Attachment 02 - Proposed Sampling Plan.pdf
PDF 1 MB Posted
- Attached to
- Aircraft Fire Training Pond Soil Sampling Federal contract opportunity
- Solicitation number
- FA485524R0034
About this file
This document appears to be an attachment titled "Proposed Sampling Plan" related to a federal contract opportunity for soil sampling services at an Aircraft Fire Training Pond.
The key details are: The contract opportunity is to provide PFAS soil samples to a depth of 15 feet beneath the evaporation pond elevation to determine the extent of the rinsate plume underneath the pond, in accordance with the Statement of Work (SOW). The Proposed Sampling Plan shows 10 bore locations with PFAS samples to be taken at 1 ft, 2 ft, 5 ft, 10 ft, and 15 ft depths. Each PFAS sample must comply with EPA Method 1633 with standard turnaround time at a DoD Environmental Laboratory Accreditation Program certified lab. The contract also requires pricing for additional bores and PFAS samples if requested, with all shipping, handling, and laboratory fees to be covered by the contractor.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA485524R0034 - Aircraft Fire Training Pond Soil Sampling - QA Update 3.pdf | ||
| FA485524R0034 - Aircraft Fire Training Pond Soil Sampling - QA Updated.pdf | ||
| Combo - Aircraft Fire Training Pond Soil Sampling - 18 Sep 2024.pdf | ||
| FA485524R0034 - Aircraft Fire Training Pond Soil Sampling - QA.pdf | ||
| Attachment 05 - SF 1449.pdf | ||
| Attachment 03 - Cannon Soil Sampling Data Validation Guidance.pdf | ||
| Attachment 04 - Wage Determination 2015-5457_Revision_25_22 Jul 2024.pdf | ||
| Combo - Aircraft Fire Training Pond Soil Sampling.pdf | ||
| Attachment 01 - Aircraft Fire Training Pond Soil Sampling SOW.pdf | ||
| Attachment 06 - Price List.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F
D
C
B
A
EL 100.40
6" DRAIN LINE
4" PIPE IS TO BE
PLACED ABOVE
GROUND
EL 1 00.40 --�
EL 96.27
4" PIPE
ELECT. ONDUIT
EL 96.27
FREEPE PROOF HYDRANT
(SEE DET. SHT. C-13
72.33' e
2 '
P.
w
0...
_J
SLOPE
w
0...
_J
3 4
EL 100.40
o· P.
EL 96.2
EL. 95.67 @
HPDE LINER
BELOW PUM
PAD C/L POND r<") r<")
SLOPE �
EL 96.2
..,.___EL 100.40
5 6
C 1 1
KEYED NOTES: 0
1. SLEEVE AND SKIRT ASSEMBLY PREFABRICATED OR FIELD WELDED
FROM LINER MATERIAL.
2. EXTRUSION WELD SLEEVE TO SKIRT.
3. FIELD EXTRUSION WELD - SKIRT TO LINER.
4. STAINLESS STEEL CLAMP "BAND IT" WITH NEOPRENE OR
SANTOPRENE GASKET AND SUITABLE CAULKING.
5. HDPE LINER
6. COMPACTED BACKFILL OR INSITU SOIL.
7. CONCRETE ANCHOR BLOCK ( 4000 PSI).
8. NOT USED
9. 6"X6" W2.9XW2.9 WELDED WIRE MESH @ CENTER OF SLAB.
10. PROTECTIVE CUSHION, GEOTEXTILE OR FOAM.
PIPE & CONDUIT
3/8" X 4" STRAP
W/ 1 /2" ANCHORS
PENETRATION DETAIL
3'x 3' CONC. PAD
HOPE LINER
3'6"x 3'6" HOPE LINER
EXTRA LAYER
NOTE:
ALL PIPES SHALL BE ABOVE
GROUND EXCEPT AS NOTED.
4" PIPE
6" DRAIN LINE
ELEC.
NO TE,
REFER TD SI TE PLAN, SHT, C-3
FDR LOCA TIONS OF NE\./ GRAVEL
SURFACING,
2" WATER LINE (SEE
SHT. C-5 FOR
CONTINUATION -----J
@WATER
1 NTS
SLOPE
NOTE: TOP OF POND ELEVATIONS SHOWN
ARE TOP OF RAW SUBGRADE ELEVATIONS.
SEE SECT. 3 ON SHT. C-13
CONSERVATION POND
SLOPE
OPERATING LIMITS OF HOLDING POND:
NORMAL DEPTH UP TO 2.23'
MIN. FREEBOARD 1'
VARIES SEE PLAN
THIS SHT.
7' HIGH CHAIN LINK
FENCE (TYP.) POSTS
SHALL NOT PENETRATE
POND LINER
�+-C-1�C-1--, (TYP.)
1 WATER CONSERVATION POND SECTION
NTS
2 3 4
� 6" SAND LAYER
���mm -
_ FILTER FABRIC_j �COMPACTED
INSITU SOIL
@PIPE ANCHOR DETAIL
C1 1 NTS
@POND
C1� NTS
DETAIL
BACKFILL/
7 8
(JY7
[> I>
I> I>
I> I> I> I> I>
I':.
I':. ' '
I':. I> I>
I> I> I>
6 I> I> I>
I> I> I> I>
KEYED NOTES: 0
1. ANCHOR BOLT(3/8" X 3-1 /2" EMBEDMENT) ON 6"
CENTER MAX
2. 1 / 4" X 2" STEEL FLAT BAR STAINLESS OR GALVANI PED
3. 3/16" NEOPRENE OR SANTOPRENE GASKET, 50 DUROMETET
4. SILICONE CAULK
5. HOPE LINER
6. 4000 PSI CONCRETE
7. 1/2" RADIUS
8. SMOOTH HAND TROWELED FINISH
9. PROTECTIVE CUSHION, GEOTEXTILE OR FOAM .
SEAL DETAIL
HDPE LINE
FILTER FABRIC
PAD DETAIL
AUG 97 AS BUil T
ACTION DATE DESCRIPTION OF REVISION
DESIGNED BY:
USAF
U.S. ARMY ENGINEER DISTRICT, ALBUQUERQUE
CORPS OF ENGINEERS
ALBUQUERQUE, NEW MEXICO
CANNON AIR FORCE BASE
CLOVIS, NEW MEXICO
DRAWN BY: CRASH FIRE RESCUE TRAINING FACILITY
N. JIRON
REVIEWED BY:
WATER CONSERVATION POND
S. HAGEN
SUBMITTED BY: CONTR. NO. DATED: JULY 1994
F
E
D
C
B
A t--------�--�-----<ci SOL NO. DACA47-94-B-OO31 SEQUENCE z
DRAWING NUMBER SHEET NO.
NO. �
C-120F 14 1 2 8
DRAWING OF WORK "AS-BUILT"
Proposed sample locations
File details come from the government source that posted it. Updated .