Attachment_0002_-_Project_Site_Photos.pdf

PDF 4 MB Posted

Attached to
Meadowood Sensory Nature Trail
Solicitation number
140L0626R0004
Issued by

About this file

This document is a Design-Build Statement of Work for the Meadowood Special Management Recreation Area project managed by BLM Eastern States, dated 13 March 2026. The SOW includes project site photographs documenting three primary task areas: the Mustang Trailhead Parking Area, the Enchanted Pond Outflow Culvert Area, and the Sensory Nature Trail Area.

The Mustang Trailhead Parking Area photographs show the existing parking infrastructure, including entrance gates, unpaved parking surfaces, a metal-frame shelter structure, and surrounding fencing and equipment storage. The Enchanted Pond Outflow Culvert Area photographs document the existing culvert infrastructure and pond conditions, showing a deteriorated metal culvert pipe and the waterway conditions. The Sensory Nature Trail Area photographs depict various sections of the trail corridor, including open grassland areas, wooded sections with mature trees, forest floor conditions, and fenced trail segments. Aerial imagery and ground-level photographs are provided for each task area to establish baseline conditions for the design-build project. All photographs include location reference markers corresponding to overall reference plans contained in a separate Meadowood SMRA Reference Plans attachment.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT

Meadowood Special Management Recreation Area BLM Eastern States

Design-Build Statement of Work 13 March 2026

Project Site Photos – MUSTANG TRAILHEAD PARKING AREA

Mustang Trailhead Parking Area

Refer to Attachment “Meadowood SMRA Reference Plans” for overall location of Task Areas relative to the project site.

C D

Photo A

A B

Photo B

Photo C Photo D

Photo E Photo F

Aerial Image Not to Scale

E F

ATTACHMENTProject Site Photos – ENCHANTED POND OUTFLOW CULVERT AREA

Enchanted Pond Area

Refer to Attachment “Meadowood SMRA Reference Plans” for overall location of Task Areas relative to the project site.

A Photo B

Photo A

Aerial Image Not to Scale

B

Meadowood Special Management Recreation Area BLM Eastern States

Design-Build Statement of Work 13 March 2026

ATTACHMENTProject Site Photos – SENSORY NATURE TRAIL AREA

Sensory Nature Trail Area

Refer to Attachment “Meadowood SMRA Reference Plans” for overall location of Task Areas relative to the project site.

A

Aerial Image Not to Scale

B

Photo A Photo B

Photo C Photo D

Photo E

C

E D

Meadowood Special Management Recreation Area BLM Eastern States

Design-Build Statement of Work 13 March 2026

Slide Number 1
Slide Number 2
Slide Number 3

File details come from the government source that posted it. Updated .