This is a Submittal Register template used to track contractor submissions throughout a construction project lifecycle. The document provides a comprehensive checklist of all required submittals organized by specification section, with columns to record submission dates, approval status, and tracking information.
The register encompasses submittals across multiple project phases and disciplines. Preconstruction submittals include Project Schedule, Certificate of Insurance, Performance and Payment Bonds, List of Proposed Subcontractors, Submittal Register, Schedule of Values, and Environmental Protection Plan. Safety-related submittals include Accident Prevention Plan, Activity Hazard Analysis, Crane Operator/Rigger Certificates, Standard Lift Plans, Hot Work Permits, and Emergency Plans. Quality control and environmental management submittals include Contractor Quality Control Plan, Construction Site Plan, Traffic Control Plan, Stormwater Pollution Prevention Plan, Spill Prevention Control and Countermeasure Plan, Solid Waste Management documentation, and Hazardous Waste Management plans. Closeout submittals include As-Built Drawings and interim DD Form 1354. Project-specific bid item submittals reference SUDAS (Standardized Utility Detail Specification) sections covering earthwork, trench excavation, pipe installation, asphalt pavement, sidewalks, pavement rehabilitation, traffic markings and signs, seeding, survey, mobilization, and concrete washout. Mechanical systems submittals include Common Piping for HVAC with specifications for pipe and fittings, valves, hydrostatic tests, thermal insulation systems, instrumentation and control devices, and prefabricated underground hydronic energy distribution components. Most submittals are marked with a "G" designation indicating government approval is required.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SU
BM
IT
AP
PR
O
VA
L N
EE
D
ED
B
Y
M
AT
ER
IA
L N
EE
D
ED
B
Y
AC
TI
O N
C O
D E
D
AT
E O
F
AC
TI
O
N
D
AT
E
FW
D T
O A
PP
R
A U
TH
D
AT
E R
C D
F R
O M
C O
N
TR
D
AT
E
FW
D T
O O
TH
ER
R
EV
IE
W
ER
D
AT
E R
C D
F R
O M
O
TH
R
EV
IE
W
ER
AC
TI
O N
C O
D E
D
AT
E O
F
AC
TI
O
N
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 32 01.00 10 - PROJECT SCHEDULE
1 01 32 01.00 10 Preliminary Project Schedule 3.4.1 G
Initial Project Schedule 3.4.2 G
01 33 00 - SUBMITTAL PROCEDURES
1 PRECON SUBMTL Certificate of Insurance 1.2.1 G 2 PRECON SUBMTL Performance and Payment Bonds 1.2.1 G 3 PRECON SUBMTL List of Proposed Subcontractors 1.2.1 G 4 PRECON SUBMTL List of Proposed Products 1.2.1 G 5 PRECON SUBMTL Baseline Network Analysis Schedule (NAS) 1.2.1 G 6 PRECON SUBMTL Submittal Register 1.2.1 G 7 PRECON SUBMTL Schedule of Values 1.2.1 G 8 PRECON SUBMTL Environmental Protection Plan 1.2.1 G
01 35 26 - GOVERNMENT SAFTEY REQUIREMENTS
1 PRECON SUBMTL Accident Prevention Plan (APP) 1.6 G 2 TEST REPORTS Notifications and Reports 1.11 G 3 TEST REPORTS Accident Reports 1.11.2 G 4 TEST REPORTS LHE Inspection Reports 1.11.3 G 5 CERTIFICATES Crane Operators/Riggers 1.5.1.3 G 6 CERTIFICATES Standard Lift Plan 1.6.3.1 G 7 CERTIFICATES Activity Hazard Analysis (AHA) 1.7 G 8 CERTIFICATES Hot Work Permit 1.8.1 9 CERTIFICATES Certificate of Compliance 1.11.4 G
10 PRECON SUBMTL Emergency Plan SOW-3.2.3.C G
01 45 00.00 10 - QUALITY CONTROL
1 PRECON SUBMTL Contractor Quality Control (CQC) Plan 1.6 G
01 50 00 - TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
1 01 50 00 Construction Site Plan 1.3 G Traffic Control Plan 3.3.1 G
01 57 19 - TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19 Preconstruction Survey 1.5.1
Regulatory Notifications 1.5.2 Environmental Protection Plan 1.6 G Dirt and Dust Control Plan 1.6.9.1 Solid Waste Management Permit 1.9 Stormwater Pollution Prevention Plan 3.2.1.1 G Stormwater Notice of Intent 3.2.1.2 Spill Prevention Control And Cuntermeasure Plan (SPCC) 3.11.2 G Monthly Solid Waste Disposal Report 1.9.1 G Inspection Reports 3.2.1.3 Regulatory Notifications 1.5.2 G Solid Waste Management Permit 1.9 G Stormwater Pollution Prevention Plan Compliance Notebook 3.2.1.4 G Stormwater Notice of Termination 3.2.1.5 G Waste Determination Documentation 3.7.1 G Project Solid Waste Disposal Documentation Report 3.7.2.1 G Sales Documentation 3.7.2.1 G Hazardous Waste/Debris Management 3.7.3.1 G Disposal Documentation for Hazardous and Regulated Waste 3.7.3.2 G
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
AC
TI
VI
TY
TR
AN
SM
IT
TA
L
SPEC SECTION DESCRIPTION ITEM SUBMITTED
PA
R
AG
R
AP
H
TY
PE
CONTRACTOR: SCHEDULE
DATES
CONTRACTOR
ACTION APPROVING AUTHORITY
M
AI
LE
D
T O
C O
N
TR
D
AT
E
R C
D F
R M
A
PP
R A
U
TH
R
EM
AR
KS
IT
AP
PR
O
VA
L N
EE
D
ED
B
Y
M
AT
ER
IA
L N
EE
D
ED
B
Y
AC
TI
O N
C O
D E
D
AT
E O
F
AC
TI
O
N
D
AT
E
FW
D T
O A
PP
R
A U
TH
D
AT
E R
C D
F R
O M
C O
N
TR
D
AT
E
FW
D T
O O
TH
ER
R
EV
IE
W
ER
D
AT
E R
C D
F R
O M
O
TH
R
EV
IE
W
ER
AC
TI
O N
C O
D E
D
AT
E O
F
AC
TI
O
N
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
AC
TI
VI
TY
TR
AN
SM
IT
TA
L
SPEC SECTION DESCRIPTION ITEM SUBMITTED
PA
R
AG
R
AP
H
TY
PE
CONTRACTOR: SCHEDULE
DATES
CONTRACTOR
ACTION APPROVING AUTHORITY
M
AI
LE
D
T O
C O
N
TR
D
AT
E
R C
D F
R M
A
PP
R A
U
TH
R
EM
AR
KS
1 PRECON SUBMTL Construction Waste Management Plan 1.6 G 2 CLOSEOUT SUBMTL Final C&D report Govt Provided G
01 78 00 - CLOSEOUT SUBMITTALS
1 CLOSEOUT SUBMTL As-Built Drawings 3.1 G
Interim DD Form 1354 3.3.1
01 78 00 - PROJECT BID ITEM SUBMITTALS SUDAS
1 PRECON SUBMTL SECTION 2010 - EARTHWORK, SUBGRADE AND SUBBASE G
2 PRECON SUBMTL SECTION 3010 - TRENCH EXCAVATION AND BACKFILL G
9 PRECON SUBMTL SECTION 5011 - FUSIBLE PVC AND HDPE PIPE G
15 PRECON SUBMTL SECTION 7020 - ASPHALT PAVEMENT G
16 PRECON SUBMTL SECTION 7030 - SIDEWALKS, SHARED USE PATHS, AND DRIVEWAYS G
17 PRECON SUBMTL SECTION 7040 - PAVEMENT REHABILITATION G
26 PRECON SUBMTL SECTION 8020 - PAVEMENT MARKINGS G
27 PRECON SUBMTL SECTION 8030 - TEMPORARY TRAFFIC CONTROL G
28 PRECON SUBMTL SECTION 8040 - TRAFFIC SIGNS AND POSTS G
29 PRECON SUBMTL SECTION 9010 - SEEDING G
40 PRECON SUBMTL SECTION 11,010 - CONSTRUCTION SURVEY G
41 PRECON SUBMTL SECTION 11,020 - MOBILIZATION G
44 PRECON SUBMTL SECTION 11,050 - CONCRETE WASHOUT G
23 05 15 - COMMON PIPING FOR HVAC
23 05 15 Record Drawings 1.2 G
01 74 19 - CONSTUCTION WASTE MAGANGEMENT
IT
AP
PR
O
VA
L N
EE
D
ED
B
Y
M
AT
ER
IA
L N
EE
D
ED
B
Y
AC
TI
O N
C O
D E
D
AT
E O
F
AC
TI
O
N
D
AT
E
FW
D T
O A
PP
R
A U
TH
D
AT
E R
C D
F R
O M
C O
N
TR
D
AT
E
FW
D T
O O
TH
ER
R
EV
IE
W
ER
D
AT
E R
C D
F R
O M
O
TH
R
EV
IE
W
ER
AC
TI
O N
C O
D E
D
AT
E O
F
AC
TI
O
N
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
AC
TI
VI
TY
TR
AN
SM
IT
TA
L
SPEC SECTION DESCRIPTION ITEM SUBMITTED
PA
R
AG
R
AP
H
TY
PE
CONTRACTOR: SCHEDULE
DATES
CONTRACTOR
ACTION APPROVING AUTHORITY
M
AI
LE
D
T O
C O
N
TR
D
AT
E
R C
D F
R M
A
PP
R A
U
TH
R
EM
AR
KS
Pipe and Fittings 2.1 G Valves 2.2 G Hydrostatic Tests 3.1 G
23 07 00 - THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 07 00 Pipe Insulation Systems 2.3 G
23 09 13 - INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 13 Temperature Sensors 2.3.1 G
Insertion Magnetic Flow Meter 2.3.2.1 G Thermometers 2.4.1 G
33 61 13.13 - PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION
33 61 13.13 Fabrication and Assembly Drawings 2.1
Submittal Register