Attachment 0006 AED Requirements Infrared Collimator.pdf
PDF 69 KB Posted
- Attached to
- Apache AH-64 Digital Captive Boresight
- Solicitation number
- W58RGZ-21-R-0113
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
07/30/2020
2019H498PRID 2305000Part Number 1240-01-202-4135NSN AH-64System
INFRARED COLLIMATORNomenclature
NAdequate DMWR Available?
DMWR ID
DMWR Date DMWR Chg #
NPre-Award Survey Recommended?
NCorrelation Performance Study Required ? YPVA Recommended?
Identify Any Special Processes, Test Procedures, and/or Instructions
NCritical Safety Item?
There are no emerging airworthiness issues, no issues related to ECPs affecting the CSI status, and no concerns over reliability/durability for the AH-64 Infrared Collimator at the time of this review.
Special Airworthiness Considerations
AED Notes: FCDD-AMA-M-Sustainment has verified the CSI and NST status through the ARISE CIM database on 28 August 2019. The part is Non-CSI and Non-NST.JC
Other Requirements / Comments
8V613 54089
If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:
NSpecial Post-Contract Award Requirements?
Special Post-Contract Award Requirements
The Prime or OEM is required to submit an M & O Plan 30 days after contract award to Aviation Engineering Directorate (AED).
The M & O plan will be reviewed and require approval by AED prior to government acceptance of contract deliverable assets.
Other Requirements / Comments (Part II)
No DMWR is available. Recommend contacting AH-64 PM IUID Office, Leah Trusley, (256)-955-3307, for any updates and/or waiver/deviation of IUID Contracting DFAR clauses on the IUID marking of the Infrared Collimator.
Other Requirements / Comments (Part III)
AED Notes: FCDD-AMA-M-Sustainment has re-verified the CSI and NST status through the ARISE CIM database on 1 October 2019. The part is Non-CSI and Non-NST. No changes made. DEM
Other Requirements / Comments (Part IV)
Other Requirements / Comments (Part V)
NDoes QE-STD-2 Apply?
N
Additional CSI Requirements
CSI Contains CSI Replacement Parts? NEngineering Testing Required?
The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:
1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.
RStatus
NTDPL?
Approved Date
M&O AED REQUIREMENTS DATA
Correlation Performance Study Requirements
Commerciality Determination Commercial Item? N NBest Commercial Practice Acceptable?
07/30/2020
2019H498PRID 2305000Part Number 1240-01-202-4135NSN AH-64System
Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes
MEOs Required for Competitive Contract?
RStatus
File details come from the government source that posted it. Updated .