Attachment 01a PWS IDIQ Draft.docx
DOCX document 43 KB Posted
- Solicitation number
- HQ003421R0130
- Issued by
-
DOD Washington Headquarters Service
About this file
This performance work statement outlines requirements for an integrated security services contract to provide support at Pentagon Force Protection Agency facilities. Key requirements include maintaining, repairing, installing, and supporting electronic security systems; physical security systems; infrastructure; and providing engineering, logistics, quality management, and training services. The contract will have a five-year ordering period and utilize firm fixed price task orders for areas including system support, logistics, repair, maintenance, and installation of hardware. The document specifies security clearance requirements for contractor personnel, places of performance, applicable standards and regulations, and delineates responsibilities for government furnished versus contractor furnished items and services.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Controlled Unclassified Information (CUI)
PERFORMANCE WORK STATEMENT (PWS)
Pentagon Force Protection Agency (PFPA) Integrated Security Services Contract 4 (ISSC)
PART 1
GENERAL INFORMATION
1. GENERAL: This is a non-personal services contract to provide Integrated Security Services. The Government shall not exercise any supervision or control over contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Prime Contractor who, in turn is responsible to the Government.
1.1. Description of Services/Introduction: The Pentagon Force Protection Agency (PFPA) Integrated Security Services Contract (ISSC) is a total system approach for providing integrated electronic and physical security systems for the Pentagon Reservation, Mark Center, Defense Health Headquarters (DHHQ), DoD leased facilities, and Raven Rock Mountain Complex (RRMC) in Adams County, PA and Washington County, MD as defined in 32 CFR 234.1.
1.2. Background: Previous contracts for this requirement, awarded in 2007, 2012, and 2017 provided comprehensive security integrator services to PFPA. Since inception, contract scope has expanded to include additional facilities, new systems, and increased security capabilities. This contract provides baseline support (system support, maintenance, repair, and logistics) to security applications to the multiple facilities above. That support will be issued and funded with task order one. Subsequent task orders will be for ordering hardware and installation of security systems and components in those facilities.
1.3. Objectives: The Government’s four, inter-related high-level objectives for the ISSC are:
Scalability and Interoperability – Systems shall be capable of scaling to accommodate additional users, sensors, capabilities, and facilities. Similarly, systems shall be able to adjust down as facilities are closed, suites are decommissioned, or requirements adjusted. Systems and their components shall to the maximum extent possible, utilize open standards and commercial-off-the-shelf (COTS) technology. Standard network protocols shall be used to traverse the Government’s network. Wherever computers are required, they shall be widely available models based on open systems architecture. Standard operating systems shall be used, such as but not limited to Microsoft Windows, Linux, and UNIX for the computer-based systems provided under ISSC.
Availability and Resiliency – The Government has a goal of operating ISSC systems at or near a 100% operational level. Systems shall be designed and implemented to be resilient to failure such that a failure of a single component should not incapacitate the entire system. To achieve this goal, the Contractor shall leverage industry best practices for assuring resiliency and availability, including but not limited to:
· Built-in redundancy
· Automatic failover
· Fault tolerance
· Virtual environments
· Data backup
· Data archiving
· Automatic updates of operating systems (OS) and applications
· Notification of software/hardware approaching end of life Power-on replacement i.e. hot swapping components or peripherals
· Power
· Continuous i.e., uninterruptible power supplies (UPSs)
· Backup power i.e. batteries and generators
· Surge suppressors
For the purposes of this contract, system reliability is defined as the probability that a system or subsystem, including all hardware, firmware, and software will satisfactorily perform the intended function(s) for which it was designed, during the duration for which it is in operation, and in the operational environment. The Contractor shall maintain system reliability at a level equal to, or higher than, the systems documented percentage or failure rate provided by the manufacture and/or as required by regulatory requirements for classified areas.
For the purposes of this contract, system availability is defined as the ratio of time a system, subsystem, or component is functional to the total time it is required or expected to function.
For the purposes of this contract, system serviceability is defined as the ease with which a component, device, or system can be maintained and repaired. All precautions should be taken to maintain and repair systems to cause as little downtime or disruption as possible and within the expected reliability and availability standards stated in this contract. The Contractor shall notify the government of any potential problems or recommended actions critical to systems operations that can be addressed by maintenance and repair, as far in advance as possible to minimize downtime or failure.
Factors that do not impact contractual requirements for system reliability, availability, or serviceability are where root cause of problems are as a result of network, power, or other external factors outside the scope of this contract and maintained by OGAs or OGCs. Outages caused by external factors shall not count against the availability or reliability statistic until the network, power, or other external factor has been restored, but may require support for the application or equipment impacted.
Reliability and Cost Sustainability – Systems and services shall be affordable across the full lifecycle while meeting the Government’s requirements, minimize the use of custom and proprietary solutions, and remove systems, hardware, and software before they incur excessive sustainment costs or reach end of service.
Accountability and Customer Satisfaction – Systems and services shall be designed and implemented, and quality checked (i.e. QA/QC) to be user friendly, mindful of the impact and sensitivities of the customer workspace, high performing, and to meet contractual service requirements
1.4. Scope: This contract shall require the contractor to maintain, repair, install, and support all aspects of electronic security systems, including but not limited to, access control; intrusion detection; visual surveillance and intelligent video analytics; physical security information management; license plate recognition; gunshot detection; under vehicle inspection; identity, credential, and access management; mass notification; biometric and multi-modal authentication; computer aided dispatch and other law enforcement mission applications; chemical, biological, radiological detection and mitigation; and operations center collaboration visualization systems.
In addition, the contract shall support all aspects of physical security, including but not limited to, personnel, vehicle, cargo, and parcel screening systems; ballistic rated glass, booths, kiosks, and mobile shields; blast-resistant waste receptacles, doors (sound-rated and force protection), window film, locks, and door hardware.
The contractor shall support all aspects of passive and active barriers, including but not limited to, turnstiles, fencing, bollards, gates, traffic control gate arms and anti-vehicle barriers. This contract requires support on infrastructure supporting the above systems, including but not limited to, cabling for electrical and information technology; trenching, grading, utilities, conduit placement, and other civil types of work.
All aspects of the scope will be provided in detail through task orders, to include the first task order to maintain, support, repair, and manage all electronic security systems at the Pentagon, RRMC, and other DoD facilities owned and leased in the National Capital Region (NCR).
To deliver these capabilities, the Contractor shall provide the following services:
a) Full Lifecycle Systems Engineering. The Contractor shall be responsible for providing full lifecycle systems engineering services for upgrades or new electronic and physical security systems. The full lifecycle shall include requirements elicitation and analysis, design, development, testing, installation, configuration, integration, verification and validation, transition, sustainment, and decommissioning.
b) System Support, Sustainment, and Administration. The Contractor shall be responsible for sustainment support of electronic security systems. This support includes system monitoring, troubleshooting, patching and software updates, configuration, and administration.
c) Third Party Software and Other Government Contractor (OGC) Support. The Contractor shall provide support to 3rd party software integrations and the OGC installing and maintaining it. This support includes software upgrades, existing or new connections/integrations to ISSC systems, testing, troubleshooting and other areas impacting either ISSC supported systems or those maintained by OGC’s.
d) Preventative Maintenance. The Contractor shall be responsible for performing periodic preventative maintenance on all electronic and physical security systems identified in this Performance Work Statement (PWS) as well as any components installed during this contract unless specified in the individual task order PWS. Periodic preventative maintenance shall be performed at minimum in accordance with manufacturer recommendations and may require additional preventative maintenance work due to amount of use or ambient conditions.
e) Repair and Sustain. The Contractor shall be responsible for responding to and repairing damaged, malfunctioning, or inoperable systems and their components as described in this PWS as well as any components installed during this contract unless specified in the individual task order PWS.
f) Configuration Management. The Contractor shall maintain a database of all ISSC electronic and physical security systems characteristics.
g) Logistics Management. The Contractor shall be responsible for procuring, storing, and inventory of materials and supplies to deliver services under this contract.
h) Quality Management. The Contractor shall be responsible for tracking, baselining, and identifying deviations from ISSC and manufacturers standards for quality and performance.
i) Installation, Decommissioning, Hardware, and Alterations. The Contractor shall be responsible for hardware, installation, extension, relocation, and alterations of electronic and physical security systems per ISSC and manufacturer standards.
j) Design and Technical Evaluation. The Contractor shall be responsible for performing technical evaluations of new and existing electronic and physical security systems to assess their capacity to meet requirements, maturity, and their continued use.
k) Training. The Contractor shall be responsible for delivering initial and reoccurring training on electronic and physical security systems to Government and Contractor personnel.
The Contractor shall be responsible for:
a) Service, maintenance, and performance of existing systems and applications at the time of award of this contract.
b) Service, maintenance, and performance of new systems and applications installed and/or upgraded while this contract is in place. These systems may be installed by the ISSC Contractor, or OGCs as part of other non-ISSC construction projects.
The work to be performed on ISSC is divided into five major categories, which are:
a) System Support
b) Logistics
c) Repair
d) Maintenance
e) Installation and Hardware
· Capital Improvement (This is a subcategory of Installation for accounting purposes)
· Non-Capital Improvement
The specific systems are provided in the PWS at the task order level. System Support, Logistics, Repair, and Maintenance will be funded and awarded at the task order level. Installation and Hardware and the Capital Improvement CLINs will be funded on separate task orders throughout the period of performance.
1.5. Period of Performance: The period of performance shall be for a five-year ordering period.
1.6. General Information:
1.6.1. Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. The QCP shall be delivered via electronic mail within 30 days of contract award. Amendments/changes to the QCP shall be delivered to the COR and KO within three business days following any change.
1.6.2. Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3. Recognized Holidays: The Contractor is responsible for completing System Support and Repair work required under this contract irrespective of Federal holidays to include any other day designated by Federal Statute, Executive Order or a Presidential proclamation. When the government grants administrative leave to government employees, or is closed as a result of inclement weather, potentially hazardous conditions, or other special circumstances, contractor personnel working at the specific facility/location granted administrative leave may also be dismissed at the discretion of the On-site Manager to the extent that the overall performance is not adversely impacted. The contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the government facility is not closed for the above reasons. All other work, including Installation and Preventative Maintenance, shall be scheduled appropriately to meet required delivery dates.
| New Year’s Day | Independence Day | |
| Martin Luther King Jr.’s Birthday | Labor Day | |
| President’s Day | Veteran’s Day | |
| Memorial Day | Thanksgiving Day | |
| Juneteenth Independence Day | Christmas Day |
1.6.4. Hours of Operation: The Contractor is responsible for providing ISSC Service Desk hours as defined in Task Order 1. Repair work shall meet the repair time objectives identified in Task Order 1. Installation, Preventative Maintenance, and Logistics shall generally be handled during 0600 to 1800 hours, Monday to Friday. The Contractor may request after-hours access to perform work that is not achievable during normal business hours due to tenant impact or other circumstances. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS. The Contractor shall provide an on-site person(s) who shall be physically present during normal duty hours to act as site supervisor(s), conduct total management coordination, and furnish liaison with the Government during system installation, maintenance, and repair. The supervisor(s) shall be the point of contact with the Government. The supervisor(s) shall have the authority to make technical decisions on-site on behalf of the Contractor. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the mission is essential.
1.6.5. Place of Performance: The PFPA provides protection for DoD facilities in the National Capital Region (NCR) not under a Military Department per DoD Directive 5105.68, 10 USC 2674, and 32 CFR 234.1. This region extends from Northern Virginia through lower Pennsylvania. The current locations of DoD facilities protected by PFPA will be provided at the task order level. This list is for informational purpose and is not intended to be definitive or binding. Facilities occupied by the Government change based on multiple factors and may increase or decrease throughout the duration of this contract. The Contractor is fully responsible for performing work at all facilities protected by PFPA.
1.6.6. Type of Contract: The Government will award a Firm Fixed Price (FFP), Indefinite Delivery Indefinite Quantity (IDIQ) contract.
1.6.7. Security Requirements: The security requirements are in accordance with the attached DD254.
Contractors are required to report to PFPA any derogatory information that may justify an unfavorable administrative action in a personnel security or building access determination. Derogatory information includes, but is not limited to, criminal conduct, illegal drug involvement, or psychological conditions that impair judgment, reliability or trustworthiness. Derogatory information must be provided to the COR and Contracting Officer as promptly as possible, but in no event later than three (3) business days after the contractor becomes aware of the information.
PFPA reserves the right and prerogative to deny and/or restrict facility and information access of any Contractor employee determined by PFPA at any time during performance to be unsuitable for access and/or present a risk of compromising sensitive Government information to which they would have access under this contract.
A determination by PFPA that a person is not suitable to perform work under this contract is not a denial, suspension or revocation of a previously granted security clearance by another agency, nor shall it be interpreted as a direction or recommendation to the Contractor regarding the suitability of an affected individual for employment outside the scope of PFPA.
1.6.7.1. Facility Clearance: The Contractor shall possess a facility clearance at the classification level of "TOP SECRET" prior to contract start date. The Contractor shall provide proof of the Top Secret facility clearance as part of their proposal
1.6.7.2. Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.6.7.3. Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.
1.6.7.3.1. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.
1.6.7.3.2. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.
1.6.7.4. Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.
1.6.8. Special Qualifications: Contractor personnel will be required to sign a Non-Disclosure Agreement (NDA).
1.6.8.1. Personnel Security Clearances: All contract personnel must possess, at minimum, a SECRET security clearance and meet the additional security requirements established in the Office of Director of National Intelligence, ICD 704 and ICD 705, unless otherwise stated in individual Delivery Orders. The Contractor shall identify appropriate individual’s performing work under this contract that will require access to classified information and shall submit them for "SECRET or TOP SECRET" security clearances at the time of proposal submission.
Application for personnel security clearances shall be made in accordance with DoD 5220.22M, Section 2. Applications for new personnel requiring security clearances shall be submitted within 10 business days of hire by the Contractor. The Government reserves the right to have the Contractor provide documentation to verify compliance with these security requirements. All Contractor personnel assigned under this contract must possess a clearance consistent with PFPA Personnel Security Clearance Policy and position sensitivity requirements. PFPA Security Service Directorate (SSD) will provide security classification guidance for the performance of this contract.
All Contractors performing system administration, database access or analysis, or otherwise with access to identity management or access control system data shall have a final TOP SECRET clearance with eligibility for Secure Compartmentalized Information per ICD 705 and ICD 704.2.
The Contractor may request deviations from the SECRET security clearance requirement from the Government. The Contractor shall request and receive approval from the Contracting Officer for any deviations prior to the commencement of any work by personnel not meeting the SECRET security clearance minimum. All requests for deviation shall be properly supported by documentation from the Contractor as to the cost efficiency of using uncleared personnel for specific work.
The Contractor shall provide personnel with Top Secret (TS) or Top Secret/Secure Compartmentalized Information (TS/SCI) eligible per the requirements of individual delivery orders.
1.6.9. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.10. Key Personnel: Key personnel will be required at the task order level.
1.6.11. Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.6.12. Contractor Travel: Not Applicable.
1.6.15. Other Direct Costs (ODCs): Not Applicable.
1.6.16. Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.17. Phase in/Phase out Period: To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board, during the 30-day phase in/phase out periods. During the phase in period, the Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date. This is described in detail at the task order level.
1.6.18. Ordering Officer: An Ordering Officer(s) may be assigned to this contract with the authority to make purchases with a credit card. The Ordering Officer will only purchase supplies and services already identified and priced on the contract under the price list. Hardware and installation services within scope and under the micro-purchase limit will be purchased via credit card by the ordering officer. All orders will be coordinated with the COR/ACOR.
1.6.19. Task Order Monitor: Task Orders will be assigned a Government Project Officer (PO) or Project Manager. The PO will provide any Government Furnished Equipment (GFE) and/or Government Furnished Information (GFI) specified at the task order level. The PO will provide Government comment on, or approval of deliverables specified in the work statement and coordinate any applicable site entry for Contractor personnel. The PO will ensure the Contractor completes the requirements of the task order within the specified period of performance. The PO will resolve technical differences not involving changes to the task order scope. All unresolved technical questions, proposed alterations or changes to scope, and unresolved differences pertaining to an individual task order must be reported to the Contracting Officer.
The PO through the COR will initiate in writing to the CO notice of any changes needed in the task order.
1.6.20. Contractor Manpower Reporting:
(a) The Contractor shall report all Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The Contractor is required to completely fill in all required data fields using the System for Award Management (SAM): http://www.sam.gov.
(b) The Contractor shall use the “All Other Defense Components” tool unless otherwise directed by the Contracting Officer’s Representative or Contracting Officer.
(c) Reporting inputs will be for the labor executed during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. The Contractor shall completely fill in all required data fields. The Contractor shall enter initial data into SAM to establish the basic contract record no later than 15 business days after receipt of contract award or contract modification incorporating this clause. The Contractor shall notify the Contracting Officer when the basic contract record has been established in SAM.
(d) Contractors may direct technical questions to the help desk at http://www.sam.gov.
[Reference: SECDEF memorandum of 16 October 2019, “Revised Department of Defense Contractor Manpower Reporting”]
1.6.20.1. Telework:
1.6.20.1.1. The Government may permit telecommuting (telework) by contractor employees when determined to be in the best interest of the Government in meeting work requirements (e.g., COOP). The contractor must have an established program subject to review by the Government. All telecommuting agreements must be authorized and approved by the COR and include date, time, and description of the work to be performed.
1.6.20.1.2. The contractor must identify to the COR any task/work requirements that may be performed at an alternate worksite. Telework will be at no additional cost to the Government. Upon approval:
1.6.20.1.3. The Government may provide as Government Furnished Equipment (GFE): Secure laptop with access to the required portals, networks, and business application. Internet connection will not be furnished, therefore, Internet access shall be provided by the Contractor.
1.6.20.1.4. Individual Contractor Personnel shall provide services from their authorized telework worksite location IAW Department of Defense Instructions (DoDI) 1035.01, Telework Policy: http://www.dtic.mil/whs/directives/corres/pdf/103501p
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
| ACC |
| Access Control Center |
| ACS |
| Access Control System |
| ACOR |
| Alternate Contracting Officer Representative |
| AMAG |
| American Magnetics |
| ANSI/EIA |
| American National Standards Institute/ Electronic Industries Alliance |
| CFR |
| Code of Federal Regulations |
| COTS |
| Commercial off the Shelf |
| CO |
| Contracting Office |
| KO |
| Contracting Officer |
| COR |
| Contracting Officer Representative |
| DHHQ |
| Defense Health Headquarters |
| DoD |
| Department of Defense |
| ESS |
| Electronic Security System |
| GSA |
| General Services Administration |
| GFE |
| Government Furnished Equipment |
| GFI |
| Government Furnished Information |
| IDIQ |
| Indefinite Delivery Indefinite Quantity |
| ISSC |
| Integrated Security Services Contract |
| NCR |
| National Capital Region |
| OS |
| Operating System |
| OGA |
| Other Government Agencies |
| OGC |
| Other Government Contractors |
| PFPA |
| Pentagon Force Protection Agency |
| PWS |
| Performance Work Statement |
| POP |
| Period of Performance |
| QA |
| Quality Assurance |
| QC |
| Quality Control |
| RRMC |
| Raven Rock Mountain Complex |
| SCI |
| Secure Compartmentalized Information |
| SSD |
| Security Services Directorate |
| TM |
| Task Monitor |
| TS |
| Top Secret |
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED PROPERTY (GFP) AND SERVICES:
3.1. SERVICES: The Government will provide project leads, for all installation projects. The Government will also provide available drawings for facilities and office spaces.
3.2. FACILITIES: The Government will provide limited office space. Office space will be limited to the access control center and network control center. The Government cannot guarantee office or storage space for technicians, key personnel or administrative personnel. Parking is limited on the Pentagon reservation and restricted to only company labeled vehicles.
3.3. MATERIALS: The Government will provide the Standard Operation Procedures for the Access Control Center. If GFP is provided, the Government will notify the contractor at the task order level. Contractor will provide all other materials for installation task orders as outlined in individual task orders.
3.4. PARKING: The Government shall provide the Contractor with limited parking at the Pentagon Reservation, Mark Center, and Raven Rock Mountain Complex on a space available basis. There is no Government provided parking at leased facilities. The Contractor shall be fully responsible for procuring parking at all locations to perform work required under this Contract.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1. GENERAL: The Contractor shall furnish all supplies, equipment, facilities and services required to perform task orders under this contract that are not listed under Section 3 of this PWS.
4.2. TOP SECRET FACILITY CLEARANCE: The contractor shall possess and maintain a TOP SECRET facility clearance from the Defense Security Service. The Contractor’s employees, performing work in support of this contract shall have been granted a SECRET security clearance from the Defense Industrial Security Clearance Office. The DD 254 is provided with the solicitation.
4.3. MATERIAL: The Contractor shall provide, maintain, and be fully accountable for all tools necessary to safely and effectively perform the services required in this contract. The contractor will also provide all necessary safety equipment (glasses, hearing and head and foot protection) for use onsite.
4.4. EQUIPMENT: The Contractor shall provide lifts, ladders and any equipment needed to perform the tasks described in this PWS. Some work is performed on roofs, light posts, in confined areas and other locations in multiple Government facilities.
4.5 UTILITIES: The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
PART 5
SPECIFIC TASKS
5. SPECIFIC TASKS:
5.1. BASIC SERVICES: The contractor shall provide services for this contract under specific task orders. Each task order will have a PWS describing all the requirements for materials, installation, or support for security of the Pentagon or other PFPA supported facility.
The work to be performed on ISSC is divided into five major categories, which are:
a) System Support:
The Contractor shall be responsible for sustainment support of electronic security systems. This support includes system monitoring, troubleshooting, patching and software updates, configuration, and administration.
b) Logistics:
The Contractor shall be responsible for procuring, storing, and inventory of materials and supplies to deliver services under this contract.
c) Repair:
The Contractor shall be responsible for responding to and repairing damaged, malfunctioning, or inoperable systems and their components as described in this PWS as well as any components installed during this contract unless specified in the individual task order PWS.
d) Maintenance:
The Contractor shall be responsible for performing periodic preventative maintenance on all electronic and physical security systems identified in this Performance Work Statement (PWS) as well as any components installed during this contract unless specified in the individual task order PWS. Periodic preventative maintenance shall be performed at minimum in accordance with manufacturer recommendations and may require additional preventative maintenance work due to amount of use or ambient conditions.
e) Installation and Hardware:
The Contractor shall be responsible for hardware, installation, extension, relocation, and alterations of electronic and physical security systems per ISSC and manufacturer standards. Installation and hardware procurement projects will be provided at the task order level.
· Capital Improvement (This is a subcategory of Installation for accounting purposes):
Capital improvements to general equipment must be noted and awarded as such when a task order performs the following: (1) the improvement increases the asset's useful life by two or more years, or increases the assets capability, or increases its capacity or size, and (2) the cost of the improvement equals or exceeds the capitalization threshold ($250K).
· Non-Capital Improvement:
These will be more common than the capital improvement projects. This includes projects or hardware that do not meet the capital improvement projects.
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures. This includes but is not limited to ICD 705, DoD 52001.01 Volume 3, and DoD 5100.76.