Attachment_0003_LaBarge_Water_Wells_Drilling_and_Casing.pdf

PDF 149 KB Posted

Attached to
LaBarge Watershed Water Wells Federal contract opportunity
Solicitation number
140L0625B0001
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This is a technical specification (Section WY-02671) detailing the requirements for well drilling and casing for water wells in the High Desert District North LaBarge Common Water Wells project. The document outlines comprehensive requirements for drilling, casing, developing, preliminary testing, and installing contractor-furnished and government-furnished property in water wells.

The specification requires drilling pilot holes (minimum 5-inch diameter) followed by well holes (minimum 9.5-inch diameter), with installation of 5-inch casing and slotted casing. Key requirements include using PVC or steel casing materials meeting specific ASTM standards, maintaining minimum 2-inch annulus, and following strict well development procedures. The contractor must complete final hole reaming, casing installation, gravel pack placement, and grout placement within one continuous workday. Payment is structured on a linear foot basis for drilling and materials installation, and hourly basis for well development and testing. The contractor is responsible for proper waste management, environmental protection, and meeting Wyoming Water Well Minimum Construction Standards, including maximum drift of one degree per 100 feet of borehole. No rig or standby time will be paid for, and the contractor must be capable of drilling 1.5 times the estimated drilling depth of the deepest well listed in the Work Data Sheet.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIVISION 2 SECTION WY-02671

SITEWORK WELL DRILLING AND CASING

Rev. 06-90

WY-02671 - 1

HIGH DESERT DISTRICT NORTH LABARGE COMMON WATER WELLS

PART 1: GENERAL

1.1 SUMMARY:

A. Section Includes: Drilling, casing, developing, preliminary testing, and installing

Contractor-furnished and Government furnished property in water wells.

1.2 RELATED WORK:

A. Specifications Sections:

General Information and Requirements Section 01009 Water Wells Section 02670 Well Testing Section 02672

1.3 REFERENCES:

A. American Association of State Highway and Transportation Officials

AASHTO T 26 Test for Quality of Water to be Used in Concrete

B. American Society for Testing and Materials:

ASTM A 53-REV A-89 Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A589-96(2001) Standard Specification for Seamless and Welded Carbon Steel

Water-Well Pipe

ASTM D 1785-99 Standard Specification for Polyvinyl Chloride (PVC) Plastic Pipe, Schedules 40, 80, and 120

ASTM D 2241-00 Standard Specification for Polyvinyl Chloride (PVC) Pressure-

Rated Pipe (SDR Series) ASTM D 2464-99 Standard Specification for Threaded Polyvinyl Chloride (PVC)

Plastic Pipe Fittings, Schedule 80

ASTM D 2466-02 Standard Specification for Polyvinyl Chloride (PVC) Plastic Pipe

Fittings, Schedule 40

WY-02671 - 2

ASTM D 2467-02 Standard Specification for Polyvinyl Chloride (PVC) Plastic Pipe Fittings, Schedule 80

ASTM D 2564-02 Standard Specification for Solvent Cements for Polyvinyl Chloride

(PVC) Plastic Piping Systems

ASTM D 2855-96 Standard Practice for Making Solvent-Cemented Joints with

Polyvinyl Chloride (PVC) Pipe and Fittings

ASTM F 480-02 Standard Specification for Thermoplastic Well Casing Pipe and

Couplings Made in Standard Dimension Ratios (SDR), SCH 40 and SCH 80

ASTM F 656-02 Standard Specification for Primers for Use in Solvent Cement

Joints of Polyvinyl Chloride (PVC) Plastic Pipe and Fittings

PCA Portland Cement Association 5420 Old Orchard Road Skokie, Il 60076

API American Petroleum Institute 1220 L Street Washington, DC 20005

AWS American Welding Society, Inc.

P.O. Box 351040 Miami, FL 33135

ACI American Concrete Institute ACI World Headquarters 38800 Country Club Dr.

Farmington Hills, MI 48331-3439

1.4 SUBMITTALS:

A. Certification: Furnish written certification from the manufacturer certifying that the

Contractor-furnished property conforms to the requirements of this section. Submittals shall be in accordance with Section 01009-General Information and Requirements.

B. Records: The Contractor will complete a report on the completion of the well to include

WY-02671 - 3

information supplementary to the well log. This can be submitted on a form 7240-1, Record of Wells (as supplied by the Contracting Officer), or in a format approved at the pre-work conference. The Contractor shall submit this report to the Contracting Officer.

C. Information for State filing: The Contractor shall furnish the Contracting Officer with a copy of the drilling information required by the State Engineer’s Office for filing on water wells.

1.5 PROJECT CONDITIONS:

A. Well Depths and Material Quantities: Well depths and material quantities listed in the

Work Data Sheet and Schedule of Items are estimates. The final determination of depths and material quantities will be made in the field by the Contracting Officer and will depend on actual geological conditions encountered during the drilling operations. The Contracting Officer will have the option of ordering abandonment of a well at any point during the drilling operation. Well abandonment shall be in accordance with Specifications 02670 – Water Wells.

B. Rig and Standby Time: No rig or standby time will be paid for in this Contract.

1.6 SCHEDULING:

A. Drilling Program: At the Pre-work Conference, the Contractor shall submit to the

Contracting Officer for approval a complete and practicable drilling program. The program shall provide for orderly performance of the work and be in such form and detail as to show the following:

1. Sequence of drilling and testing operations.

2. The days of the week and month that work is to be performed.

3. The number and length of each shift per day. The length of a shift may be extended in the field as required to avoid interrupting a drilling and/or testing operation.

4. Type of rig and support equipment.

5. Plan for disposal of waste.

6. Mud (and/or air) program (list of additives, mixing rate) if applicable.

WY-02671 - 4

7. Materials list and specifications (casing, slotted casing, well screen, gravel pack, grout, disinfectant, and any other materials incorporated into the project).

8. Drilling water source.

PART 2: PRODUCTS

2.1 GOVERNMENT FURNISHED MATERIALS

A. See Section 01019, Government-Furnished Property if applicable.

2.2 CONTRACTOR-FURNISHED MATERIALS

A. Casing: Materials specified shall be new and free from defects. However, if the contractor deems it necessary or desirable to use temporary casing, the casing may be used, subject to the approval of the Contracting Officer.

B. PVC Well Casing (including any slotted casing): Polyvinyl Chloride (PVC) well casing shall conform as referenced in Section 1.3 B and shall carry the National Sanitation Foundation (NSF) seal of approval for well casing (NSF-WC). Each section of PVC plastic casing shall be marked to show, at a minimum, the diameter, type of material, standard number, SDR number or Schedule, and United States manufacturer. Casing shall be Certa- Lok brand name or approved equal. Physical dimension shall be described in the Contractor’s submittal based on the SDR number or Schedule required for the well bore conditions defined by the Contracting Officer. Casing (including slotted casing) shall be of the size shown on the Work Data Sheet.

C. PVC Casing Couplings and Fittings: Casing coupling shall be of the same material as casing, with a pressure rating equal to or greater that casing, and shall be Certa-Lok Coupling brand name, or approved equal. The coupling shall be watertight with locking groves, PVC spline, and gaskets manufactured for specifically for the coupling. Solvent-weld type fittings shall be designed to be interference free for at least one-half of the socket depth and have a beveled entrance to prevent wiping off solvents while being installed.

D. PVC Solvent: Primer and cement shall be recommended and approved by the pipe manufacturer. Primer and cement shall be approved by NSF for drinking water.

E. Steel Casing Joints: Shall be watertight and may be either welded or threaded and coupled.

F. Steel Casing (if required): Well casing shall be API Limited-Service grade (or better – i.e., WY-02671 - 5

J-55), 15.5 pounds/foot, threaded & coupled. Materials specified shall be new and free from defects. However, if the contractor deems it necessary or desirable to use temporary casing, the casing may be used, subject to the approval of the Contracting Officer.

G. Bentonite: Granular bentonite shall be American Colloid KWK, CS/55 or approved equal.

Pellet bentonite shall be American Colloid Vol-Clay or approved equal.

H. Stainless Steel Well Screen (if required): The well screens shall be of the size shown on the

Work Data Sheet. The screens shall be of wire-wound, cage-type, V-slot, all-welded construction, type 304 stainless steel. The column, tensile and collapse strengths shall be certified for depth and casing of individual wells. At least 95% of the screen slot opening shall be completely clean and free of burrs, frayed edges, cuttings, slag, and other such materials.

I. Drilling Fluid Additive: An NSF drinking water approved sodium or ammonium base, biodegradable foaming agent ("High Foam" or an approved equal) will be allowed for air-rotary drilling. Other additives (i.e., Drispac Plus, Alcomer 123L, etc.) must be submitted with the drilling plan and approved by the Contracting Officer.

J. Gravel Packing: The gravel-pack material shall be clean, with well-rounded grains that are smooth and uniform. The material shall consist of a minimum of 95% siliceous particles, with a maximum of 5% calcareous material. The gravel pack will be of appropriate size for the slot size in the screen or slotted casings installed in the well and as approved by the Contracting Officer.

K. Grout: Grout may be pelletized bentonite, or bentonite gravel material free of dirt and foreign matter, hydrated per manufacturer’s specification or bentonite grout (i.e., Black Hills Ultra Grout or equivalent) mixed to a minimum specific gravity of 9.75 to 9.85 pounds per gallon with a minimum solids content of 22% to 25%.

L. Cement Grout Mix: Neat Cement Grout shall consist of a mixture of Type II Portland cement and not more than 6 gallons of clean water per bag (94-pound bag or one cubic foot). Sand Cement Grout must consist of a mixture of Type II Portland cement, sand, water, and a maximum of 2% calcium chloride in a proportion of not more than 6 gallons of water per sack of cement (94-pound sack or one cubic foot) and not more than one part sand to one part cement.

M. Water used for drilling and cementing operations shall be potable water or from a source approved by the Contracting Officer.

WY-02671 - 6

N. Casing Centralizers: Shall be stainless steel, or a Contracting Officer approved alternate, sized to fit the casing and the borehole placed on the bottom, top, and through the screened interval and spaced not more than 20 feet apart.

O. Disinfectant: Calcium hypochlorite (65% available chlorine) or alternative as approved by the Contracting Officer.

2.3 EQUIPMENT:

A. Drilling Equipment: Except otherwise specified, the type of drilling equipment shall be determined by the driller (Contractor).

B. Minimum Equipment: The Contractor shall furnish equipment of sufficient size and in sufficient quantities to drill 1-1/2 times the estimated drilling depth of the deepest well listed in the Work Data Sheet.

C. Air Volume Requirement: (Air-Rotary Drilling): Contractors intending to use air-rotary drilling equipment should be aware of the volume of air required to maintain proper up-hole velocity to lift the drill cuttings from the bore hole under various conditions. The volume of air produced by an on-rig compressor, or in conjunction with auxiliary compressors shall be sufficient to lift drill cuttings to the ground surface for the size and estimated depth (1-1/2 times the estimated depth) of the bore holes shown on the Work Data Sheet.

D. Well Development: Well development methodology and equipment (jetting, surging, surge block, swabbing, etc.) shall be approved by the contracting officer.

2.4 CEMENT FOR PLUGS AND CASING SEAL:

A. Cement: The cement slurry shall be API Class G, slurry weight 15.8 lbs. per gallon (118 lbs.

per cu. Ft.) mixed with not more than 5 gallons of water per 94-pound sack. The cement shall be in bulk with any additives blended at the bulk-cement facility. Additives may include 2% Calcium Chloride materials to help prevent circulation loss or additives determined necessary after the hole is drilled. All additives must be approved by the contracting officer prior to use. The mixing water shall be potable.

2.5 CEMENT GROUT:

A. Cement Grout: Shall be API Glass G Cement or equivalent. Cement shall have an accelerant and include ¼ pound of flow seal per sack. Variations from cement as specified must be approved by the Contracting Officer.

WY-02671 - 7

B. Grout Placement: The casing will be cemented from the top of the production zone to the land surface. The grout may be placed by any method that assures complete filling of the annulus from the top of the production zone to the surface including pumping down the casing and displacing or utilizing a tremie in the annular space.

C. Grout volume will include estimated 30% overrun or 10% overrun based on volumes calculated from the geophysical logs.

D. If cement grout is used in conjunction with PVC casing, heat of hydration will need to be controlled or mitigated to avoid compromising casing.

PART 3: EXECUTION

3.1 INSTALLATION:

A. Drilling Location: Drill the well at the location staked by the Contracting Officer.

B. Order of Drilling: The drilling of the well hole shall be done in two steps. A pilot hole will be drilled and then reamed. Contracting Officer (CO) must witness drilling of pilot hole.

Drilling shall continue until water of adequate quality and quantity has been encountered or that unfavorable conditions require hole abandonment. If drilling results are favorable for completing well, Contractor shall then ream the pilot hole to full size to the required depth.

C. Work Time Limits: Completion of final hole reaming, casing installation, gravel pack placement, and initiation of grout placement shall be done within one continuous workday.

Failure to comply with this time limit shall be sufficient cause to abandon hole due to Contractor's actions if the well cannot be successfully completed in accordance with Specification 02670 - Water Wells.

D. Hole Size: The hole shall be of sufficient diameter to provide a minimum 2” annulus. In example, not less than 9-1/2 inch for 5-inch nominal size casing and large enough to accommodate tremie pipe.

E. Estimated Drilling Depth: As shown on Work Data Sheet.

F. Using Pilot Hole as Test Well: If the Contractor drills a pilot hole and encounters water, the

Contracting Officer, after considering all the evidence, shall determine whether to deepen the hole, enlarge the hole to the size specified, or to abandon the well. The pilot hole shall be a minimum of 5 inches in diameter.

WY-02671 - 8

G. Water Used to Facilitate Completion of Well: Any water introduced into a well by the

Contractor to facilitate drilling, developing, cleaning and gravel packing operations, including water added to an approved drilling additive shall be potable water or from a supply approved by the Contracting Officer.

H. Drilling Fluid Additives: All drilling fluid additives must be approved by the Contracting

Officer and be NSF approved for drinking water.

I. Recirculation and Mud Drilling: Bentonite based mud drilling is discouraged. If bentonite-based muds are proposed under special drilling circumstances, justification must be provided to the Contracting Officer. All drilling programs (polymer-based muds, bentonite-based muds, air foam, etc.) must be approved by the Contracting Officer.

J. Depth of Casing: The hole shall be cased the full depth unless casing of a portion of the well is deemed unnecessary by the Contracting Officer.

K. Backfill: If in the process of locating water-bearing strata, the well was drilled deeper than needed, the Contractor shall back fill the well with approved formation stabilizer to a point 20 feet below the bottom of the lowest water-bearing strata. Back fill shall be disinfected in the same manner as the gravel pack.

L. Casing Installation: Casing shall be installed in accordance with the drilling method used.

For PVC casing, the joined casing string shall be installed in a predrilled hole. Casing shall not be dropped onto the bottom of the well hole, nor forced down against the bottom of the hole during installation. Casing shall be kept continually suspended during and after installation, until such time that all of the gravel pack and grout have been properly installed.

1. Casing joints shall be watertight.

2. 5 to 20 feet of casing (blank or slotted, as determined by the contracting officer), sealed, and pointed or capped at the lower end, may be required below the primary screen (rat hole).

3. The casing string shall be capped on the bottom.

M. Water-Bearing Strata: If it is necessary to extend casing through developable water-bearing zones, the portion of the casing opposite the water bearing zones shall be screened or sealed off as determined in the field by the Contracting Officer.

WY-02671 - 9

1. Casing centralizers shall be installed on the casing immediately above and below the screened zone, and every 20 feet through the screened zone.

N. Surface Seal: Installation of the seal shall be performed in the presence of the Contracting

Officer. No work shall be done on the well until surface grout has set at least 24 hours after final placement.

O. Stainless Steel Well Screen (if specified): The Contractor shall select the installation method, in accordance with the screen manufacturer's recommendations. Screens may have either a weld ring, pipe-thread, or spline lock-end fittings. Welds shall be made with stainless-steel welding rod. The screen fittings shall be stainless steel of the same type as the screen. Joints must be straight and tight and retain 100% of the original screen strength.

P. Gravel Packing: Install approximately a 2-inch thickness (minimum) of gravel pack material in the annular space in the zones opposite the screens including 5 to 20 feet below (rat hole) and five feet above and below each screened zone or as determined by the Contracting Officer upon review of the logs. Placement of gravel pack and grout shall be performed in the presence of the Contracting Officer.

1. Disinfection: Disinfect the gravel pack material by mixing 1 pound of calcium hypochlorite (65% available chlorine) in each cubic yard of packing material as it is installed in the well.

Q. Water Bearing Formation Seal: Install bentonite gravel or pellet material for a thickness of ten feet directly above the gravel pack. This material shall be installed in the same manner as the gravel packing. Installation of the seal shall be performed in the presence of the

R. Zone Isolation Seal: If water yielding zones are encountered that are of unacceptable quality water, these zones will be sealed off with bentonite. Install bentonite grout, gravel, or pellet material for a thickness of at least ten feet directly above and below the zone to be isolated.

S. Grout: Install grout in the remaining zones in the well which do not require gravel pack material or surface grout. Installation of the grout shall be performed in the presence of the

T. Well Log and Samples: Shall be taken in accordance with Specification 02670 -Water

Wells.

WY-02671 - 10

U. Hole Cleanliness: The drilled hole shall be kept clean to prevent plugging off small yields of water. Sufficient compressed air, and water as needed, shall be circulated to prevent cuttings from booting or caking walls of hole. Circulation shall be established before drilling begins and shall be maintained throughout the drilling process. The return of cuttings to ground surface shall be continuous. When drilling stops, circulation shall be maintained until all cuttings have returned to ground surface. Failure to maintain a clean hole shall be sufficient cause to abandon hole due to Contractor's actions in accordance with Specification 02670 - Water Wells.

V. Well Development: Well development methodology (jetting, surging, surge block, swabbing, etc.) shall be approved by the contracting officer. Contractor shall be cognizant of the collapse strength of the casing and hydraulic conditions of the well in order to perform well development in a manner as to not compromise the casing and well. After the well has been completely constructed and all drilling fluids and additives removed from the well, each exposed water-bearing zone targeted for water production shall be developed.

Development work shall be performed in the presence of the Contracting Officer.

W. Preliminary Well Testing: The Contractor shall make preliminary yield tests, as specified in

Specification 02672 – Part 3.1 Preliminary Yield Testing of the Well, on each water bearing zone penetrated. If water in adequate quantity and quality is obtained the well shall be cased and developed.

3.2 FIELD QUALITY CONTROL:

A. Alignment:

1. As per the State of Wyoming Water Well Minimum Construction Standards, the well shall drift off plumb no more than one degree per 100 feet of borehole. The alignment shall allow a 40-foot-long section of pipe, ½ inch less than the inside diameter of the casing, to pass freely from the top of the casing through the anticipated pump setting depth.

2. If the well does not pass the alignment test, correct the alignment, or abandon the well and drill a new well within 50 feet of the original hole, at no additional cost to the Government. The Contractor shall abandon in accordance with state law, prior to starting a new hole.

B. Well Development:

1. The Contractor shall develop the well until the produced water does not contain

WY-02671 - 11

appreciable amounts of sand, silt, or turbidity.

3.3 PROTECTION:

A. Drilling Waste: Drilling waste such as drilling fluid and drill cuttings shall be removed so that wastes will not interfere with installation of the well platform and pumping equipment and will not pollute surface waters or cause contamination of the well. Drill cuttings shall be scattered so that the material is 1-inch or less in depth or as approved by the contracting officer.

B. Drilling Fluid and Water: Drilling fluids containing chemicals of any kind, including muddy water consisting of sediment and suspended sediment, shall be directed away from streams and surface bodies of water. Drilling fluids shall not come into contact with any streams, streambeds, or surface bodies of water. The Contractor is responsible for the cleanup of any streams, streambeds, or surface bodies of water that come into contact with drilling fluid chemicals, including muddy and dirty water, and the costs associated thereof.

C. Abandonment of the Well: Shall be in accordance with Specification 02670 - Water

Wells.

D. Sanitary Protection: Shall be in accordance with Specification 02670 - Water Wells.

PART 4: MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT:

A. General:

1. Rig or Standby time will not be paid for.

2. No payment will be made for drilling, installing casing, removing casing, or the plugging of a well abandoned due to Contractor's actions.

3. No payment will be made for time spent developing and testing wells which occur prior to the well being completed (cased, gravel packed and grouted).

4. When the Contracting Officer determines that a well should be drilled deeper, the Contractor shall be required to drill a maximum of one and one-half times the estimated depth shown on the Work Data Sheet at the unit price bid. The Contractor

WY-02671 - 12

shall be required to provide all additional work and materials needed to satisfactorily complete the deeper well, at the unit price bid for the respective work performed.

5. No payment will be made for disinfection of the well, furnishing and installing the cap or compression seal, and casing centralizers. The Contractor shall include consideration for these items in the bid price for other items of the Contract.

B. Units:

1. Well drilling, installing casing and well screen, gravel pack material, bentonite seal, and grouting will be measured and paid for per linear foot.

2. Payment will be made per linear foot for drilling, installing casing and well screen, gravel pack material, bentonite seal, and grouting for the quantity abandoned due to causes not the fault of the Contractor.

3. Payment for pulling casing and plugging the hole when the well is abandoned due to causes not the fault of the Contractor will be based on the price negotiated by the

4. Well development and final testing will be measured and paid for by the number of hours of development and testing required for each well beginning when the pumps, compressors, and other equipment have been installed and actual development or testing have begun.

5. If the Contracting Officer determines from information obtained from a Contractor's pilot hole that the well site should be abandoned due to no fault of the Contractor, measurement and payment will be negotiated and the Contract will be modified in writing.

6. Mobilization to the job site and between locations will be measured and paid for as a lump sum.

4.2 BASIS OF PAYMENT:

A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:

Pay Item Pay Unit

WY-02671 - 13

WY-02671 (1) Drilling Pilot Hole (5-inch min. dia.) ............................................Linear Foot WY-02671 (2) Drilling Well Hole (9-1/2-inch min. dia.) ......................................Linear Foot WY-02671 (3) Furnish and Install 5-Inch Casing ..................................................Linear Foot WY-02671 (4) Furnish and install 5-Inch Slotted Casing......................................Linear Foot WY-02671 (5) Gravel Packing / Bentonite Seal ....................................................Linear Foot WY-02671 (6) Grout, Surface Grout ......................................................................Linear Foot WY-02671 (7) Well Development .........................................................................Hours WY-02671 (8) Well Testing ...................................................................................Hours

END OF SECTION

M. Water used for drilling and cementing operations shall be potable water
or from a source approved by the Contracting Officer.
N. Casing Centralizers: Shall be stainless steel, or a Contracting Officer approved alternate, sized to fit the casing and the borehole placed on the bottom, top, and through the screened interval and spaced not more than 20 feet apart.
O. Disinfectant: Calcium hypochlorite (65% available chlorine) or alternative as approved by the Contracting Officer.
lump sum.

File details come from the government source that posted it. Updated .