Attachment 0004 Appendix C_2023-0755 Submittal Register.pdf
PDF 82 KB Posted
- Attached to
- Replace Roofing - Building 66 & 67
- Solicitation number
- W519TC-24-R-2001
About this file
This submittal register outlines the required submittals for the solicitation to replace roofing on Buildings 66 and 67 for the Department of the Army Materiel Command Contracting Command at Rock Island Arsenal. Key submittals include plans, reports, certificates, shop drawings, warranties, and closeout documents for roofing, demolition, construction waste management, and safety requirements. The solicitation number is W519TC-24-R-2001, with responses due on unspecified dates. The submittal register includes 28 line items across 15 specifications covering pre-construction, product, test, design, manufacturer, and closeout submittals. It identifies the paragraph requiring each submittal and the required approval and material delivery dates.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 5 PAGES
2023-755
Repair Roof B66 & B67 portion
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.6 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.11.2 GAccident Reports
1.11.3LHE Inspection Reports
SD-07 Certificates 1.5.1.4Crane Operators/Riggers 1.7Activity Hazard Analysis (AHA) 1.8.1Confined Space Entry Permit 1.8.1Hot Work Permit 1.11.4Certificate of Compliance
License Certificates 01 45 00.10 20 SD-01 Preconstruction Submittals
1.6 GQC Plan
01 50 00 SD-01 Preconstruction Submittals
1.2 GConstruction Site Plan
3.3.1 GTraffic Control Plan
01 74 19 SD-01 Preconstruction Submittals
1.7 GConstruction Waste Management
Plan 1.9.2Quarterly Reports 1.9.3Annual Report
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 5 PAGES
Repair Roof B66 & B67 portion
01 74 19 1.10 SFinal Construction Waste Diversion Report
01 78 00 SD-03 Product Data 1.5.3Warranty Tags
SD-08 Manufacturer’s Instructions Instructions
SD-10 Operation and Maintenance Data
3.4 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
GFinal Approved Shop Drawings
3.6.1 GInterim DD FORM 1354
3.6.2 GChecklist for DD FORM 1354
02 41 00 SD-01 Preconstruction Submittals
1.1.2 GDemolition Plan
06 10 00 SD-02 Shop Drawings GRafters;
SD-03 Product Data Underlayment; G
1.8Fire-retardant Treatment Structural-use and OSB Panels Oriented Strand Board
SD-06 Test Reports Preservative-treated
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 5 PAGES
Repair Roof B66 & B67 portion
06 10 00 SD-07 Certificates 1.7Preservative Treatment
07 41 13 SD-02 Shop Drawings GRoofing Shingle Panels
1.4.4 GFlashing and Accessories
1.4.4 GGutter/Downspout Assembly
SD-03 Product Data GRoof shingke Panels
Recycled Content for Aluminum Roof Panels
Energy Star Label for Metal Roofing Product
Heat Island Reduction
1.4.4 GFactory-Applied Color Finish
2.1 GAccessories
1.4.4 GFasteners
1.4.4 GPressure Sensitive Tape
2.3 GUnderlayments
SD-04 Samples GRoof Shingle Panels
1.4.4 GFactory-applied Color Finish
2.1 GAccessories
1.4.4 GFasteners
SD-05 Design Data
1.2.1.1 GWind Uplift Resistance
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 5 PAGES
Repair Roof B66 & B67 portion
07 41 13 GRoof shingle Panels
2.3.2 GSelf-Adhering Modified Bitumen
Underlayment
1.4.1 GQualification of Manufacturer
1.4.2 GQualification of Applicator
SD-08 Manufacturer’s Instructions GInsulation
1.4.4 GInstallation Manual
SD-09 Manufacturer’s Field Reports
3.9.1 GManufacturer's Field Inspection
Reports
SD-11 Closeout Submittals
1.8 GWarranties
3.10 GInformation Card
07 57 13 SD-03 Product Data
2.1 GSpray Urethane Foam
2.2 GProtective Coating
SD-04 Samples
1.3.3 GFoam Roof System Mock-Up
SD-11 Closeout Submittals
3.12 GInformation Card
07 60 00 SD-02 Shop Drawings
3.1.6 GGutters
3.1.7 GDownspouts
3.1.2 GBase Flashing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 5 PAGES
Repair Roof B66 & B67 portion
07 60 00 3.1.3 GCounterflashing GFlashing at Roof Penetrations and Equipment Supports GReglets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR