Attachment_001_CANA_Replace_Fellers_Dock_General_Specifications.pdf

PDF 982 KB Posted

Attached to
CONSTRUCTION, REPLACE FELLERS' BOATHOUSE DOCK, CAN Federal contract opportunity
Solicitation number
140P5424R0013
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This document is the General Specifications for the replacement of the Fellers' Boathouse Dock located within Canaveral National Seashore. The National Park Service (NPS) is seeking proposals for this construction project. Key details include:

The scope of work involves the replacement of the Fellers' Boathouse Dock at Canaveral National Seashore in Volusia County, Florida. The contract requires the contractor to provide quality control, testing and inspections, and other standard construction management activities. Specific requirements cover materials, equipment, workmanship, and documentation. The contractor will be responsible for all aspects of the project, including preparing a quality control plan, conducting preparatory and initial phases, and documenting work through daily reports and other submittals. The project is subject to availability of funds.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CANAVERAL NATIONAL SEASHORE

VOLUSIA COUNTY, FLORIDA

REPLACE FELLERS OUSE DOCK AND PIER

GENERAL SPECIFICATIONS

NATIONAL PARK SERVICE (NPS)

Digitally signed by Curtis N.

Todd Date:

2024.01.25 16:10:47 -05'00'

CANA 233967 01 40 00 - 1

012721 QUALITY REQUIREMENTS

NPS Division 1 Specifications National Park Service (NPS)

CANA 233967

SECTION 01 40 00 - QUALITY REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for quality assurance and quality control.

B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of its duty to follow Contract Document requirements. Quality of work shall be the contractor's responsibility.

1. Specified tests, inspections, and related actions do not limit Contractor's other quality assurance and control procedures that facilitate compliance with Contract Document requirements.

C. See Divisions 2 through 49 Sections for specific test and inspection requirements.

1.2 DEFINITIONS

A. Quality Assurance Services: Activities, actions, and procedures performed before and during execution of the work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements.

B. Quality Control Services: Tests, inspections, procedures, and related actions during and after execution of the work to evaluate actual products incorporated into the work and completed construction comply with requirements.

C. Mockups: Full-size physical assemblies constructed on-site. Mockups are constructed from selections made under Sample submittals; to show aesthetic effects and, where indicated, qualities of materials and performance; to review coordination, testing, or operation; to show interface between dissimilar materials; and to demonstrate compliance with specified installation tolerances. Mockups are not Samples. Approved mockups establish the standard by which the Work will be judged, unless otherwise indicated.

1. Laboratory Mockups: Full-size physical assemblies constructed at a testing facility to verify performance characteristics.

2. Integrated Exterior Mockups: Mockups of exterior envelope erected separately from building but on Project site, consisting of multiple products, assemblies, and subassemblies.

CANA 233967 01 40 00 - 2

012721 QUALITY REQUIREMENTS

3. Room Mockups: Mockups of typical interior spaces complete with wall, floor, and ceiling finishes, doors, windows, millwork, casework, specialties, furnishings and equipment, and lighting.

D. Preconstruction Testing: Tests and inspections performed specifically for project before products and materials are incorporated into work to verify performance or compliance with specified criteria.

E. Product Testing: Tests and inspections performed by a Nationally Recognized Testing Laboratory (NRTL), a National Voluntary Laboratory Accreditation Program (NVLAP), or a testing agency qualified to conduct product testing, to establish product performance and compliance with industry standards.

F. Source Quality Control Testing: Tests and inspections performed at the source, i.e., plant, mill, factory, or shop.

G. Field Quality Control Testing: Tests and inspections performed on-site for installation of work and for completed work.

H. Testing Agency or Laboratory: Entity engaged to perform specific tests, inspections, or both.

Testing laboratory shall mean the same as testing agency.

I. Installer or Applicator or Erector: Contractor or another entity contractor engaged as an employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, and similar operations.

1. Using a term such as "carpentry" does not imply certain construction activities must be performed by accredited or unionized individuals of a corresponding generic name, such as "carpenter." It also does not imply that requirements specified apply exclusively to trades people of corresponding generic name.

1.3 CONFLICTING REQUIREMENTS

A. Reference Standards: If following two or more standards is specified and standards establish different or conflicting requirements for minimum quality levels, follow the most stringent requirement. Refer uncertainties and requirements that are different, but apparently equal, to Contracting Officer before proceeding.

B. Minimum Quality Levels: Quality level shown or specified shall be minimum provided or performed. Actual installation may comply exactly with minimum quality specified, or it may exceed minimum within reasonable limits. To follow requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Contracting Officer before proceeding.

1.4 SUBMITTALS

A. Quality Control Plan:

1. After contract award and before Pre-Construction conference, submit a written Contractor Quality Control (CQC) plan.

CANA 233967 01 40 00 - 3

QUALITY REQUIREMENTS

2. If plan requires revisions or corrections, Contractor shall resubmit plan within 10 calendar days.

3. Government reserves the right to require changes in plan during contract period as necessary to obtain the quality specified.

4. No change in the approved plan may be made without the Contracting Officer's written concurrence.

B. Qualification Data: For testing agencies specified in "Quality Assurance" Article to demonstrate their abilities and experience. Include proof of qualifications in form of a recent report on inspection of testing agency by a recognized authority.

C. Contractor Quality Control (CQC) Daily Reports: Submit showing inspections and tests on first workday following date covered by report. Quality Control Supervisor shall use DSC Forms.

1. Review Construction Management Representative (CMR) Daily report if applicable and reconcile any differences prior to posting.

D. Test Reports

1. Test reports shall be completed by person performing test.

2. Submit Daily Test Information Sheets with Quality Control Daily Reports.

3. Submit failing test results and proposed remedial actions within four hours of noted deficiency.

4. Submit three copies of complete test results no later than one calendar day after test was performed.

E. Accessibility Inspection Report:

1. Fill out applicable sections of the Accessibility Inspection Report and attach to Contractor Quality Control Daily Report.

2. Utilize attached Accessibility Inspection form to document compliance with Architectural Barriers Act Accessibility Standards (ABAAS).

3. Inspect at various stages of construction as needed to ensure finished product meets standards.

4. Submit report no later than one calendar day after inspection was performed.

F. Off-Site Inspection Reports: Submit prior to shipment.

G. If Contractor Quality Control plan and Quality Control Daily Reports are not submitted as specified, Contracting Officer may retain payments until such time plan(s) is/are accepted and implemented, or may retain payments for work completed on days with no Quality Control Daily Reports.

H. Permits, Licenses, and Certificates: For National Park Service (NPS) records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of work.

1.5 QUALITY ASSURANCE

A. General: Qualifications paragraphs in this Article establish minimum qualification levels required; individual Specification Sections specify additional requirements.

CANA 233967 01 40 00 - 4

B. Contractors Quality Control Staff:

1. Contractor's Quality Control Supervisor may also perform other duties.

2. Contractor's Quality Control Supervisor shall be assigned no other duties.

3. Contractor's designated Quality Control Supervisor shall be on the project site whenever contract work is in progress.

4. Contractor's job supervisory staff may be used to assist Quality Control Supervisor supplemented, as necessary, by additional certified testing technicians.

C. Installer Qualifications: Firm or individual experienced in installing, erecting, or assembling work similar in material, design, and extent indicated for Project, whose work has resulted in construction with a record of successful in-service performance.

D. Manufacturer Qualifications: Firm experienced in manufacturing products or systems similar to those indicated for Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

E. Fabricator Qualifications: Firm experienced in producing products similar to those indicated for Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

F. Professional Engineer Qualifications: Professional engineer legally qualified to practice in jurisdiction where Project is located and is experienced in providing engineering services of kind indicated (including Structural Tests and Special Inspections (STSI)). Engineering services are defined as those performed for installations of system, assembly, or products similar to those indicated for Project in material, design, and extent.

G. Specialists: Certain sections of the Specifications require that specific construction activities shall be performed by entities who are recognized experts in those operations. Specialists shall satisfy qualification requirements indicated and shall be engaged for activities indicated.

1. Requirement for specialists shall not supersede building codes and regulations governing Work.

H. Testing Agency Qualifications: A Nationally Recognized Testing Laboratory (NRTL), a National Voluntary Laboratory Accreditation Program (NVLAP), or an independent agency with experience and capability to conduct testing and inspecting indicated, according to ASTM E 329;

and with additional qualifications specified in individual Sections; and where required by Contract, is acceptable to Contracting Officer.

1. Nationally Recognized Testing Laboratory (NRTL): Nationally recognized testing laboratory according to 29 CFR 1910.7 (Code of Federal Regulations).

2. National Voluntary Laboratory Accreditation Program (NVLAP): Testing agency accredited according to National Institute of Standards and Technology’s (NIST) National Voluntary Laboratory Accreditation Program.

3. Measuring devices, laboratory equipment, and instruments shall be calibrated at established intervals against certified standards in accordance with NIST requirements.

Measuring and testing devices shall be made available for use by Government for verification tests.

CANA 233967 01 40 00 - 5

I. Factory-Authorized Service Representative Qualifications: Authorized representative of manufacturer who is trained and approved by manufacturer to inspect installation of manufacturer's products similar in material, design, and extent to those indicated for Project.

J. Mockups: Before installing portions of work requiring mockups, build mockups for each form of construction and finish required to comply with following requirements, using materials indicated for completed work:

1. Build mockups in location and of size indicated; if not indicated, as directed by Contracting Officer.

2. Notify Contracting Officer seven calendar days in advance of dates and times when mockups will be constructed.

3. Demonstrate proposed range of aesthetic effects and workmanship.

4. Obtain Contracting Officer’s approval of mockups before starting work, fabrication, or construction.

5. Maintain mockups in an undisturbed condition as a standard for judging the completed work.

6. Demolish and remove mockups when directed, unless otherwise indicated.

1.6 QUALITY CONTROL

A. Contractor is responsible for testing and inspections, including Structural Tests and Special Inspections (STSI), as identified in attached STSI. Inspect and test work as needed to ensure quality of materials, workmanship, construction, finish, and functional performance are in compliance with applicable specifications, drawings, and those required by the Building Code.

1. Engage qualified testing agency to perform quality-control services.

2. Submit appropriate report for each quality-control service.

3. Testing and inspecting requested by Contractor and not required by Contract Documents are Contractor's responsibility.

4. Contracting Officer may designate test locations.

B. Manufacturer's Field Services: Where indicated, engage factory-authorized service representative to inspect field-assembled components and equipment installation, including service connections.

Report results in writing.

C. Re-testing/Re-inspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and re-inspecting, for construction of replaced work that failed to comply with Contract Documents.

D. Testing Agency Responsibilities: Cooperate with NPS and Contractor in performance of duties.

Provide qualified personnel to perform required tests and inspections.

1. Notify Contracting Officer and Contractor promptly of irregularities or deficiencies observed in work during performance of services.

2. Determine location from which test samples will be taken and in which in-situ tests are conducted.

3. Conduct and interpret tests and inspections, State in each report whether tested and inspected work complies with or deviates from requirements.

4. Submit 3 copies of certified written report of each test, inspection, and similar quality-control service through Contractor.

CANA 233967 01 40 00 - 6

5. Do not release, revoke, alter, or increase Contract Document requirements or approve or accept any portion of Work.

E. Associated Services: Cooperate with agencies performing required tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as requested. Notify agency sufficiently in advance of operations to permit assignment of personnel. Provide:

1. Access to Work.

2. Incidental labor and facilities necessary to facilitate tests and inspections.

3. Adequate quantities of representative samples of materials that require testing and inspecting. Assist agency in obtaining samples.

4. Facilities for storage and field curing of test samples.

5. Delivery of samples to testing agencies.

6. Preliminary design mix proposed for material mixes that require control by testing agency.

7. Security and protection for samples and testing and inspecting equipment at Project site.

F. Coordination: Coordinate sequence of activities to accommodate required quality assurance and control services with minimum delay and to avoid removing and replacing construction to accommodate testing and inspecting.

1. Schedule times for tests, inspections, obtaining samples, and similar activities.

PART 2 - PRODUCTS

2.1 QUALITY CONTROL PLAN

A. Quality Control Plan shall include:

1. List of personnel responsible for quality control and assigned duties. Include each person's qualifications. Include alternate(s) and qualifications.

2. Copy of letter of direction to Contractor's Quality Control Supervisor(s) outlining assigned duties and authorities designated by principal or owner.

3. Names, qualifications / accreditations, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms from laboratories.

4. Methods of performing, documenting, and enforcing quality control of work including Contractor report forms and acknowledgment of NPS forms.

5. Methods of monitoring and controlling environmental pollution and contamination as required by regulations and laws.

6. Specific discussion regarding mockups, off-site visits, receiving inspections, manufacturers representation, startup requirements, and other aspects of performance specific to Project.

7. Provisions for substantial completion(s) and final inspection(s) per Contract.

PART 3 - EXECUTION

3.1 OFF-SITE CONTROL

A. Items fabricated or assembled off-site shall be inspected for quality control at place of fabrication.

CANA 233967 01 40 00 - 7

3.2 ON-SITE CONTROL

A. Notification:

1. Notify Contracting Officer at least 48 hours in advance of preparatory phase meeting.

2. Notify Contracting Officer at least 24 hours in advance of initial and follow-up phases.

B. Preparatory Phase: Perform before beginning each feature of work.

1. Review control submittal requirements with personnel directly responsible for quality assurance and quantity control of the work. As a minimum, Contractor's Quality Control Supervisor and foreman responsible for feature of work shall be in attendance.

2. Review applicable specifications sections and drawings related to feature of work.

3. Ensure copies of referenced standards related to sampling, testing, and execution for feature of work are available on site.

4. Ensure provisions have been made for field control testing.

5. Examine work area to ensure preliminary work has been completed.

6. Verify field dimensions and advise Contracting Officer of discrepancies with contract documents.

7. Ensure necessary equipment and materials are at project site and they comply with approved shop drawings and submittals.

8. Document preparatory phase activities and discussions on Contractor's Quality Control

Daily Report.

C. Initial Phase:

1. As soon as work begins, inspect and test representative portion of particular feature of work for quality of workmanship.

2. Review control testing procedures to ensure compliance with contract requirements.

3. Document initial phase activities and discussions on Contractor's Quality Control Daily

Report. Exact location of initial phase shall be indicated for future reference and comparison with follow-up phases.

D. Follow-Up Phase: Inspect and test as work progresses to ensure compliance with contract requirements until completion of work.

E. Additional Preparatory and Initial Phases: Additional preparatory and initial phases may be required on same feature of work for following reasons:

1. Quality of on-going work is unacceptable.

2. Changes in quality control staff, on-site production supervision, or work crew.

3. Work on particular feature of work is resumed after substantial period of inactivity.

3.3 DOCUMENTATION

A. Maintain Quality Control Daily Reports, Daily Test Report Information Sheets, and Accessibility Inspection Reports of quality control activities and tests. (Download from DSC Workflows website > Forms/Templates/Samples/Guidelines page > Construction Forms section.)

B. Quality Control Daily Reports shall not be substituted for other written reports required under clauses of contract, such as Disputes, Differing Site Conditions, or Changes.

CANA 233967 01 40 00 - 8

3.4 ENFORCEMENT

A. Contractor shall stop work on any item or feature pending satisfactory correction of deficiency noted by quality control staff or Contracting Officer.

3.5 REPAIR AND PROTECTION

A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes.

1. Provide materials and comply with installation requirements specified in other Specification Sections. Restore patched areas and extend restoration into adjoining areas with durable seams as invisible as possible.

2. Comply with Contract Document requirements for Section 01 73 29 "Cutting and Patching."

B. Protect construction exposed by or for quality-control service activities.

C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.

END OF SECTION 01 40 00

CANA 233967 01 42 00 - 1

REFERENCE STANDARDS

NPS DSC Division 1 Specifications National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21

CANA 233967

SECTION 01 42 00 – REFERENCE STANDARDS

PART 1 - GENERAL

1.1 ENVIRONMENTAL DEFINITIONS

A. Definitions pertaining to sustainable development: As defined in ASTM E2114 and as specified herein.

B. Biobased Materials: As defined in the Farm Security and Rural Investment Act, for purposes of Federal procurement of biobased products, "biobased" means a "commercial or industrial product (other than food or feed) that is composed, in whole or in significant part, of biological products or renewable domestic agricultural materials (including plant, animal, and marine materials) or forestry materials." Biobased materials also include fuels, chemicals, building materials, or electric power or heat produced from biomass as defined by The Biomass Research and Development Act of 2000.

1. Biobased content: Amount of biobased carbon in the material or product as a percentage of weight (mass) of total organic carbon in the material or product.

C. Chain-of-Custody: Process whereby a product or material is maintained under physical possession or control during its entire life cycle.

D. Deconstruction: Disassembly of buildings for purpose of recovering materials.

E. DFE (Design for the Environment): A technique that includes elements of resource conservation and pollution prevention as applied in various product sectors. A technique that incorporates approaches which are part of product (or assembly) concept, need and design. Considerations involve material selection, material and energy efficiency, reuse, maintainability and design for disassembly and recyclability. Refer to International Organization for Standardization (ISO) Guide 64 for additional clarification.

F. Environmentally preferable products: Products and services that have a lesser or reduced effect on the environment in comparison to conventional products and services. Refer to EPA’s Final Guidance on Environmentally Preferable Purchasing Program.

G. Non-Renewable Resource: A resource that exists in a fixed amount that cannot be replenished on a human time scale. Non-renewable resources have potential for renewal only by geological, physical, and chemical processes taking place over of millions of years. Examples include iron ore, coal, and oil.

H. Perpetual Resource: A resource that is virtually inexhaustible on a human time scale. Examples include solar energy, tidal energy, and wind energy.

CANA 233967 01 42 00 - 2

I. Recycled Content Materials: Products that contain pre-consumer or post-consumer materials as all or part of their feedstock. Recycled content claim shall be consistent Federal Trade Commission (FTC) Guide for Use of Environmental Marketing Claims.

J. Renewable Resource: A resource that is grown, naturally replenished, or cleansed, at a rate which exceeds depletion of the usable supply of that resource. A renewable resource can be exhausted if improperly managed. However, a renewable resource can last indefinitely with proper stewardship. Examples include trees in forests, grasses in grasslands, and fertile soil.

1.2 QUALITY ASSURANCE

A. Applicability of Standards: Unless the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into Contract Documents to the extent referenced. Such standards are made a part of Contract Documents by reference.

B. Publication Dates: Comply with standards in effect as of date of Contract Documents, unless otherwise indicated.

C. Conflicting Requirements: Where compliance with two or more standards is specified, and standards may establish different or conflicting requirements for minimum quantities or quality levels, comply with most stringent requirement. Refer uncertainties and requirements that are different, but apparently equal, to Contracting Officer (CO) for decision before proceeding.

1.3 INDUSTRY STANDARDS

A. Applicability of Standards: Unless Contract Documents include more stringent requirements, applicable construction industry standards have same force and effect as if bound or copied directly into Contract Documents to the extent referenced. Such standards are made a part of Contract Documents by reference.

B. Publication Dates: Comply with standards in effect as of date of Contract Documents unless otherwise indicated.

C. Copies of Standards: Each entity engaged in construction on Project should be familiar with industry standards applicable to its construction activity. Copies of applicable standards are not bound with Contract Documents.

1. Where copies of standards are needed to perform a required construction activity, obtain copies directly from publication source.

1.4 ABBREVIATIONS AND ACRONYMS

A. Industry Organizations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities found in Section 01 42 00 Sources for Reference Publications, Unified Facilities Guide Specifications (UFGS) (accessible via Masters website > Downloads section > click on UFGS Master (WBDG Website).

CANA 233967 01 42 00 - 3

Names, telephone numbers, and websites are subject to change and are believed to be accurate and up-to-date as of date of Contract Documents.

XX EXAMPLE Association (The) www.EXAMPLE.org

B. Code Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in following list. Names, telephone numbers, and websites are subject to change and are believed to be accurate and up-to-date as of date of Contract Documents.

DIN Deutsches Institut fur Normung e.V. 49 30 2601-3003 www.din.de

IAPMO International Association of Plumbing and Mechanical Officials (909) 472-4100 www.iapmo.org

ICC International Code Council (888) 422-7233 www.iccsafe.org

ICC-ES ICC Evaluation Service, Inc. (800) 423-6587 icc-es.org (562) 699-0543

C. Federal Government Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in following list.

Names, and websites are subject to change and are believed to be accurate and up-to-date as of date of Contract Documents.

ABA &

ABAAS United States Access Board

Architectural Barriers Act (ABA) Architectural Barriers Act Accessibility Standards (ABAAS) www.access-board.gov

CoE Army Corps of Engineers www.usace.army.mil

CPSC Consumer Product Safety Commission www.cpsc.gov

DOC Department of Commerce www.commerce.gov

DOD Department of Defense www.defense.gov

DOJ Department of Justice www.justice.gov

CANA 233967 01 42 00 - 4

DOE Department of Energy www.energy.gov

EPA Environmental Protection Agency www.epa.gov

FAA Federal Aviation Administration www.faa.gov

FCC Federal Communications Commission www.fcc.gov

FDA Food and Drug Administration www.fda.gov

GSA General Services Administration www.gsa.gov

HUD Department of Housing and Urban Development www.hud.gov

LBL Lawrence Berkeley National Laboratory www.lbl.gov

NCHRP National Cooperative Highway Research Program (See TRB (Transportation Resource Board))

NIST National Institute of Standards and Technology www.nist.gov

OSHA Occupational Safety & Health Administration www.osha.gov

PHS U.S. Department of Health and Human Services www.hhs.gov

RUS Rural Utilities Service (See USDA (Department of Agriculture))

SD State Department www.state.gov

TRB Transportation Research Board www.nationalacademies.org/trb/transportation-research-board

USDA Department of Agriculture www.usda.gov

USP U.S. Pharmacopeia www.usp.org

CANA 233967 01 42 00 - 5

USPS Postal Service www.usps.com

D. Standards and Regulations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the standards and regulations in following list. Names, telephone numbers, and websites are subject to change and are believed to be accurate and up-to-date as of date of Contract Documents.

ABAAS Architectural Barriers Act Accessibility Standards www.access-board.gov

CFR Code of Federal Regulations Available from Government Printing Office www.govinfo.gov/app/collection/cfr

DOD Department of Defense Military Specifications and Standards Available from Department of Defense Single Stock Point www.dsp.dla.mil/Specs-Standards/

DSCC Defense Supply Center Columbus (See FS (Federal Specification))

FED-STD Federal Standard (See FS (Federal Specification))

FS Federal Specification Available from Department of Defense Single Stock Point www.dsp.dla.mil/Specs-Standards/ Available from General Services Administration www.gsa.gov

Available from National Institute of Building Sciences www.nibs.org

FTMS Federal Test Method Standard (See FS (Federal Specification))

MIL (See MILSPEC (Military Specification and Standards))

MIL-STD (See MILSPEC (Military Specification and Standards))

MILSPEC Military Specification and Standards Available from Department of Defense Single Stock Point www.dsp.dla.mil/Specs-Standards/

UFAS Uniform Federal Accessibility Standards Available from Access Board www.access-board.gov/guidelines-and-standards/buildings-and-sites/about-the-aba-standards/ufas (UFAS is only for housing projects per Fair Housing Act. See also the Fair Housing Act Design Manual, www.huduser.gov/portal/publications/destech/fairhousing)

CANA 233967 01 42 00 - 6

1.5 ENVIRONMENTAL REFERENCE STANDARDS

A. American Forest and Paper Association:

1. Sustainable Forestry Initiative

B. American Society of Heating Refrigerating and Air Conditioning Engineers (ASHRAE):

ASHRAE 52.2, Method of Testing General Ventilation Air Cleaning Devices for

Removal Efficiency by Particle Size ASHRAE 55, Thermal Environmental Conditions for Human Occupancy ASHRAE 62.1, Ventilation for Acceptable Indoor Air Quality ASHRAE 62.2, Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential

Buildings ASHRAE/IESNA 90.1, Energy Standard for Buildings, Except Low-Rise Residential

Buildings ASHRAE 90.2, Energy Efficient Design of Low-Rise Residential Buildings

C. American Association of State Highway and Transportation Officials (AASHTO):

M288 Geotextile Specification for Highway Applications MP009-06 Standard Specification for Compost for Erosion/Sediment Control (Filter

Berms and Filter Socks) MP010-03 Standard Specification for Compost for Erosion/Sediment Control

(Compost Blankets)

D. American Society for Testing and Materials International (ASTM):

A478 Standard Specification for Chromium-Nickel Stainless Steel Weaving and Knitting

Wire A580/A580M Standard Specification for Stainless Steel Wire A653/A653M Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-

Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process B813 Standard Specification for Liquid and Paste Fluxes for Soldering of Copper and

Copper Alloy Tube C1240 Standard Specification for Silica Fume Used in Cementitious Mixtures C128 Standard Test Method for Density, Relative Density (Specific Gravity), and

Absorption of Fine Aggregate C131 Standard Test Method for Resistance to Degradation of Small-Size Coarse

Aggregate by Abrasion and Impact in the Los Angeles Machine C1319 Standard Specification for Concrete Grid Paving Units C1338 Standard Test Method for Determining Fungi Resistance of Insulation Materials and Facings C136 Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates C1371 Standard Test Method for Determination of Emittance of Materials Near Room

Temperature Using Portable Emissometers C1386 Standard Specification for Precast Autoclaved AERATED Concrete (PAAC) Wall

Construction Units C1483 Standard Specification for Exterior Solar Radiation Control Coatings on Buildings C1549 Standard Test Method for Determination of Solar Reflectance Near Ambient

Temperature Using a Portable Solar Reflectometer

CANA 233967 01 42 00 - 7

C1601 Standard Test Method for Field Determination of Water Penetration of Masonry Wall Surfaces

C289 Standard Test Method for Potential Alkali-Silica Reactivity of Aggregates (Chemical Method)

C311 Test Methods for Sampling and Testing Fly Ash or Natural Pozzolans for Use as a Mineral Admixture in Portland-Cement Concrete

C33 Standard Specification for Concrete Aggregates C593 Standard Specification for Fly Ash and Other Pozzolans for Use With Lime C595 Standard Specification for Blended Hydraulic Cements C618 Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for

Use as a Mineral Admixture in Concrete C67 Standard Test Methods for Sampling and Testing Brick and Structural Clay Tile C739 Standard Specification for Cellulosic Fiber (Wood-Base) Loose-Fill Thermal

Insulation C936 Standard Specification for Interlocking Concrete Paver Units C989 Standard Specification for Ground Granulated Blast-Furnace Slag for Use in

Concrete and Mortars D1435 Standard Practice for Outdoor Weathering of Plastics D1557 Standard Test Methods for Laboratory Compaction Characteristics of Soil Using

Modified Effort (56,000 foot pound force per cubic foot (ft-lbf/ft3) (2,700 kilonewton meter per cubic meter (kN-m/m3))

D1972 Standard Practice for Generic Marking of Plastic Products D198 Standard Test Methods of Static Tests of Lumber in Structural Sizes D2103 Standard Specification for Polyethylene Film and Sheeting D217 Standard Test Methods for Cone Penetration of Lubricating Grease D2369 Standard Test Method for Volatile Content of Coatings D3273 Standard Test Method for Resistance to Growth of Mold on the Surface of Interior

Coatings in an Environmental Chamber D3786 Standard Test Method for Hydraulic Bursting Strength of Textile Fabrics-

Diaphragm Bursting Strength Tester Method D3792 Standard Test Method for Water Content of Coatings by Direct Injection Into a

Gas Chromatograph D3864 Standard Guide for Continual On-Line Monitoring Systems for Water Analysis D3960 Standard Practice for Determining Volatile Organic Compound (VOC) Content of

Paints and Related Coatings D4017 Standard Test Method for Water in Paints and Paint Materials by Karl Fischer

Method D4263 Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet

Method D4444 Standard Test Methods for Use and Calibration of Hand-Held Moisture Meters D4491 Standard Test Methods for Water Permeability of Geotextiles by Permittivity D4552 Standard Practice for Classifying Hot-Mix Recycling Agents D4632 Standard Test Method for Grab Breaking Load and Elongation of Geotextiles D4716 Test Method for Determining the (In-plane) Flow Rate per Unit Width and

Hydraulic Transmissivity of a Geosynthetic Using a Constant Head D4833 Standard Test Method for Index Puncture Resistance of Geotextiles, Geomembranes, and Related Product D4840 Standard Guide for Sampling Chain-of-Custody Procedures

CANA 233967 01 42 00 - 8

D4887 Standard Test Method for Preparation of Viscosity Blends for Hot Recycled Bituminous Materials

D5106 Standard Specification for Steel Slag Aggregates for Bituminous Paving Mixtures D5116 Standard Guide for Small-Scale Environmental Chamber Determinations of

Organic Emissions from Indoor Materials/Products D5199 Standard Test Method for Measuring the Nominal Thickness of Geosynthetics D5261 Standard Test Method for Measuring Mass per Unit Area of Geotextiles D5268 Standard Specification for Topsoil Used for Landscaping Purposes D5359 Standard Specification for Glass Cullet Recovered from Waste for Use in

Manufacture of Glass Fiber D5505 Standard Practice for Classifying Emulsified Recycling Agents D5509 Standard Practice for Exposing Plastics to a Simulated Compost Environment D5512 Standard Practice for Exposing Plastics to a Simulated Compost Environment

Using an Externally Heated Reactor D5539 Standard Specification for Seed Starter Mix D5957 Standard Guide for Flood Testing Horizontal Waterproofing Installations D5603 Standard Classification for Rubber Compounding Materials—Recycled

Vulcanizate Particulate Rubber D5663 Standard Guide for Validating Recycled Content in Packaging Paper and

Paperboard D5759 Standard Guide for Characterization of Coal Fly Ash and Clean Coal Combustion

Fly Ash for Potential Uses D5792 Standard Practice for Generation of Environmental Data Related to Waste

Management Activities: Development of Data Quality Objectives D5834 Standard Guide for Source Reduction Reuse, Recycling, and Disposal of Solid and Corrugated Fiberboard (Cardboard) D5851 Standard Guide for Planning and Implementing a Water Monitoring Program D5852 Standard Test Method for Erodibility Determination of Soil in the Field or in the

Laboratory by the Jet Index Method D6002 Standard Guide for Assessing the Compostability of Environmentally Degradable

Plastics D6006 Standard Guide for Assessing Biodegradability of Hydraulic Fluid D6007 Standard Test Method for Determining Formaldehyde Concentration in Air from

Wood Products Using a Small Scale Chamber D6046 Standard Classification of Hydraulic Fluids for Environmental Impact D6081 Standard Practice for Aquatic Toxicity Testing of Lubricants: Sample Preparation and Results Interpretation D6108 Standard Test Method for Compressive Properties of Plastic Lumber and Shapes D6109 Standard Test Methods for Flexural Properties of Unreinforced and Reinforced

Plastic Lumber D6112 Standard Test Methods for Compressive and Flexural creep and Creep-Rupture of

Plastic Lumber and Shapes D6117 Standard Test Methods for Mechanical Fasteners In Plastic Lumber and Shapes D6155 Standard Specification for Nontraditional Coarse Aggregates for Bituminous

Paving Mixtures D6245 Standard Guide for Using Indoor Carbon Dioxide Concentrations to Evaluate

Indoor Air Quality and Ventilation D6261 Standard Specification for Extruded and Compression Molded Basic Shapes

Made from Thermoplastic Polyester (TPES)

CANA 233967 01 42 00 - 9

D6262 Standard Specification for Extruded, Compression Molded, and Injection Molded Basic Shapes of Poly(aryl ether ketone) (PAEK)

D6270 Standard Practice for Use of Scrap Tires in Civil Engineering Applications D6329 Standard Guide for Developing Methodology for Evaluating the Ability of Indoor

Materials to Support Microbial Growth Using Static Environmental Chambers D6330 Standard Practice for Determination of Volatile Organic Compounds (Excluding

Formaldehyde) Emissions from Wood-Based Panels Using Small Environmental Chambers Under Defined Test Conditions

D6345 Standard Guide for Selection of Methods for Active, Integrative Sampling of Volatile Organic Compounds in Air

D6400 Standard Specification for Compostable Plastics D6435 Standard Test Method for Shear Properties of Plastic Lumber and Plastic Lumber

Shapes D6629 Standard Guide for Selection of Methods for Estimating Soil Loss by Erosion D6662 Standard Specification for Polyolefin-Based Plastic Lumber Decking Boards D6712 Standard Specification for Ultra-High-Molecular-Weight Polyethylene (UHMW-

PE) Solid Plastic Shapes D6886 Standard Test Method for Speciation of the Volatile Organic Compounds (VOCs) in Low VOC Content Waterborne Air-Dry Coatings by Gas Chromatography D692 Standard Specification for Coarse Aggregate for Bituminous Paving Mixtures D696 Standard Test Method for Coefficient of Linear Thermal Expansion of Plastics

Between -30°C and 30°C With a Vitreous Silica Dilatometer D698 Standard Test Methods for Laboratory Compaction Characteristics of Soil Using

Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3)) D7186 Standard Practice for Quality Assurance Observation of Roof Construction and

Repair E1021 Standard Test Methods for Measuring Spectral Response of Photovoltaic Cells E1038 Standard Test Method for Determining Resistance of Photovoltaic Modules to

Hail by Impact with Propelled Ice Balls E1039 Standard Test Method for Calibration of Silicon Non-Concentrator Photovoltaic

Primary Reference Cells Under Global Irradiation E1040 Standard Specification for Physical Characteristics of Nonconcentrator Terrestrial

Photovoltaic Reference Cells E1105 Standard Test Method for Field Determination of Water Penetration of Installed

Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform or Cyclic Static Air Pressure Difference

E1171 Standard Test Method for Photovoltaic Modules in Cyclic Temperature and Humidity Environments

E1333 Standard Test Method for Determining Formaldehyde Concentrations in Air and Emission Rates from Wood Products Under Defined Test Conditions Using a Large Chamber

E1362 Standard Test Method for Calibration of Non-Concentrator Photovoltaic Secondary Reference Cells

E1433 Standard Guide for Selection of Standards on Environmental Acoustics E1462 Standard Test Methods for Insulation Integrity and Ground Path Continuity of

Photovoltaic Modules E1596 Standard Test Methods for Solar Radiation Weathering of Photovoltaic Modules E1597 Standard Test Method for Saltwater Pressure Immersion and Temperature Testing of Photovoltaic Modules for Marine Environments

CANA 233967 01 42 00 - 10

E1609 Standard Guide for Development and Implementation of a Pollution Prevention Program

E1686 Standard Guide for Selection of Environmental Noise Measurements and Criteria E1690 Standard Test Method for Determination of Ethanol Extractives in Biomass E1721 Standard Test Method for Determination of Acid-Insoluble Residue in Biomass E1755 Standard Test Method for Ash in Biomass E1758 Standard Test Method for Determination of Carbohydrates in Biomass by High

Performance Liquid Chromatography E1780 Standard Guide for Measuring Outdoor Sound Received from a Nearby Fixed

Source E1799 Standard Practice for Visual Inspections of Photovoltaic Modules E1802 Standard Test Methods for Wet Insulation Integrity Testing of Photovoltaic

Modules E1821 Standard Test Method for Determination of Carbohydrates in Biomass by Gas

Chromatography E1827 Standard Test Methods for Determining Airtightness of Buildings Using an

Orifice Blower Door E1830 Standard Test Methods for Determining Mechanical Integrity of Photovoltaic

Modules E1861 Standard Guide for Use of Coal Combustion By-Products in Structural Fills E1918 Standard Test Method for Measuring Solar Reflectance of Horizontal and Low-

Sloped Surfaces in the Field E1971 Standard Guide for Stewardship for the Cleaning of Commercial and Institutional

Buildings E1980 Standard Practice for Calculating Solar Reflectance Index of Horizontal and Low-

Sloped Opaque Surfaces E1991 Standard Guide for Environmental Life Cycle Assessment of Building

Materials/Products E2047 Standard Test Method for Wet Insulation Integrity Testing of Photovoltaic Arrays E2114 Standard Terminology for Sustainability Relative to the Performance of Buildings E2128 Standard Guide for Evaluating Water Leakage of Building Walls E2129 Standard Practice for Data Collection for Sustainability Assessment of Building

Products E2397 Standard Practice for Determination of Dead Loads and Live Loads associated with Green Roof Systems E2398 Standard Test Method for Water Capture and Media Retention of Geocomposite

Drain Layers for Green Roof Systems E2399 Standard Test Method for Maximum Media Density for Dead Load Analysis of

Green Roof Systems E2400 Standard Guide for Selection, Installation, and Maintenance of Plants for Green

Roof Systems E241 Standard Guide for Limiting Water-Induced Damage to Buildings E2432 Standard Guide for General Principles of Sustainability Relative to Buildings E408 Standard Test Methods for Total Normal Emittance of Surfaces Using Inspection-

Meter Techniques E413 Standard Classification for Rating Sound Insulation E477 Standard Test Method for Measuring Acoustical and Airflow Performance of Duct

Liner Materials and Prefabricated Silencers

CANA 233967 01 42 00 - 11

E648 Standard Test Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source

E683 Standard Practice for Installation and Service of Solar Space Heating Systems for One- and Two-Family Dwellings

E779 Standard Test Method for Determining Air Leakage Rate by Fan Pressurization E781 Standard Practice for Evaluating Absorptive Solar Receiver Materials When

Exposed to Conditions Simulating Stagnation in Solar Collectors With Cover Plates E782 Standard Practice for Exposure of Cover Materials for Solar Collectors to Natural

Weathering Under Conditions Simulating Operational Mode E823 Standard Practice for Nonoperational Exposure and Inspection of a Solar Collector E881 Standard Practice for Exposure of Solar Collector Cover Materials to Natural

Weathering Under Conditions Simulating Stagnation Mode E90 Standard Test Method for Laboratory Measurement of Airborne Sound Transmission

Loss of Building Partitions and Elements E903 Standard Test Method for Solar Absorptance, Reflectance, and Transmittance of

Materials Using Integrating Spheres E948 Standard Test Method for Electrical Performance of Photovoltaic Cells Using

Reference Cells Under Simulated Sunlight F1869 Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete

Subfloor Using Anhydrous Calcium Chloride F2034 Standard Specification for Sheet Linoleum Floor Covering F2170 Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs

Using in situ Probes

E. Bat Conservation International:

Bat Approved Bat Houses

F. Carpet and Rug Institute Green Label & Green Label Plus Testing Programs, carpet-rug.org/testing/green-label-plus

G. Center for Resource Solutions Green-e program

H. Environmental Protection Agency (EPA):

Comprehensive Procurement Guidelines

ENERGY STAR

Environmentally Preferable Purchasing Program Final Guidance GreenScapes program Heat Island Initiative Indoor Air Quality Building Education and Assessment Model (I-BEAM) National Environmental Performance Track Pollution Prevention (P2) Product Stewardship Program Significant New Alternatives Policy (SNAP) Program

I. Federal Trade Commission:

Guide for the Use of Environmental Marketing Claims

CANA 233967 01 42 00 - 12

J. Forest Stewardship Council:

Chain-Of-Custody Forest Management

K. Green Building Initiative (GBI):

Green Globes - US

L. Green Seal:

GC-03 Anti-Corrosive Paints GC-12 Occupancy Sensors GC-13 Split-Ductless Air-Source Heat Pumps GS-05 Compact Fluorescent Lamps GS-11 Paints GS-13 Windows GS-14 Window Films GS-31 Electric Chillers GS-32 Photovoltaic Modules GS-36 Commercial Adhesives GS-37 Industrial & Institutional Cleaners

M. International Iron and Steel Institute:

CO2 Breakthrough Program

N. International Organization of Standardization:

Guide 64; Guide for Inclusion of Environmental Aspects in Product Standards 9660 Information processing -- Volume and file structure of CD-ROM for information interchange 14001 Environmental management systems – Specification with guidance for use 14004 Environmental Management Systems – General Guidelines on Principles, Systems and Supporting Techniques 14020 Environmental labels and declarations – General principles 14024 Environmental labels and declarations – Type I environmental labelling -

Principles and procedures 14040 Environmental management – Life cycle assessment – Principles and framework

O. National Association of Home Builders:

Advanced Framing Techniques: Optimum Value Engineering

P. National Institute of Building Sciences:

MOIST program for transfer of heat and moisture Whole Building Design Guide

Q. National Institute of Standards and Technology:

BEES (Building for Environmental and Economic Sustainability) Lifecycle Decision

Support Tool

R. Sheet Metal and Air Conditioning Contractors’ National Association (SMACNA):

IAQ Guidelines for Occupied Buildings Under Construction

CANA 233967 01 42 00 - 13

S. Southcoast Air Quality Management District:

1168 Adhesive And Sealant Applications

T. US Composting Council:

Seal of Testing Assurance Program

U. US Department of Agriculture:

Biobased Products – Definitions and Descriptions

V. US Green Building Council:

LEED™ 2009 Green Building Rating System LEED™ v4 (version 4) Green Building Rating System

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 42 00

CANA 233967 01 50 00 - 1

TEMPORARY FACILITIES AND CONTROLS

NPS DSC Division 1 Specifications National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21

CANA 233967

SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes requirements for temporary utilities, support facilities, and security.

1.2 DEFINITIONS

A. Permanent Enclosure: As determined by Contracting Officer (CO), permanent or temporary roofing is complete, insulated, and weathertight; exterior walls are insulated and weathertight;

and openings are closed with permanent construction or substantial temporary closures.

1.3 USE CHARGES

A. General: Cost or use charges for temporary facilities shall be included in Contract Sum as required.

B. Water Service: Potable Water from existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations with any additional permit costs.

C. Electric Power Service: Electric power from existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations with any additional permit costs.

1.4 QUALITY ASSURANCE

A. Electric Service: Comply with National Electrical Contractors Association (NECA), National Electrical Manufacturers Association (NEMA), and Underwriter Laboratories (UL) standards and regulations for temporary electric service. Install service to comply with National Fire Protection Association (NFPA) 70.

B. Environmental Protection: Provide environmental protection as required by agency(ies) with jurisdiction and as indicated in Contract Documents. Coordinate with requirements of the following:

1. Regulatory Requirements

2. Indoor Air Quality (IAQ) Management

3. Noise and Acoustics Management

CANA 233967 01 50 00 - 2

4. Environmental Management

5. Construction Waste Management

C. Accessible Temporary Egress: Comply with applicable provisions in the United States (U.S.)

Architectural & Transportation Barriers Compliance Board’s Architectural Barriers Act Accessibility Standard (ABAAS) Accessibility Guidelines.

1.5 PROJECT CONDITIONS

A. Temporary Use of Permanent Facilities: Installer of each permanent service shall assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before NPS acceptance,…

This is the start of the file's text. The full file is on GovTribe.