Attachment 01 Schedule B Supplies or Services and Prices 03262025.pdf

PDF 368 KB Posted

Attached to
USDA-FS GWJ NF Call for Quals Design-Build Virginia Creeper Bridge(s) /Trail(s) Reconstruction
Solicitation number
12445125R0002
Issued by

About this file

Attachment 001 Schedule B is a detailed pricing schedule for the Virginia Creeper Trail Design-Build Reconstruction project, covering debris/cleanup/demolition, bridge design, trail design, and bridge and trail construction across four mile-marker segments (0-5, 5-10, 10-15, and 15-20). The document outlines specific requirements for 47 bridge structures with varying superstructure types including steel truss, wooden trestle, steel girder, and steel arch culvert, with each bridge categorized by trail mile post, removal needs, access requirements, and estimated debris volume.

The schedule requires contractors to provide unit pricing for design and construction activities, with a note that creosote timbers are considered "special waste" in Virginia and must be disposed of in specific landfills. Contractors are instructed to include price breakdown excel supporting data with their price package and to complete sections for design and construction of bridges and trails, with references to additional attachment details. The project involves reconstructing approximately 18 miles of the eastern Virginia Creeper National Recreation Trail, which was heavily damaged by Tropical Storm Helene in September 2024, with the goal of rebuilding the trail in its original footprint while maintaining its original grade.

View the file

Other files

File Type Posted
12445125R0002 Questions Asked 06062025 REV2.doc DOC document
12445125R0002 VA Creeper Pre-Proposal Conference One 6-02-25.docx DOCX document
VCT Preproposal Conference Presentation.pptx PPTX presentation
12445125R0002 VA Creeper Pre-Proposal Conference One - Attendance report 6-02-25.xlsx XLSX spreadsheet
Attachment 07 - Section L Submission Instructions 05222025.pdf PDF
Attachment 15 Example-SMALL BUSINESS SUBCONTRACTING PLAN TEMPLATE.docx DOCX document
Attachment 06 VCNRT Restoration Map.pdf PDF
Attachment 03 Davis-Bacon Act WD GRAYSON AND WASHINGTON.pdf PDF
Attachment 08 - Section M Evaluations Factors 05212025.pdf PDF
Attachment 11 Architect- Engineering Experience Form.docx DOCX document
Attachment 12 Construction Past Performance Questionnaire Fillable.pdf PDF
Attachment 10 Construction Experience Form.docx DOCX document
Attachment 04 NRM VA Creeper Trail Features.pdf PDF
Attachment 16 PARTICIPATION GOALS FOR MINORITIES AND FEMALES.pdf PDF
Attachment 02 SECTION C SOO Version 05052025 FINAL.pdf PDF
Attachment 14 Key Personnel Resume Fillable.pdf PDF
12445125R0002 CALL FOR QUALS GWJ CREEPER Phase I 05222025.pdf PDF
12445125R0002 SF1442 Complete without attachments 05222025.pdf PDF
Attachment 13 - Architect-Engineering Past Performance Questionnaire Fillable.pdf PDF
Attachment 05 VCT Dec 2024 Damage Map.pdf PDF
Attachment 09 12445125R0002 Subcontract Plan Evaluation.xls XLS spreadsheet
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: 12445125R0002 Project Name: Virginia Creeper Trail 2 Step D/B

FAC 2025-03; 17JAN2025

Attachment 001 Schedule B VA Creeper Trail Design-Build Reconstruction Debri/Cleanup/Demolition- Bridge and Trails

# ITEM DESCRIPTION Est Qty Unit Unit Price TOTALS

Debris/Cleanup/Demolition- Bridge and Trails; Includes any land survey for partner shared boundary Mile Marker 0 to 5

- Bridge/Trussell Est: 1,500CY

- Trail Est: 3,500CY

CONTRACTOR INTENDED POP: FROM TO

5,000 CY $ $

Debris/Cleanup/Demolition- Bridge and Trails; Includes any land survey for partner shared boundary Mile Marker 5 to 10

- Bridge/Trussell Est: 3,000CY

- Trail Est: 3,500CY

CONTRACTOR INTENDED POP: FROM TO

6,500 CY $ $

Debris/Cleanup/Demolition- Bridge and Trails; Includes any land survey for partner shared boundary Mile Marker 10 to 15

- Bridge/Trussell Est: 1,500CY

- Trail Est: 3,500CY

CONTRACTOR INTENDED POP: FROM TO

5,000 CY $ $

Debris/Cleanup/Demolition- Bridge and Trails; Includes any land survey for partner shared boundary Mile Marker 15 to 20

- Bridge/Trussell Est: 500CY

- Trail Est: 3,500CY

CONTRACTOR INTENDED POP: FROM TO

4,000 CY $ $

TOTAL ESTIMATE $

*Include price breakdown excel supporting data with price package

Overall period of performance for demo/cleanup from to

CONTRACTOR NAME:

SIGNATURE

**WARNING: it appears that Creosote timbers are considered "special waste" and not hazardous waste in Virginia according to the Virginia Department of Environmental Quality. That source indicates that that the timbers can only be taken to certain landfills if disposed of within Virginia. https://www.deq.virginia.gov/our-programs/land-waste/solid-hazardous-waste/special-waste https://www.deq.virginia.gov/our-programs/land-waste/solid-hazardous-waste/special-waste

DESIGN of BRIDGES Struct

Trail Mile Post

Pre-storm Trail Bridge Superstructure Type remove Y/N access Y/N

Debris

EST

CY

Notes UNIT PRICE MILE BLOCK TOTAL

16 0.04 Steel truss/wooden trestle approaches

N Y 0 SEE ATTACHMENT 002 $

17 0.44 Steel truss/wooden trestle approaches

N Y 0 SEE ATTACHMENT 002 $

18 2.35 Steel truss Y Y 350 SEE ATTACHMENT 002 $ 19 2.53 Steel girder Y Y 500 SEE ATTACHMENT 002 $ 20 2.63 Steel girder Y Y 0 SEE ATTACHMENT 002 $ 21 3.77 Steel truss Y Y 50 SEE ATTACHMENT 002 $ 22 4.78 Wooden trestle Y Y 100 SEE ATTACHMENT 002 $

23 5 Wooden trestle Y Y 200 SEE ATTACHMENT 002 $

24 5.21 Wooden trestle Y Y 200 SEE ATTACHMENT 002 $ 25 5.8 Wooden trestle Y N 200 SEE ATTACHMENT 002 $ 26 6.09 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 27 7.05 Wooden trestle Y N 250 SEE ATTACHMENT 002 $ 28 7.25 Wooden trestle N N 10 SEE ATTACHMENT 002 $ 29 7.89 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 30 8.09 Wooden trestle Y N 200 SEE ATTACHMENT 002 $ 31 8.69 Wooden trestle Y N 200 SEE ATTACHMENT 002 $ 32 9.12 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 33 9.52 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 34 9.8 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 35 9.9 Steel Truss N N 220 SEE ATTACHMENT 002 $

36 10.17 Steel Truss N N 30 SEE ATTACHMENT 002 $

37 10.21 Steel Girder Y N 260 SEE ATTACHMENT 002 $

38 10.75 Steel girder/wooden trestle approaches N N 0 SEE ATTACHMENT 002 $

39 11.45 Steel truss/wooden trestle approaches N N 0 SEE ATTACHMENT 002 $

40 11.51 Wooden Trestle N N 0 SEE ATTACHMENT 002 $ 41 12.16 Wooden Trestle Y Y 160 SEE ATTACHMENT 002 $ 42 12.49 Steel Truss N Y 0 SEE ATTACHMENT 002 $ 43 12.85 Steel Truss N Y 0 SEE ATTACHMENT 002 $ 44 12.94 Wooden Trestle Y Y 15 SEE ATTACHMENT 002 $ 45 13.92 Wooden Trestle N Y 15 SEE ATTACHMENT 002 $ 48 14.93 Steel Arch Culvert N N 0 SEE ATTACHMENT 002 $

46 16.95 Wooden Trestle N N 0 SEE ATTACHMENT 002 $

47 18.24 Wooden Trestle N N 0 SEE ATTACHMENT 002 $

TOTAL $

Price should include all analysis and studies required (Geotech/hydrology, etc)/ *Include price breakdown excel supporting data with price package

Vendor Name:

Unique SAM ID:

Period of Performance Date Available:

SIGNATURE:

DESIGN of TRAILS

Trail Mile Post

Essential Element to be Repaired Length Latitude Longitude Unit Price Mile Block Total

SEE ATTACHMENT 04 NRM TRAIL DETAILS

PRICE ALL ITEMS EXCEPT FOR BRIDGE DESIGN/REPLACEMENT

5.00

SEE ATTACHMENT 04 NRM TRAIL DETAILS

SEE ATTACHMENT 04 NRM TRAIL DETAILS

SEE ATTACHMENT 04 NRM TRAIL DETAILS

PRICE ALL ITEMS EXCEPT FOR BRIDGE DESIGN/REPLACEMENT

$ 20

TOTAL TRAIL DESIGN $

Price should include all analysis and studies required (Geotech/hydrology, etc)/ *Include price breakdown excel supporting data with price package

Vendor Name:

Unique SAM ID:

Period of Performance Date Available:

SIGNATURE:

CONSTRUCTION of BRIDGES Struct

Trail Mile Post

Pre-storm Trail Bridge Superstructure Type remove Y/N access Y/N

Debris

EST

CY

Notes UNIT PRICE MILE BLOCK TOTAL

16 0.04 Steel truss/wooden trestle approaches N Y 0 SEE ATTACHMENT 002 $

17 0.44 Steel truss/wooden trestle approaches N Y 0 SEE ATTACHMENT 002 $

18 2.35 Steel truss Y Y 350 SEE ATTACHMENT 002 $ 19 2.53 Steel girder Y Y 500 SEE ATTACHMENT 002 $ 20 2.63 Steel girder Y Y 0 SEE ATTACHMENT 002 $ 21 3.77 Steel truss Y Y 50 SEE ATTACHMENT 002 $ 22 4.78 Wooden trestle Y Y 100 SEE ATTACHMENT 002 $

23 5 Wooden trestle Y Y 200 SEE ATTACHMENT 002 $

24 5.21 Wooden trestle Y Y 200 SEE ATTACHMENT 002 $ 25 5.8 Wooden trestle Y N 200 SEE ATTACHMENT 002 $ 26 6.09 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 27 7.05 Wooden trestle Y N 250 SEE ATTACHMENT 002 $ 28 7.25 Wooden trestle N N 10 SEE ATTACHMENT 002 $ 29 7.89 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 30 8.09 Wooden trestle Y N 200 SEE ATTACHMENT 002 $ 31 8.69 Wooden trestle Y N 200 SEE ATTACHMENT 002 $ 32 9.12 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 33 9.52 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 34 9.8 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 35 9.9 Steel Truss N N 220 SEE ATTACHMENT 002 $

36 10.17 Steel Truss N N 30 SEE ATTACHMENT 002 $

37 10.21 Steel Girder Y N 260 SEE ATTACHMENT 002 $

38 10.75 Steel girder/wooden trestle approaches

N N 0 SEE ATTACHMENT 002 $

39 11.45 Steel truss/wooden trestle approaches

N N 0 SEE ATTACHMENT 002 $

40 11.51 Wooden Trestle N N 0 SEE ATTACHMENT 002 $ 41 12.16 Wooden Trestle Y Y 160 SEE ATTACHMENT 002 $ 42 12.49 Steel Truss N Y 0 SEE ATTACHMENT 002 $ 43 12.85 Steel Truss N Y 0 SEE ATTACHMENT 002 $ 44 12.94 Wooden Trestle Y Y 15 SEE ATTACHMENT 002 $ 45 13.92 Wooden Trestle N Y 15 SEE ATTACHMENT 002 $ 48 14.93 Steel Arch Culvert N N 0 SEE ATTACHMENT 002 $

46 16.95 Wooden Trestle N N 0 SEE ATTACHMENT 002 $

47 18.24 Wooden Trestle N N 0 SEE ATTACHMENT 002 $

TOTAL $

Price should include all analysis and studies required (Geotech/hydrology, etc)/ *Include price breakdown excel supporting data with price package

Vendor Name:

Unique SAM ID:

Period of Performance Date Available:

SIGNATURE:

**WARNING: it appears that Creosote timbers are considered "special waste" and not hazardous waste in Virginia according to the Virginia Department of Environmental Quality. That source indicates that that the timbers can only be taken to certain landfills if disposed of within

CONSTRUCTION of TRAILS – OTHER THAN BRIDGES

Trail Mile Post

Essential Element to be Repaired Length Latitude Longitude Unit Price Mile Block Total

SEE ATTACHMENT 04 NRM TRAIL DETAILS

5.00

SEE ATTACHMENT 04 NRM TRAIL DETAILS

SEE ATTACHMENT 04 NRM TRAIL DETAILS

SEE ATTACHMENT 04 NRM TRAIL DETAILS

PRICE ALL ITEMS EXCEPT FOR BRIDGE DESIGN/REPLACEMENT

$ 20

TOTAL TRAIL CONSTRUCTION $

Vendor Name:

Unique SAM ID:

Period of Performance Date Available:

SIGNATURE:

**WARNING: it appears that Creosote timbers are considered "special waste" and not hazardous waste in Virginia according to the Virginia Department of Environmental Quality. That source indicates that that the timbers can only be taken to certain landfills if disposed of within

fill_1:
fill_2:
fill_3:
fill_4:
fill_5:
fill_6:
fill_7:
fill_8:
fill_9:
fill_1_2:
fill_3_2:
fill_4_2:
fill_5_2:
fill_6_2:
fill_7_2:
fill_8_2:
fill_2_2:
fill_9_2:
fill_11:
fill_12:
fill_13:
fill_14:
fill_15:
fill_16:
fill_17:
fill_18:
fill_19:
fill_20:
fill_21:
fill_22:
fill_10:
fill_23:
fill_25:
fill_26:
fill_27:
fill_28:
fill_29:
fill_30:
fill_31:
fill_32:
fill_33:
fill_34:
fill_24:
fill_35:
fill_37:
fill_36:
fill_38:
Length:
fill_28_2:
fill_30_2:
fill_32_2:
fill_36_2:
fill_38_2:
fill_1_3:
fill_3_3:
fill_4_3:
fill_5_3:
fill_6_3:
fill_7_3:
fill_8_3:
fill_2_3:
fill_9_3:
fill_11_2:
fill_12_2:
fill_13_2:
fill_14_2:
fill_15_2:
fill_16_2:
fill_17_2:
fill_18_2:
fill_19_2:
fill_20_2:
fill_21_2:
fill_22_2:
fill_10_2:
fill_23_2:
fill_25_2:
fill_26_2:
fill_27_2:
fill_28_3:
fill_29_2:
fill_30_3:
fill_31_2:
fill_32_3:
fill_33_2:
fill_34_2:
fill_24_2:
fill_35_2:
fill_37_2:
fill_36_3:
fill_38_3:
fill_28_4:
fill_30_4:
fill_32_4:
fill_36_4:
fill_38_4:
Date1_af_date:
Date2_af_date:
Date3_af_date:
Date4_af_date:
Date5_af_date:
Date6_af_date:
Date7_af_date:
Date8_af_date:
Date9_af_date:
Date10_af_date:
Text11:
Text14:
Text19:
Text20:
Text21:
Text22:

File details come from the government source that posted it. Updated .