Attachment_006_JaxBO_PDCs_AP__1-6_All_Activities_0001.pdf

PDF 246 KB Posted

Attached to
CONSTRUCTION, REPLACE FELLERS' BOATHOUSE DOCK, CAN
Solicitation number
140P5424R0013
Issued by

About this file

This document contains the Project Design Criteria (PDCs) applicable to all projects under the Programmatic Biological Opinion (JaxBO) for the National Marine Fisheries Service Protected Resources Division. The PDCs address requirements under Section 7 of the Endangered Species Act for listed species and designated critical habitat. The PDCs cover in-water activities, in-water noise from pile and sheet pile installation, and requirements for projects in areas with mangroves, seagrasses, corals, or hard bottom habitat. The document also outlines specific zones where additional restrictions or exclusions apply, such as critical habitat for smalltooth sawfish, Gulf sturgeon, and Atlantic sturgeon, as well as educational sign zones for North Atlantic right whales and sea turtle critical habitat. This Opinion only covers new construction and does not apply to after-the-fact consultations or enforcement actions.

The related federal contract opportunity is for the construction to replace the Fellers' Boathouse Dock within Canaveral National Seashore. This is a 100% Small Business Set-Aside solicitation with a proposal due date of 05/20/2024. The solicitation number is 140P5424R0013 and is issued by the Department of the Interior National Park Service Southeast Region.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Design Criteria (PDCs) Applicable to All Projects

NOTE - You are required to comply with the following PDCs, which serve to address requirements pursuant to Section 7, Endangered Species Act (ESA) for those listed species and designated critical habitat under purview of the National Marine Fisheries Service Protected, Resources Division. These PDCs are taken from the Programmatic Biological Opinion (PBO) referred to as JaxBO. These criteria serve to address ESA requirements only, and additional conditions may be required to address other Federal laws, including the Magnuson-Stevens Fishery Conservation and Management Reauthorization Act. Authorization under this permit is conditional upon your compliance with all applicable PDCs, which are made part of this permit.

You are reminded that you must complete the attached self-certification statement of compliance following completion of the authorized work. Your statement of compliance does not obviate the need to satisfy all PDCs, including those requirements (e.g., such as structural dimensions and educational signs) that are observable post-construction, and those requirements (e.g., construction methods or procedures to be followed) that are not observable post-construction. Please note that failure to comply with the applicable PDCs of this PBO, where a take of the listed species occurs, would constitute an unauthorized take, and it would also constitute noncompliance with this permit. The NMFS is the appropriate authority to determine compliance with the terms and conditions of this PBO.

AP.1. The applicant must agree to adhere to PDCs for In-Water Activities (provided below).

AP.2. All projects involving the installation of piles or sheet piles shall follow the PDCs for In- Water Noise from Pile and Sheet Pile Installation (Section 2.2). This Opinion does not cover projects that use seismic surveys, low frequency sonar, explosions, and seismic air guns.

AP.3. All projects proposed in or near areas with mangroves, seagrasses, corals, or hard bottom habitat must refer to PDCs for Mangroves, Seagrasses, Corals, and Hard Bottom for All Projects (provided below) to determine whether the project is covered under the Opinion and, if it is covered, to ensure it is sited, designated, and implemented following all of the PDCs in that section.

AP.4. For every project, the USACE must determine if the project is located within:

a) Smalltooth sawfish critical habitat limited exclusion zones (Section 2.1.1.1)

b) Gulf sturgeon critical habitat migratory restriction zones (Section 2.1.1.2)

c) Atlantic sturgeon critical habitat exclusion zone (St. Marys River) (Section 2.1.1.3)

d) North Atlantic right whale educational sign zones (Section 2.1.1.4)

e) U.S. Caribbean sea turtle critical habitat restriction zones (Section 2.1.1.5)

f) Bryde’s whale exclusion zone (Section 2.1.1.6)

Where the activity is excluded from the Opinion within a particular zone, the application must be processed under a separate consultation. Where additional restrictions apply to activities within that zone, the USACE or other authorizing entity must ensure that the project meets the requirements for that zone.

AP.5. This Opinion only covers new construction (i.e., installation, repair, replacement) and does not apply to after-the-fact consultations or enforcement actions handled by the Corps.

AP.6. All activities must be completed during daylight hours.