This document includes a Performance Work Statement (PWS) and draft Request for Proposal (RFP) related to engineering services for Soldier Unmanned Aircraft Systems. The PWS outlines requirements for design and development of a wireless interface between a Handheld Ground Control Station and ground radio over 12 months. Key deliverables include program management plans, trade studies, preliminary and critical design reviews, interface specifications and control documents, prototype units, and technical data packages. The draft RFP seeks cost-plus-fixed-fee proposals on a small business set-aside basis for engineering support of Group 1 UAS including Short Range, Medium Range, and Long Range reconnaissance aircraft as well as the Handheld Ground Control Station. Questions regarding the draft RFP are due by February 11th, 2022 and the official RFP will be released on February 24th, 2022. The opportunity is issued by the US Army Materiel Command Contracting Command at Redstone Arsenal.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task Order 0001 Soldier UAS (SUAS)

Design & Development Engineering Services Contract W58RGZ-20-R-0309

TSM TITLE TSM NUMBER Rev TSM DURATION TERM/COMPLETION NONSEVERABLE

Handheld – Ground Control Station Wireless Interface Design and Development 0001 0 12 Months ARO TERM YES

PRIME PROGRAM MANAGER PRIME PROJECT ENGINEER SUAS

TBD TBD Richard M. Szcepanski

1) Revision History:

Revision Explanation of Revision

0 Initial Release

2) Scope Overview:

The Soldier Unmanned Aircraft Systems (SUAS) Product Office intends to develop a wireless interface between the Handheld – Ground Control Station (H-GCS) and ground radio. For the scope of this program the Contractor shall provide Engineering support to the Solider UAS Product Office with the development of a wireless interface utilizing an Ultra-Wide Bandwidth (UWB) technology, provide a Technical Data Package (TDP), prototype units for testing and supporting documentation produced to achieve this task.

3) Requirements:

The contractor shall:

Req.

Number Requirement PWS

Ref

1. Conduct Program Management Reviews (PMRs) as to the overall program status quarterly at the

Contractors Site. Hold Bi-weekly Integrated Product Teams (IPTs) and collaborate with the Government.

Provide slides and meeting minutes for IPTs, PMRs, Preliminary Design Review (PDR) and Critical Design Review (CDR) events via email to all attendees.

3.2.2 3.2.4

2. Provide Program Management oversite for task execution for cost, schedule, and technical performance.

Provide and update a Work Breakdown Structure (WBS) (A023) and Integrated Master Schedule (IMS) (A032).

3.2.1 3.2.5

3. Conduct a Trade Study to access current and emerging technology in the UWB field to meet SUAS’s Size, Weight, and Power (SWAP) needs within industry and the United States Government. Then determine the performance and physical characteristics solution(s), document the characteristics, and deliver the recommended solution (A009).

3.3.3 3.5.4

4. Utilize Object-Oriented Systems Engineering (OOSEM) processes to capture various aspects of the wireless solution.

3.3.8

5. Conduct a Preliminary Design Review (PDR) of the recommended UWB solution’s characteristics and specifications documents as well as the OOSEM process used and the aspects captured.

3.3.4

6. Develop the interface requirements specification within the OOSEM process, utilizing Cameo Enterprise Architecture (EA) software suite for capturing various aspects of the interface to include use case analysis, requirements, and design (A062).

3.3.7

7. Develop an Interface Control Document (ICD) within the OOSEM process, utilizing Cameo EA software suite for capturing various aspects of the interface to include use case analysis, requirements, and design (A020).

3.3.5

8. Utilize the PDR approved criteria to develop solid models, Computer Aided Designs (CAD) drawings, etc.

of the UWB solution to support prototype builds and incorporation into the Government’s TDP (A050).

4.5.4

9. Conduct a Critical Design Review (CDR) of the UWB ICD, Specification Document and design as well as the supporting files created during the Model-Based Systems Engineering (MBSE) process (A034).

3.3.4

10. Finalize the ICD and supporting models generated throughout the OOSEM process and enter into a Dynamic Object-Oriented Requirements System (DOORS) or Government approved equivalent data base and deliver a loadable export of the specification document (A020).

3.3.5

Task Order 0001 Soldier UAS (SUAS)

Design & Development Engineering Services Contract W58RGZ-20-R-0309

TSM TITLE TSM NUMBER Rev TSM DURATION TERM/COMPLETION NONSEVERABLE

Handheld – Ground Control Station Wireless Interface Design and Development 0001 0 12 Months ARO TERM YES

Req.

Number Requirement PWS

Ref

11. Utilize the CDR approved solid model to finalize the design and create drawings to be incorporated into the Governments TDP (A049 and A050) 3.5.4

12. Develop and deliver 5 (Five) prototype units using the delivered Technical Data. 3.5.5

4) Deliverables:

a) Contract Data Requirements List (CDRL) Deliverables:

Data Item Title CDRL

Number Format Initial Submission Subsequent submission

TSM

Requirement(s)

1. Work Breakdown Structure (WBS) A023 DI-MGMT-81334D 30DAC N/A 2

2. Integrated Master Schedule (IMS) A032 DI-MISC-80508B 30DAC As Req’d 2

3. Trade Study A009 DI-MISC-80508B 45DAC N/A 3

4. Interface Requirements Specification (IRS) A062 DI-IPSC-81434A 10 days prior to CDR

30 Days Prior to End of PoP

5. Draft Interface Control Document (ICD) A020 DI-SESS-81248B 10 days prior to CDR N/A 7

6. Draft Product Drawings/Models and Associated Lists 2D A049 DI-SESS-81000E 10 days prior to CDR N/A 8

7. Critical Design Review (CDR) Report A034 DI-ADMN-81505 10 days prior to CDR N/A 9

8. Interface Control Document (ICD) A020 DI-SESS-81248B 30 Days Prior to End of PoP N/A 10

9. Product Drawings/Models and Associated Lists 2D A049 DI-SESS-81000E 30 Days Prior to

End of PoP N/A 11

10. Product Drawings / Models and Associated Lists Solid Models (3-D) A050 DI-SESS-81000E 30 Days Prior to

End of PoP N/A 11

b) Hardware Deliverables:

Data Item Description Qty Delivery

1. Prototype wireless interface between the HGCS & ground radio 5 10 Days Prior to End of PoP

5) Ground Rules & Assumptions:

NA

6) Security:

Paragraph15.0 of the Services Base Performance Work Statement (PWS), shall apply to this Task Order. No access to classified information is authorized. Only U.S. citizens are authorized to work on this contract. Anti- Terrorism/Operations Security Requirements are not applicable to this task. Task to be performed at contractor’s CONUS facility. Contractor will not require Common Access Card (CAC) access to Government Information systems, classified data or support Information Assurance (IA) / Information Technology (IT) functions.

1) Revision History:
2) Scope Overview:
3) Requirements:
4) Deliverables:
a) Contract Data Requirements List (CDRL) Deliverables:
b) Hardware Deliverables:
5) Ground Rules & Assumptions: NA