Attachment_0008_Limitations_on_Subcontracting.xlsx
XLSX spreadsheet 94 KB Posted
- Attached to
- LaBarge Watershed Water Wells Federal contract opportunity
- Solicitation number
- 140L0625B0001
About this file
This is a Limitations on Subcontracting template spreadsheet designed to help contractors calculate and demonstrate compliance with FAR 52.219-14(e)(3) or (4) requirements. The spreadsheet provides a structured format for breaking down total proposed amounts into material costs and labor costs, with separate sections for tracking payments to both small business subcontractors (SSS) and large business subcontractors (LBS).
The template calculates the limitation on subcontracting percentage by dividing the difference between total labor cost and total LBS payments by the total labor cost. It includes space for listing up to six small business subcontractors and six large business subcontractors, with notes clarifying that subcontractors must be first-tier and qualify as small businesses under the solicitation NAICS code. The template specifies that material costs include special tooling, testing equipment, and construction equipment as defined in 13 CFR 125.1, while total labor costs encompass all contractual costs other than material.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_0010_Schedule_of_Items_0001.pdf | ||
| Sol_140L0625B0001_Amd_0001.pdf | ||
| Attachment_0011_Sign_in_sheet_0001.pdf | ||
| Attachment_0012_-_Q_A_0001.pdf | ||
| Sol_140L0625B0001.pdf | ||
| Attachment_0007_Wage_Determination_WY20230031.pdf | ||
| Attachment_0009_Instructions_on_1442.pdf | ||
| Attachment_0001_LaBarge_Water_Wells_General_Requirements.pdf | ||
| Attachment_0003_LaBarge_Water_Wells_Drilling_and_Casing.pdf | ||
| Attachment_0006_North_LaBarge_Common_Wellls_Map.pdf | ||
| Attachment_0002_LaBarge_Water_Wells__Sitework.pdf | ||
| Attachment_0004_LaBarge_Water_Wells_Testing.pdf | ||
| Attachment_0005_LaBarge_Water_Wells_Work_Data_Sheet.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)
| Solicitation Number | |
| Type of Set-Aside | Small Business |
| Performance Period | |
| Required Self-Performance | 15% |
(A) Total Amount Proposed¹
(B) Total Material Cost2
(C) Self Performed Labor
| (D) Small Business Subcontractor (SSS) Labor3 | ||
| Total Amount Paid to [Insert First SSS Name] | ||
| Total Amount Paid to [Insert Second SSS Name] | ||
| Total Amount Paid to [Insert Third SSS Name] | ||
| Total Amount Paid to [Insert Fourth SSS Name] | ||
| Total Amount Paid to [Insert Fifth SSS Name] | ||
| Total Amount Paid to [Insert Sixth SSS Name] | ||
| Total Amount Paid to SSS Companies | $0.00 |
| (E) Large Business Subcontractor (LBS) Labor | ||
| Total Amount Paid to [Insert First LBS Name] | ||
| Total Amount Paid to [Insert Second LBS Name] | ||
| Total Amount Paid to [Insert Third LBS Name] | ||
| Total Amount Paid to [Insert Fourth LBS Name] | ||
| Total Amount Paid to [Insert Fifth LBS Name] | ||
| Total Amount Paid to [Insert Sixth LBS Name] | ||
| Total Amount Paid to LBS Companies | $0.00 |
(F) Total Labor Cost4 $0.00
| (G) Limitation on Subcontracting Percentage5 | ||
| (Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor Cost | ERROR:#DIV/0! |
| *Note 1: (A) Total Amount Proposed = (B) Total Material Cost + (F) Total Labor Cost |
| *Note 2: Total Material Cost includes special tooling, special testing equipment, and construction equipment. Additional definition of material cost can be found at 13 CFR 125.1. |
| *Note 3: Subcontractors must be first tier and qualify as a small business under the solicitation NAICS. All second tier subcontractors are counted as LBS labor. |
| *Note 4: Total labor costs consist of all contractual costs other than material. |
| *Note 5: To be compliant, limitation percentage must be greater than the required self-performance percentage. |
Sheet2
| Services (except construction) |
| General construction |
| Construction by special trade contractors |
File details come from the government source that posted it. Updated .