Attachment 001 Schedule B is a detailed pricing schedule for the Virginia Creeper Trail Design-Build Reconstruction project, covering debris/cleanup/demolition, bridge design, trail design, and bridge and trail construction across four mile-marker segments (0-5, 5-10, 10-15, and 15-20). The document outlines specific requirements for 47 bridge structures with varying superstructure types including steel truss, wooden trestle, steel girder, and steel arch culvert, with each bridge categorized by trail mile post, removal needs, access requirements, and estimated debris volume.
The schedule requires contractors to provide unit pricing for design and construction activities, with a note that creosote timbers are considered "special waste" in Virginia and must be disposed of in specific landfills. Contractors are instructed to include price breakdown excel supporting data with their price package and to complete sections for design and construction of bridges and trails, with references to additional attachment details. The project involves reconstructing approximately 18 miles of the eastern Virginia Creeper National Recreation Trail, which was heavily damaged by Tropical Storm Helene in September 2024, with the goal of rebuilding the trail in its original footprint while maintaining its original grade.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No: 12445125R0002 Project Name: Virginia Creeper Trail 2 Step D/B
FAC 2025-03; 17JAN2025
Attachment 001 Schedule B VA Creeper Trail Design-Build Reconstruction Debri/Cleanup/Demolition- Bridge and Trails
# ITEM DESCRIPTION Est Qty Unit Unit Price TOTALS
Debris/Cleanup/Demolition- Bridge and Trails; Includes any land survey for partner shared boundary Mile Marker 0 to 5
- Bridge/Trussell Est: 1,500CY
- Trail Est: 3,500CY
CONTRACTOR INTENDED POP: FROM TO
5,000 CY $ $
Debris/Cleanup/Demolition- Bridge and Trails; Includes any land survey for partner shared boundary Mile Marker 5 to 10
- Bridge/Trussell Est: 3,000CY
- Trail Est: 3,500CY
CONTRACTOR INTENDED POP: FROM TO
6,500 CY $ $
Debris/Cleanup/Demolition- Bridge and Trails; Includes any land survey for partner shared boundary Mile Marker 10 to 15
- Bridge/Trussell Est: 1,500CY
- Trail Est: 3,500CY
CONTRACTOR INTENDED POP: FROM TO
5,000 CY $ $
Debris/Cleanup/Demolition- Bridge and Trails; Includes any land survey for partner shared boundary Mile Marker 15 to 20
- Bridge/Trussell Est: 500CY
- Trail Est: 3,500CY
CONTRACTOR INTENDED POP: FROM TO
4,000 CY $ $
TOTAL ESTIMATE $
*Include price breakdown excel supporting data with price package
Overall period of performance for demo/cleanup from to
CONTRACTOR NAME:
SIGNATURE
**WARNING: it appears that Creosote timbers are considered "special waste" and not hazardous waste in Virginia according to the Virginia Department of Environmental Quality. That source indicates that that the timbers can only be taken to certain landfills if disposed of within Virginia. https://www.deq.virginia.gov/our-programs/land-waste/solid-hazardous-waste/special-waste https://www.deq.virginia.gov/our-programs/land-waste/solid-hazardous-waste/special-waste
DESIGN of BRIDGES Struct
Trail Mile Post
Pre-storm Trail Bridge Superstructure Type remove Y/N access Y/N
Debris
EST
CY
Notes UNIT PRICE MILE BLOCK TOTAL
16 0.04 Steel truss/wooden trestle approaches
N Y 0 SEE ATTACHMENT 002 $
17 0.44 Steel truss/wooden trestle approaches
N Y 0 SEE ATTACHMENT 002 $
18 2.35 Steel truss Y Y 350 SEE ATTACHMENT 002 $ 19 2.53 Steel girder Y Y 500 SEE ATTACHMENT 002 $ 20 2.63 Steel girder Y Y 0 SEE ATTACHMENT 002 $ 21 3.77 Steel truss Y Y 50 SEE ATTACHMENT 002 $ 22 4.78 Wooden trestle Y Y 100 SEE ATTACHMENT 002 $
23 5 Wooden trestle Y Y 200 SEE ATTACHMENT 002 $
24 5.21 Wooden trestle Y Y 200 SEE ATTACHMENT 002 $ 25 5.8 Wooden trestle Y N 200 SEE ATTACHMENT 002 $ 26 6.09 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 27 7.05 Wooden trestle Y N 250 SEE ATTACHMENT 002 $ 28 7.25 Wooden trestle N N 10 SEE ATTACHMENT 002 $ 29 7.89 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 30 8.09 Wooden trestle Y N 200 SEE ATTACHMENT 002 $ 31 8.69 Wooden trestle Y N 200 SEE ATTACHMENT 002 $ 32 9.12 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 33 9.52 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 34 9.8 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 35 9.9 Steel Truss N N 220 SEE ATTACHMENT 002 $
36 10.17 Steel Truss N N 30 SEE ATTACHMENT 002 $
37 10.21 Steel Girder Y N 260 SEE ATTACHMENT 002 $
38 10.75 Steel girder/wooden trestle approaches N N 0 SEE ATTACHMENT 002 $
39 11.45 Steel truss/wooden trestle approaches N N 0 SEE ATTACHMENT 002 $
40 11.51 Wooden Trestle N N 0 SEE ATTACHMENT 002 $ 41 12.16 Wooden Trestle Y Y 160 SEE ATTACHMENT 002 $ 42 12.49 Steel Truss N Y 0 SEE ATTACHMENT 002 $ 43 12.85 Steel Truss N Y 0 SEE ATTACHMENT 002 $ 44 12.94 Wooden Trestle Y Y 15 SEE ATTACHMENT 002 $ 45 13.92 Wooden Trestle N Y 15 SEE ATTACHMENT 002 $ 48 14.93 Steel Arch Culvert N N 0 SEE ATTACHMENT 002 $
46 16.95 Wooden Trestle N N 0 SEE ATTACHMENT 002 $
47 18.24 Wooden Trestle N N 0 SEE ATTACHMENT 002 $
TOTAL $
Price should include all analysis and studies required (Geotech/hydrology, etc)/ *Include price breakdown excel supporting data with price package
Vendor Name:
Unique SAM ID:
Period of Performance Date Available:
SIGNATURE:
DESIGN of TRAILS
Trail Mile Post
Essential Element to be Repaired Length Latitude Longitude Unit Price Mile Block Total
SEE ATTACHMENT 04 NRM TRAIL DETAILS
PRICE ALL ITEMS EXCEPT FOR BRIDGE DESIGN/REPLACEMENT
5.00
SEE ATTACHMENT 04 NRM TRAIL DETAILS
SEE ATTACHMENT 04 NRM TRAIL DETAILS
SEE ATTACHMENT 04 NRM TRAIL DETAILS
PRICE ALL ITEMS EXCEPT FOR BRIDGE DESIGN/REPLACEMENT
$ 20
TOTAL TRAIL DESIGN $
Price should include all analysis and studies required (Geotech/hydrology, etc)/ *Include price breakdown excel supporting data with price package
Vendor Name:
Unique SAM ID:
Period of Performance Date Available:
SIGNATURE:
CONSTRUCTION of BRIDGES Struct
Trail Mile Post
Pre-storm Trail Bridge Superstructure Type remove Y/N access Y/N
Debris
EST
CY
Notes UNIT PRICE MILE BLOCK TOTAL
16 0.04 Steel truss/wooden trestle approaches N Y 0 SEE ATTACHMENT 002 $
17 0.44 Steel truss/wooden trestle approaches N Y 0 SEE ATTACHMENT 002 $
18 2.35 Steel truss Y Y 350 SEE ATTACHMENT 002 $ 19 2.53 Steel girder Y Y 500 SEE ATTACHMENT 002 $ 20 2.63 Steel girder Y Y 0 SEE ATTACHMENT 002 $ 21 3.77 Steel truss Y Y 50 SEE ATTACHMENT 002 $ 22 4.78 Wooden trestle Y Y 100 SEE ATTACHMENT 002 $
23 5 Wooden trestle Y Y 200 SEE ATTACHMENT 002 $
24 5.21 Wooden trestle Y Y 200 SEE ATTACHMENT 002 $ 25 5.8 Wooden trestle Y N 200 SEE ATTACHMENT 002 $ 26 6.09 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 27 7.05 Wooden trestle Y N 250 SEE ATTACHMENT 002 $ 28 7.25 Wooden trestle N N 10 SEE ATTACHMENT 002 $ 29 7.89 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 30 8.09 Wooden trestle Y N 200 SEE ATTACHMENT 002 $ 31 8.69 Wooden trestle Y N 200 SEE ATTACHMENT 002 $ 32 9.12 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 33 9.52 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 34 9.8 Wooden trestle Y N 180 SEE ATTACHMENT 002 $ 35 9.9 Steel Truss N N 220 SEE ATTACHMENT 002 $
36 10.17 Steel Truss N N 30 SEE ATTACHMENT 002 $
37 10.21 Steel Girder Y N 260 SEE ATTACHMENT 002 $
38 10.75 Steel girder/wooden trestle approaches
N N 0 SEE ATTACHMENT 002 $
39 11.45 Steel truss/wooden trestle approaches
N N 0 SEE ATTACHMENT 002 $
40 11.51 Wooden Trestle N N 0 SEE ATTACHMENT 002 $ 41 12.16 Wooden Trestle Y Y 160 SEE ATTACHMENT 002 $ 42 12.49 Steel Truss N Y 0 SEE ATTACHMENT 002 $ 43 12.85 Steel Truss N Y 0 SEE ATTACHMENT 002 $ 44 12.94 Wooden Trestle Y Y 15 SEE ATTACHMENT 002 $ 45 13.92 Wooden Trestle N Y 15 SEE ATTACHMENT 002 $ 48 14.93 Steel Arch Culvert N N 0 SEE ATTACHMENT 002 $
46 16.95 Wooden Trestle N N 0 SEE ATTACHMENT 002 $
47 18.24 Wooden Trestle N N 0 SEE ATTACHMENT 002 $
TOTAL $
Price should include all analysis and studies required (Geotech/hydrology, etc)/ *Include price breakdown excel supporting data with price package
Vendor Name:
Unique SAM ID:
Period of Performance Date Available:
SIGNATURE:
**WARNING: it appears that Creosote timbers are considered "special waste" and not hazardous waste in Virginia according to the Virginia Department of Environmental Quality. That source indicates that that the timbers can only be taken to certain landfills if disposed of within
CONSTRUCTION of TRAILS – OTHER THAN BRIDGES
Trail Mile Post
Essential Element to be Repaired Length Latitude Longitude Unit Price Mile Block Total
SEE ATTACHMENT 04 NRM TRAIL DETAILS
5.00
SEE ATTACHMENT 04 NRM TRAIL DETAILS
SEE ATTACHMENT 04 NRM TRAIL DETAILS
SEE ATTACHMENT 04 NRM TRAIL DETAILS
PRICE ALL ITEMS EXCEPT FOR BRIDGE DESIGN/REPLACEMENT
$ 20
TOTAL TRAIL CONSTRUCTION $
Vendor Name:
Unique SAM ID:
Period of Performance Date Available:
SIGNATURE:
**WARNING: it appears that Creosote timbers are considered "special waste" and not hazardous waste in Virginia according to the Virginia Department of Environmental Quality. That source indicates that that the timbers can only be taken to certain landfills if disposed of within
| fill_1: |
| fill_2: |
| fill_3: |
| fill_4: |
| fill_5: |
| fill_6: |
| fill_7: |
| fill_8: |
| fill_9: |
| fill_1_2: |
| fill_3_2: |
| fill_4_2: |
| fill_5_2: |
| fill_6_2: |
| fill_7_2: |
| fill_8_2: |
| fill_2_2: |
| fill_9_2: |
| fill_11: |
| fill_12: |
| fill_13: |
| fill_14: |
| fill_15: |
| fill_16: |
| fill_17: |
| fill_18: |
| fill_19: |
| fill_20: |
| fill_21: |
| fill_22: |
| fill_10: |
| fill_23: |
| fill_25: |
| fill_26: |
| fill_27: |
| fill_28: |
| fill_29: |
| fill_30: |
| fill_31: |
| fill_32: |
| fill_33: |
| fill_34: |
| fill_24: |
| fill_35: |
| fill_37: |
| fill_36: |
| fill_38: |
| Length: |
| fill_28_2: |
| fill_30_2: |
| fill_32_2: |
| fill_36_2: |
| fill_38_2: |
| fill_1_3: |
| fill_3_3: |
| fill_4_3: |
| fill_5_3: |
| fill_6_3: |
| fill_7_3: |
| fill_8_3: |
| fill_2_3: |
| fill_9_3: |
| fill_11_2: |
| fill_12_2: |
| fill_13_2: |
| fill_14_2: |
| fill_15_2: |
| fill_16_2: |
| fill_17_2: |
| fill_18_2: |
| fill_19_2: |
| fill_20_2: |
| fill_21_2: |
| fill_22_2: |
| fill_10_2: |
| fill_23_2: |
| fill_25_2: |
| fill_26_2: |
| fill_27_2: |
| fill_28_3: |
| fill_29_2: |
| fill_30_3: |
| fill_31_2: |
| fill_32_3: |
| fill_33_2: |
| fill_34_2: |
| fill_24_2: |
| fill_35_2: |
| fill_37_2: |
| fill_36_3: |
| fill_38_3: |
| fill_28_4: |
| fill_30_4: |
| fill_32_4: |
| fill_36_4: |
| fill_38_4: |
| Date1_af_date: |
| Date2_af_date: |
| Date3_af_date: |
| Date4_af_date: |
| Date5_af_date: |
| Date6_af_date: |
| Date7_af_date: |
| Date8_af_date: |
| Date9_af_date: |
| Date10_af_date: |
| Text11: |
| Text14: |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
File details come from the government source that posted it. Updated .