ATTACHMENT 001 - STS Accumulators v2.pdf

PDF 103 KB Posted

Attached to
John Day Dam STS Accumulators Federal contract opportunity
Solicitation number
W9127N25QA088
Issued by
Department of the Army Corps of Engineers Engineering District Portland

About this file

This document is an Attachment to Specifications for Submerged Traveling Screen Accumulators for the John Day-Willow Creek Project in Oregon. The specification requires a contractor to provide 100 new diaphragm-type accumulators with specific technical requirements: 170 CI (2.8 Liter) size, Hydrin type rubber diaphragm, 3600 PSI designed pressure, and precise dimensional specifications including 6.9-inch diameter and 10.6-inch length.

The contractor must deliver the accumulators to John Day Lock and Dam, located at I-84, Exit 109 in Rufus, Oregon, with specific delivery parameters including arrival between 7:00 a.m. and 3:00 p.m. during normal working hours (6:30 a.m. to 5:00 p.m., Monday through Thursday). The contract includes requirements for packaging, shipping preparation, and documentation, including submission of O&M manuals, technical drawings, and product data sheets. The accumulators come with a three-year warranty after receipt and acceptance at the delivery site.

View the file

Other files for this federal contract opportunity

Other files attached to John Day Dam STS Accumulators, newest first.
File Type Posted
B.08 Solicitation Amendment W9127N25QA0880001 SF 30.pdf PDF
PWS - STS Accumulators - REV002.pdf PDF
B.08 Solicitation - W9127N25QA088.pdf PDF
B.01 Combined Synopsis Solicitation.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1 – SPECIFICATIONS

Submerged Traveling Screen Accumulators

John Day-Willow Creek Project, Oregon

1. SCOPE

Contractor shall provide John Day Lock and Dam 100 new accumulators for their Submerged Traveling Screens (STS). Contractor shall provide a physical and digital copy of the accumulator O&M manual, technical drawings, and product data sheets. Specifications for the accumulators are listed in this document.

2. SPECIFICATIONS

a. ACCUMULATORS SHALL

i. Be a diaphragm type accumulator.

1. Hydrin type rubber for diaphragm material.

ii. Have a size of 170 CI (2.8 Liter).

iii. Have a designed pressure of 3600 PSI, max pressure rating 3630 PSI.

iv. Have a #8 SAE (3/4-16 UNF) female connection and threaded Schrader charging connection.

v. Have the following approximate dimensions

1. Diameter: 6.9in (175.26mm)

2. Length: 10.6in (309.88mm)

b. THE CONTRACTOR SHALL

i. Provide 100 accumulators that meet the requirements in the “SPECIFICATIONS” section and deliver it to John Day Lock and Dam.

ii. Submit for approval prior to delivery a digital copy of the O&M manual, technical drawings and product data sheets for the accumulators.

iii. Provide 1 physical copy and 1 digital copy of the accumulators O&M manual, technical drawings, and product data sheets.

3. WARRANTY

a. Warranty provisions of these Specifications shall apply, except that notwithstanding inspection and acceptance, accumulators warranted to conform to these specifications for three years after receipt and acceptance at delivery site.

4. SHIPMENT

a. The following general requirements apply to the accumulators:

i. Shipping General

1. Prepare all components for shipment in a manner to protect them from damage. The Contractor must be responsible for and make good at no extra cost to the Government damage resulting from improper preparation, as well as for damage occurring during inspection, or shipping.

2. Prior to shipment, coat components with a suitable preservative and cover all inlets and outlets to exclude dirt, water, etc.

3. If steel banding is used, use adequate protection so that it does not harm accumulators.

4. All packaging materials used become the property of the Government.

ii. Shipment of the Accumulators

1. Provide packaging, package for shipment, and provide transportation to the project facility.

5. SCHEDULE AND DELIVERY

a. Deliver to Government personnel at site. Normal working hours at John Day Dam are

6:30 a.m. to 5:00 p.m., Monday through Thursday. The delivery shall arrive between 7:00 a.m. and 3:00 p.m. during normal working days. This is to allow for unloading and inspection. The delivery shall be made to the south side of the dam. Delivery address is as follows:

John Day Lock and Dam I-84, Exit 109 Rufus, Oregon 97050