Attachment 0004 Appendix C_2023-0755 Submittal Register.pdf

PDF 82 KB Posted

Attached to
Replace Roofing - Building 66 & 67 Federal contract opportunity
Solicitation number
W519TC-24-R-2001
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

This submittal register outlines the required submittals for the solicitation to replace roofing on Buildings 66 and 67 for the Department of the Army Materiel Command Contracting Command at Rock Island Arsenal. Key submittals include plans, reports, certificates, shop drawings, warranties, and closeout documents for roofing, demolition, construction waste management, and safety requirements. The solicitation number is W519TC-24-R-2001, with responses due on unspecified dates. The submittal register includes 28 line items across 15 specifications covering pre-construction, product, test, design, manufacturer, and closeout submittals. It identifies the paragraph requiring each submittal and the required approval and material delivery dates.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 5 PAGES

2023-755

Repair Roof B66 & B67 portion

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.6 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.11.2 GAccident Reports

1.11.3LHE Inspection Reports

SD-07 Certificates 1.5.1.4Crane Operators/Riggers 1.7Activity Hazard Analysis (AHA) 1.8.1Confined Space Entry Permit 1.8.1Hot Work Permit 1.11.4Certificate of Compliance

License Certificates 01 45 00.10 20 SD-01 Preconstruction Submittals

1.6 GQC Plan

01 50 00 SD-01 Preconstruction Submittals

1.2 GConstruction Site Plan

3.3.1 GTraffic Control Plan

01 74 19 SD-01 Preconstruction Submittals

1.7 GConstruction Waste Management

Plan 1.9.2Quarterly Reports 1.9.3Annual Report

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 5 PAGES

Repair Roof B66 & B67 portion

01 74 19 1.10 SFinal Construction Waste Diversion Report

01 78 00 SD-03 Product Data 1.5.3Warranty Tags

SD-08 Manufacturer’s Instructions Instructions

SD-10 Operation and Maintenance Data

3.4 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

GFinal Approved Shop Drawings

3.6.1 GInterim DD FORM 1354

3.6.2 GChecklist for DD FORM 1354

02 41 00 SD-01 Preconstruction Submittals

1.1.2 GDemolition Plan

06 10 00 SD-02 Shop Drawings GRafters;

SD-03 Product Data Underlayment; G

1.8Fire-retardant Treatment Structural-use and OSB Panels Oriented Strand Board

SD-06 Test Reports Preservative-treated

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 5 PAGES

Repair Roof B66 & B67 portion

06 10 00 SD-07 Certificates 1.7Preservative Treatment

07 41 13 SD-02 Shop Drawings GRoofing Shingle Panels

1.4.4 GFlashing and Accessories

1.4.4 GGutter/Downspout Assembly

SD-03 Product Data GRoof shingke Panels

Recycled Content for Aluminum Roof Panels

Energy Star Label for Metal Roofing Product

Heat Island Reduction

1.4.4 GFactory-Applied Color Finish

2.1 GAccessories

1.4.4 GFasteners

1.4.4 GPressure Sensitive Tape

2.3 GUnderlayments

SD-04 Samples GRoof Shingle Panels

1.4.4 GFactory-applied Color Finish

2.1 GAccessories

1.4.4 GFasteners

SD-05 Design Data

1.2.1.1 GWind Uplift Resistance

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 5 PAGES

Repair Roof B66 & B67 portion

07 41 13 GRoof shingle Panels

2.3.2 GSelf-Adhering Modified Bitumen

Underlayment

1.4.1 GQualification of Manufacturer

1.4.2 GQualification of Applicator

SD-08 Manufacturer’s Instructions GInsulation

1.4.4 GInstallation Manual

SD-09 Manufacturer’s Field Reports

3.9.1 GManufacturer's Field Inspection

Reports

SD-11 Closeout Submittals

1.8 GWarranties

3.10 GInformation Card

07 57 13 SD-03 Product Data

2.1 GSpray Urethane Foam

2.2 GProtective Coating

SD-04 Samples

1.3.3 GFoam Roof System Mock-Up

SD-11 Closeout Submittals

3.12 GInformation Card

07 60 00 SD-02 Shop Drawings

3.1.6 GGutters

3.1.7 GDownspouts

3.1.2 GBase Flashing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 5 PAGES

Repair Roof B66 & B67 portion

07 60 00 3.1.3 GCounterflashing GFlashing at Roof Penetrations and Equipment Supports GReglets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR