Attachment 0005 - PRICE MATRIX.xlsx

XLSX spreadsheet 127 KB Posted

Attached to
Demilitarization Research & Development (R&D) Federal contract opportunity
Solicitation number
W15QKN-22-R-0016
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

This solicitation seeks proposals for a Demilitarization Research & Development contract to develop and improve conventional ammunition demilitarization capabilities for the U.S. Army. The five-year IDIQ contract includes both FFP and CPFF task orders and has a 100% small business set-aside. The US Army Contracting Command - New Jersey will award to support the Product Director for Demilitarization in developing new demilitarization processes and equipment to dispose of over 300,000 short tons of excess, unserviceable, and obsolete conventional ammunition for all Military Services. Proposals are due no later than March 22, 2021. The point of contact is Mr. Anthony Bleakley of ACC-JA at Picatinny Arsenal.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FFP Labor

OFFEROR NAME:= Offeror Fill-In Cells
= Gov't Provided Amounts; Do not change
W15QKN-22-R-0016 - Demilitarization Technology and Development= Formulas; Do not change
ATTACHMENT 0005
FFP LABOR RATES - ALL ORDERING PERIODS
1 Select the appropriate option for each labor category from the drop down list (SCLS-Covered or Exempt)
2 For labor categories that are subject to the Service Contract Labor Standards (SCLS), the element of cost breakout for the FFP fully loaded labor rates must be completed on the "SCLS Labor" tab of this workbook.
LABOR CATEGORY *SCLS Covered or Exempt 1Firm Fixed Price
Ordering Period 1Ordering Period 2Ordering Period 3Ordering Period 4Ordering Period 5
Government
Provided HoursFFP Fully Loaded Labor Rate 2
Extended AmountGovernment
Provided HoursFFP Fully Loaded Labor Rate 2
Extended AmountGovernment
Provided HoursFFP Fully Loaded Labor Rate 2
Extended AmountGovernment
Provided HoursFFP Fully Loaded Labor Rate 2
Extended AmountGovernment
Provided HoursFFP Fully Loaded Labor Rate 2
Extended Amount
Scientist18$020$0.0080$0.0018$0.004$0.00
Project Manager525$0593$0.00508$0.00518$0.0099$0.00
Senior Engineer1,962$02,344$0.002,033$0.001,651$0.00258$0.00
General Engineer4,415$05,507$0.003,545$0.005,885$0.00743$0.00
QC Engineer1,973$02,293$0.002,062$0.001,857$0.00110$0.00
Engineering Technician1,659$02,344$0.002,315$0.004,461$0.00263$0.00
Draftsman280$0775$0.001,245$0.00285$0.0055$0.00
Manufacturing140$0955$0.0011,392$0.004,458$0.00110$0.00
Inspection & Testing10$0240$0.001,160$0.00160$0.0010$0.00
QC Technician45$0325$0.001,015$0.00605$0.0040$0.00
Production Control10$0200$0.00910$0.00100$0.0010$0.00
Tool Die & Model Maker10$0200$0.00900$0.00100$0.0010$0.00
Total FFP Labor11,047$015,796$0.0027,165$0.0020,098$0.001,712$0.00

FFP SCLS Labor

Offeror Name:0= Offeror Fill-In Cells
= Formulas; Do not change
W15QKN-22-R-0016 - Demilitarization Technology and Development
ATTACHMENT 0005
FFP LABOR RATES
SCLS (previously SCA) Covered Labor Categories
* based upon 2080 hours
Offerors shall provide explanation if fully loaded labor rate detailed below differs from the proposed labor rate shown on "FFP Labor" tab
Solicitation Labor CategoryWage Determination
Number / RevisionSCLS Occupation
TitleSCLS

Occupation

CodeHours Per YearHourly Wage Rate *
TotalHolidayVacationSickProductive HoursWorker's CompensationH&WAll other Indirects & ProfitTotal Loaded Labor Rate
For Sample Purposes Only, Morris County was used as Place of Performance for Wage Determination; Offeror are to use Wage Determinations based upon their anticipated place of performance
SAMPLE ONLY: Tool, Die & Model Maker2015-4211 / Rev. 16Tool and Die Maker190402,0808880561,856$30.07$0.80$4.23$16.54$51.64
Complete the below information for all labor categories covered by SCA. Additional rows may be added, if necessary.
2,0802,080$0.00
2,0802,080$0.00
2,0802,080$0.00
2,0802,080$0.00
2,0802,080$0.00
2,0802,080$0.00

Basis For SCLS Benefits:

1. Holiday: Explain Holiday Benefits Paid Reflected In Column K

2. Vacation: Explain Vacation Benefits Paid Reflected In Column L

3. Sick: Explain Sick Leave Benefits Paid Reflected In Column M

4. H&W: Explain H&W Benefits Paid Per Hour Reflected In Cell N5

SAMPLE ONLY
Basis For SCLS Benefits:

1. Holiday: Explain Holiday Benefits Paid Reflected In Column K Per the Wage Determination, A Minimum of Eleven Paid Holidays Per Year Will Be Paid.

2. Vacation: Explain Vacation Benefits Paid Reflected In Column L Per the Wage Determination, 2 Weeks of Paid Vacation Will Be Paid After 1 Year of Service, 3 Weeks After 5 Years, and 4 Years After 15 Years.

2. Sick Leave: Explain Sick Leave Benefits Paid Reflected In Column M Executive Order (EO) 13706 - Paid sick leave up to 56 hours each year

3. H&W: Explain H&W Benefits Paid Per Hour Reflected In Cell N5 Per the Wage Determination, Health & Welfare Benefits EP 13706: $4.23 Per Hour Will Be Paid.

CPFF Labor

OFFEROR NAME:0= Offeror Fill-In Cells
= Gov't Provided Amounts; Do not change
W15QKN-22-R-0016 - Demilitarization Technology and Development= Formulas; Do not change
ATTACHMENT 0005
CPFF LABOR RATES - ALL ORDERING PERIODS
1 Select the appropriate option for each labor category from the drop down list (SCLS-Covered or Exempt)
2 The sum of the allocated hours between the Prime Offeror and the Subcontractor MUST equal the Government Provided Hours for each labor category
3 Fully Loaded CPFF Labor Rates must agree to the details provided on the CPFF LaborRate tabs for both the Prime Contractor and Subcontractor. If there are any unexplained variances, the Government will utilize the higher of the rates shown in its evaluation.
Ordering Period 1Total
LABOR CATEGORYSCLS Covered or Exempt 1Government
Provided HoursPrime OfferorSubcontractor 1: Insert Name HereSubcontractor 2: Insert Name HereSubcontractor 3: Insert Name HereSubcontractor 4: Insert Name Here
Allocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Extended Amount
Scientist2,877$0$0.00$0.00$0.00$0.000$0.00
Project Manager1,208$0$0.00$0.00$0.00$0.000$0.00
Senior Engineer4,537$0$0.00$0.00$0.00$0.000$0.00
General Engineer8,508$0$0.00$0.00$0.00$0.000$0.00
QC Engineer3,647$0$0.00$0.00$0.00$0.000$0.00
Engineering Technician3,962$0$0.00$0.00$0.00$0.000$0.00
Draftsman530$0$0.00$0.00$0.00$0.000$0.00
Manufacturing364$0$0.00$0.00$0.00$0.000$0.00
Inspection & Testing20$0$0.00$0.00$0.00$0.000$0.00
QC Technician65$0$0.00$0.00$0.00$0.000$0.00
Production Control20$0$0.00$0.00$0.00$0.000$0.00
Tool Die & Model Maker20$0$0.00$0.00$0.00$0.000$0.00
Total CPFF Labor Ordering Period 125,75800000$0.00
Ordering Period 2Total
LABOR CATEGORY *SCLS Covered or Exempt 1Government
Provided HoursPrime OfferorSubcontractor 1: Insert Name HereSubcontractor 2: Insert Name HereSubcontractor 3: Insert Name HereSubcontractor 4: Insert Name Here
Allocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountHoursExtended Amount
Scientist2,393$0$0.00$0.00$0.00$0.000$0.00
Project Manager1,499$0$0.00$0.00$0.00$0.000$0.00
Senior Engineer5,125$0$0.00$0.00$0.00$0.000$0.00
General Engineer9,981$0$0.00$0.00$0.00$0.000$0.00
QC Engineer3,921$0$0.00$0.00$0.00$0.000$0.00
Engineering Technician3,976$0$0.00$0.00$0.00$0.000$0.00
Draftsman1,400$0$0.00$0.00$0.00$0.000$0.00
Manufacturing1,950$0$0.00$0.00$0.00$0.000$0.00
Inspection & Testing320$0$0.00$0.00$0.00$0.000$0.00
QC Technician385$0$0.00$0.00$0.00$0.000$0.00
Production Control200$0$0.00$0.00$0.00$0.000$0.00
Tool Die & Model Maker200$0$0.00$0.00$0.00$0.000$0.00
Total CPFF Labor Ordering Period 231,35000000$0.00
Ordering Period 3Total
LABOR CATEGORY *SCLS Covered or Exempt 1Government
Provided HoursPrime OfferorSubcontractor 1: Insert Name HereSubcontractor 2: Insert Name HereSubcontractor 3: Insert Name HereSubcontractor 4: Insert Name Here
Allocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountHoursExtended Amount
Scientist1,397$0$0.00$0.00$0.00$0.000$0.00
Project Manager925$0$0.00$0.00$0.00$0.000$0.00
Senior Engineer3,603$0$0.00$0.00$0.00$0.000$0.00
General Engineer6,117$0$0.00$0.00$0.00$0.000$0.00
QC Engineer3,222$0$0.00$0.00$0.00$0.000$0.00
Engineering Technician4,425$0$0.00$0.00$0.00$0.000$0.00
Draftsman1,350$0$0.00$0.00$0.00$0.000$0.00
Manufacturing20,994$0$0.00$0.00$0.00$0.000$0.00
Inspection & Testing1,790$0$0.00$0.00$0.00$0.000$0.00
QC Technician1,665$0$0.00$0.00$0.00$0.000$0.00
Production Control1,520$0$0.00$0.00$0.00$0.000$0.00
Tool Die & Model Maker1,500$0$0.00$0.00$0.00$0.000$0.00
Total CPFF Labor Ordering Period 348,50800000$0.00
Ordering Period 4Total
LABOR CATEGORY *SCLS Covered or Exempt 1Government
Provided HoursPrime OfferorSubcontractor 1: Insert Name HereSubcontractor 2: Insert Name HereSubcontractor 3: Insert Name HereSubcontractor 4: Insert Name Here
Allocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountHoursExtended Amount
Scientist26$0$0.00$0.00$0.00$0.000$0.00
Project Manager821$0$0.00$0.00$0.00$0.000$0.00
Senior Engineer2,728$0$0.00$0.00$0.00$0.000$0.00
General Engineer9,712$0$0.00$0.00$0.00$0.000$0.00
QC Engineer3,169$0$0.00$0.00$0.00$0.000$0.00
Engineering Technician7,705$0$0.00$0.00$0.00$0.000$0.00
Draftsman430$0$0.00$0.00$0.00$0.000$0.00
Manufacturing8,096$0$0.00$0.00$0.00$0.000$0.00
Inspection & Testing260$0$0.00$0.00$0.00$0.000$0.00
QC Technician1,125$0$0.00$0.00$0.00$0.000$0.00
Production Control200$0$0.00$0.00$0.00$0.000$0.00
Tool Die & Model Maker200$0$0.00$0.00$0.00$0.000$0.00
Total CPFF Labor Ordering Period 434,47200000$0.00
Ordering Period 5Total
LABOR CATEGORY *SCLS Covered or Exempt 1Government
Provided HoursPrime OfferorSubcontractor 1: Insert Name HereSubcontractor 2: Insert Name HereSubcontractor 3: Insert Name HereSubcontractor 4: Insert Name Here
Allocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountAllocated Hours 2Fully Loaded Labor Rates 3Extended AmountHoursExtended Amount
Scientist8$0$0.00$0.00$0.00$0.000$0.00
Project Manager198$0$0.00$0.00$0.00$0.000$0.00
Senior Engineer516$0$0.00$0.00$0.00$0.000$0.00
General Engineer1,486$0$0.00$0.00$0.00$0.000$0.00
QC Engineer220$0$0.00$0.00$0.00$0.000$0.00
Engineering Technician516$0$0.00$0.00$0.00$0.000$0.00
Draftsman110$0$0.00$0.00$0.00$0.000$0.00
Manufacturing200$0$0.00$0.00$0.00$0.000$0.00
Inspection & Testing20$0$0.00$0.00$0.00$0.000$0.00
QC Technician80$0$0.00$0.00$0.00$0.000$0.00
Production Control20$0$0.00$0.00$0.00$0.000$0.00
Tool Die & Model Maker20$0$0.00$0.00$0.00$0.000$0.00
Total CPFF Labor Ordering Period 53,39400000$0.00

CMR

Offeror Name:0= Offeror Fill-In Cells
= Formulas; Do not change
W15QKN-22-R-0016 - Demilitarization Technology and Development
ATTACHMENT 0005
Only complete this tab if Contractor Manpower Reporting is separately priced, in accordance with Offeror's standard accounting practices
DescriptionCLIN 0006 OP1CLIN 1006 OP2CLIN 2006 OP3CLIN 3006 OP4CLIN 4006 OP5
Contractor Manpower Reporting

Prime CPFF LaborRate-OP1

OFFEROR:0= Offeror Fill-In Cells
= Formulas; Do not change
W15QKN-22-R-0016 - Demilitarization Technology and Development
ATTACHMENT 0005
CPFF LABOR RATES DETAIL - ORDERING PERIOD 1

Based on 2080 hours

Location of PerformanceLabor Category - Government ProvidedPrime Own Labor CategoyrSCLS / ExemptSCLS CodeSCLS Occupation TitleWage Determination # / RevisionHourly RateFringe, if separate from Labor OH (For SCLS, inclusive of H&W)Labor OverheadG&AFully Burdened Labor RateFixed Fee RateCPFF Fully Loaded Labor Rate
Fringe (Exempt)
50.00%80.00%28.00%6.00%
Picatinny, NJTool, Die & Model MakerSCLS19040Tool and Die Maker2015-4211/Rev 16$35.75$17.88$42.90$27.03$123.55$7.41$130.97
0.0%
SCA Covered Labor Categories
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
Exempt Labor Cateogories
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00

SAMPLE ONLY

Prime CPFF LaborRate-OP2

OFFEROR:0= Offeror Fill-In Cells
= Formulas; Do not change
W15QKN-22-R-0016 - Demilitarization Technology and Development
ATTACHMENT 0005
CPFF LABOR RATES DETAIL - ORDERING PERIOD 2

Based on 2080 hours

Location of PerformanceLabor Category - Government ProvidedPrime Own Labor CategoyrSCLS / ExemptSCLSCodeSCLS Occupation TitleWage Determination # / RevisionHourly RateFringe, if separate from Labor OH (For SCLS, inclusive of H&W)Labor OverheadG&AFully Burdened Labor RateFixed Fee RateCPFF Fully Loaded Labor Rate
Fringe (Exempt)
50.00%80.00%28.00%6.00%
Picatinny, NJTool, Die & Model MakerSCLS19040Tool and Die Maker2015-4211/Rev 16$35.75$17.88$42.90$27.03$123.55$7.41$130.97
0.0%
SCA Covered Labor Categories
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
Exempt Labor Cateogories
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00

Prime CPFF LaborRate-OP3

OFFEROR:0= Offeror Fill-In Cells
= Formulas; Do not change
W15QKN-22-R-0016 - Demilitarization Technology and Development
ATTACHMENT 0005
CPFF LABOR RATES DETAIL - ORDERING PERIOD 3

Based on 2080 hours

Location of PerformanceLabor Category - Government ProvidedPrime Own Labor CategoyrSCLS / ExemptSCLS CodeSCLS Occupation TitleWage Determination # / RevisionHourly RateFringe, if separate from Labor OH (For SCLS, inclusive of H&W)Labor OverheadG&AFully Burdened Labor RateFixed Fee RateCPFF Fully Loaded Labor Rate
Fringe (Exempt)
50.00%80.00%28.00%6.00%
Picatinny, NJTool, Die & Model MakerSCLS19040Tool and Die Maker2015-4211/Rev 16$35.75$17.88$42.90$27.03$123.55$7.41$130.97
0.0%
SCA Covered Labor Categories
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
Exempt Labor Cateogories
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00

Prime CPFF LaborRate-OP4

OFFEROR:0= Offeror Fill-In Cells
= Formulas; Do not change
W15QKN-22-R-0016 - Demilitarization Technology and Development
ATTACHMENT 0005
CPFF LABOR RATES DETAIL - ORDERING PERIOD 4

Based on 2080 hours

Location of PerformanceLabor Category - Government ProvidedPrime Own Labor CategoyrSCLS / ExemptSCLS CodeSCLS Occupation TitleWage Determination # / RevisionHourly RateFringe, if separate from Labor OH (For SCLS, inclusive of H&W)Labor OverheadG&AFully Burdened Labor RateFixed Fee RateCPFF Fully Loaded Labor Rate
Fringe (Exempt)
50.00%80.00%28.00%6.00%
Picatinny, NJTool, Die & Model MakerSCLS19040Tool and Die Maker2015-4211/Rev 16$35.75$17.88$42.90$27.03$123.55$7.41$130.97
0.0%
SCA Covered Labor Categories
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
Exempt Labor Cateogories
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00

Prime CPFF LaborRate-OP5

OFFEROR:0= Offeror Fill-In Cells
= Formulas; Do not change
W15QKN-22-R-0016 - Demilitarization Technology and Development
ATTACHMENT 0005
CPFF LABOR RATES DETAIL - ORDERING PERIOD 5

Based on 2080 hours

Location of PerformanceLabor Category - Government ProvidedPrime Own Labor CategoyrSCLS / ExemptSCLS CodeSCLS Occupation TitleWage Determination # / RevisionHourly RateFringe, if separate from Labor OH (For SCLS, inclusive of H&W)Labor OverheadG&AFully Burdened Labor RateFixed Fee RateCPFF Fully Loaded Labor Rate
Fringe (Exempt)
50.00%80.00%28.00%6.00%
Picatinny, NJTool, Die & Model MakerSCLS19040Tool and Die Maker2015-4211/Rev 16$35.75$17.88$42.90$27.03$123.55$7.41$130.97
0.0%
SCA Covered Labor Categories
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00
Exempt Labor Cateogories
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00

Sub CPFF LaborRate-OP1

OFFEROR NAME:0= Offeror MUST Fill-In Cells with Prime/Subcontractor Information
= Offeror shall Fill-In Cells with Subcontractor Information, if provided
= Offeror shall Fill-In Cells with Subcontractor Information, if detail not provided
W15QKN-22-R-0016 - Demilitarization Technology and Development= Formulas Do Not ChangeOfferors MUST complete this column when subcontractor detail is not provided; Fully loaded labor rate would be input directly into Column N
ATTACHMENT 0005
CPFF LABOR RATES DETAIL -SUBCONTRACTORS ORDERING PERIOD 1

If the offeror is unable to obtain the required documentation from its subcontractors, the offeror shall only input the cells highlighted in ORANGE and the subcontractor shall provide the information directly to the Government following the exact submission instructions of this RFP

Separate detailed subcontractor proposals MUST be submitted to support the Subcontractor Fully Loaded Labor Rates reflected in this schedule

Offerors MUST complete these columns even when subcontractor detail is not providedHourly RateFringe, if separate from Labor OH (For SCLS, inclusive of H&W)Labor OverheadG&ASubcontractor Fully Burdened Labor RateSubcontractor Profit/FeeSUB Fully Loaded Labor RatePrime Mat'l Handling (if applicable)Prime G&ASUB Fully Burdened Labor Rate (with Prime's Burdens)Prime Fee RateSUB CPFF Fully Loaded Labor Rate w/ Prime Burden and Fee
Subcontractor NameSubcontract TypeLocation of PerformanceSubcontractor Labor CategorySCLS / ExemptSCLS Code, if applicableWage Determination #Fringe (Exempt)
50.00%80.00%28.00%8.00%0.00%28.00%6.00%
SUB XYZCPFFPicatinny, NJTool, Die & Model MakerSCLS190402015-4211/Rev XX$35.75$17.88$42.90$27.03$123.55$9.88$133.44$0.00$37.36$170.80$10.25$181.05
SUB 123T&MPicatinny, NJSenior EngineerExempt$135.00$0.00$37.80$172.80$10.37$183.17
0.0%
SCA Covered Categories
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt Categories
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Basis/Assumptions For SCA WD Benefits:
1. Wage Determination Number / Revision / Revision Date:
2. Holiday: Explain Holiday Benefits Paid Above
3. Vacation: Explain Vacation Benefits Paid Reflected Above
4. Sick: Explain Sick Leave Benefits Paid Reflected Above
5. Additional Basis/Assumptions: Provide as necessary

SAMPLE ONLY

Sub CPFF Labor Rate-OP2

OFFEROR NAME:0= Offeror MUST Fill-In Cells with Prime/Subcontractor Information
= Offeror shall Fill-In Cells with Subcontractor Information, if provided
= Offeror shall Fill-In Cells with Subcontractor Information, if detail not provided
W15QKN-22-R-0016 - Demilitarization Technology and Development= Formulas Do Not ChangeOfferors MUST complete this column when subcontractor detail is not provided; Fully loaded labor rate would be input directly into Column AC
ATTACHMENT 0005
CPFF LABOR RATES DETAIL -SUBCONTRACTORS ORDERING PERIOD 2

If the offeror is unable to obtain the required documentation from its subcontractors, the offeror shall only input the cells highlighted in ORANGE and the subcontractor shall provide the information directly to the Government following the exact submission instructions of this RFP

Separate detailed subcontractor proposals MUST be submitted to support the Subcontractor Fully Loaded Labor Rates reflected in this schedule

Offerors MUST complete these columns even when subcontractor detail is not providedHourly RateFringe, if separate from Labor OH (For SCLS, inclusive of H&W)Labor OverheadG&ASubcontractor Fully Burdened Labor RateSubcontractor Profit/FeeSUB Fully Loaded Labor RatePrime Mat'l Handling (if applicable)Prime G&ASUB Fully Burdened Labor Rate (with Prime's Burdens)Prime Fee RateSUB CPFF Fully Loaded Labor Rate w/ Prime Burden and Fee
Subcontractor NameSubcontract TypeLocation of PerformanceSubcontractor Labor CategorySCLS / ExemptSCLS Code, if applicableWage Determination #Fringe (Exempt)
50.00%80.00%28.00%8.00%0.00%28.00%6.00%
SUB XYZCPFFPicatinny, NJTool, Die & Model MakerSCLS190402015-4211/Rev XX$35.75$17.88$42.90$27.03$123.55$9.88$133.44$0.00$37.36$170.80$10.25$181.05
SUB 123T&MPicatinny, NJSenior EngineerExempt$135.00$0.00$37.80$172.80$10.37$183.17
0.0%
SCA Covered Categories
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt Categories
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Basis/Assumptions For SCA WD Benefits:
1. Wage Determination Number / Revision / Revision Date:
2. Holiday: Explain Holiday Benefits Paid Above
3. Vacation: Explain Vacation Benefits Paid Reflected Above
4. Sick: Explain Sick Leave Benefits Paid Reflected Above
5. Additional Basis/Assumptions: Provide as necessary

SAMPLE ONLY

Sub CPFF LaborRate-OP3

OFFEROR NAME:0= Offeror MUST Fill-In Cells with Prime/Subcontractor Information
= Offeror shall Fill-In Cells with Subcontractor Information, if provided
= Offeror shall Fill-In Cells with Subcontractor Information, if detail not provided
W15QKN-22-R-0016 - Demilitarization Technology and Development= Formulas Do Not ChangeOfferors MUST complete this column when subcontractor detail is not provided; Fully loaded labor rate would be input directly into Column AC
ATTACHMENT 0005
CPFF LABOR RATES DETAIL -SUBCONTRACTORS ORDERING PERIOD 3

If the offeror is unable to obtain the required documentation from its subcontractors, the offeror shall only input the cells highlighted in ORANGE and the subcontractor shall provide the information directly to the Government following the exact submission instructions of this RFP

Separate detailed subcontractor proposals MUST be submitted to support the Subcontractor Fully Loaded Labor Rates reflected in this schedule

Offerors MUST complete these columns even when subcontractor detail is not providedHourly RateFringe, if separate from Labor OH (For SCLS, inclusive of H&W)Labor OverheadG&ASubcontractor Fully Burdened Labor RateSubcontractor Profit/FeeSUB Fully Loaded Labor RatePrime Mat'l Handling (if applicable)Prime G&ASUB Fully Burdened Labor Rate (with Prime's Burdens)Prime Fee RateSUB CPFF Fully Loaded Labor Rate w/ Prime Burden and Fee
Subcontractor NameSubcontract TypeLocation of PerformanceSubcontractor Labor CategorySCLS / ExemptSCLS Code, if applicableWage Determination #Fringe (Exempt)
50.00%80.00%28.00%8.00%0.00%28.00%6.00%
SUB XYZCPFFPicatinny, NJTool, Die & Model MakerSCLS190402015-4211/Rev XX$35.75$17.88$42.90$27.03$123.55$9.88$133.44$0.00$37.36$170.80$10.25$181.05
SUB 123T&MPicatinny, NJSenior EngineerExempt$135.00$0.00$37.80$172.80$10.37$183.17
0.0%
SCA Covered Categories
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt Categories
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Basis/Assumptions For SCA WD Benefits:
1. Wage Determination Number / Revision / Revision Date:
2. Holiday: Explain Holiday Benefits Paid Above
3. Vacation: Explain Vacation Benefits Paid Reflected Above
4. Sick: Explain Sick Leave Benefits Paid Reflected Above
5. Additional Basis/Assumptions: Provide as necessary

SAMPLE ONLY

Sub CPFF LaborRate-OP4

OFFEROR NAME:0= Offeror MUST Fill-In Cells with Prime/Subcontractor Information
= Offeror shall Fill-In Cells with Subcontractor Information, if provided
= Offeror shall Fill-In Cells with Subcontractor Information, if detail not provided
W15QKN-22-R-0016 - Demilitarization Technology and Development= Formulas Do Not ChangeOfferors MUST complete this column when subcontractor detail is not provided; Fully loaded labor rate would be input directly into Column AC
ATTACHMENT 0005
CPFF LABOR RATES DETAIL -SUBCONTRACTORS ORDERING PERIOD 4

If the offeror is unable to obtain the required documentation from its subcontractors, the offeror shall only input the cells highlighted in ORANGE and the subcontractor shall provide the information directly to the Government following the exact submission instructions of this RFP

Separate detailed subcontractor proposals MUST be submitted to support the Subcontractor Fully Loaded Labor Rates reflected in this schedule

Offerors MUST complete these columns even when subcontractor detail is not providedHourly RateFringe, if separate from Labor OH (For SCLS, inclusive of H&W)Labor OverheadG&ASubcontractor Fully Burdened Labor RateSubcontractor Profit/FeeSUB Fully Loaded Labor RatePrime Mat'l Handling (if applicable)Prime G&ASUB Fully Burdened Labor Rate (with Prime's Burdens)Prime Fee RateSUB CPFF Fully Loaded Labor Rate w/ Prime Burden and Fee
Subcontractor NameSubcontract TypeLocation of PerformanceSubcontractor Labor CategorySCLS / ExemptSCLS Code, if applicableWage Determination #Fringe (Exempt)
50.00%80.00%28.00%8.00%0.00%28.00%6.00%
SUB XYZCPFFPicatinny, NJTool, Die & Model MakerSCLS190402015-4211/Rev XX$35.75$17.88$42.90$27.03$123.55$9.88$133.44$0.00$37.36$170.80$10.25$181.05
SUB 123T&MPicatinny, NJSenior EngineerExempt$135.00$0.00$37.80$172.80$10.37$183.17
0.0%
SCA Covered Categories
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt Categories
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Basis/Assumptions For SCA WD Benefits:
1. Wage Determination Number / Revision / Revision Date:
2. Holiday: Explain Holiday Benefits Paid Above
3. Vacation: Explain Vacation Benefits Paid Reflected Above
4. Sick: Explain Sick Leave Benefits Paid Reflected Above
5. Additional Basis/Assumptions: Provide as necessary

SAMPLE ONLY

Sub CPFF LaborRate-OP5

OFFEROR NAME:0= Offeror MUST Fill-In Cells with Prime/Subcontractor Information
= Offeror shall Fill-In Cells with Subcontractor Information, if provided
= Offeror shall Fill-In Cells with Subcontractor Information, if detail not provided
W15QKN-22-R-0016 - Demilitarization Technology and Development= Formulas Do Not ChangeOfferors MUST complete this column when subcontractor detail is not provided; Fully loaded labor rate would be input directly into Column AC
ATTACHMENT 0005
CPFF LABOR RATES DETAIL -SUBCONTRACTORS ORDERING PERIOD 5

If the offeror is unable to obtain the required documentation from its subcontractors, the offeror shall only input the cells highlighted in ORANGE and the subcontractor shall provide the information directly to the Government following the exact submission instructions of this RFP

Separate detailed subcontractor proposals MUST be submitted to support the Subcontractor Fully Loaded Labor Rates reflected in this schedule

Offerors MUST complete these columns even when subcontractor detail is not providedHourly RateFringe, if separate from Labor OH (For SCLS, inclusive of H&W)Labor OverheadG&ASubcontractor Fully Burdened Labor RateSubcontractor Profit/FeeSUB Fully Loaded Labor RatePrime Mat'l Handling (if applicable)Prime G&ASUB Fully Burdened Labor Rate (with Prime's Burdens)Prime Fee RateSUB CPFF Fully Loaded Labor Rate w/ Prime Burden and Fee
Subcontractor NameSubcontract TypeLocation of PerformanceSubcontractor Labor CategorySCLS / ExemptSCLS Code, if applicableWage Determination #Fringe (Exempt)
50.00%80.00%28.00%8.00%0.00%28.00%6.00%
SUB XYZCPFFPicatinny, NJTool, Die & Model MakerSCLS190402015-4211/Rev XX$35.75$17.88$42.90$27.03$123.55$9.88$133.44$0.00$37.36$170.80$10.25$181.05
SUB 123T&MPicatinny, NJSenior EngineerExempt$135.00$0.00$37.80$172.80$10.37$183.17
0.0%
SCA Covered Categories
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SCLS$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt Categories
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Exempt$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Basis/Assumptions For SCA WD Benefits:
1. Wage Determination Number / Revision / Revision Date:
2. Holiday: Explain Holiday Benefits Paid Above
3. Vacation: Explain Vacation Benefits Paid Reflected Above
4. Sick: Explain Sick Leave Benefits Paid Reflected Above
5. Additional Basis/Assumptions: Provide as necessary

SAMPLE ONLY

Material Travel

OFFEROR:0= Offeror Fill-In Cells
= Gov't Provided Amounts; Do not change
W15QKN-22-R-0016 - Demilitarization Technology and Development= Formulas; Do not change
ATTACHMENT 0005
FFP and CPFF Material/ CR Travel
Note: Indirect costs applicable to Material and Travel should be applied based upon the Offeror's established accounting practices. Additional rows may be added, if necessary
* INDIRECT RATES SHALL BE THE SAME AS PROPOSED ON THE CPFF LABOR RATE DETAIL TABS OF THIS WORKBOOK; OUTYEAR RATES SHALL BE BASED UPON THE SUPPORTING DETAIL PROVIDED FOR THOSE YEARS
CPFF MATERIALApplication BaseOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4Ordering Period 5
Indirect RateTotalIndirect RateTotalIndirect RateTotalIndirect RateTotalIndirect RateTotal
Description
Government Provided Material$20,000$1,820,000$4,280,000$790,000$510,000
Example: G&ATotal Cost Input12.00%$2,40012.00%$218,40012.00%$513,60012.00%$94,80012.00%$61,200
Fee Rate5.50%$1,2325.50%$112,1125.50%$263,6485.50%$48,6645.50%$31,416
Total CPFF Material$23,632$2,150,512$5,057,248$933,464$602,616
FFP MATERIALOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4Ordering Period 5
Markup RateTotalMarkup RateTotalMarkup RateTotalMarkup RateTotalMarkup RateTotal
Government Provided FFP Material Dollars$10,000$910,000$2,140,000$395,000$255,000
Mark-up Rate (Inclusive of Profit)$0$0$0$0$0
Total FFP Material$10,000$910,000$2,140,000$395,000$255,000
CPFF MATERIALApplication BaseOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4Ordering Period 5
Indirect RateTotalIndirect RateTotalIndirect RateTotalIndirect RateTotalIndirect RateTotal
Description
Government Provided CPFF Material Dollars$20,000$1,820,000$4,280,000$790,000$510,000
Insert Indirect Cost Title$0$0$0$0$0
Insert Indirect Cost Title$0$0$0$0$0
Fee Rate$0$0$0$0$0
Total CPFF Material$20,000$1,820,000$4,280,000$790,000$510,000
CR TRAVELApplication BaseOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4Ordering Period 5
Indirect RateTotalIndirect RateTotalIndirect RateTotalIndirect RateTotalIndirect RateTotal
Description
Government Provided Travel Dollars$97,750$88,300$103,300$278,200$40,410
Insert Indirect Cost Title$0$0$0$0$0
TOTAL CR TRAVEL$97,750$88,300$103,300$278,200$40,410

SAMPLE

File details come from the government source that posted it. Updated .