Attachment 0002 AED Requirements.pdf
PDF 4 KB Posted
- Attached to
- Overhaul Engine, Gas Turbine
- Solicitation number
- W58RGZ-22-B-0002
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
09/20/2021
BI601-2PRID 3800232-1-4Part Number
2835-01-180-0452NSN NOT LISTEDSystem
ENGINE, GAS TURBINENomenclature
YAdequate DMWR Available?
DMWR-1-2835-213&PDMWR ID
09/30/2013DMWR Date
1DMWR Chg #
YPre-Award Survey Recommended?
YCorrelation Performance Study Required ? YPVA Recommended?
Identify Any Special Processes, Test Procedures, and/or Instructions
NCritical Safety Item?
There are no emerging airworthiness issues, no issues related to ECPs affecting the CSI status, and no concerns over reliability/durability for the Engine, Gas Turbine at the time of this review.
Per coordination with the Propulsion Division, there are no emerging airworthiness issues, new ECP affecting CSI, concerns over reliability, durability issues that would affect the overhaul of the subject item in its current configuration.
Special Airworthiness Considerations
FCDD-AMR-AM Sustainment has re-verified the CSI/NST status through ARISE CIM on 28 May 2021 and the part is still Non- CSI and Non-NST.JC
Other Requirements / Comments
If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:
NSpecial Post-Contract Award Requirements?
Special Post-Contract Award Requirements
DMWR 1-2835-213&P does not contain detailed IUID requirements for this component. No PM IUID Office/POC is available for any updates and/or waiver/deviation of IUID Contracting DFAR clauses on the IUID marking of Engine, Gas Turbine at the time of this review.
Other Requirements / Comments (Part II)
FCDD-AMR-AM Sustainment has re-verified the CSI/NST status through ARISE CIM on 29 June 2021 and the part is still Non- CSI and Non-NST. No Changes required.JC
Other Requirements / Comments (Part III)
Other Requirements / Comments (Part IV)
Other Requirements / Comments (Part V)
NDoes QE-STD-2 Apply?
N
Additional CSI Requirements
CSI Contains CSI Replacement Parts? NEngineering Testing Required?
The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:
1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.
RStatus
YTDPL?
Approved Date
M&O AED REQUIREMENTS DATA
Correlation Performance Study Requirements
Engine test stand to be correlated IAW DMWR 1-2835-213&P dated 09/30/2013, Change 1 (6/6/2016), WP 0012
Commerciality Determination
Commercial Item? N NBest Commercial Practice Acceptable?
09/20/2021
BI601-2PRID 3800232-1-4Part Number
2835-01-180-0452NSN NOT LISTEDSystem
C4598
P7185
S1373
S1501A
S1534A
T1356D
Authorization for substitute tooling addressed by MEO C4598. Tooling may be verified at PVA.
Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes
MEOs Required for Competitive Contract?
RStatus
File details come from the government source that posted it. Updated .