Attachment 0006 QASP Design ES TO 0001 031621.pdf
PDF 193 KB Posted
- Attached to
- Draft RFP for SOLDIER UNMANNED AIRCRAFT SYSTEMS (SUAS) DESIGN AND DEVELOPMENT ENGINEERING SERVICES CONTRACT
- Solicitation number
- W58RGZ-22-R-0073
About this file
This document contains a Quality Assurance Surveillance Plan (QASP) for a design and development engineering services contract to provide support to the Soldier Unmanned Aircraft Systems (SUAS) Product Office. The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items to support sustainment and technical engineering services as defined in the Performance Work Statement. Performance will be monitored according to requirements in five areas: technical support, program management and administration support, contract data requirement list reports, contract management and cost reports, and prototype unit development and delivery. Acceptable quality levels and methods of surveillance are defined for each performance requirement. The contracting officer representative and quality assurance evaluator will conduct random sampling, customer feedback, and semi-annual evaluations to ensure requirements are met.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
FOR
DESIGN AND DEVELOPMENT ENGINEERING SERVICES
INDEFINITE DELIVERY INDEFINITE QUANTITY TASK ORDER 0001
SOLDIER UNMANNED AIRCRAFT SYSTEMS (SUAS)
2 FEBRUARY 2021
Reviewed by:
ERIC G. SHULL
Lead Systems Engineer, SUAS Date
GREGORY A. WILSON
Contracting Officer US Army Contracting Command, Redstone Arsenal Date
INTRODUCTION
1.1 Purpose. The purpose of this Quality Assurance Surveillance Plan (QASP) is to identify the methods and procedures the Government will use to evaluate contractor actions while performing the requirements in the Performance Work Statement (PWS). The period of performance will be one year with four option years.
1.1.1 This QASP is designed to provide a systematic method to monitor and evaluate the services the contractor is required to furnish and provide direction to personnel performing contract surveillance activities. The Product Management of the Soldier Unmanned Aircraft Systems (SUAS) Product Office (PdO) will perform surveillance by monitoring contractor performance for each listed performance objective in Appendix A, Performance Requirement Summary. The government will maintain a quality standard for these services for the work performed and deliverables provided under the contract.
1.1.2 The SUAS PdO personnel developed this QASP, will oversee the contractor’s performance, and review the consequent deliverables required by the PWS.
2.0 DESCRIPTION OF SERVICES
2.1 Scope of Work. The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and non-personal services necessary to provide sustainment and technical engineering support services to the SUAS PdO as defined in the PWS.
3.0 ROLES AND RESPONSIBILITIES
3.1 Contracting Officer Representative (COR). The COR is responsible for quality assurance guidance and ensuring that contract quality requirements, provision, standards, and thresholds are defined, practical, enforceable, necessary and verifiable. The COR evaluates and documents contractor performance in accordance with the QASP and PWS, notifies the Contracting Officer (KO) of any significant performance deficiencies, maintains surveillance documentation, and recommends improvements to the QASP and PWS throughout the life of the contract. COR is not authorized to direct work, offer advice on how the work should be performed, change the contract or in any way obligate funds.
Assigned Primary COR (Technical): Eric Shull Organization or Agency: Soldier Unmanned Aircraft Systems (SUAS) (UAS Project Office-Redstone) Telephone: (256) 313-5358 Email: eric.g.shull2.civ@mail.mil mailto:eric.g.shull2.civ@mail.mil
3.2 Contracting Officer. The Contracting Officer (KO) is responsible for safeguarding the interests of the United States in contractual relationships. Only the KO is authorized to bind the government or direct or make changes to the contract. The KO delegates authority for inspection and/or acceptance in accordance with terms of the contract and informs the contractor of the names, duties, and limitations of authority for all quality assurance personnel assigned to the contract.
Assigned KO: Gregory A. Wilson Organization: ACC-RSA Telephone: 256-313-4180 Email: gregory.a.wilson12.civ@mail.mil
3.3 Quality Assurance Evaluator (QAE). An individual designated by the requiring activity to assist the COR and provide oversight of the contractor’s performance.
The QAE’s primary duty is to monitor the contractor’s performance by physically checking to see that tasks are completed, reports are submitted, and desired outcomes are achieved. When a surveillance observation results in an unacceptable evaluation, the QAE will report the unacceptable performance to the COR. The QAE is not authorized to direct work, offer advice on how the work should be performed, change the contract, or in any way obligate payment of funds by the government.
Assigned QAE: Joseph (Jody) Brown
Organization or Agency: Soldier Unmanned Aircraft Systems (SUAS) Telephone: (256) 313-8333 Email: joseph.w.brown154.civ@mail.mil
4.0 QUALITY REQUIREMENTS
4.1 Quality Control Program. The contractor, not the government, is responsible for management and quality control actions to meet the terms of the contract.
4.1.1 The quality control program is the driver for quality. The contractor is required to develop a comprehensive program of inspections and monitoring actions. The first major step to ensuring a “self-correcting” contract is to ensure that the Quality Control Plan (QCP) approved at the beginning of the contract provides the measures needed to lead the contractor to success.
4.1.2 Once the QCP is accepted, careful application of the process and standards presented in the remainder of this document will ensure a robust quality assurance and control program.
5.0 SURVEILLANCE
5.1 Surveillance Methods. This QASP will incorporate random sampling, inspection, and customer feedback as the approach to ensure the contractor complies with the PWS requirements. Re-performance is the preferred method of correcting any unacceptable performance. See Performance Requirement Summary below.
5.1.1 Validated Customer Complaint. Customer complaints shall be surveyed as described below. Anyone who observes unacceptable services, either incomplete or not performed, should immediately contact the COR/QAE. The COR/QAE will conduct an investigation to determine the validity of the complaint. If the complaint is determined to be valid, the COR/QAE will document the findings and notify the customer and the Contractor using the Contractor Discrepancy Report (CDR), Appendix B. The COR/QAE will retain the annotated copy of the written complaint for the government’s files. If the complaint is valid, the contractor will be given a specific, appropriate amount of time to correct the unacceptable services.
5.1.1.1 The COR/QAE should inform the customer(s) of when the unacceptable services must be corrected and advise them to contact the COR/QAE if the unacceptable services are not corrected. The COR/QAE will consider the customer complaint resolved unless notified otherwise by the customer.
5.1.1.2 The contractor shall return the written CDR document to the COR/QAE, completed with the actions taken to correct the unacceptable services. The government will retain this document to ensure the contractor has taken appropriate action(s) to prevent the recurrence of unacceptable services. The COR/QAE will retain and file the complaint form. At the end of each month, all validated complaints will be counted to determine if performance is satisfactory or unsatisfactory based on the criteria in the Acceptable Quality Levels (AQL). The KO shall be notified in writing by the COR/QAE of any unsatisfactory performance.
5.1.2 Acceptable Quality Levels (AQL): AQLs are contained in Appendix A, Performance Requirements Summary.
5.1.3 Periodic Surveillance: This method of surveillance is at Appendix A, Performance Requirements Summary.
5.1.4 Unacceptable Performance. If the number of complaints / unacceptable services exceeds the performance threshold for any objective, the COR will determine the possible cause of this unacceptable performance and notify the KO.
Government-caused complaints / unacceptable services shall not be counted against the contractor. The same applies to any other requirement of the contract when government-caused complaints / unacceptable services are the cause of unacceptable contractor performance. If the contractor’s performance is judged unacceptable for any requirement, the COR will inform the contractor’s designated representative, and request his / her signature and date of surveillance on documentation acknowledging notification. If the designated representative refuses to sign, the COR personnel shall annotate on the documentation the date and time of notification and name of representative and his/her refusal to acknowledge. If the contractor disputes the results of surveillance, the COR must refer the contractor to the KO for resolution.
5.1.5 Re-performance. Re-performance is the preferred method of correcting any unacceptable performance. The contractor shall provide the government written response why the performance threshold was not met, how performance will be returned to acceptable levels, and how recurrence of the cause will be prevented in the future.
5.1.6. Revisions. Revisions to this QASP are the joint responsibility of the requiring activity and the contracting office. However, as a result of partnering with the contractor, surveillance checklists may be revised jointly by COR personnel and contractor personnel. The KO must approve the revisions in writing before being used by the COR.
6.0 DOCUMENTATION REQUIREMENTS
6.1 The COR is responsible for maintaining a Surveillance Folder at a designated location. The following information should be contained in the Surveillance Folder:
1. QASP
2. Contractor’s Quality Control Plan
3. Applicable portions of the contract, to include PWS, and any modifications
4. Appointment Letters and Training Certificates of the COR
5. Contractor Discrepancy Reports
6. Memorandums / Miscellaneous Correspondence
7. Risk Based Surveillance Schedule
8. Current Office of Government Ethics (OGE) Form 450 signed by the COR’s
Supervisor
APPENDIX A – PERFORMANCE REQUIREMENTS SUMMARY
Performance Objective Standard Acceptable Quality
Levels Method of
Surveillance
PRS #1
The Contractor shall perform all aspects of SUAS technical support as required in support of the SUAS PdO.
Task Order 3.3-3.11
95% of all technical support required completed no later than the specified delivery date. 90% of all technical support content requires no re-work in order to achieve acceptance by the specified approval authority.
No deviation from standards without written approval from the COR of Contracting Officer.
The QAE will conduct surveillance employing random sampling of technical support as defined in the PWS and Task Orders.
The QAE will conduct a formal evaluation on semi-annual basis.
PRS #2
The contractor shall perform all aspects of SUAS Technical Program Management and Administrative support as required in support of the SUAS PdO.
Task Order 3.1, 3.2, 3.5, 3.9
95% of Program Management and Administrative Support completed no later than the specified delivery date. 90% of the support requires no re-work in order to achieve acceptance by the specified approval authority.
No deviation from standards without written approval from the COR of Contracting Officer.
The QAE will conduct surveillance employing random sampling of Program Management and Admin Support as defined in the PWS and Task Orders.
The QAE will conduct a formal evaluation on semi-annual basis.
PRS #3
The contractor shall deliver Contract Data Requirements List (CDRL) reports as required by the SUAS PdO.
Task Order 4.1- 4.10
95% of documents submitted no later than the specified delivery date. 90% of document content requires no revision in order to achieve acceptance by the specified approval authority.
No deviation from standards without written approval from the COR of Contracting Officer.
The QAE will conduct surveillance employing random sampling of the CDRLs defined in the PWS and Task Orders. The QAE will conduct a formal evaluation of these documents on semi-annual basis.
PRS #4
The Contractor shall provide Contract Management and Cost Reports.
Task Order 3.2
Contractor’s Progress, Status and Management Report and Performance and Cost Report due NLT the tenth working day following the preceding month.
No deviation from standards without written approval from the COR of Contracting Officer.
The QAE will conduct surveillance employing random sampling of Contractor’s Progress, Status and Management Report and Performance and Cost Report. The QAE will conduct a formal evaluation of these documents on semi-annual basis.
Performance Objective Standard Acceptable Quality
Levels Method of
Surveillance
PRS #5
The Contractor shall develop and deliver 5 (Five) prototype units.
Task Order 3.11, and 3.12
100% of prototype unit’s delivered NLT schedule.
No deviation from standards.
The QAE will conduct surveillance employing random sampling of Contractor’s Progress. The QAE will conduct a formal evaluation on a semi-annual basis.
APPENDIX B – CONTRACTOR DISCREPANCY REPORT (CDR)
1. CONTRACT NUMBER DISCREPANCY REPORT NUMBER:
2. TO: (CONTRACTOR & MANAGER’S NAME) 3. FROM: (NAME OF COR)
DATES
4. PREPARED ORAL NOTIFICATION RETURNED BY CONTRACTOR
ACTION COMPLETE
DISCREPANCY OR PROBLEM (DESCRIBE IN DETAIL. INCLUDE PWS REFERENCES. ATTACH
CONTINUATION SHEET IF NECESSARY):
SIGNATURE OF COR/QAE:
7. TO: (CONTRACTING OFFICER) FROM (CONTRACTOR)
CONTRACTOR RESPONSE AS TO CLAUSE, CORRECTIVE ACTION AND ACTIONS TO PREVENT
RECURRENCE (ATTACH CONTINUATION SHEET IF NECESSARY. CITE APPLICABLE QC PROGRAM
PROCEDURES OR NEW QC PROCEDURES):
9. SIGNATURE OF CONTRACTOR REPRESENTATIVE: DATE:
10. GOVERNMENT EVALUATION (ACCEPTANCE, PARTIAL ACCEPTANCE, REJECTION. ATTACH
CONTINUATION SHEET IF NECESSARY):
GOVERNMENT ACTIONS (PAYMENT DEDUCTION, CURE NOTICE, SHOW CAUSE, OTHER):
CLOSE OUT
NAME: TITLE SIGNATURE DATE
CONTRACTOR NOTIFIED:
COR: