Attachment 002 - Capability Form.pdf
PDF 87 KB Posted
- Solicitation number
- 80KSC020R0032
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 002 80KSC020R0032
CAPABILITY FORM
1. DATE
2. CONTRACT LINE ITEM NUMBER
3. PAGE 1 OF
4. CONTRACTOR/OFFEROR NAME
5. SOLICITATION NUMBER
6. CONTRACT NUMBER
7. CONTRACTOR/OFFEROR ADDRESS
8. CONTRACTOR/OFFEROR PRIMARY CONTACT (Name, Email, Phone, Fax)*
9. CONTRACTOR/OFFEROR ALTERNATE CONTACT (Name, Email, Phone, Fax)
10. PRIMARY PRODUCTION FACILITY 11. ALTERNATE PRODUCTION FACILITY
A. ADDRESS
A. ADDRESS
B. MAXIMUM FIXED STORAGE
B. MAXIMUM FIXED STORAGE
C. MAXIMUM DAILY PRODUCTION
D. MAXIMUM MONTHLY PRODUCTION
C. MAXIMUM DAILY PRODUCTION
D. MAXIMUM MONTHLY PRODUCTION
E. PRODUCTION FACILITY CONTACT
E. PRODUCTION FACILITY CONTACT
12. DISTRIBUTION INFORMATION FOR BLOCK 10
A. NUMBER OF TANKER TRAILERS
B. AVERAGE TANKER TRAILER CAPACITY
C. AVERAGE NUMBER OF DRIVERS
In process inspection, end-item inspection, and test verification shall be performed by the Contractor at the Contractor’s facilities to ensure compliance with the contract requirements. The Government shall have access to perform periodic inspections or audits at the Contractor’s, and/or sub-tier supplier, facilities to verify, inspect, and ensure that supplies meet the contract requirements, including calibrations, process control monitoring, drawings and specifications. If production facility is not owned by contractor then attach supply/purchase agreement between contractor and production facility owner.
Printed name and signature of authorized representative:
Name:_______________________________________ Signature:____________________________________
Note 1: The contractor will furnish one point of contact, and an alternate if the contractor so desires, to receive placement of delivery orders by the Government (refer to Block 8).
Note 2: The contractor shall identify the primary production facility that will produce and/or deliver LNG to meet contract line item number requirements. This production facility will be the shipping point used to determine any charges accrued due to the Government’s inability to accept deliveries. The contractor may also identify any alternate facilities that could be used in performance of this contract.
| 1 DATE: |
| 2 CONTRACT LINE ITEM NUMBER: |
| 3 PAGE 1 OF: |
| 4 CONTRACTOROFFEROR NAME: |
| 5 SOLICITATION NUMBER: |
| 6 CONTRACT NUMBER: |
| 7 CONTRACTOROFFEROR ADDRESS: |
| 8 CONTRACTOROFFEROR PRIMARY CONTACT Name Email Phone Fax: |
| 9 CONTRACTOROFFEROR ALTERNATE CONTACT Name Email Phone Fax: |
| A ADDRESS: |
| A ADDRESS_2: |
| B MAXIMUM FIXED STORAGE: |
| B MAXIMUM FIXED STORAGE_2: |
| C MAXIMUM DAILY PRODUCTION: |
| D MAXIMUM MONTHLY PRODUCTION: |
| C MAXIMUM DAILY PRODUCTION_2: |
| D MAXIMUM MONTHLY PRODUCTION_2: |
| E PRODUCTION FACILITY CONTACT: |
| E PRODUCTION FACILITY CONTACT_2: |
| A NUMBER OF TANKER TRAILERS: |
| B AVERAGE TANKER TRAILER CAPACITY: |
| C AVERAGE NUMBER OF DRIVERS: |
| Name: |
File details come from the government source that posted it. Updated .