Attachment 001 Schedule B Fillable Choctaw Spillway CE.pdf

PDF 140 KB Posted

Attached to
MS Choctaw Spillway Bank Repairs
Solicitation number
12445124B0005
Issued by

About this file

This document contains an invitation for bid for bank repairs to the Choctaw Lake spillway. The project will repair washout damage to the spillway bank from a heavy rain event and make repairs to the PVC siphon system pipes, gabion mattress, and install heavier rock riprap. The solicitation is set aside 100% for small businesses with a NAICS code of 237990 and PSC of Z2KA. The location is the Choctaw Lake spillway in Mississippi. The estimated value is between $100,000 to $250,000 and the period of performance is from April 15, 2024 to July 31, 2024. One award will be made to the lowest priced responsive and responsible bidder. The last day for questions is March 16, 2024 and bids are due by March 22, 2024. The site visit will be on March 12, 2024 and all bids must be emailed to the points of contact at the USDA Forest Service Southern Region.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item

No.

Description

Method of Meas.

Unit Qty.

Unit

Price Total

151.01 MOBILIZATION L.S.Q. LS 1 xxxxxxxxxx $

204.07

BORROW EXCAVATION, PLACEMENT

METHOD E

C.Q. C.Y. 1700 $ $

209.01 STRUCTURE EXCAVATION AND BACKFILL C.Q. L.S. 1 xxxxxxxxxx $

308.02

ROADWAY AGGREGATE, TYPE CRUSHED

LIMESTONE, GRADE 610, COMPACTION A

A.Q. TON 30 $ $

625.01 TURF ESTABLISHMENT C.Q. Acre 0.2 $ $

635.01 TEMPORARY TRAFFIC CONTROL L.S.Q. LS 1 xxxxxxxxxx $

705.01 GABION REPAIR L.S.Q. LS 1 xxxxxxxxxx $

705.02 ROCK RIPRAP 400# Gradation C.Q. TON 250 $ $

705.02 ROCK RIPRAP Class 5 C.Q. TON 300 $ $

708.05 PVC Siphon Pipe Repair w/ connections and

seals L.S.Q. LS 1 xxxxxxxxxx $

714.01 GEOTEXTILE C.Q. S.Y. 400 $ $

Signature

Available to Perform Work TO

COMPANY NAME:

UNIQUE ID:

Attachment 001 Schedule of Items Choctaw Lake Spillway Bank Repair

TOTAL

fill_41:
fill_42:
fill_43:
fill_44:
fill_45:
fill_46:
fill_48:
fill_49:
fill_50:
fill_52:
fill_54:
fill_55:
fill_57:
fill_58:
fill_59:
fill_61:
fill_62:
Text1:
Text2:
Date3_af_date:
Date4_af_date:
Text6:

File details come from the government source that posted it. Updated .