Attachment 0011 Price Matrix.xlsx
XLSX spreadsheet 54 KB Posted
- Solicitation number
- W15QKN21R0073
About this file
This solicitation requests proposals for the fabrication and delivery of 7.62mm M240L Medium Machine Guns, spare titanium receivers, and related items. The U.S. Army Contracting Command, Picatinny Arsenal is seeking proposals for an indefinite-delivery, indefinite-quantity contract with five ordering periods and firm fixed price orders. The maximum contract quantities are 4,000 machine guns and 1,750 spare receivers. The minimum contract amount if there is a single awardee will be $5 million, consisting of costs for a First Article Test and weapons up to that amount. If there are two awards, the minimum will be $2.5 million each. Proposals are due within 45 days of solicitation release.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offeror
| Offeror Name: |
| Price Matrix |
| W15QKN-18-R-02XN |
| OFFEROR: ASSERT WHETHER YOUR OFFER IS / IS NOT PREDICATED UPON THE USE OF GOVERNMENT PROPERTY IN YOUR POSSESSION OR ONE OF YOUR SUBCONTRACTOR'S POSSESSION: (Select response from the Drop Down Menu) |
| IF YOU RESPONDED "IS", ALSO COMPLETE COLUMN E. |
| CLIN | Description | Quantity/ Quantity Range | Unit Price | Per Unit Rental Value of Government Property1 |
| Ordering Period 1 | ||||
| 0001 | M4 - FAT, OP1 | 1 | $0.00 | $0.00 |
| 0002 | M4 - Production, OP1 | 1 - 10,000 | $0.00 | $0.00 |
| 10,001 - 20,000 | $0.00 | $0.00 | ||
| 20,001 - 40,000 | $0.00 | $0.00 | ||
| 40,001 - 80,000 | $0.00 | $0.00 | ||
| 80,001 - 167,195 | $0.00 | $0.00 | ||
| 0003 | M4A1 - FAT, OP1 | 1 | $0.00 | $0.00 |
| 0004 | M4A1 - Production, OP1 | 1 - 10,000 | $0.00 | $0.00 |
| 10,001 - 20,000 | $0.00 | $0.00 | ||
| 20,001 - 40,000 | $0.00 | $0.00 | ||
| 40,001 - 80,000 | $0.00 | $0.00 | ||
| 80,001 - 167,195 | $0.00 | $0.00 | ||
| 0005 | CDRLs | NSP | NSP | |
| Ordering Period 2 | ||||
| 0006 | M4 - FAT, OP2 | 1 | $0.00 | $0.00 |
| 0007 | M4 - Production, OP2 | 1 - 10,000 | $0.00 | $0.00 |
| 10,001 - 20,000 | $0.00 | $0.00 | ||
| 20,001 - 40,000 | $0.00 | $0.00 | ||
| 40,001 - 80,000 | $0.00 | $0.00 | ||
| 80,001 - 167,195 | $0.00 | $0.00 | ||
| 0008 | M4A1 - FAT, OP2 | 1 | $0.00 | $0.00 |
| 0009 | M4A1 - Production, OP2 | 1 - 10,000 | $0.00 | $0.00 |
| 10,001 - 20,000 | $0.00 | $0.00 | ||
| 20,001 - 40,000 | $0.00 | $0.00 | ||
| 40,001 - 80,000 | $0.00 | $0.00 | ||
| 80,001 - 167,195 | $0.00 | $0.00 | ||
| Ordering Period 3 | ||||
| 0010 | M4 - FAT, OP3 | 1 | $0.00 | $0.00 |
| 0011 | M4 - Production, OP3 | 1 - 10,000 | $0.00 | $0.00 |
| 10,001 - 20,000 | $0.00 | $0.00 | ||
| 20,001 - 40,000 | $0.00 | $0.00 | ||
| 40,001 - 80,000 | $0.00 | $0.00 | ||
| 80,001 - 167,195 | $0.00 | $0.00 | ||
| 0012 | M4A1 - FAT, OP3 | 1 | $0.00 | $0.00 |
| 0013 | M4A1 - Production, OP3 | 1 - 10,000 | $0.00 | $0.00 |
| 10,001 - 20,000 | $0.00 | $0.00 | ||
| 20,001 - 40,000 | $0.00 | $0.00 | ||
| 40,001 - 80,000 | $0.00 | $0.00 | ||
| 80,001 - 167,195 | $0.00 | $0.00 | ||
| Ordering Period 4 | ||||
| 0014 | M4 - FAT, OP4 | 1 | $0.00 | $0.00 |
| 0015 | M4 - Production, OP4 | 1 - 10,000 | $0.00 | $0.00 |
| 10,001 - 20,000 | $0.00 | $0.00 | ||
| 20,001 - 40,000 | $0.00 | $0.00 | ||
| 40,001 - 80,000 | $0.00 | $0.00 | ||
| 80,001 - 167,195 | $0.00 | $0.00 | ||
| 0016 | M4A1 - FAT, OP4 | 1 | $0.00 | $0.00 |
| 0017 | M4A1 - Production, OP4 | 1 - 10,000 | $0.00 | $0.00 |
| 10,001 - 20,000 | $0.00 | $0.00 | ||
| 20,001 - 40,000 | $0.00 | $0.00 | ||
| 40,001 - 80,000 | $0.00 | $0.00 | ||
| 80,001 - 167,195 | $0.00 | $0.00 | ||
| Ordering Period 5 | ||||
| 0018 | M4 - FAT, OP5 | 1 | $0.00 | $0.00 |
| 0019 | M4 - Production, OP5 | 1 - 10,000 | $0.00 | $0.00 |
| 10,001 - 20,000 | $0.00 | $0.00 | ||
| 20,001 - 40,000 | $0.00 | $0.00 | ||
| 40,001 - 80,000 | $0.00 | $0.00 | ||
| 80,001 - 167,195 | $0.00 | $0.00 | ||
| 0020 | M4A1 - FAT, OP5 | 1 | $0.00 | $0.00 |
| 0021 | M4A1 - Production, OP5 | 1 - 10,000 | $0.00 | $0.00 |
| 10,001 - 20,000 | $0.00 | $0.00 | ||
| 20,001 - 40,000 | $0.00 | $0.00 | ||
| 40,001 - 80,000 | $0.00 | $0.00 | ||
| 80,001 - 167,195 | $0.00 | $0.00 | ||
| 1Propose the per unit rental value of Government property when your offer is predicated upon the use of Government property in your possession or the possession of one of your subcontractors during the performance of a contract awarded as a result of this solicitation. See solicitation instruction on Use and Rental of Government Property and FAR 52.245-9 Use and Charges. |
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104
Offeror TEP
| FOR OFFICIAL USE ONLY - SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104 | |||||||||||||
| Offeror Name: | 0 | ||||||||||||
| W15QKN-18-R-02XN | |||||||||||||
| Royalty Adjustment Amount | |||||||||||||
| CLIN | Description | Quantity/ Quantity Range | Unit Price including Per Unit Rental Value | Weight % | Weighted Unit Price | Evaluated Quantity | Weighted Evaluated Price | Weapon System | Weighted Evaluated Price for Production CLINs * | Allocation % | Total Dollars Subject to Royalty in TEP | Royalty % | Evaluated Royalty Amount |
| Ordering Period 1 | |||||||||||||
| 0001 | M4 - FAT, OP1 | 1 | $0.00 | 100% | $0.00 | 1 | $0 | M4 | $0.00 | 36.22% | $0.00 | 5.00% | $0.00 |
| 0002 | M4 - Production, OP1 | 1 - 10,000 | $0.00 | 30% | $0.00 | 7 | $0 | M4A1 | $0.00 | 35.82% | $0.00 | 5.00% | $0.00 |
| 10,001 - 20,000 | $0.00 | 30% | Total | $0.00 | |||||||||
| 20,001 - 40,000 | $0.00 | 25% | |||||||||||
| 40,001 - 80,000 | $0.00 | 10% | * FAT units are delilverable and part of the contract quantities; therefore, only the contract quantities for production are subject to the royalty fee | ||||||||||
| 80,001 - 167,195 | $0.00 | 5% | |||||||||||
| 0003 | M4A1 - FAT, OP1 | 1 | $0.00 | 100% | $0.00 | 1 | $0 | ||||||
| 0004 | M4A1 - Production, OP1 | 1 - 10,000 | $0.00 | 5% | $0.00 | 60,805 | $0 | ||||||
| 10,001 - 20,000 | $0.00 | 10% | |||||||||||
| 20,001 - 40,000 | $0.00 | 30% | |||||||||||
| 40,001 - 80,000 | $0.00 | 30% | |||||||||||
| 80,001 - 167,195 | $0.00 | 25% | |||||||||||
| 0005 | CDRLs | ||||||||||||
| Ordering Period 2 | |||||||||||||
| 0006 | M4 - FAT, OP2 | 1 | $0.00 | 100% | $0.00 | 1 | $0 | ||||||
| 0007 | M4 - Production, OP2 | 1 - 10,000 | $0.00 | 30% | $0.00 | 2,030 | $0 | ||||||
| 10,001 - 20,000 | $0.00 | 30% | |||||||||||
| 20,001 - 40,000 | $0.00 | 25% | |||||||||||
| 40,001 - 80,000 | $0.00 | 10% | |||||||||||
| 80,001 - 167,195 | $0.00 | 5% | |||||||||||
| 0008 | M4A1 - FAT, OP2 | 1 | $0.00 | 100% | $0.00 | 1 | $0 | ||||||
| 0009 | M4A1 - Production, OP2 | 1 - 10,000 | $0.00 | 5% | $0.00 | 24,060 | $0 | ||||||
| 10,001 - 20,000 | $0.00 | 25% | |||||||||||
| 20,001 - 40,000 | $0.00 | 30% | |||||||||||
| 40,001 - 80,000 | $0.00 | 30% | |||||||||||
| 80,001 - 167,195 | $0.00 | 10% | |||||||||||
| Ordering Period 3 | |||||||||||||
| 0010 | M4 - FAT, OP3 | 1 | $0.00 | 100% | $0.00 | 1 | $0 | ||||||
| 0011 | M4 - Production, OP3 | 1 - 10,000 | $0.00 | 30% | $0.00 | 2,030 | $0 | ||||||
| 10,001 - 20,000 | $0.00 | 30% | |||||||||||
| 20,001 - 40,000 | $0.00 | 25% | |||||||||||
| 40,001 - 80,000 | $0.00 | 10% | |||||||||||
| 80,001 - 167,195 | $0.00 | 5% | |||||||||||
| 0012 | M4A1 - FAT, OP3 | 1 | $0.00 | 100% | $0.00 | 1 | $0 | ||||||
| 0013 | M4A1 - Production, OP3 | 1 - 10,000 | $0.00 | 5% | $0.00 | 24,060 | $0 | ||||||
| 10,001 - 20,000 | $0.00 | 25% | |||||||||||
| 20,001 - 40,000 | $0.00 | 30% | |||||||||||
| 40,001 - 80,000 | $0.00 | 30% | |||||||||||
| 80,001 - 167,195 | $0.00 | 10% | |||||||||||
| Ordering Period 4 | |||||||||||||
| 0014 | M4 - FAT, OP4 | 1 | $0.00 | 100% | $0.00 | 1 | $0 | ||||||
| 0015 | M4 - Production, OP4 | 1 - 10,000 | $0.00 | 30% | $0.00 | 2,030 | $0 | ||||||
| 10,001 - 20,000 | $0.00 | 30% | |||||||||||
| 20,001 - 40,000 | $0.00 | 25% | |||||||||||
| 40,001 - 80,000 | $0.00 | 10% | |||||||||||
| 80,001 - 167,195 | $0.00 | 5% | |||||||||||
| 0016 | M4A1 - FAT, OP4 | 1 | $0.00 | 100% | $0.00 | 1 | $0 | ||||||
| 0017 | M4A1 - Production, OP4 | 1 - 10,000 | $0.00 | 5% | $0.00 | 24,060 | $0 | ||||||
| 10,001 - 20,000 | $0.00 | 25% | |||||||||||
| 20,001 - 40,000 | $0.00 | 30% | |||||||||||
| 40,001 - 80,000 | $0.00 | 30% | |||||||||||
| 80,001 - 167,195 | $0.00 | 10% | |||||||||||
| Ordering Period 5 | |||||||||||||
| 0018 | M4 - FAT, OP5 | 1 | $0.00 | 100% | $0.00 | 1 | $0 | ||||||
| 0019 | M4 - Production, OP5 | 1 - 10,000 | $0.00 | 30% | $0.00 | 2,030 | $0 | ||||||
| 10,001 - 20,000 | $0.00 | 30% | |||||||||||
| 20,001 - 40,000 | $0.00 | 25% | |||||||||||
| 40,001 - 80,000 | $0.00 | 10% | |||||||||||
| 80,001 - 167,195 | $0.00 | 5% | |||||||||||
| 0020 | M4A1 - FAT, OP5 | 1 | $0.00 | 100% | $0.00 | 1 | $0 | ||||||
| 0021 | M4A1 - Production, OP5 | 1 - 10,000 | $0.00 | 5% | $0.00 | 24,060 | $0 | ||||||
| 10,001 - 20,000 | $0.00 | 25% | |||||||||||
| 20,001 - 40,000 | $0.00 | 30% | |||||||||||
| 40,001 - 80,000 | $0.00 | 30% | |||||||||||
| 80,001 - 167,195 | $0.00 | 10% | |||||||||||
| Evaluated Price-All CLINs | $0 | ||||||||||||
| Evaluated Royalty Amount | $0 | ||||||||||||
| Price Evaluation Preference for Hubzone Small Business Concerns | Base | Rate | $0 | ||||||||||
| $0 | 10% | ||||||||||||
| Total Evaluated Price | $0 | ||||||||||||
| *Rounded to the nearest whole dollar |
IGCE TEP
FOR OFFICIAL USE ONLY - SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104
| Offeror Name: IGCE |
| W15QKN-18-R-02XN |
| Royalty Adjustment Amount | |||||||||||||
| CLIN | Description | Quantity/ Quantity Range | Unit Price including Per Unit Rental Value | Weight % | Weighted Unit Price | Evaluated Quantity | Weighted Evaluated Price | Weapon System | Weighted Evaluated Price for Production CLINs | Allocation % | Total Dollars Subject to Royalty in TEP | Royalty % | Evaluated Royalty Amount |
| Ordering Period 1 | |||||||||||||
| 0001 | M4 - FAT, OP1 | 1 | $11,447.87 | 100% | $11,447.87 | 1 | $11,448 | M4 | $7,698,551.00 | 36.22% | $2,788,415.17 | 5.00% | $139,420.76 |
| 0002 | M4 - Production, OP1 | 1 - 10,000 | $775.61 | 30% | $728.74 | 2,030 | $1,479,342 | M4A1 | $112,177,028.00 | 35.82% | $40,181,811.43 | 5.00% | $2,009,090.57 |
| 10,001 - 20,000 | $738.68 | 30% | Total | $2,148,511.33 | |||||||||
| 20,001 - 40,000 | $703.50 | 25% | |||||||||||
| 40,001 - 80,000 | $668.33 | 10% | ` | ||||||||||
| 80,001 - 167,195 | $634.91 | 5% | |||||||||||
| 0003 | M4A1 - FAT, OP1 | 1 | $11,447.87 | 100% | $11,447.87 | 1 | $11,448 | ||||||
| 0004 | M4A1 - Production, OP1 | 1 - 10,000 | $775.61 | 5% | $682.93 | 60,805 | $41,525,559 | ||||||
| 10,001 - 20,000 | $738.68 | 10% | |||||||||||
| 20,001 - 40,000 | $703.50 | 30% | |||||||||||
| 40,001 - 80,000 | $668.33 | 30% | |||||||||||
| 80,001 - 167,195 | $634.91 | 25% | |||||||||||
| 0005 | CDRLs | NSP | |||||||||||
| Ordering Period 2 | |||||||||||||
| 0006 | M4 - FAT, OP2 | 1 | $11,676.83 | 100% | $11,676.83 | 1 | $11,677 | ||||||
| 0007 | M4 - Production, OP2 | 1 - 10,000 | $791.13 | 30% | $743.32 | 2,030 | $1,508,940 | ||||||
| 10,001 - 20,000 | $753.45 | 30% | |||||||||||
| 20,001 - 40,000 | $717.57 | 25% | |||||||||||
| 40,001 - 80,000 | $681.69 | 10% | |||||||||||
| 80,001 - 167,195 | $647.61 | 5% | |||||||||||
| 0008 | M4A1 - FAT, OP2 | 1 | $11,735.21 | 100% | $11,735.21 | 1 | $11,735 | ||||||
| 0009 | M4A1 - Production, OP2 | 1 - 10,000 | $791.13 | 5% | $712.46 | 24,060 | $17,141,788 | ||||||
| 10,001 - 20,000 | $753.45 | 25% | |||||||||||
| 20,001 - 40,000 | $717.57 | 30% | |||||||||||
| 40,001 - 80,000 | $681.69 | 30% | |||||||||||
| 80,001 - 167,195 | $647.61 | 10% | |||||||||||
| Ordering Period 3 | |||||||||||||
| 0010 | M4 - FAT, OP3 | 1 | $11,910.36 | 100% | $11,910.36 | 1 | $11,910 | ||||||
| 0011 | M4 - Production, OP3 | 1 - 10,000 | $806.94 | 30% | $758.18 | 2,030 | $1,539,105 | ||||||
| 10,001 - 20,000 | $768.51 | 30% | |||||||||||
| 20,001 - 40,000 | $731.92 | 25% | |||||||||||
| 40,001 - 80,000 | $695.33 | 10% | |||||||||||
| 80,001 - 167,195 | $660.56 | 5% | |||||||||||
| 0012 | M4A1 - FAT, OP3 | 1 | $11,969.91 | 100% | $11,969.91 | 1 | $11,970 | ||||||
| 0013 | M4A1 - Production, OP3 | 1 - 10,000 | $806.94 | 5% | $726.71 | 24,060 | $17,484,643 | ||||||
| 10,001 - 20,000 | $768.51 | 25% | |||||||||||
| 20,001 - 40,000 | $731.92 | 30% | |||||||||||
| 40,001 - 80,000 | $695.33 | 30% | |||||||||||
| 80,001 - 167,195 | $660.56 | 10% | |||||||||||
| Ordering Period 4 | |||||||||||||
| 0014 | M4 - FAT, OP4 | 1 | $12,148.57 | 100% | $12,148.57 | 1 | $12,149 | ||||||
| 0015 | M4 - Production, OP4 | 1 - 10,000 | $823.08 | 30% | $773.34 | 2,030 | $1,569,880 | ||||||
| 10,001 - 20,000 | $783.89 | 30% | |||||||||||
| 20,001 - 40,000 | $746.56 | 25% | |||||||||||
| 40,001 - 80,000 | $709.24 | 10% | |||||||||||
| 80,001 - 167,195 | $673.77 | 5% | |||||||||||
| 0016 | M4A1 - FAT, OP4 | 1 | $12,209.31 | 100% | $12,209.31 | 1 | $12,209 | ||||||
| 0017 | M4A1 - Production, OP4 | 1 - 10,000 | $823.08 | 5% | $741.24 | 24,060 | $17,834,234 | ||||||
| 10,001 - 20,000 | $783.89 | 25% | |||||||||||
| 20,001 - 40,000 | $746.56 | 30% | |||||||||||
| 40,001 - 80,000 | $709.24 | 30% | |||||||||||
| 80,001 - 167,195 | $673.77 | 10% | |||||||||||
| Ordering Period 5 | |||||||||||||
| 0018 | M4 - FAT, OP5 | 1 | $12,391.54 | 100% | $12,391.54 | 1 | $12,392 | ||||||
| 0019 | M4 - Production, OP5 | 1 - 10,000 | $839.54 | 30% | $788.81 | 2,030 | $1,601,284 | ||||||
| 10,001 - 20,000 | $799.56 | 30% | |||||||||||
| 20,001 - 40,000 | $761.49 | 25% | |||||||||||
| 40,001 - 80,000 | $723.41 | 10% | |||||||||||
| 80,001 - 167,195 | $687.24 | 5% | |||||||||||
| 0020 | M4A1 - FAT, OP5 | 1 | $12,453.50 | 100% | $12,453.50 | 1 | $12,453 | ||||||
| 0021 | M4A1 - Production, OP5 | 1 - 10,000 | $839.54 | 5% | $756.06 | 24,060 | $18,190,804 | ||||||
| 10,001 - 20,000 | $799.56 | 25% | |||||||||||
| 20,001 - 40,000 | $761.49 | 30% | |||||||||||
| 40,001 - 80,000 | $723.41 | 30% | |||||||||||
| 80,001 - 167,195 | $687.24 | 10% | |||||||||||
| Evaluated Price-All CLINs | $119,994,970 | ||||||||||||
| Evaluated Royalty Amount | $2,148,511 | ||||||||||||
| Price Evaluation Preference for Hubzone Small Business Concerns | Base | Rate | $12,214,348 | ||||||||||
| $122,143,481 | 10% | ||||||||||||
| Total Evaluated Price | $134,357,829 | ||||||||||||
| *Rounded to the nearest whole dollar |
IGCE Unit Prices
| FOR OFFICIAL USE ONLY - Source Selection Information - See FAR 2.101 and 3.104 |
| The below breakdown provides an estimated cost for various quantity ranges. Ranges were based of known maximum quantity ranges and historical pricing data. The quantity breakdown is shown for each year. |
| Notes: |
| 1) M4 and M4A1 are same price |
| Description | Quantity Range | Estimated Unit |
| Price |
Ordering Period 1 % Split
M4/M4A1 - FAT N/A $11,448
| M4/M4A1 - Production | 1 - 10,000 | $775.61 |
| 10,001 - 10,000 | $738.68 | |
| 20,001- 40,000 | $703.50 | |
| 40,001 -80,000 | $668.33 | |
| 80,001 – 167,195 | $634.91 |
Ordering Period 2
M4/M4A1 - FAT N/A $11,677
| M4/M4A1 - Production | 1 - 10,000 | $791.13 |
| 10,001 - 10,000 | $753.45 | |
| 20,001- 40,000 | $717.57 | |
| 40,001 -80,000 | $681.69 | |
| 80,001 – 167,195 | $647.61 |
Ordering Period 3
M4/M4A1 - FAT N/A $11,910
| M4/M4A1 - Production | 1 - 10,000 | $806.94 |
| 10,001 - 10,000 | $768.51 | |
| 20,001- 40,000 | $731.92 | |
| 40,001 -80,000 | $695.33 | |
| 80,001 – 167,195 | $660.56 |
Ordering Period 4
M4/M4A1 - FAT N/A $12,149
| M4/M4A1 - Production | 1 - 10,000 | $823.08 |
| 10,001 - 10,000 | $783.89 | |
| 20,001- 40,000 | $746.56 | |
| 40,001 -80,000 | $709.24 | |
| 80,001 – 167,195 | $673.77 |
Ordering Period 5
M4/M4A1 - FAT N/A $12,392
| M4/M4A1 - Production | 1 - 10,000 | $839.54 |
| 10,001 - 10,000 | $799.56 | |
| 20,001- 40,000 | $761.49 | |
| 40,001 -80,000 | $723.41 | |
| 80,001 – 167,195 | $687.24 |
FOR OFFICIAL USE ONLY - Source Selection Information - See FAR 2.101 and 3.104
Weight by Item FY20-24
| FY | ITEM | Total (QTY) | |
| FY20 | M4 | 2030 | 3% |
| M4A1 | 60805 | 97% | |
| TOTAL | 62835 | ||
| FY21 | M4 | 2030 | 8% |
| M4A1 | 24060 | 92% | |
| TOTAL | 26090 | ||
| FY22 | M4 | 2030 | 8% |
| M4A1 | 24060 | 92% | |
| TOTAL | 26090 | ||
| FY23 | M4 | 2030 | 8% |
| M4A1 | 24060 | 92% | |
| TOTAL | 26090 | ||
| FY24 | M4 | 2030 | 8% |
| M4A1 | 24060 | 92% | |
| TOTAL | 26090 | ||
| TOTAL | M4 | 10150 | 6% |
| M4A1 | 157045 | 94% | |
| TOTAL | 167195 |
Weighted Eval UP Max
| Royalty Adjustment Amount | |||||||||||||||||
| CLIN | Description | Quantity/ Quantity Range | Evaluated Quantity | Proposed Unit Price | Evaluated Amount | Weight Per Qty/Qty Range | Weighted Evaluated Price Per Qty/Qty Range | Weight Per Weapon System | Weighted Evaluated Price | Weapon System | Total Price for FAT Units | Weighted Evaluated Price for Production CLINs | Total Price/Weighted Evaluated Price for FAT & Production Units | Allocation % | Total Dollars Subject to Royalty in TEP | Royalty % | Evaluated Royalty Amount |
| 0001 | M4 - FAT, OP1 | 1 | 1 | $5,462.00 | $5,462.00 | 100% | $5,462.00 | 100% | $5,462.00 | M4 | $48,194.69 | ERROR:#REF! | ERROR:#REF! | 36.22% | ERROR:#REF! | 5.00% | ERROR:#REF! |
| 0002 | M4 - Production, OP1 | 1-20,000 | 20,000 | $771.75 | $15,435,000.00 | 10% | $1,543,500.00 | M4A1 | $48,435.66 | ERROR:#REF! | ERROR:#REF! | 35.82% | ERROR:#REF! | 5.00% | ERROR:#REF! | ||
| 20,001-40,000 | 40,000 | $735.00 | $29,400,000.00 | 25% | $7,350,000.00 | Total | ERROR:#REF! | ||||||||||
| 40,001 - 80,000 | 80,000 | $700.00 | $56,000,000.00 | 40% | $22,400,000.00 | ||||||||||||
| 80,001 - 160,000 | 160,000 | $665.00 | $106,400,000.00 | 20% | $21,280,000.00 | ||||||||||||
| 160,001-292,000 | 292,000 | $631.75 | $184,471,000.00 | 5% | $9,223,550.00 | ||||||||||||
| Evaluated Price - CLIN 0002 M4 - Production, OP1 | $61,797,050.00 | ERROR:#REF! | ERROR:#REF! | ||||||||||||||
| 0003 | M4A1 - FAT, OP1 | 1 | 1 | $5,489.31 | $5,489.31 | 100% | $5,489.31 | 100% | $5,489.31 | ||||||||
| 0004 | M4A1 - Production, OP1 | 1-20,000 | 20,000 | $775.61 | $15,512,175.00 | 10% | $1,551,217.50 | ||||||||||
| 20,001-40,000 | 40,000 | $738.68 | $29,547,000.00 | 25% | $7,386,750.00 | ||||||||||||
| 40,001 - 80,000 | 80,000 | $703.50 | $56,280,000.00 | 40% | $22,512,000.00 | ||||||||||||
| 80,001 - 160,000 | 160,000 | $668.33 | $106,932,000.00 | 20% | $21,386,400.00 | ||||||||||||
| 160,001-292,000 | 292,000 | $634.91 | $185,393,355.00 | 5% | $9,269,667.75 | ||||||||||||
| Evaluated Price - CLIN 0004 M4A1 - Production, OP1 | $62,106,035.25 | ERROR:#REF! | ERROR:#REF! | ||||||||||||||
| 0005 | CDRLs | NSP | |||||||||||||||
| 0006 | M4 - FAT, OP2 | 1 | 1 | $5,770.60 | $5,770.60 | 100% | $5,770.60 | 100% | $5,770.60 | ||||||||
| 0007 | M4 - Production, OP2 | 1-20,000 | 20,000 | $787.19 | $15,743,800.00 | 10% | $1,574,380.00 | ||||||||||
| 20,001-40,000 | 40,000 | $749.70 | $29,988,000.00 | 25% | $7,497,000.00 | ||||||||||||
| 40,001 - 80,000 | 80,000 | $714.00 | $57,120,000.00 | 40% | $22,848,000.00 | ||||||||||||
| 80,001 - 160,000 | 160,000 | $678.30 | $108,528,000.00 | 20% | $21,705,600.00 | ||||||||||||
| 160,001-292,000 | 292,000 | $644.39 | $188,161,880.00 | 5% | $9,408,094.00 | ||||||||||||
| Evaluated Price - CLIN 0007 M4 - Production, OP2 | $63,033,074.00 | ERROR:#REF! | ERROR:#REF! | ||||||||||||||
| 0008 | M4A1 - FAT, OP2 | 1 | 1 | $5,799.45 | $5,799.45 | 100% | $5,799.45 | 100% | $5,799.45 | ||||||||
| 0009 | M4A1 - Production, OP2 | 1-20,000 | 20,000 | $791.13 | $15,822,519.00 | 10% | $1,582,251.90 | ||||||||||
| 20,001-40,000 | 40,000 | $753.45 | $30,137,940.00 | 25% | $7,534,485.00 | ||||||||||||
| 40,001 - 80,000 | 80,000 | $717.57 | $57,405,600.00 | 40% | $22,962,240.00 | ||||||||||||
| 80,001 - 160,000 | 160,000 | $681.69 | $109,070,640.00 | 20% | $21,814,128.00 | ||||||||||||
| 160,001-292,000 | 292,000 | $647.61 | $189,102,689.40 | 5% | $9,455,134.47 | ||||||||||||
| Evaluated Price - CLIN 0009 M4A1 - Production, OP2 | $63,348,239.37 | ERROR:#REF! | ERROR:#REF! | ||||||||||||||
| 0010 | M4 - FAT, OP3 | 1 | 1 | $5,880.39 | $5,880.39 | 100% | $5,880.39 | 100% | $5,880.39 | ||||||||
| 0011 | M4 - Production, OP3 | 1-20,000 | 20,000 | $802.93 | $16,058,600.00 | 10% | $1,605,860.00 | ||||||||||
| 20,001-40,000 | 40,000 | $764.69 | $30,587,600.00 | 25% | $7,646,900.00 | ||||||||||||
| 40,001 - 80,000 | 80,000 | $728.28 | $58,262,400.00 | 40% | $23,304,960.00 | ||||||||||||
| 80,001 - 160,000 | 160,000 | $691.87 | $110,699,200.00 | 20% | $22,139,840.00 | ||||||||||||
| 160,001-292,000 | 292,000 | $657.27 | $191,922,840.00 | 5% | $9,596,142.00 | ||||||||||||
| Evaluated Price - CLIN 0011 M4 - Production, OP3 | $64,293,702.00 | ERROR:#REF! | ERROR:#REF! | ||||||||||||||
| 0012 | M4A1 - FAT, OP3 | 1 | 1 | $5,909.79 | $5,909.79 | 100% | $5,909.79 | 100% | $5,909.79 | ||||||||
| 0013 | M4A1 - Production, OP3 | 1-20,000 | 20,000 | $806.94 | $16,138,893.00 | 10% | $1,613,889.30 | ||||||||||
| 20,001-40,000 | 40,000 | $768.51 | $30,740,538.00 | 25% | $7,685,134.50 | ||||||||||||
| 40,001 - 80,000 | 80,000 | $731.92 | $58,553,712.00 | 40% | $23,421,484.80 | ||||||||||||
| 80,001 - 160,000 | 160,000 | $695.33 | $111,252,696.00 | 20% | $22,250,539.20 | ||||||||||||
| 160,001-292,000 | 292,000 | $660.56 | $192,882,454.20 | 5% | $9,644,122.71 | ||||||||||||
| Evaluated Price - CLIN 0013 M4A1 - Production, OP3 | $64,615,170.51 | ERROR:#REF! | ERROR:#REF! | ||||||||||||||
| 0014 | M4 - FAT, OP4 | 1 | 1 | $5,991.81 | $5,991.81 | 100% | $5,991.81 | 100% | $5,991.81 | ||||||||
| 0015 | M4 - Production, OP4 | 1-20,000 | 20,000 | $818.99 | $16,379,800.00 | 10% | $1,637,980.00 | ||||||||||
| 20,001-40,000 | 40,000 | $779.99 | $31,199,600.00 | 25% | $7,799,900.00 | ||||||||||||
| 40,001 - 80,000 | 80,000 | $742.85 | $59,428,000.00 | 40% | $23,771,200.00 | ||||||||||||
| 80,001 - 160,000 | 160,000 | $705.71 | $112,913,600.00 | 20% | $22,582,720.00 | ||||||||||||
| 160,001-292,000 | 292,000 | $670.42 | $195,762,640.00 | 5% | $9,788,132.00 | ||||||||||||
| Evaluated Price - CLIN 0015 M4 - Production, OP4 | $65,579,932.00 | ERROR:#REF! | ERROR:#REF! | ||||||||||||||
| 0016 | M4A1 - FAT, OP4 | 1 | 1 | $6,021.77 | $6,021.77 | 100% | $6,021.77 | 100% | $6,021.77 | ||||||||
| 0017 | M4A1 - Production, OP4 | 1-20,000 | 20,000 | $823.08 | $16,461,699.00 | 10% | $1,646,169.90 | ||||||||||
| 20,001-40,000 | 40,000 | $783.89 | $31,355,598.00 | 25% | $7,838,899.50 | ||||||||||||
| 40,001 - 80,000 | 80,000 | $746.56 | $59,725,140.00 | 40% | $23,890,056.00 | ||||||||||||
| 80,001 - 160,000 | 160,000 | $709.24 | $113,478,168.00 | 20% | $22,695,633.60 | ||||||||||||
| 160,001-292,000 | 292,000 | $673.77 | $196,741,453.20 | 5% | $9,837,072.66 | ||||||||||||
| Evaluated Price - CLIN 0017 M4A1 - Production, OP4 | $65,907,831.66 | ERROR:#REF! | ERROR:#REF! | ||||||||||||||
| 0018 | M4 - FAT, OP5 | 1 | 1 | $6,105.90 | $6,105.90 | 100% | $6,105.90 | 100% | $6,105.90 | ||||||||
| 0019 | M4 - Production, OP5 | 1-20,000 | 20,000 | $835.36 | $16,707,285.00 | 10% | $1,670,728.50 | ||||||||||
| 20,001-40,000 | 40,000 | $795.59 | $31,823,400.00 | 25% | $7,955,850.00 | ||||||||||||
| 40,001 - 80,000 | 80,000 | $757.70 | $60,616,000.00 | 40% | $24,246,400.00 | ||||||||||||
| 80,001 - 160,000 | 160,000 | $719.82 | $115,170,400.00 | 20% | $23,034,080.00 | ||||||||||||
| 160,001-292,000 | 292,000 | $683.82 | $199,676,681.00 | 5% | $9,983,834.05 | ||||||||||||
| Evaluated Price - CLIN 0019 M4 - Production, OP5 | $66,890,892.55 | ERROR:#REF! | ERROR:#REF! | ||||||||||||||
| 0020 | M4A1 - FAT, OP5 | 1 | 1 | $6,136.43 | $6,136.43 | 100% | $6,136.43 | 100% | $6,136.43 | ||||||||
| 0021 | M4A1 - Production, OP5 | 1-20,000 | 20,000 | $839.54 | $16,790,821.43 | 10% | $1,679,082.14 | ||||||||||
| 20,001-40,000 | 40,000 | $799.56 | $31,982,517.00 | 25% | $7,995,629.25 | ||||||||||||
| 40,001 - 80,000 | 80,000 | $761.49 | $60,919,080.00 | 40% | $24,367,632.00 | ||||||||||||
| 80,001 - 160,000 | 160,000 | $723.41 | $115,746,252.00 | 20% | $23,149,250.40 | ||||||||||||
| 160,001-292,000 | 292,000 | $687.24 | $200,675,064.41 | 5% | $10,033,753.22 | ||||||||||||
| Evaluated Price - CLIN 0021 M4A1 - Production, OP5 | $67,225,347.01 | ERROR:#REF! | ERROR:#REF! | ||||||||||||||
| Evaluated Price-All CLINs | ERROR:#REF! | ||||||||||||||||
| Evaluated Royalty Amount | ERROR:#REF! | ||||||||||||||||
| Rental Equivalent Factor for Value of Government Property | $7,000.00 | ||||||||||||||||
| Price Evaluation Preference for Hubzone Small Business Concerns | Base | Rate | |||||||||||||||
| ERROR:#REF! | 10% | ERROR:#REF! | |||||||||||||||
| Total Evaluated Price | ERROR:#REF! |
Avg Unit Price
| Evaluated Royalty Amount Calculation: | |||||||||||||||||||
| Description | Qty/ Qty Range | OP1 | OP2 | OP3 | OP4 | OP5 | Avg U/P | Evaluated Qty | Evaluated Amount | Weight % | Weighted Evaluated Price | Item | FAT Units | Production Total Evaluated Price | Total Evaluated Price for Units | % of Unit Price Subject to Royalty | Total Dollars Subject to Royalty | Royalty % | Evaluated Royalty Amount |
| M4 - FAT | 1 | $5,462.00 | $5,770.60 | $5,880.39 | $5,991.81 | $6,105.90 | N/A | 1 | 29,210.70 | 100% | $ 29,210.70 | M4 | $48,194.69 | $ 64,318,930.11 | $64,367,124.80 | 36.22% | $23,313,772.60 | 5.00% | $3,218,356.24 |
| M4 - Production | 1-20,000 | $771.75 | $787.19 | $802.93 | $818.99 | $835.36 | $803.24 | 20,000 | 16,064,897.00 | 10% | $ 1,606,489.70 | M4A1 | $48,194.69 | $ 64,318,930.11 | $64,367,124.80 | 36.22% | $23,313,772.60 | 5.00% | $3,218,356.24 |
| 20,001-40,000 | $735.00 | $749.70 | $764.69 | $779.99 | $795.59 | $764.99 | 40,000 | 30,599,720.00 | 25% | $ 7,649,930.00 | Total | $6,436,712.48 | |||||||
| 40,001 - 80,000 | $700.00 | $714.00 | $728.28 | $742.85 | $757.70 | $728.57 | 80,000 | 58,285,280.00 | 40% | $ 23,314,112.00 | |||||||||
| 80,001 - 160,000 | $665.00 | $678.30 | $691.87 | $705.71 | $719.82 | $692.14 | 160,000 | 110,742,240.00 | 20% | $ 22,148,448.00 | |||||||||
| 160,001-292,000 | $631.75 | $644.39 | $657.27 | $670.42 | $683.82 | $657.53 | 292,000 | 191,999,008.20 | 5% | $ 9,599,950.41 | |||||||||
| Evaluated Price - M4 Production | $ 64,318,930.11 | ||||||||||||||||||
| M4A1 - FAT | 1 | $5,462.00 | $5,770.60 | $5,880.39 | $5,991.81 | $6,105.90 | N/A | 1 | 29,210.70 | 100% | $ 29,210.70 | ||||||||
| M4A1 - Production | 1-20,000 | $771.75 | $787.19 | $802.93 | $818.99 | $835.36 | $803.24 | 20,000 | 16,064,897.00 | 10% | $ 1,606,489.70 | ||||||||
| 20,001-40,000 | $735.00 | $749.70 | $764.69 | $779.99 | $795.59 | $764.99 | 40,000 | 30,599,720.00 | 25% | $ 7,649,930.00 | |||||||||
| 40,001 - 80,000 | $700.00 | $714.00 | $728.28 | $742.85 | $757.70 | $728.57 | 80,000 | 58,285,280.00 | 40% | $ 23,314,112.00 | |||||||||
| 80,001 - 160,000 | $665.00 | $678.30 | $691.87 | $705.71 | $719.82 | $692.14 | 160,000 | 110,742,240.00 | 20% | $ 22,148,448.00 | |||||||||
| 160,001-292,000 | $631.75 | $644.39 | $657.27 | $670.42 | $683.82 | $657.53 | 292,000 | 191,999,008.20 | 5% | $ 9,599,950.41 | |||||||||
| Evaluated Price - M4A1 Production | $ 64,318,930.11 | ||||||||||||||||||
| Evaluated Price-M4 & M4A1 FAT and Production | $ 128,696,281.62 | ||||||||||||||||||
| Royalty Evaluated Amount | $6,436,712.48 | ||||||||||||||||||
| Rental Equivalent Factor for Value of Government Property | $7,000.00 | ||||||||||||||||||
| Price Evaluation Preference for Hubzone Small Business Concerns | 10% | $442,423.00 | |||||||||||||||||
| TOTAL EVALUATED PRICE | $135,582,417.10 |
File details come from the government source that posted it. Updated .