk 7' Wide with (2) Lateral 6" Wide Lines with Transverse Diagonal 12" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 1500 | LF | ||
| 2001BL | Arrows (Straight, Right, Left)-VDOT Type B, Class III Epoxy | 20 | EA | ||
| 2001BM | Raise Rectangular/Square Manhole 1"-4" | 1 | EA | ||
| 2001BN | Raise Utility Boxes 1"-4" | 1 | EA | ||
| 2001BP | Cold Milling 2" | 15,000 | SY | ||
| 2001BQ | Cold Milling 3" | 5,000 | LF | ||
| 2001BR | Cold Milling 4" | 3,000 | SY | ||
| 2001BS | Asphalt Slurry B of C | 2,000 | LF | ||
| 2001BT | Cape Seal | 5,000 | SY | ||
| 2001BU | Surface Treatment (Chip Seal) | 250 | SY | ||
| 2001BV | Patch Potholes | 500 | TN | ||
| TOTAL OPTION YEAR 2 GRAND TOTAL |
Option Year 3
| OPTION YEAR 3 PRICING WORKSHEET | |||||
| POP: 01 April 2024 through 31 March 20205 | |||||
| Item | Description | QTY | Unit | Unit Price | Total Amount |
| 3001AA | VDOT SM 12.5 A Asphalt Concrete | 3000 | TN | ||
| 3001AB | VDOT SM 9.5 A Asphalt Concrete | 11000 | TN | ||
| 3001AC | VDOT BM 25.0 A Asphalt Concrete | 500 | TN | ||
| 3001AD | CMS2 or CRS Tack Coat | 1000 | Gal | ||
| 3001AE | NTCQS-1HLM Trackless Tack Coat | 1000 | Gal | ||
| 3001AF | NTCRS-1HSP Trackless Tack Coat | 1000 | Gal | ||
| 3001AG | RC 250 Prime Coat | 1000 | Gal | ||
| 3001AH | 21A Base Course | 250 | TN | ||
| 3001AJ | Geotextile Interlayers | 3000 | SY | ||
| 3001AK | Crack Sealing | 500 | LF | ||
| 3001AL | Raise Round Manhole 1"-4" | 1 | EA | ||
| 3001AM | Raise Rectangular/Square Manhole 1"-4" | 1 | EA | ||
| 3001AN | Raise Utility Boxes 1"-4" | 1 | EA | ||
| 3001AP | Cold Milling 2" | 15000 | SY | ||
| 3001AQ | Cold Milling 3" | 5000 | SY | ||
| 3001AR | Cold Milling 4" | 3000 | SY | ||
| 3001AS | Asphalt Slurry B of C | 2000 | SY | ||
| 3001AT | Cape Seal | 5000 | SY | ||
| 3001AU | Surface Treatment (Chip Seal) | 250 | SY | ||
| 3001AV | Excavation and Removal of Soil | 1 | CY | ||
| 3001AW | Fine Grading | 100 | SY | ||
| 3001AX | Parking Lots 4" Wide Lines-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 3001AY | Parking Lots 4" Wide Lines-VDOT Type B, Class III Epoxy | 10000 | LF | ||
| 3001AZ | Detail Layout-Park Lots 4" Wide Lines-VDOT Type B, Class III Epoxy | 5000 | EA | ||
| 3001AB | Broken White or Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 3001BB | Broken White or Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 200 | LF | ||
| 3001BC | Solid White or Yellow Center or Edge 4" Wide Lines (Roadway Length)-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 3001BD | Solid White or Yellow Center or Edge 4" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 5000 | LF | ||
| 3001BE | Solid Double Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 3001BF | Solid Double Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 5000 | LF | ||
| 3001BG | Handicap Spaces 4" Wide Lines with International Symbol of Accessibility- VDOT Type B, Class III Epoxy | 15 | EA | ||
| 3001BH | Parallel Parking Spaces 4" Wide Lines-VDOT Type B, Class III Epoxy | 5 | EA | ||
| 3001BJ | Stop Bar 24" Wide Lines-VDOT Type B, Class III Epoxy | 400 | LF | ||
| 3001BK | Crosswalk 7' Wide with (2) Lateral 6" Wide Lines with Transverse Diagonal 12" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 1500 | LF | ||
| 3001BL | Arrows (Straight, Right, Left)-VDOT Type B, Class III Epoxy | 20 | EA | ||
| 3001BL | Tape Rumble Strips 4" Wide Lines-VDOT Type B, Class VI Thermoplastic | 1 | LF | ||
| 3001BM | Raise Rectangular/Square Manhole 1"-4" | 1 | EA | ||
| 3001BN | Raise Utility Boxes 1'-4" | 1 | EA | ||
| 3001BP | Cold Milling 2" | 15,000 | SY | ||
| 3001BQ | Cold Milling 3" | 5,000 | LF | ||
| 3001BR | Cold Miling 4" | 3,000 | SY | ||
| 3001BS | Asphalt Slurry B of C | 2,000 | SY | ||
| 3001BT | Cape Seal | 5,000 | SY | ||
| 3001BU | Surface Treatment (Chip Seal) | 250 | SY | ||
| 3001BV | Patch Potholes | 500 | TN |
TOTAL OPTION YEAR 3 GRAND TOTAL
Option Year 4
| OPTION YEAR 4 PRICING WORKSHEET | |||||
| POP: 01 April 2025 through 31 March 2026 | |||||
| Item | Description | QTY | Unit | Unit Price | Total Amount |
| 4001AA | VDOT SM 12.5 A Asphalt Concrete | 3000 | TN | ||
| 4001AB | VDOT SM 9.5 A Asphalt Concrete | 11000 | TN | ||
| 4001AC | VDOT BM 25.0 A Asphalt Concrete | 500 | TN | ||
| 4001AD | CMS2 or CRS Tack Coat | 1000 | Gal | ||
| 4001AE | NTCQS-1HLM Trackless Tack Coat | 1000 | Gal | ||
| 4001AF | NTCRS-1HSP Trackless Tack Coat | 1000 | Gal | ||
| 4001AG | RC 250 Prime Coat | 1000 | Gal | ||
| 4001AH | 21A Base Course | 250 | TN | ||
| 4001AJ | Geotextile Interlayers | 3000 | SY | ||
| 4001AK | Crack Sealing | 500 | LF | ||
| 4001AL | Raise Round Manhole 1"-4" | 1 | EA | ||
| 4001AM | Raise Rectangular/Square Manhole 1"-4" | 1 | EA | ||
| 4001AN | Raise Utility Boxes 1"-4" | 1 | EA | ||
| 4001AP | Cold Milling 2" | 15000 | SY | ||
| 4001AQ | Cold Milling 3" | 5000 | SY | ||
| 4001AR | Cold Milling 4" | 3000 | SY | ||
| 4001AS | Asphalt Slurry B of C | 2000 | SY | ||
| 4001AT | Cape Seal | 5000 | SY | ||
| 4001AU | Surface Treatment (Chip Seal) | 250 | SY | ||
| 4001AV | Excavation and Removal of Soil | 1 | CY | ||
| 4001AW | Fine Grading | 100 | SY | ||
| 4001AX | Parking Lots 4" Wide Lines-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 4001AY | Parking Lots 4" Wide Lines-VDOT Type B, Class III Epoxy | 10000 | LF | ||
| 4001AZ | Detail Layout-Park Lots 4" Wide Lines-VDOT Type B, Class III Epoxy | 5000 | EA | ||
| 4001BA | Broken White or Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 4001BB | Broken White or Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 200 | LF | ||
| 4001BC | Solid White or Yellow Center or Edge 4" Wide Lines (Roadway Length)-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 4001BD | Solid White or Yellow Center or Edge 4" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 5000 | LF | ||
| 4001BE | Solid Double Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class I Thermoplastic | 1 | LF | ||
| 4001BF | Solid Double Yellow Center 4" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 5000 | LF | ||
| 4001BG | Handicap Spaces 4" Wide Lines with International Symbol of Accessibility- VDOT Type B, Class III Epoxy | 15 | EA | ||
| 4001BH | Parallel Parking Spaces 4" Wide Lines-VDOT Type B, Class III Epoxy | 5 | EA | ||
| 4001BJ | Stop Bar 24" Wide Lines-VDOT Type B, Class III Epoxy | 400 | LF | ||
| 4001BK | Crosswalk 7' Wide with (2) Lateral 6" Wide Lines with Transverse Diagonal 12" Wide Lines (Roadway Length)-VDOT Type B, Class III Epoxy | 1500 | LF | ||
| 4001BL | Arrows (Straight, Right, Left)-VDOT Type B, Class III Epoxy | 20 | EA | ||
| 4001BM | Raise Rectangular/Square Manhole 1"-4" | 1 | EA | ||
| 4001BN | Raise Utility Boxes 1"-4" | 1 | EA | ||
| 4001BP | Cold Milling 2" | 1 | LF | ||
| 4001BQ | Cold Milling 3" | 5,000 | SY | ||
| 4001BR | Cold Milling 4" | 3,000 | SY | ||
| 4001BS | Asphalt Slurry B of C | 2,000 | SY | ||
| 4001BT | Cape Seal | 5,000 | SY | ||
| 4001BU | Surface Treatment (Chip Seal) | 250 | SY | ||
| 4001BV | Patch Potholes | 500 | TN |
TOTAL OPTION YEAR 4 GRAND TOTAL
OVERALL TOTAL
| BASE YEAR |
| OPTION YEAR ONE |
| OPTION YEAR TWO |
| OPTION YEAR THREE |
| OPTION YEAR FOUR |
| OVERALL TOTAL |
File details come from the government source that posted it. Updated .