Attachment 009 - PostBlastReportForm.pdf

PDF 85 KB Posted

Attached to
French Hazard WUI Project Road Improvements
Solicitation number
1282B124R0026
Issued by

About this file

This document is the Post Blast Report Form for a blasting contractor working on a federal contract. The form requires the contractor to provide details about each blast performed, including the location, materials blasted, explosive types and quantities used, and firing method. The contractor must also attach pre-blast and post-blast surveys.

The related federal contract opportunity is for the French Hazard WUI Project Road Improvements, Solicitation Number 1282B124R0026. This project requires approximately 2.4 miles of new road construction and 10 miles of road reconstruction to support future vegetation and prescribed fire treatment activities in the West Mountain Geographic area near Cascade, Idaho. The project area has been identified as at risk from wildfire.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 009 - PostBlastReport

POST BLAST CONTRACT REPORT

Date (Contract Work Period) __________________

COR ________________________ email_______________

District _________________________

Contract Number _____________________

BLASTING CONTRACTOR

Name______________________ License number ________________

Mailing Address____________________________________________

Phone Number_______________________ email__________________

SHOT RECORDS

Blast Location: (per shot)

Township___________ Range ________________ Section ________________

GPS Coordinates, MP, or location map (attach) ___________________

Minimum Information: (per shot)

May attach any form of shot records that contains listed information.

Type of Materials Blasted: ____________________No. Holes: ______________

Burden: _________ Spacing: _________ Hole Diameter: _______ Hole Depth ____

Explosives Used: (Type and Brand Name) __________________

Total wt. in shot _______________

Method of firing ____________ Delay _____________ Circuit type_____________

Pre-Blast and Post Blast Surveys (attach)

BLASTING CONTRACTOR
SHOT RECORDS
Pre-Blast and Post Blast Surveys

File details come from the government source that posted it. Updated .