Attachment_0013_Lim_on_SubK_Breakout.xlsx
XLSX spreadsheet 91 KB Posted
- Attached to
- Meadowood Sensory Nature Trail
- Solicitation number
- 140L0626R0004
About this file
This is a Limitations on Subcontracting Breakout template for use in a Small Business set-aside solicitation. The template is designed for solicitation 140L0626R0004 (Meadowood Sensory Nature Trail) issued by the Department of the Interior Bureau of Land Management and establishes compliance tracking for the required 15% self-performance threshold under FAR 52.219-14(e)(3) or (4).
The template requires contractors to itemize total contract value broken down into material costs (including special tooling, special testing equipment, and construction equipment) and labor costs. Contractors must document self-performed labor separately from subcontracted labor, differentiating between Small Business Subcontractors (SSS) and Large Business Subcontractors (LBS), with provisions to list up to six vendors in each category. The limitation on subcontracting percentage is calculated by dividing the difference between total labor cost and amounts paid to LBS companies by the total labor cost, which must exceed the required 15% self-performance percentage to demonstrate compliance. The template includes tabs for three service categories: Services (except construction), General construction, and Construction by special trade contractors.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)
| Solicitation Number | 140L0626R0004 |
| Type of Set-Aside | Small Business |
| Performance Period | |
| Required Self-Performance | 15% |
(A) Total Amount Proposed¹
(B) Total Material Cost2
(C) Self Performed Labor
| (D) Small Business Subcontractor (SSS) Labor3 | ||
| Total Amount Paid to [Insert First SSS Name] | ||
| Total Amount Paid to [Insert Second SSS Name] | ||
| Total Amount Paid to [Insert Third SSS Name] | ||
| Total Amount Paid to [Insert Fourth SSS Name] | ||
| Total Amount Paid to [Insert Fifth SSS Name] | ||
| Total Amount Paid to [Insert Sixth SSS Name] | ||
| Total Amount Paid to SSS Companies | $0.00 |
| (E) Large Business Subcontractor (LBS) Labor | ||
| Total Amount Paid to [Insert First LBS Name] | ||
| Total Amount Paid to [Insert Second LBS Name] | ||
| Total Amount Paid to [Insert Third LBS Name] | ||
| Total Amount Paid to [Insert Fourth LBS Name] | ||
| Total Amount Paid to [Insert Fifth LBS Name] | ||
| Total Amount Paid to [Insert Sixth LBS Name] | ||
| Total Amount Paid to LBS Companies | $0.00 |
(F) Total Labor Cost4 $0.00
| (G) Limitation on Subcontracting Percentage5 | ||
| (Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor Cost | ERROR:#DIV/0! |
| *Note 1: (A) Total Amount Proposed = (B) Total Material Cost + (F) Total Labor Cost |
| *Note 2: Total Material Cost includes special tooling, special testing equipment, and construction equipment. Additional definition of material cost can be found at 13 CFR 125.1. |
| *Note 3: Subcontractors must be first tier and qualify as a small business under the solicitation NAICS. All second tier subcontractors are counted as LBS labor. |
| *Note 4: Total labor costs consist of all contractual costs other than material. |
| *Note 5: To be compliant, limitation percentage must be greater than the required self-performance percentage. |
Sheet2
| Services (except construction) |
| General construction |
| Construction by special trade contractors |
File details come from the government source that posted it. Updated .